CHRISTOPHER TOHRU GUIGNON
PROFESSIONAL WORK PORTFOLIO
CHRISTOPHER
TOHRU
GUIGNON
7127 CARD LANE, PITTSBURGH, PA 15208 • PHONE 617-777-3727 • EMAIL C.GUIGNON@GMAIL.COM
EDUCATION
Massachusetts Institute of Technology, Cambridge, MA February 2010 Master of Architecture, Architectural Design, Sustainable Design University of Pittsburgh, Pittsburgh, PA April 2004 Bachelor of Arts (Honors), Architectural Studies, Minor: Philosophy
REGISTRATION/ ACCREDITATION
Pennsylvania Architectural Registration LEED AP BD+C, US Green Building Council EcoDistricts AP, Ecodistricts
PRACTICE
evolve Environment::Architecture, Pittsburgh, PA 2013-present Associate | Senior Project Manager Project architect and discipline lead for architecture, urban planning, and sustainability consulting firm. Projects include residential and commercial additions and renovations in Pittsburgh and Millvale, PWSA critical infrastructure buildings in Highland Park, air quality monitoring station protoypes for the Triboro Ecodistricts, a 62-unit sustainable pocket neighborhood in Bozeman, MT, and graphic design and architectural representation on award-winning community planning projects in Pittsburgh and regionally. Safdie Architects, Somerville, MA 2010-2013 Junior Architect Designer and research fellow at world-renowned architecture firm of Moshe Safdie. Projects include the Los Morros Master Plan in Cartagena, Columbia; Sky Habitat high-rise in Singapore; and the Altair tower in Colombo, the tallest residential building in Sri Lanka. Other work included management of the Xiqu Centre submission, a global architecture competition for an opera house in Kowloon, and participation in the 2010 Safdie Architects Research Fellowship study on Mobility in Demand. Lubetz Architects, Pittsburgh, PA 2003-2004 Architectural Intern Intern designer. Work included construction documents revisions of the Carnegie Library of Pittsburgh Squirrel Hill branch, and conceptual design of a private residence.
TEACHING
PROFESSIONAL AFFILIATION
University of Pittsburgh Architectural Studies Program, Pittsburgh, PA 2014-present Studio Instructor: Design Studio 1: Context and Architectural Form Making, Design Studio 2: System Based Design, Design Studio 3: Sustainable Strategies for Urban Living, Design Studio 4: Construction Systems and Documentation. American Institute of Architects, Pittsburgh Chapter Member, 2018-current AIA Pittsburgh Design + Research Group Member, 2020-current
SKILLS
Proficiency: AutoCAD, Sketchup, Rhino, Photoshop, Illustrator, Indesign, Microsoft Office, Morpholio Trace, Handsketching Competency: Revit, V-Ray, Cove.Tool, Sefaira
ii
Professional Work
ADDITIONAL EXPERIENCE
AIA Pittsburgh Foundation for Architecture, Leadership Institute for Emerging Professionals; Pittsburgh, PA Class 2018/2019 Participant - Co-lead a team of seven architects in the development of a “Day of Learning” event that explored the relationship between refugees and the City of Pittsburgh. The half-day event included a panel discussion at the City of Asylum with guests from local government and refugee/immigrant-centered non-profits. Thresholds, Journal of Architecture, Art, and Media Culture; Cambridge, MA 2007-2010 Managing Editor - Managed the production and distribution of four 100-page issues with circulation of 900. Organized and completed the digitization of backlog archives spanning ten years. Returned distribution to its proper schedule after major publication lapse prior to 2007 Sweat! Design! Build! Louisiana Lift House; New Orleans, LA Spring 2007 Team Leader - Led a team of four in a one week design-build of a trellis system incorporated into the MIT-designed Louisiana Lift House. Tiled 1000 sf. house on a five member team. JET Programme, Fukuoka, Japan 2004-2006 English Language Instructor - Taught and designed curriculum for Elementary and Junior High School. Conducted weekly adult lessons, and bi-monthly presentations.
