Avenue B
(13th Street to 8th Street)
Curb and gutter, sidewalk, and roadway base have been installed from 13th Street to 10th Street. Work will continue with the installation of drainage at 9th Street.

Avenue D
(Indian River Drive to 29th Street)
This project has been split into two phases to expedite the bidding process. Phase I is Avenue D from 29th Street to US 1 and will include milling and resurfacing of the roadway, replacement of the existing brick paver crosswalks with stamped asphalt crosswalks, and the addition of sidewalk on the south side of Avenue D from 29th Street to 25th Street. As needed ADA upgrades, enhanced pavement marking, and signage will be included. Phase 1 Final Plans are currently in review and are expected to be advertised in June.
Phase 2 of the project will include full roadway reconstruction of Avenue D between U.S. Highway 1 and Indian River Drive with sidewalks, ADA upgrades, curb and gutter, a raised intersection at 2nd Street, stormwater drainage, conversion of overhead utilities to underground, improved landscaping, street light installation and enhanced signage and pavement marking. A revised typical section is under review.
Ohio Avenue
(US Highway 1 to 11th Street)
Request to award the $2,486,699.50 construction contract to the low bidder, PRP Construction, will be presented to the Commission for their approval at the June 5, 2023 meeting.
The Oaks at Moore’s Creek Phase II (Means Court Extension)
Construction of the subdivision infrastructure is underway. The project includes the extension of Means Court roadway between Avenue B and Moore’s Creek to support a 15-lot singlefamily affordable housing subdivision. Improvements include water, sewer, gas, and storm drainage facilities, along with sidewalks, curb & gutter, street lighting, landscaping, and underground electric.
Construction commenced on April 20, 2023 and the contractor has completed the sanitary sewer collection system, the potable water distribution system, and 90% complete with the storm drainage work. FPUA has completed the installation of the gas main.


Georgia Avenue Basin Water Quality Improvements
Construction is on-going with the contractor completing the sheet piling installation and rip-rap at the control structure. Material delivery delays have pushed the construction completion date back from July 2023 to October 2023.
In honor of National Public Works Week, the City of Fort Pierce Public Works Department had several beautification projects planned at the Indian Hills Recreation Area off Savannah Road. These projects included removing trees, palms, and exotic tree species around the lake, trimming existing trees, debris removal, repairing the walking path around the North and East side of the lake, removing garbage, general maintenance, and sidewalk cleaning throughout the area.
The Indian Hills Recreation Area off Savannah Road features a .94-mile walking and biking trail which is a part of the Florida SUN Trail Network, a 17-hole Disk Golf Course, exercise stations, benches, and informational kiosks which educate visitors about the stormwater protection system throughout the area. It is truly a beautiful area with expanding amenities and the Public Works Department is excited about the improvements and beautification projects they were able to recently complete for National Public Works Week.
For more information on the Indian Hills Recreation Area or the City of Fort Pierce Public Works Department please visit the city’s website at www. cityoffortpierce.com



River Walk Center Sales Report April 2023

Welcome New Businesses
QUEEN SOPHIA LLC DBA ESTRELLA INSURANCE
COLDWELL BANKER PARADISE
FEIJOO, RODOLFO & LILIANA
GORY, STEVE & CYNTHIA
ZAYAC, CONSTANCE
HALE, ANNE
FUENTES, RAMON & LYDIA
MALOFEY, RONALD & ANNE
ALLOCCO, VINCENT & HYUN
QUICK CARE OF THE TREASURE COAST
SARGENT, DAVID
RADECKE, JASON MD.
SALAZAR, VICTOR
GOOCH INVESTMENTS LLC
SHIROKAWA, JOHN
PACE, VINCENT
ASCENSION EXPEDITED HAULING LLC
THOMPSON CONTRACTING GROUP, INC
BEZUIDENHOUT, ROBIN JEAN
ORANGE SUNOCO FOOD AND GAS
CURINGA, ERNEST JR
MR AHOJ LLC
ARDEN, WILLIAM
CREMEN, FRANK & LYNN
MENDIGUTIA, FELIX
WODZENSKI, ROBERT
SPRINGER, RETA G
WILSON, JAN & KELLI
HOFFMAN, WENDY

UNUSUAL INVESTMENTS INC
SCHIFFER, JESSICA
MARVILLA BUILDERS LLC
SIDWAY, GINA
WINTER, SELINA
RODRIGUEZ & SONS PAVERS INC
PEELER, JARED & SUSAN
SOUTHBY, JOHN
CADE, FREDERICK & THERASE
MANEVSKI, JOVICA
GOODWIN, THOMAS
CONNOLLY, DEBRA
CRISTINAS CLEANING SERVICES