Fort Pierce 2022 Strategic Plan Update - October 2022

Page 1

FORT PIERCE Strategic Plan 2022 Goals i CONTENTS GOAL 1: Police Retention and Compensation Police Services and Staffing....................................1 GOAL 2: City FPUA Strategy: Key Issues and Joint Action Plan 2 GOAL 3: Regional Homeless Strategy...........................................................................................................3 GOAL 4: Street Condition and Funding........................................................................................................4 GOAL 5: City Legislative Advocacy and Agenda........................................................................................5 GOAL 6: Planning and Development Policies and Process 6 GOAL 7: American Rescue Plan .......................................................................................................................7 GOAL 8: City Compensation Policy ................................................................................................................8 GOAL 9: Enterprise Resource Planning Software (ERP)...........................................................................9 GOAL 10: City Surplus Properties .................................................................................................................10 GOAL 11: Federal Infrastructure Program Preparation.........................................................................11 GOAL 1: Entrances/Gateways/Community Beautification Plan 12 GOAL 2: Parks and Playgrounds Upgrade.................................................................................................13 GOAL 3: Fort Pierce Corridor Streetscape and Beautification Projects 14 GOAL 4: Greenway Trail 15 GOAL 5: Wayfinding Signage.........................................................................................................................16 GOAL 6: Foreclosures Program/Process.....................................................................................................17 GOAL 7: Clean and Safe Program Building Demolition 17 GOAL 1: Parking Strategy ................................................................................................................................18 GOAL 2: Island Reclamation Plant Relocation..........................................................................................19 GOAL 3: Downtown Development Master Plan 20 GOAL 4: Annexations Strategy/Interlocal Service Boundary Agreement.......................................21 GOAL 5: South Beach Overlay Plan..............................................................................................................22 GOAL 6: 13th Street Upgrade 23 GOAL 7: Neighborhood Identity and Branding.......................................................................................24 GOAL 8: Housing Authority Strategy...........................................................................................................25 GOAL 9: 17th Street Upgrade (North to Graveyard and South to Okeechobee) 26 GOAL 10: Wave Garden Construction.........................................................................................................27
FORT PIERCE Strategic Plan 2022 Goals ii GOAL 11: King’s Landing Development .....................................................................................................28 GOAL 12: Fisherman’s Wharf Development 29 GOAL 13: Port Development ..........................................................................................................................30 GOAL 14: City Economic Incentives Policy ................................................................................................31 GOAL 15: Seaplanes: Facility and Service 32 GOAL 16: Mobility Action Plan and Impact Fee ......................................................................................33 GOAL 17: Landscape Code..............................................................................................................................33 GOAL 18: Vacant Parcels: Identification, Direction and City Actions 34 GOAL 1: Community and City Equity Policy and Action Plan.............................................................35 GOAL 2: Community Outreach with Faith Community.........................................................................36 GOAL 3: Community Engagement Strategy and Action Plan 37 GOAL 4: Community Policing Expansion ...................................................................................................38 GOAL 1: Mental Health Strategy and City Actions .................................................................................39 GOAL 2: Sunrise Theatre Future 40 GOAL 3: Recreational Programs Expansion 41 GOAL 4: Smart City Initiative Development..............................................................................................42 GOAL 5: Sunrise Theatre Plan for 2023 42 GOAL 6: Lincoln Theater Restoration Plan/Program Development .................................................44
Strategic Plan 2022 Goals 1 GOAL 1: Police Retention and Compensation Police Services and Staffing: Report, Direction and Funding Key Issues  PBA Labor Contract  Competitive Market  Report with Options  Funding October 2022 Update 1. Negotiate PBA labor contract 4/22 Complete 2. DECISION: PBA Contract 5/22 Complete 3. Prepare updated Police Staffing Report Ongoing Preparation of an updated Police Staffing Report is ongoing and will include a multi plan. 4. Prepare FY23 budget proposal 6/22 Complete 5. BUDGET WORKSHOP: Budget FY23 Presentation and Direction 7/22 Complete 6 DECISION: Budget FY23 Funding 9/22 Complete Responsibility: Police Chief
FORT PIERCE
PIERCE Strategic Plan 2022 Goals 2 GOAL 2: City – FPUA Strategy: Key Issues and Joint Action Plan Key Issues  Development Process Streamlining  Streetlights  Wastewater Treatment Plant Re location  Support for Sunrise Theatre, Marina, etc.  Annexation Alignment  Growth Model for Utilities Alignment 1. City Manager FPUA Director prepare a “To Do List” Complete 2. JOINT MEETING: City Commission and FPUA Board Complete 3. DECISION: Streetlights Maintenance Agreement 12/22 Responsibility: City Manager/FPUA Director
Street
Maintenance
FORT
October 2022 Update
Light
program has been working with a high degree of efficiency. FPUA staff will schedule the next round of inspections to collect new outages.