PUBLICATIONS/ EXHIBITIONS
The Parable of the Glass House. Get It Louder Exhibition, Orange Hall, Sanlitun, Beijing, China, 2014 AIA Center for Emerging Professionals Annual Exhibition, AIA National, Washington, DC., 2013. [Editor] Luna, Rafael, and Dongwoo Yim. I Want to be Metropolitan - Boston Case Study. Ed. Non Arkaraprasertkul. N.p.: Oro Editions, 2012
“The Parable of the Glass House: Independent Study Project.” Testing to Failure: Design & Research in MIT’s Dept. of Architecture. Ed. Sarah M. Hirschman. Cambridge: SA+P, 2011 “Design for Decline: The Bank of Savings and Futures.” Ed. Orkan Telhan. Thresholds 38: Future. The MIT Press Journals, Fall 2010 Guignon, Christopher. The Parable of the Glass House. Little t, Vol. 9. Cambridge: MIT Dept. of Architecture, 2010
AWARDS
evolve Environment::Architecture AIA Pittsburgh Small Project: Certificate of Merit, Winterton Street Residence American Institute of Architects Pittsburgh, Design Awards, 2020 Sustainable Urban Design Plan Award and AIA Pittsburgh Regional + Urban Design Honor Award, Breathe Easy: Millvale Air Quality Planning American Planning Association’s Sustainable Communities Division, Awards for Excellence in Sustainability, 2019 American Institute of Architects Pittsburgh, Design Awards, 2018 AIA Pittsburgh Regional + Urban Design: Certificate of Merit, Busway Futures: Penn Station Transit Plan American Institute of Architects Pittsburgh, Design Awards, 2018
Massachusetts Institute of Technology Merit-based Full Tuition Scholarship (awarded 2 consecutive semesters) Second Place Award Winner, Velux Daylighting Design Competition 2008 University of Pittsburgh Graduated with honors. Summa cum laude Recipient of Faculty Special Commendation Award. Class of 2004 Certificate of Merit, Columbia University Scholastic Press, Gold Circle Awards 2004 Christopher Guignon
iii
iv
Professional Work
PROJECTS 02 WINTERTON STREET RESIDENCE 10 ORTHOPHOSPHATE PAVILIONS 18 AIR QUALITY STATIONS 26 ALTAIR RESIDENCES 32 SERENA DEL MAR 40 DESIGN + REPRESENTATION
Christopher Guignon
01
Location: Pittsburgh, PA Office: evolveEA Role: project architect Phases: PD >> CD
WINTERTON ST. RESIDENCE
A modest addition and two-car garage set into the hillside creates a series of indoor and outdoor rooms, each with a distinct character and connection to the small site. Using simple extruded forms, the project reconfigures the center of gravity of the original house, improving interior flow. Dramatic views and natural light are prioritized, as is a simple material palette that compliments the existing brick house and neighborhood context. Winner of Design Pittsburgh 2020 Certificate of Merit
02
Professional Work
Christopher Guignon
03
EXISTING ELEVATION
NEW ELEVATION
04
Professional Work
TECTONIC | STEREOTOMIC The Winterton Street Residence explores the relationship of tectonic and stereotomic expression. To define protected outdoor spaces and connect zones for living in the hilly site, two masonry volumes are embedded into the earth. These stereotomic masses are in immediate dialogue with the existing masonry structure. Counterbalancing the heaviness of the masonry, an extruded gable volume (the tectonic frame) perches like a treehouse and gestures to the hillside views and morning sun.
Christopher Guignon
05
PRO
1 A3.0
2 A4.1
1 A4.1
13'-8" 1'-8"
2'-3"
OPEN SHELF AT EXG WINDOW OPENING BEDROOM 2 204 C 3 D B A1.3 A
UP 1
18'-5"
203A
MASTER BATH 206
2'-3"
2 A3.1
MASTER BR
205
7'-9"
EXG HDWD
CLOSET 202
1 A3.1
GWB LAMINATION
206B
TILE
206A
P
2 A4.0
5'-6"
BEDROOM 1
203
P
21'-4"
RECONFIG. CLOSET, N.I.C.
11'-1"
2'-0 1/2" 1'-8"
9"
205A
1 A4.0
DN 206C
200
LANDING
R+S
CLOSET 207
~109'-0"
4'-1 1/2" NEW WINDOW
R+S
P
4'-1 1/2"
C L
8'-1"
EXG BATHROOM SEE OWNER'S SCOPE
1'-8"
BATHROOM 201
BALCONY RAILING
11'-1"
O
J 6 P T C
SECOND FLOOR PLAN
A1.1
SCALE:
A
1/4"=1'-0"
e
1 A3.0
1
5 A4.3
4 A4.3
2 A4.1
REPLACE EXG TILE W/NEW WD FL TO MATCH EXG WD FL
GRADE BEAM NDN (DASHED), RSE REMOVED; TOR TO VERIFY LOCATION, AND N OF EXG FNDN
EXG R.L.
1 A4.1
G
RAIN LEADER
REPAIR WALLS + CLG AS NEEDED
B 4 S T
11'-8" 5'+/-
OTUBE INF.
5 P T F w C
4'-0 1/2"
C L 1'-11"
NEW HEADERS IF REQ'D
UP
104
6" STEP 106
LIVING RM
1
2 A4.0
FAMILY RM C 2 D B A1.3 A
DINING RM
101
106A
NEW WD FL
WD FL. 2 2'
1
17'
1061.5' 2 A3.1
1 A3.1
ALIGN
c
REV
EQ.
1
GRADE BEAM NDN (DASHED), RSE REMOVED; TOR TO VERIFY LOCATION, AND N OF EXG FNDN
PRO
19'-3"
AM WIDENS
G 3/A4.2
N.I.C. REFINISH EXG WD FL
5'-6"
N.I.C. REFINISH EXG WD FL
GRADE
2'-10"
104A
NEW WD ENTRY 100
DN 105A
KITCHEN
103A
WC 103
OTUBE INF.
R+S
9'-0 1/2"+/-
EXG R.L. LAMINATE GWB @ EXG TEXTURED WALL WHERE SHOWN
E:
NEW WINDOW
FURNITURE FOR REFERENCE ONLY, N.I.C.
PIVOT HINGE CLOSET DOORS
VERIFY FIREPLACE FLUE CONFIG IS ABLE TO BE USED IN A 2-SIDED FIREPLACE CONFIG.
1 A4.0
1'-4"
OPEN SHELF IN EXG WINDOW OPENING TRIM FRAME W/PTD 1X RAINLEADER LAMINATE GWB @ EXG TEXTURED WALL
N
NEW STL FIREPLACE HEADER @ FIREPLACE OPENING, ENGIN. BY CONTRACTOR
CONTRACTOR TO VERIFY REQ'D FIRE BOX CONDITION + FLUE
C L
CLOSET 105
EQ.
