24/7 security
110 108 106 104 102
support building
109 107 105 103 101
WATER TANK
cinelease
offices
S
stage stage 9 8
stage 7
stage 11
MILL 1
stage 12
stage 14
ENTRANCE
stage 15
MILL 2
MILL 3 HWY 142
stage 10
herc
STAGE 6 STAGE 5
MOORES LN.
PON CITY
11642 GA-142 COVINGTON, GA 30014
D RO AD
STAGE 3
STAGE 1
Stage 1: 36,400 sq/ft [130’ x 280’ x 40’] plus 6,000 sq/ft of attached office and support
Stages 7, 8, & 9: 10,000 sq/ft each [100’ x 100’ x 30’]
Production Offices: (10) 7,000 sq/ft Private Office Suites
Stage 9: Green Screen 120’ long x 30’ tall [80’ long side, 40’ short side]
Stage 3: 36,400 sq/ft [130’ x 280’ x 40’] plus 6,000 sq/ft of attached office and support
Stages 10, 11, & 12: 22,000 sq/ft each [146.5’ x 150’ x 40’]
Set Lighting, Grip, and Heavy Equipment Rental On-Site
Stages 5 & 6: 18,200 sq/ft each [130’ x 140’ x 40’] plus 6,000 sq/ft of attached office and support
Stages 14 & 15: 24,000 sq/ft each [130’ x 185’ x 50’] Mills 1, 2, & 3: 20,000 sq/ft each
20,000 sq/ft of Additional Flex and Vendor Support On-Site
P Parking Spaces
S 24/7 Security Gate