October 2022 Update

Commissioner Gaines has reported that the Countywide homeless task force will continue to be a functioning unit with input from various agencies and entities. Commissioner Gaines will continue to participate on this committee.

Strategic Plan 2022 Goals 3 GOAL 3: Regional Homeless Strategy: Goals/Outcomes, Community Problem Analysis and Development Key Issues  Goals  Future Direction  City Role and Level of Participation  Problem Analysis for Our Community  Facility(ies)  Services  Partners 1. Continue discussion with One St. Lucie Homeless Task Force Ongoing 2. Prepare Update Report Complete 3. REPORT: Update, Discussion and Next Steps Complete
FORT PIERCE
Responsibility: Commissioner Gaines

Key

PIERCE

Responsibility: City Engineer

October 2022 Update

• 2022 Street Resurfacing has been completed

• Streets have been identified for 2023 Resurfacing.

• List of potential streets to be sent to FPUA for utility coordination

4
FORT
Strategic Plan 2022 Goals
GOAL 4: Street Condition and Funding: Direction, Funding Level and Projects for 2022
Issues  Annual Funding Level: $800,000 from Surtax Revenues  Projects 1. Prepare list of streets to be resurfaced to FPUA Complete 2. Present updated Street Conditions Report to City Manager Complete 3. DECISION: Award Contract for Resurfacing and Reconstruction Complete 4. Coordinate projects with FPUA Utility Projects Ongoing
Strategic Plan 2022 Goals 5 GOAL 5: City Legislative Advocacy and Agenda: Goals, Advocacy Options, Direction and Funding Key Issues  Goals  Lobbying Options  Critical Issues  Reports on Proposed Legislation  Funding October 2022 Update 1. Continue discussion with St. Lucie County on future relationship and direction Ongoing Complete 2. REPORT: Status update and options 10/22 Complete. Contract awarded to Gray Robinson at 10/3/22 Commission meeting. Responsibility: City Manager
FORT PIERCE

Responsibility: City Clerk

October 2022

Update

The entire process is being significantly reviewed and revised under new planning leadership; the process will be refined as we progress through the Tyler software build out and when complete, we will be able to more fully define by way of a flow chart and/or manual.