102
DRA
SCA
FIRST FLOOR PLAN
A1.1
SCALE:
1/4"=1'-0"
DRA
CHE
06
Professional Work
PRO
Christopher Guignon
07
08
Professional Work
PROJECT TITLE
RIDGE VENT
PROJECT TITLE
RIDGE VENT
6338 Bryant Street Pittsburgh, PA 15206
WALL SECTION
6338 Bryant Street PERMIT Pittsburgh, PA SET 15206
A.W.M. GUTTER NAILER W/ FLASHING ROOF ASSEMBLY (TYP.) + DRIP EDGE STANDING SEAM MTL ROOFING 1X WD BATTEN + AIR SPACE HALF-ROUND GUTTER + STRAP ADHESIVE WATERPROOF MEMBRANE (A.W.M.) AT FACE
3
environment :: architecture
ROUGH FRAMING
CLADDING EXG HOUSEASSEMBLY BEYOND (TYP.) STANDING SEAM MTL ROOFING 1X WD BATTEN + AIR SPACE A.W.M. AT FACE
CLADDING ASSEMBLY (TYP.) STANDING SEAM MTL ROOFING 1X WD BATTEN + AIR SPACE A.W.M. AT FACE
CASEWORK
12" DEEP 2X FLOOR TRUSS
AIR SEAL @ SILL PLATE SOFFIT HDWD FLOOR 107'-012" V.I.F. 3
ROUGH FRAMING
4"
PLYWD SEE 2/A4.2, SIM.
12" DEEP 2X FLOOR TRUSS WALL ASSEMBLY @ CEDAR CEDAR SIDING 2X RIM JOIST (EXT.) 1X WD FURRING + AIR SPACE 3 / MOISTURE BARRIER AIR " EXT. GR. PLYWD 4 3 CONTINUOUS OVER 4" PLYWOOD BOTTOM CLOSURE FLOOR WALL ASSEMBLY 2X6 STUD+WALL, BATT INSUL. 3 FLASHING W./ DRIP EDGE 4" PLYWOOD VAPOR BARRIER WD BATTEN W/ INSECT SCREEN
INSECT SCREEN 1"
(3) 2x10 LVL BEAM
11 1/2"
1"
(3) 2x10 LVL BEAM
FLOOR
WD TRIM EXISTING FIRST FLOOR 100'-0"
DITION - TOP OF SLAB
FIRST FLOOR ADDITION - TOP OF SLAB 99'-412" 1 4" : 12" SLOPE WD TRIM
2 1/2"
IRONSPOT BRICK VENEER (EXT.) 1" AIR GAP WEEP HOLE @ 24" C.C. HORIZ. AIR / MOISTURE BARRIER 3 GR. PLYWOOD 4" EXT. MTL FLASHING 2X6 STUD WALL, BATT INSUL. 8" LIMESTONE SILL PLATE VAPOR BARRIER PTD GWB (INT.) RIGID INSUL. THERMAL BREAK
INSECT SCREEN @ FURRING STRIP 4" CONC. SLAB W/ 1" RIGIDWWF, INSULATION W1.4XW1.4X6X6 6 MIL POLY VAPOR BARRIER, 4" RIGID INSUL. (R-20) 4" GRAVEL CHOKED / SAND
8" MIN. 18"
DITION - TOP OF SLAB
2X6 WD BLOCKING @ 2'-0", STAPLE INSECT SCREEN TO BEYOND UNDERSIDE BOTTOM CLOSURE GWB FLASHING W./ DRIP EDGE BATT INSULATION WD BATTEN W/ INSECT 2X6 FRAMING SCREEN WALL ASSEMBLY @ BRICK IRONSPOT BRICK VENEER 2X6 WD BLOCKING @ 2'-0", (EXT.) 1" AIR GAP STAPLE INSECT SCREEN AIR / MOISTURE BARRIER TO UNDERSIDE 3 " EXT. GR. PLYWOOD 4 2X6 STUD WALL, BATT INSUL. VAPOR BARRIER PTD GWB (INT.) @ BRICK WALL ASSEMBLY
8"
11 1/2"
LOOR
2 1/2"
WEEP HOLE @ 24"2/A4.2, C.C. HORIZ. SEE SIM. GRADE BEAM, SEE 2/A4.2, SIM. GRADE BEAM MTL FLASHING 1" RIGID INSUL. BEYOND 8" LIMESTONE SILL PLATE
4" CONC. SLAB W/ W1.4XW1.4X6X6 WWF, SEE 2/A4.2, SIM. 6 MIL POLY VAPOR BARRIER, 4" RIGID INSUL. (R-20) 4" GRAVEL CHOKED / SAND
FACE OF BRICK
1'
2" RIGID INSUL.
WALL SECTION @ BRICK SCALE:
1'
1"=1'-0"
FACE OF BRICK
A4.3
WALL SECTION WALL SECTION @ BRICK A4.3
SCALE: SCALE: A4.2 1"=1'-0"
1"=1'-0"
18" MIN.
2" RIGID INSUL.