FORT PIERCE Strategic Plan 2022 Goals 6
Planning and Development
Process:
Key Issues  State Regulations and Requirements  Potential Impact:
the Process  Development Flow Chart  Staff Capacity  Developers/Builders Perception and Expectations  Development Process Streamlining  Alignment
1 Seek
participants
stakeholders
2 Develop
3. Revise
processes
4.
5.
6.
GOAL 6:
Policies and
Refinement/Streamlining
Slow
of City FPUA
input from
and
Complete
Development Process Flow Chart 1/23
development policies and
1/23
Prepare Report 2/23
REPORT: Presentation and Discussion 2/23
Implement Tyler System for Development Process Go Live 3/23
Development Process
PIERCE Strategic Plan 2022 Goals 7 GOAL 7: American Rescue Plan: Update and Project Direction Key Issues  Total: $13.5 million  Project Completion  Future Projects  Community Information about ARP Funding and Value to Residents  Unallocated Funds: $2 Million  Beautification Projects  City Broadband Service
ARP Projects 1. Little Jim Septic to Sewer 11/22 2. Atlantic Avenue (5th to 7th): Design and Construction
3. NW 16th Street: Construction
4. Avenue Q (14th to 17th): Construction
5. Surfside Improvement Project: Design
6. Refuse Collection Trucks Purchase and Operational 2023 7. Police Technology a. Cameras 12/22 b. Tasers
c. Vehicles
Future Projects 1. DECISION: Project Direction
AMERICAN RESCUE PLAN
FORT
A.
11/22
11/22
11/22
12/22
12/22
2023 B.
11/22 Responsibility: City Manager
October 2022 Update In progress.
PIERCE Strategic Plan 2022 Goals 8 GOAL 8: City Compensation Policy: Salary Study for Critical Positions and Funding Key Issues  Competitive Employment Market  Some Positions Behind Current Market  Critical Positions: Mechanics, Planners, Engineers, Skilled Labor, Marina. Inspectors and others October 2022 Update 1. Complete market analysis 12/22 In progress 2 DECISION: Presentation and Direction 12/22 Responsibility: Human Resources Director
FORT

FORT PIERCE Strategic Plan 2022 Goals

GOAL

Key

9: Enterprise Resource Planning Software (ERP): Implementation

Issues  Installation Process  Processes Evaluation

1. Complete ERP Financial System Module Installation 10/22 Complete

October 2022 Update

2 Complete ERP Building and Development Module Installation 3/23 In progress. Project is on schedule.

3. Complete ERP Human Resources Module Installation 10/23 In progress. Project is on schedule to begin on time.

Responsibility: Information Technology Director

9
FORT PIERCE Strategic Plan 2022 Goals 10 GOAL 10: City Surplus Properties: Review Inventory and Direction Key Issues  City Properties  Uses/Potential Uses  Developer Interests 612 N 25th Street 1 Land Size 0.14 Assessed Value $2,569 Market Value $9,100 October 2022 Update 1. Identify potential properties 6/22 Complete 2. Explore opportunities for potential partnerships and development Ongoing Responsibility: City Manager
PIERCE Strategic Plan 2022 Goals 11 GOAL 11: Federal Infrastructure Program Preparation: Guidelines, Projects and Funding Key Issues  Dollars Available  Federal Guidelines  Potential Projects  13th Street 1. Monitor Federal actions and guidelines Ongoing Responsibility: City Manager
FORT
FORT PIERCE Strategic Plan 2022 Goals 12 GOAL 1: Entrances/Gateways/Community Beautification Plan: Definition, Plan and Funding Key Issues  Gateways Definition  Outcomes  First Impression  Best Practices  Creating a “Sense of Place”  Design Standards  Public Art Policy  Public Input  Landscape Architect Service  Landscape Designplay 1. Select and hire consultant/contractor Complete 2. Define the scope and projects 11/22 3. Identify and review gateways 11/22 4. Develop plan with options 11/22 5. CONFERENCE AGENDA: Presentation and Direction 11/22 6 DECISION: Funding Direction 12/22 Responsibility: Public Works Director/FPUA October 2022 Update RFP for signage is being prepared and is anticipated to open this year.
FORT PIERCE Strategic Plan 2022 Goals 13 GOAL 2: Parks and Playgrounds Upgrade: Direction, Funding, and City Actions Key Issues  Goals  Projects  Project Costs  Funding Mechanism  Grant Opportunities for Shovel Ready Projects 1. Prepare Report with Projects, Options, Costs and Funding Complete 2. CONFERENCE AGENDA: Report Presentation and Direction Complete 3. Prepare FY23 budget proposal Complete 4. BUDGET WORKSHOP: Budget FY23 Presentation and Direction Complete 5 DECISION: Budget FY23 Funding Complete Responsibility: Public Works Director
PIERCE Strategic Plan 2022 Goals 14 GOAL 3: Fort Pierce Corridor Streetscape and Beautification Projects: Action Plan Key Issues  Economic Development Incentives for Private Sector  Façade Improvement Grants  Streetscape Designs  Projects  Funding Mechanism  Grant Opportunities  Complete Streets Concept  Indian River Drive Moore’s Creek Bridge Condition  Public Input into Designs
A. Avenue D Corridor (29th to Indian River Drive) Project 1. Complete design 11/22 Plans received from consultant and are currently being reviewed by staff. Bid specifications
for bidding
2. Complete construction 6/23 B. Indian River Drive Corridor Project 1. DECISION: Interlocal Agreement with St. Lucie County 12/22 2. Hire consultant 12/22 Grant awarded
services
3. Develop streetscape plan 8/23 C. Orange Avenue Corridor (FDOT) Project 1. Provide City input into design Ongoing 2. Complete resurfacing design for 33rd to U.S. 1 (FDOT) 7/23 3. Complete construction (FDOT) 2024 Responsibility: City Engineer/FPUA
FORT
October 2022 Update
being prepared
in December 2022.
by DEO. Agreement being reviewed by City. Anticipate approval of design
contract by December 2022.

October 2022 Update

Highwaymen Trail Segment

Final review of plans underway by City and FDOT

Engineering cost estimate indicates significant increase in cost. Request for increase funding being prepared for FDOT review.

Historic Downtown Route

Design currently on hold. Final route to take in consideration Downtown Master Plan as well as Indian River Drive reconstruction plans and Moore’s Creek Bridge replacement.

PIERCE Strategic Plan 2022 Goals 15 GOAL 4: Greenway
Development Key Issues  Link to Sun Trail  Goals  Options  Funding  Route through Downtown  FEC Land Acquisition (Small Parcel 1. Complete Highwaymen Trail Gap Design 11/22 2. Solidify Historic Downtown route On Hold 3. CONFERENCE AGENDA: Presentation and Direction 11/22 4. DECISION: Historic Downtown Route TBD Responsibility: City Engineer
FORT
Trail:
FORT PIERCE Strategic Plan 2022 Goals 16 GOAL 5: Wayfinding Signage: Upgraded Design and Funding Key Issues  Design  Themes  Colors  Locations  Digital “Wayfinding” 1. Prepare plan and finalize design options Complete 2. Finalize report Complete 3. FPRA DECISION: Presentation, Direction and Funding Complete 4. Mobilize project 3/23 5. Complete installation 8/23 Responsibility: City Manager October 2022 Update Contract award will be presented to the FPRA Board in February 2023.
Strategic Plan 2022 Goals 17 GOAL 6: Foreclosures Program/Process: Implementation Key Issues  Properties  Actions GOAL 7: Clean and Safe Program Building Demolition: Update Key Issues  Demolition
2022 Update 1. Resolve litigation Ongoing 2. Identify properties Ongoing Properties are
identified/referred for legal action on
3 REPORT: Update TBD Responsibility: City Attorney 1. Prepare Annual Report On Hold 2. REPORT: Presentation TBD Responsibility: Community Response Director
The
Demolition report has
hold.
FORT PIERCE
October
being
an ongoing basis.
October 2022 Update
City continues, on a rolling basis, to evaluate properties for potential foreclosure actions, and to file suit where appropriate. As cases resolve and properties are sold at auction, the City will continue to receive proceeds on a rolling basis. October 2022 Update
been placed on
Being replaced with Foreclosure Program.

October

Update

Plan
18
FORT PIERCE Strategic
2022 Goals
Parking
Direction
GOAL 1:
Strategy: Study and
 Paid Parking 1. Complete public workshop Complete 2. Finalize Report Complete 3. DECISION: Report Approval and Direction Complete
City Manager
Key Issues
Responsibility:
Commissioners
date
2022
Joint meeting with Saint Lucie County Board of County
to be scheduled for a
in early 2023.