1'-9"
RIGID INSUL. THERMAL BREAK 2'
EXG FOUNDATION, CONTRACTOR TO VERIFY GRADE BEAM, SEE 2/A4.2, SIM. CONFIGURATION, LOCATION, EXG FNDN BEYOND, TOP 1" RIGID INSUL. AND DIMENSION OF EXISTING COURSE REMOVED, FOUNDATION CONTRACTOR TO VERIFY CONFIG., LOCATION, AND 1 UPDATED ASSEMBLIES DIMENSION 2' EXG FOUNDATION, CONTRACTOR TO VERIFY CONFIGURATION, LOCATION, AND DIMENSION OF EXISTING FOUNDATION
1
1 UPDATED UPDATED ASSEMBLIES ASSEMBLIES
1
UPDATED FOUNDATION
Jessica Trybus & Anthony Lacenere
6338 Bryant Street Project Team Pittsburgh, PA 15206 T 412.901.6950
Contact: Jess Trybus OWNER: Jessica Trybus & Anthony Lacenere
ARCHITECT:
6338 Bryant Street MTL RAILING W/ WIRE MESH GUARD Pittsburgh, PA 15206
evolve LLC
T 412.901.6950 5530 Penn Avenue Contact: Jess Pittsburgh, PATrybus 15206 T 412.362.2100 ARCHITECT: F 412.291.1582 www.evolveEA.com evolve LLC 2X BLOCKING Contact: Christine Mondor 5530 Penn Avenue 3 4" PLYWOOD Pittsburgh, PA 15206 SHEATHING GENERAL CONTRACTOR: T 412.362.2100 PTD PVC TRIM Malcolm FBrendan 412.291.1582 423 Oliver Rd. www.evolveEA.com SECOND FLOOR - ROUGH FRAMING SECOND FLOOR - ROUGH FRAMING1 Sewickley, PA 15143 Contact: Christine Mondor 108'-11 2" V.I.F. 7" 108'-1112" V.I.F. T 412.303.7947 1'-
GENERAL PTD PVC TRIM Brendan MTL FLASHING
SECOND FLOOR - ROUGH FRAMING 108'-1112" V.I.F.
PROFESSIONAL SEAL PTD PVC TRIM
SOFFIT 107'-0" V.I.F.
PATIO DOOR THRESHOLD HDWD FLOOR, 3 4" PLYWOOD
12
CONTRACTOR: 8
Malcolm 423 Oliver Rd. 2X FRAMING @ RAKE Sewickley, PA 15143 INSULATION T 412.303.7947
12" DEEP 2X4 WD TRUSS INSULATE TO 3' FROM EXTERIOR
SOFFIT 107'-012" V.I.F.
PTD GWB (2) 2X10 HEADER PTD MDO SOFFIT PROFESSIONAL SEAL
SOFFIT 107'-0" V.I.F.
c
1X PTD WD TRIM CONT. AIR SEAL @ ALL WINDOW EDGES
evolve LLC 2016
REVISIONS
1 EXISTING FIRST FLOOR 100'-0"
c
29 JULY 16
evolve LLC 2016
EXISTING FIRST FLOOR REVISIONS 100'-0"
FIRST FLOOR ADDITION - TOP OF SLAB 29 JULY 16 FIRST FLOOR ADDITION1 - TOP OF SLAB 99'-412" 99'-412" 1 4" : 12" SLOPE SLOPE EXISTING FIRST FLOOR 100'-0" LIMESTONE BLOCK FIRST FLOOR ADDITION - TOP OF SLAB 1" RIGID INSUL. 99'-412"
SLOPE 1" RIGID INSUL.
FINISH FLOOR
4" CONC. SLAB W/ W1.4XW1.4X6X6 WWF, 6 MIL POLY VAPOR BARRIER, 4" RIGID INSUL. (R-20) 4" GRAVEL CHOKED W/ SAND
WALL SECTIONS
DRAWING TITLE
DATE NEW FOOTER, VERIFY CONDITION IN AS NOTED FIELD ANDSCALE CONFIRM CONFIGURATION CTG ENG. WITH STRUCTURAL
22 JUNE 2016 12"
WALL SECTIONS
DRAWN BY DRAWING TITLE
CKM CHECKED BY 18" O.D. SONOTUBE PIERS DATE W/REINFORCEMENT AT NOTED 14-411 CORNERS AS SCALE PROJECT NO.
CTG CKM CHECKED BY
GRADE BEAM BEYOND EXG FNDN BEYOND, TOP COURSE REMOVED, CONTRACTOR TO VERIFY CONFIG., LOCATION, AND DIMENSION
A4.3 22 JUNE 2016
SHEET NUMBER
DRAWN BY
A4.3
WALL SECTION
SCALE: A4.2 14-411
PROJECT NO.
Christopher Guignon
AIR SEAL PATIO DOOR UNIT
OWNER:
2X RIM JOIST 3 4" EXT. GR. PLYWD CEDAR SIDING OVER CONTINUOUS FLOOR + WALL ASSEMBLY PTD GWB
WD TRIM
HEAD FLASHING
8"
WALL ASSEMBLY 1 2" PTD GWB 2X6 WD FRAMING R- INSUL. SECOND FLOOR - ROUGH FRAMING 3 4" PLYWD1 108'-11 2" V.I.F. CASEWORK INSECT SCREEN AIR SEAL @ SILL PLATE WALL ASSEMBLY 1 2" PTD GWB HDWD 2X6 WDFLOOR FRAMING R3 INSUL. 4" PLYWD 3 4" PLYWD
AIR SEAL, TYP.