October 2022

Update

Staff is currently reviewing the 60% design plans. The final remaining permit approval will go before the City Commission in October. Groundwork may begin this year, which is sooner than expected. FPUA DOU and City Manager continue to discuss disposition of property for the benefit of both entities.

FORT PIERCE Strategic Plan 2022 Goals 19 GOAL 2: Island Reclamation Plant Relocation: Design Key Issues  Target Date: 12/25  Grants and Outside Funding Sources  Debt Restructure  Rate Structure  Use of Property  Plant Design 1. Complete 30% design Complete 2. Prepare report with recommendations Complete 3. DECISION: Debt Restructure and Rate Approval Complete 4. Complete 60% design 11/22 5. Complete 90 100% design 12/22 6. Begin construction 2023 Responsibility: FPUA
PIERCE Strategic Plan 2022 Goals 20 GOAL 3: Downtown Development Master Plan: Development Key Issues  Vision  Boundary  Projects  Land Uses  Development Standards 1. Finalize scope of project Complete 2. DECISION: Funding Direction Complete 3. Task 1: Kick off, Data Collection, and Project Management Complete 4. Task 2: Public Engagement Complete 5. Task 3: Market Study, Frameworks Overlays Complete 6. Task 4: Design Charette Complete 7. Task 5: Final Master Plan Presentation 11/22 Responsibility: City Manager
FORT
2022 Update The Downtown Master Plan will be presented to the CRA Advisory Committee on November 2, 2022 and the FPRA Board on November 8, 2022.
Photo by CKW Productions
October

October 2022 Update List of contiguous parcels for voluntary annexation will be prepared for Planning & Zoning review and compliance by January 2023. Selected enclaves will be included in this list and will be annexed by interlocal agreement if an annexation agreement has not been assigned to the associated parcel.

Strategic Plan 2022 Goals 21 GOAL 4: Annexations Strategy/Interlocal Service Boundary Agreement: Direction and City Next Steps Key Issues  New Approach  Service Boundary (City and FPUA)  Interlocal Service Boundary Agreement (ISBA)  Pre Annexation Agreements  Link to Major Development Project  City Service Capacity  Working with St. Lucie County 1. Prepare proposal Complete 2. DECISION: Presentation and Direction Complete 3. Develop and finalize ISBA with St. Lucie County 1/23 4. DECISION: ISBA Approval 5/23 Responsibility: City Manager
FORT PIERCE
PIERCE Strategic Plan 2022 Goals 22 GOAL 5: South Beach Overlay Plan: Development Key Issues  Scope  Land Use  Zoning  Development Standards  Restrictions  Community Input 1. Finalize scope of project 11/22 2. Kick off planning effort 12/22 3. Develop initial Plan 1/23 4. CONFERENCE AGENDA: Presentation and Direction 2/23 Responsibility: Planning Director October 2022 Update Staff discussion regarding use of Planned Development Zoning as controlling mechanism.
FORT
PIERCE Strategic Plan 2022 Goals 23 GOAL 6: 13th Street Upgrade: Direction and Funding (North and South) Key Issues  Project Costs: $10 million  Funding Source  Grant Opportunities  Federal Infrastructure  North Design 1. Identify initial funding options South Ongoing 2. Incorporate in CIP Update 12/22 3. Updated Plan Completed 1/23 Responsibility: City Engineer October 2022 Update 13th Street (Georgia Avenue to Orange Avenue) • Request proposal to update plans and specifications for bidding to be accomplished by December 2022. • Continue to search for funding opportunities.
FORT
PIERCE Strategic Plan 2022 Goals 24 GOAL 7: Neighborhood Identity and Branding: Direction and Funding Key Issues  Goals  Methods  Funding October 2022 Update 1. Keep Fort Pierce Beautiful to prepare report on vision and background information 6/22 Complete 2. CONFERENCE: Presentation and Direction 6/22 Complete 3. Prepare FY23 budget proposal 6/22 Complete 4. BUDGET WORKSHOP: Budget FY23 Presentation and Direction 7/22 Complete 5. DECISION: Budget FY23 Funding 9/22 Complete 6. Acquire services of consultant 12/22 Meeting with consultant to discuss revised scope on November 7, 2022. Responsibility: Public Works Director
FORT
PIERCE Strategic Plan 2022 Goals 25 GOAL 8: Housing Authority Strategy: Key Issues, Direction and City Actions Key Issues  Development Working Relations  Goals  Partnership  Actions  Re Branding  City Strategic Plan: Vision, 5 Year Plan and Action Agenda 2022  Code Enforcement October 2022 Update 1. JOINT MEETING: Fort Pierce City Commission and Housing Authority Board 8/22 Complete. The joint meeting was held on August 29, 2022. Responsibility: City Manager
FORT
Strategic Plan 2022 Goals 26 GOAL 9: 17th Street Upgrade: Direction and Funding (North to Graveyard and South to Okeechobee)
Issues  Streetscape  Complete Streets Concepts  Sidewalk 1. Complete sidewalk project 12/22 Responsibility: City Engineer October 2022 Update • Engineering Department is currently updating streets/curb and gutter/sidewalk inventory list. Emphasis is centered around a 2 mile radius of schools (ongoing). • Preliminary report still under development.
FORT PIERCE
Key
PIERCE Strategic Plan 2022 Goals 27 GOAL 10: Wave Garden Construction: Permitting and Construction Key Issues  Site Plan  Permitting October 2022 Update 1. DECISION: Final Adoption of Development Ordinance 2/22 Complete. 2. Issue permits 11/22 3. Begin construction 12/22 Responsibility: Planning Director/Building Official October 2022 Update Awaiting building permit applications.
FORT