Project Team
3'-6"
WALL ASSEMBLY @ CEDAR RAINLEADER BEYOND CEDAR SIDING (EXT.) 2X WD FURRING + AIR SPACE EXG HOUSE BEYOND AIR / MOISTURE BARRIER 3 WINDOW UNIT 4" PLYWOOD 2X6 STUD WALL, BATT INSUL. VAPOR BARRIER CEDAR SIDING (INT.) RAINLEADER BEYOND
5530 Penn Avenue Pittsburgh, PA 15206
(3) 2X6 W/1" RIGID INSUL. T 412.362.2100 F 412.291.1582 www.evolveea.com THERMAL BREAK
MIN. 18"
1"
J-BEAD + 2" REVEAL
CEILING ASSEMBLY (TYP.) VAPOR BARRIER PAINT, AIR SEAL @ ALL JOINTS + CHANGES IN MATERIAL 1 2" GWB 2X10 WD FRAMING R-40 INSUL. 3 4" PLYWD ADHESIVE WATERPROOF MEMBRANE
5530 Penn Avenue Pittsburgh, PA 15206 T 412.362.2100 F 412.291.1582 www.evolveea.com
evolve
INSECT SCREEN WRAPPING BOTTOM OF BATTENS WINDOW VERT. MTLUNIT CLOSURE TRIM BEYOND
CONT. AIR SEAL
1/2"
environment :: architecture
PTD PVC TRIM
2X HEADER W/FOAM INSUL. PTD WD TRIM
1'-3
evolve
WINDOW UNIT
INSECT SCREEN @ VENT INSECT SCREEN WRAPPING BOTTOM OF BATTENS (TYP.) CLADDING ASSEMBLY STANDING MTL TRIM ROOFING VERT. MTL SEAM CLOSURE BEYOND 1X WD BATTEN + AIR SPACE A.W.M. AT FACE
1
2"
PLYWD
FLASHING
GUTTER NAILER W/ FLASHING CLADDING ASSEMBLY (TYP.) +STANDING DRIP EDGE SEAM MTL ROOFING 1X WD BATTEN + AIR SPACE HALF-ROUND GUTTER + STRAP A.W.M. AT FACE
1"
4"
2X BLOCKING
INSECT SCREEN @ VENT A.W.M.
CHANGES IN MATERIAL INSECT SCREEN 2X HEADER W/FOAM INSUL. 1 2" GWB 1 2X10 WD+ FRAMING J-BEAD 2" REVEAL R-40 INSUL. 3PTD WD TRIM 4" PLYWD ADHESIVE CONT. AIR WATERPROOF SEAL MEMBRANE
PERMIT SET
PTD PVC TRIM
11 1/4"
CEILING ASSEMBLY (TYP.) VAPOR BARRIER PAINT, AIR SEAL @ ALL JOINTS + CHANGES IN MATERIAL 1 2" GWB SEE 2/A4.2, SIM. 2X10 WD FRAMING R-40 INSUL. SEE 2/A4.2, SIM. 3 4" PLYWD CEILING ASSEMBLY (TYP.) ADHESIVE WATERPROOF VAPOR BARRIER PAINT, AIR TRIM + MTL FLASHING MEMBRANE SEAL @ ALL JOINTS +
7 1/4"
1"=1'-0"
PTD PVC TRIM
6"
SCALE:
KNIFE EDGE OVERHANG (2" BEYOND FASCIA; HOLD BACK 1ST BATTEN, PAINT EDGE TO MATCH ROOF)
ROOF ASSEMBLY (TYP.) STANDING SEAM MTL ROOFING 1X WD BATTEN + AIR SPACE ADHESIVE WATERPROOF MEMBRANE (A.W.M.) AT FACE
WALL SECTION
A4.3
ROOF ASSEMBLY (TYP.) STANDING SEAM MTL ROOFING 1X WD BATTEN + AIR SPACE ADHESIVE WATERPROOF MEMBRANE (A.W.M.) AT FACE
1"=1'-0"
MIN. 42" BELOW FINISH GRADE
SCALE:
7 1/2"
A4.3
1"=1'-0"
1
UPDATED ASSEMBLIES
SHEET NUMBER
09
Location: Pittsburgh, PA Office: evolveEA Role: project architect Phases: PD >> CD
ORTHOPHOSPHATE PAVILION
PWSA’s Orthophosphate Pavilions distribute lead-preventative chemicals into 2/3 of the city water supply. Sited adjacent to Reservoir #1 and the Membrane Filtration Plant, they occupy greenspaces in a vibrant public park. The pavilions are small pieces of city infrastructure that must feel welcoming to pedestrians and visitors to Highland Park.
10
Professional Work
Christopher Guignon
11
ORTHOPHOSPHATE BUILDING CONCEPT
PAVILION CONVERSION CONCEPT
SECOND-LIFE ADAPTABILITY Because the chemical distribution purpose of the Orthophosphate Pavilions will be obsolete in 10-15 years, the structures were designed to convert into full park shelters, reclaiming the entire footprint of the building when the walls of the chemical room are removed. In its second life, the panelized ceiling can be removed to reveal the full extent of the timber roof structure and cedar tongue and groove deck. Stack bond brick indicates where walls are non-structural and can be removed.