FORT PIERCE

Strategic Plan 2022 Goals

GOAL 11: King’s Landing Development: Site Plan and Preparation

Key Issues

 Site Plan

1. DECISION: Site Plan Approval Complete 2. DECISION: Land Conveyance Complete 3. Initiate site preparation work 2023

Responsibility: City Manager

October 2022 Update

Audubon began the subsurface debris removal process with a contribution from the FPRA and DEP approval has been obtained.

Audubon must meet the following deadlines for Phase I as outlined in the agreement:

• Closing date: April 7, 2022 (date deed recorded in OR Book 4804, Page 2930) COMPLETE

• Deadline to submit application for building permit: August 22, 2022 COMPLETE

• Commence construction of Phase 1: February 17, 2023.

• Complete construction of Phase 1: July 7, 2025.

28

October 2022 Update

The City of Fort Pierce and Fort Pierce Redevelopment Agency entered into an Agreement for the Purchase and Development of Fisherman’s Wharf with Pierce 1 Marina, LLC on August 16, 2021. The first amendment to further extend the deadline for the City to cure the title objections and survey objections was executed on March 21, 2022. The City now anticipates that it will need additional time beyond September 1, 2022 to cure the objections. This second amendment will extend the City's deadline to March 1, 2023.

PIERCE Strategic Plan 2022 Goals 29 GOAL 12: Fisherman’s Wharf Development: Next Steps Key Issues  Site Plan  Land Conveyance  Boat Storage Facility 1. Complete “due diligence” Complete 2. Review land uses Complete 3. Submit site plan 12/22 4. TRC Review 1/23 5. Planning Board Review 2/23 6. DECISION: 1st Reading 4/23 7. DECISION: 2nd Reading and Approval 5/23 8. DECISION: Land Conveyance 9/23 Responsibility: City Manager
FORT
Strategic Plan
30
Port
Key
 Land Use  Project Direction  Timing 1. Continue discussion with property owner(s) 3/22 2. Review draft proposal 3/22 3. Finalize proposal and land use changes 4/22 4. Planning Board Review 11/22 5. DECISION: 1st Reading 12/22 6. Submit to State 12/22 7. DECISION: 2nd Reading Final Approval 1/23 Responsibility: Planning
FORT PIERCE
2022 Goals
GOAL 13:
Development: Re-Zoning Direction
Issues
Director
October 2022 Update Draft code to be presented to Technical Review Committee on 11/14/22.
FORT PIERCE Strategic Plan 2022 Goals 31 GOAL 14: City Economic Incentives Policy: Review and Direction October 2022 Update 1. FPRA DECISION: Award Commercial Façade Grants 3/22 Complete 2. FPRA DECISION: Execute Commercial Façade Grant Agreements 4/22 Complete 3. FPRA DECISION: Award Interior Uplift Grants 7/22 Complete 4. FPRA DECISION: Execute Interior Uplift Grant Agreements 8/22 Complete Responsibility: City Manager 616 Atlantic Avenue 118 N. 9th Street 705 S. 5th Street 300 S. 6th Street 710 Orange Avenue
PIERCE Strategic Plan 2022 Goals 32 GOAL 15: Seaplanes: Facility and Service Key Issues  Design  Funding  Construction 1. Obtain permits 11/22 2. DECISION: Funding and Design 12/22 3. Complete construction TBD 4. Ribbon cutting and 1st Flight TBD Responsibility: City Engineer October 2022 Update Proposal received from Tetra Tech for preliminary design and permitting with FDEP and Army Corp. Specific Work Authorization being prepared for consulting services.
FORT
FORT PIERCE Strategic Plan 2022 Goals 33 GOAL 16: Mobility Action Plan and Impact Fee: Direction Key Issues  Goals  Mobility Trends  Micro Mobility  Complete Streets Concept  Electric Vehicle  Community Input GOAL 17: Landscape Code: Revision Key Issues  Code Modifications 1. DECISION: Final Proposal and Contract 8/22 2. Complete Phase 1 Analysis 12/22 3. Complete Phase 2 Analysis 5/23 4. CONFERENCE AGENDA: Draft Plan Presentation and Direction 6/23 5.. Incorporate in CIP FY24 2023 Responsibility: City Manager October 2022 Update 1. Finalize draft code revisions 12/22 Staff discussion and draft code amendments in preparation. 2. Planning Board review 1/23 3. DECISION: 1st Reading 2/23 4. DECISION: 2nd Reading Approval 2/23 Responsibility: Planning Director October 2022
This project and contractual relationship with vendor have been terminated due to a lack of responsiveness by the vendor.
Update
Plan
34
18: Vacant Parcels: Identification, Direction and City Actions
Issues  Development Initiatives 1. Establish Incentives for Development Complete Responsibility: City Manager
FORT PIERCE Strategic
2022 Goals
GOAL
Key
PIERCE Strategic Plan 2022 Goals 35 GOAL 1: Community and City Equity Policy and Action Plan: Training, Champions and Actions Key Issues  City Focus First  Training  Departmental Champions 1. Complete Mandatory Training for Managers and Supervisors Complete 2. Identify departmental “Champions” Complete 3. Initiate “Best Practices” Complete Responsibility: City Manager
FORT

FORT PIERCE

Strategic Plan 2022 Goals 36
2: Community
with Faith
Direction and Actions Key Issues  Pastor Coalition 1. Refine list of pastors Complete 2. Reach out to pastors Complete Responsibility: City Clerk October 2022 Update Complete. No additional action required from the City Clerk’s Office.
GOAL
Outreach
Community:
FORT PIERCE Strategic Plan 2022 Goals 37 GOAL 3: Community Engagement Strategy and Action Plan: Report and Direction Key Issues  Goals  Best Practices  Social Media  Pastors Communications  Trust in City Government  Performance Metrics  Town Hall Meetings  “State of City” Message 1. Mayor’s State of City video Complete 2. Review current activities Complete 3. Investigate “best practices” from other cities Complete 4. Prepare Report with options and performance metrics Complete 5. CONFERENCE AGENDA: Report Presentation and Direction 11/22 Responsibility: Information Technology Director October 2022 Update Currently preparing report presentation for 11/14/22 Conference Agenda meeting

FORT PIERCE

Strategic Plan 2022 Goals

GOAL 4: Community Policing Expansion: Actions 2022

1. REPORT: Update 7/22

October 2022 Update

Complete. Discussed at the June 13, 2022 Conference Agenda meeting.