Watchman’s Tower
12
Professional Work
Membrane Filtration Plant
Orthophosphate Pavilion Schematic Rendering
SERVICE DRIVE EXISTING SEWER MANHOLE ELECTRICAL + FIBEROPTIC TRAILHEAD PLAZA
EXISTING 66” DIA. WATER MAIN 12’X12’ VAULT WITH 30” MANHOLE ACCESS
Christopher Guignon
13
14
Professional Work
2 A4.3 3 A4.0
2 A4.0
EXHAUST OPENING/FAN BEYOND ALUMINUM CAP FLASHING, BLACK
POLYCARBONATE RIDGE SKYLIGHT RIDGE SKYLIGHT BEYOND
SLATE ROOF 2X6 CEDAR DECKING 14.2
12 1 A4.3
STEEL CABLE COLLAR TIE
RAFTERS BEYOND 1 RAFTERS AND T&G DECKING A4.0 BEYOND W/GALVANIZED FASTENERS
RIDGE SKYLIGHT, BLACK
RAFTERS + T&G DECKING BEYOND
FROSTED POLYCARBONATE OR TEMPERED GLASS SKYLIGHT, ALUMINUM COMPRESSION FRAME VERTICAL MEMBERS ONLY, BLACK
2X10 WOOD CEILING FRAMING @ 20" C.C., DOUBLED @ PANEL SEAMS
WOOD BLOCKING COPPER FLASHING AND DRIP EDGE
GLASS SECURITY WINDOW (40"X32") CMU WALL
9'-6" B.O. BEAM
FIBERGLASS DECK (SEE ENG. DWGS)
8"H CONCRETE BASE
CONTROL JOINTS @ BRICK STACK BOND RUNNING BOND BRICK BRICK SOLDIER COURSE W/ WEEPS
CONTAINMENT SUMP (SEE ENG. DWGS)
1 A4.1
3'-4"
3'-4"
3'-4"
1 A4.2
A4.0
SCALE:
2 A4.2
3'-4"
LONG SECTION
1
3
STEEL KNIFEPLATE CONNECTION, SEE A4.4
4X12 GLULAM BEAM
CONCRETE SLAB W/ TURNDOWN FOOTERS TO FROST LINE (SEE ENG. DWGS)
A4.0
GLULAM POST
HP LAMINATE PANEL CEILING W/ 41 REVEAL, EXPOSED SEX HEAD CONNECTORS, COLOR TO MATCH PANEL (BLACK)
9'-5" CLG HEIGHT
9'-6" B.O. BEAM
CMU BOND BEAM LINTEL SEE ENG. DWGS. FOR GROUTING AND STRUCTURE
GLULAM BEAM STEEL KNIFEPLATE CONNECTION, SEE A4.4
VENT AND FLASHING BEYOND
CONCRETE SLAB W/ TURNDOWN FOOTERS TO FROST LINE
1/4"=1'-0"
CROSS SECTION - PICNIC SHELTER
evolve LLC
1/4"=1'-0"View SCALE: Gateway
Plaza 1600 West Carson Street 1 Pittsburgh, PA, 15219-1031 A4.0 T (412) 497 2900 F (412) 497 2901 W www.mottmac.com/americas
REGISTERED ARCHITECT # 01
evolve
COPPER CAP FLASHING
environment :: ar
SLATE ROOF
6020 Broad Street Pittsburgh, PA 1520 T 412.362.2100 F 4 www.evolveea.com
2X6 T&G CEDAR DECKING
RAFTER BEYOND
12
A
12/07/18
Rev STEEL CABLE COLLAR TIE Date (SEE 1/A1.3 FOR PREFERRED LOCATIONS) SEE ENG. DWGS.
10.8 Z:\400 Projects\17-409 PWSA Highland Park PS\04_Orthophosphate\02_2D-3D Drawings\ORTHO - PRINT SHEET - SHELTER.dwg Dec 7, 2018 11:08AM Chris
CTG
ISSUED TO CONTRACTOR
Drawn
Description
CKM Ch’k’d App’d
Project Number
18-408
RAFTERS + T&G DECKING BEYOND W/ GALVANIZED FASTENERS 2X WD. FRAME CLG., 34" EXT. GR. PLYWD. TOP & UNDERSIDE GLULAM BEAM ON CMU BOND BEAM
9'-6" B.O. BEAM
9'-5" CLG HEIGHT
WD BLOCKING CMU BOND BEAM LINTEL (SEE ENG. DWGS FOR GROUTING AND STRUCTURE)
GLASS SECURITY WINDOW (40" X 32" R.O.)
VENT DAMPER FIBERGLASS DECK (SEE ENG. DWGS)
4 A4.2
2 A4.0
1/4"=1'-0"
Designed
XXX
Drawn
CTG
environment :: architecture
Dwg check
CKM
6020 Broad Street Pittsburgh, PA 15206 T 412.362.2100 F 412.291.1582 www.evolveea.com
Scale at ANSI D
lve LLC
evolve
Christopher Guignon
18-408
B/O
CONTAINMENT SUMP
CROSS SECTION - ORTHOPHOSPHATE FACILITY
SCALE:
TERED ARCHITECT # 015371
mber
FRAMED WALL FOR CHEMICAL TANK INSTALLATION/REMOVAL
CONCRETE SLAB W/ TURNDOWN FOOTERS TO FROST LINE
1 A4.1, SIM.
Total
XXX
XXX
XXX XXX
10/19/18 Approved
Status
AS NOTED
Drawing Number
Eng check
10/19/18 Coordination XXX
A4.0
Rev
XXX
XXX
Security
PWSA CORROSION CONTROL CHEMICAL STORAGE & FEED SYSTEMS PROJECT SYCAMORE GROVE SITE BUILDING SECTIONS
15
CONCRETE FOOTER W/ STEEL ANCHOR (SEE A4.4), TYP.
SOLDIER CS. BRICK
SOLDIER CS. BRICK
1 A4.1
ELEVATION - SOUTH
4 A3.0
SCALE:
2 A4.1
3 A4.2, SIM.
1/4"=1'-0"
GLULAM BEAM
STEEL ANGLE EDGE ROOF EXHAUST FANS GOOSENECK VENT W/ BIRD SCREEN
POLYCARBONATE RIDGE SKYLIGHT
CHEMICAL FILL CONTROL PANEL, RECESSED INTO FRAMING, COLOR TO MATCH HP LAMINATE PANELS
EQ.
EXT. GR. PLYWOOD, COLOR TO MATCH HP LAMINATE PANEL CHEMICAL FILL STATION CONTROL PANEL, RECESSED INTO FRAMING, COLOR TO MATCH HP LAMINATE PANELS
1'
7'H DOOR
MITRED HIPS. . SLATE ROOF
PERF. METAL SCREEN
EQ.
COPPER SNOW. GUARDS
VENT DAMPER (HIDDEN)
COPPER FLASHING.
EQ.
EQ.
EQ.
HP LAMINATE PANELS W/ APPLIED SIGNAGE (BY OTHER) STL PERF. METAL PANEL, SEE A4.1 FOR DETAIL
EQ.
VENT DAMPER (HIDDEN) RUNNING BOND BRICK
1" TYP. 44
SOLDIER CS. BRICK
BLAST RESISTANT DOORS (SEE ENG. DWGS) WITH HP LAMINATE PANELS, APPLIED TO BE FLUSH WITH ADJACENT PANELS
PANEL GAP AT DOOR FRAME
5 A3.0
5
ELEVATION - NORTH
2 A3.0
SCALE:
A3.0
1/4"=1'-0"
1" 92
ELEVATION - PERFORATED METAL PANEL
SCALE:
3/4"=1'-0"
DETAIL Designed
evolve LLC
XXX
XXX
Eng check
XXX
XXX
PWSA
CORROSION CONTROL CHEMICAL Familiar materials coupled with contemporary detailing celebrate the historic context and lends a tactile quality evolve STORAGE & FEED SYSTEMS PROJECT to the experience of the pavilion. Custom cut perforated metal louvres evoke imagery of flowing water and allude SYCAMORE GROVE SITE to the building’s function as a critical piece of the city’s water infrastructure. Custom steel timber connectors EXTERIOR ELEVATIONS celebrate the exposed structure. Reveals in the steel plate connectors offer a lightness to the structure that 18-408 A3.0 balances the heaviness of the slate roof. REGISTERED ARCHITECT # 015371
12/07/18
CTG
ISSUED TO CONTRACTOR
Date
Drawn
Description
16
2" TYP.
N
v
WALL PTD TO MATCH PANEL COLOR
9'-3"
ROOF EXHAUST FAN
CKM
Project Number
Ch’k’d App’d
Professional Work
Drawn
CTG
environment :: architecture
Dwg check
CKM
6020 Broad Street Pittsburgh, PA 15206 T 412.362.2100 F 412.291.1582 www.evolveea.com
Scale at ANSI D
B/O
AS NOTED
Total
Drawing Number
10/19/18 Coordination XXX 10/19/18 Approved
Status
Rev
XXX XXX
XXX
Security
2"
1" 14
T.O. BEAM EL 110'-514"
FLUSH
B.O. BEAM EL 109'-6"
1" 22
B.O. BEAM
10"
B.O. BEAM
2"
B.O. BEAM EL 109'-6" 2"
2"
1" 12
10"
EDGE FLUSH W/ POST
BEAM 1"
10" FLUSH
2"
1" 22
1" 22
2"
B.O. BEAM EL 109'-6"
T.O. BEAM EL 110'-514"
1" 14
EDGE FLUSH W/ POST
1" 12
10"
2"
T.O. BEAM EL 110'-514"
FLUSH
10"
2" 2"
10"
1" 14
EDGE FLUSH W/ POST
BEAM
BEAM
BEAM
BEAM
PLAN
ELEVATIONS
PLAN
PLAN
ELEVATIONS
ELEVATIONS
MARK DESCRIPTION
CUSTOM/PREFAB*
A B C1 C2 C3 D E F G
CUSTOM CUSTOM/PREFAB CUSTOM CUSTOM CUSTOM CUSTOM CUSTOM/PREFAB CUSTOM/PREFAB CUSTOM/PREFAB
POST BASE RAFTER TO BEAM POST TO BEAM (CORNER) POST TO BEAM (2 BEAM) POST TO BEAM (3 BEAM) BEAM CORNER TO HIP RAFTER HIP RAFTER TO RAFTER RIDGE TO HIP RAFTER RIDGE TO COMMON RAFTER
NOTES:
NOT TO SCALE - SHOWN FOR REFERENCE
NOT TO SCALE - SHOWN FOR REFERENCE
C1 - KNIFEPLATE CORNER POST - BEAM CONNECTOR
3
SCALE:
A4.4
1" = 1'-0"
4 A4.4
SCALE:
*WITH APPROVAL BY ARCHITECT
NOT TO SCALE - SHOWN FOR REFERENCE
C2 - KNIFEPLATE POST - 2 BEAM CONNECTOR
5
1" = 1'-0"
A4.4
STRUCTURAL TIMBER CONNECTORS TO BE GALVANIZED STEEL, POWDER-COATED, BLACK.