38
Responsibility: Police Chief
FORT PIERCE Strategic Plan 2022 Goals 39 GOAL 1: Mental Health Strategy and City Actions: Direction and City Actions Key Issues  Problems Definition  Partner Provider Best Practices  Police Training  Psychologist Services Contract 1. Police Training and Certification Ongoing 2. Police Scenarios Ongoing 3 Prepare FY23 budget proposal Complete 4 BUDGET WORKSHOP: Budget FY23 Presentation and Direction Complete 5 DECISION: Budget FY23 Funding Complete Responsibility: Police Chief October 2022 Update Police Training and Certification and Police Scenarios remain ongoing.
FORT PIERCE Strategic Plan 2022 Goals 40 GOAL 2: Sunrise Theatre Future: Update Report, Direction and City Actions Key Issues  Goals  Options  City Role  Building Responsibilities  Programming  Funding Mechanism 1. Prepare initial Report of Sunrise Theatre future with options Complete 2. CONFERENCE AGENDA: Report Presentation, Goals and Direction Complete 3. Finalize Report Complete 4. CONFERENCE AGENDA: Direction Complete 5. DECISION: Sunrise Theatre Future Direction Complete Responsibility: Sunrise Theatre Director October 2022 Update The Sunrise Theatre is moving forward with a robust and diverse schedule for the coming year.
FORT PIERCE Strategic Plan 2022 Goals 41 GOAL 3: Recreational Programs Expansion: Needs Assessment, Report with Option, Funding and Direction Key Issues  Youth Recreation Programs  Senior Programs  Adult Programs  Link to Arts and Culture  Link to Marina  Link to Golf  Link to Sunrise Theatre  Recreation Staffing  Funding 1. Prepare report on program expansion assessment Complete 2. BUDGET WORKSHOP: Budget FY23 Presentation and Direction Complete 3. DECISION: Budget FY23 Funding Complete Responsibility: Public Works Director

GOAL 4: Smart City Initiative Development: Plan and Actions

Key Issues

1. DECISION: Agreement with FPUA Plan 11/22

Responsibility: FPUA

October 2022 Update

AMI contract amendment has been approved. Staff has coordinated with the supplier for the remaining material required to complete project. Supplier has placed material list into production queue for partial delivery in calendar year 2022. Supply chain issues continue to cause delay resulting in partial delivery.

Lincoln Park Smart Neighborhood has completed all conduit installation. FPUA crews are currently adjusting poles as needed to underground transition of fiber system. Currently, fiber cable is expected for delivery in November. Fiber is projected to be completed in April 2023 pending any additional supply chain delays.

FORT
Strategic
42
PIERCE
Plan 2022 Goals
Downtown Kiosk
Community Connectivity
AMI Initiative
Funding
PIERCE Strategic Plan 2022 Goals 43 GOAL 5: Sunrise Theatre Plan for 2023: Direction Key Issues  Programs 1. Prepare Report on Next Year Complete 2. Prepare FY23 budget proposal Complete 3. BUDGET WORKSHOP: Budget FY23 Presentation and Direction Complete 4. DECISION: Budget FY23 Funding Complete Responsibility: Sunrise Theatre Director
FORT
Strategic Plan 2022 Goals 44 GOAL 6: Lincoln Theater Restoration Plan/Program Development: Update Report Key Issues  Action Plan 2022  Deliverables  Alignment with City Actions 1. Private Responsibility: Design and Funding Ongoing 2. REPORT: Foundation Update Report 11/22 Responsibility: City Manager
FORT PIERCE

Turn static files into dynamic content formats.

Create a flipbook