C3 - KNIFEPLATE POST - 3 BEAM CONNECTOR
SCALE:
1" = 1'-0"
SEE ENGINEERING/FABRICATOR DRAWINGS FOR FINAL LOCATIONS + SIZING OF STRUCTURAL STEEL CONNECTORS AND FASTENERS. F
T.O. RAFTER
GLULAM POST
EDGE FLUSH
141" MIN.
EDGE FLUSH W/ POST
B 2/A4.4 (TYP.) G (TYP.)
10"
1'
E
LONG EDGE RAFTERS
PLAN
T.O. BEAM EL 110'-514"
E
10" 1" 14
10"
CONC. POST BASE BELOW
F
SHORT EDGE RAFTERS
T.O. BEAM
EMBEDDED IN CONC. POST BASE
PLAN
ELEVATIONS
C3 5/A4.4
D B.O. BEAM EL 109'-6"
B 2/A4.4 (TYP.)
E
ELEVATIONS
B 2/A4.4 (TYP.) E
D E
A 1/A4.4
C1 3/A4.4
C3 5/A4.4
E
5/A4.3
A 1/A4.4
1 A4.4
A - KNIFEPLATE POST BASE
SCALE:
1" = 1'-0"
Gateway View Plaza 1600 West Carson Street Pittsburgh, PA, 15219-1031 T (412) 497 2900 F (412) 497 2901 W www.mottmac.com/americas Z:\400 Projects\17-409 PWSA Highland Park PS\04_Orthophosphate\02_2D-3D Drawings\ORTHO - PRINT SHEET - SHELTER.dwg Dec 7, 2018 11:08AM Chris
Christopher Guignon
A 1/A4.4
C1 3/A4.4 D
NOT TO SCALE - SHOWN FOR REFERENCE
NOT TO SCALE - SHOWN FOR REFERENCE
C2 4/A4.4
B 2/A4.4 (TYP.)
A 1/A4.4
E 2 A4.4
B - RAFTER - BEAM CONNECTOR
SCALE:
A4.4
SCALE:
evolve LLC
REGISTERED ARCHITECT # 015371
evolve
environment :: architecture 6020 Broad Street Pittsburgh, PA 15206 T 412.362.2100 F 412.291.1582 www.evolveea.com
A
12/07/18
CTG
ISSUED TO CONTRACTOR
Rev
Date
Drawn
Description
A 1/A4.4
CONNECTION LOCATOR DIAGRAM
1" = 1'-0"
CKM Ch’k’d App’d
Project Number
18-408
B/O
NOT TO SCALE
A 1/A4.4
Designed
XXX
XXX
XXX
Drawn
CTG
10/19/18 Coordination XXX
XXX
Dwg check
CKM
10/19/18 Approved
XXX
Scale at ANSI D
XXX
Status
AS NOTED
Total
Drawing Number
A4.4
Eng check
Rev
XXX
Security
PWSA CORROSION CONTROL CHEMICAL STORAGE & FEED SYSTEMS PROJECT SYCAMORE GROVE SITE STEEL CONNECTION DIAGRAMS
17
Location: Etna; Sharpsburg; Millvale, PA Office: evolveEA Role: project architect Phases: PD>>fabrication
AIR QUALITY STATIONS
The Breathe Easy Air Quality Station is a prototype for an interactive, placemaking device that delivers real-time air quality information. Born out of an Ecodistricts planning effort in Millvale, the AQ Stations act as a bench, a beacon, and an interface to an online air quality dashboard, which was developed as a companion project to the stations.
18
Professional Work
Christopher Guignon
19
BREATHE EASY: MILLVALE AIR QUALITY PLANNING The Breathe Easy planning effort was developed to bring awareness to a persistent, but invisible, problem in the region: poor air quality. The goal is to empower residents through engagment and education within the community. Four placemaking projects were proposed along the central spine of Millvale’s business district, each serving to inform the community about current and persistent trends in air quality. Three of the four projects have been developed or are in a form of development. The AQ Station and AQ Dashboard are directly inspired by the Breathe Easy proposals. Winner of APA National Sustainable Communities Division 2019 Award for Excellence in Sustainability and Design Pittsburgh 2018 Honor Award
20
Professional Work
KAYAK LAUNCH AIR QUALITY BEACON
A NEW PUBLIC SPACE FOR WATERCRAFT ENCOURAGES ALTERNATIVE MODES OF TRANSPORTATION
A LARGE-SCALE ART INSTALLATION VIZUALIZES REAL-TIME AIR QUALITY DATA FROM LOCAL MONITORS
PEDESTRIAN PATH
TREE BUFFER
IMPROVED PUBLIC SPACE FOR PEDESTRIANS PRIORITIZES WALKING, BIKING, AND KAYAKING
A 65 FT VEGETATED BUFFER CAN REDUCE PARTICULATE POLLUTION BY 40 TO 75 PERCENT
BUFFER PARK
A vegetated buffer and interactive air quality light installation at Millvale’s southern gateway. The Buffer Park connects Grant Ave. to Millvale’s riverfront.
CLEAN AIR HUB DESIGNATES A PUBLIC BUILDING WITH CLEAN AIR DUE TO BUILDING IMPROVEMENTS AND AIR FILTRATION
AQ DASHBOARD RESIDENTS CAN REVIEW AIR QUALITY DATA FROM MILLVALE AND REGIONAL MONITORING EFFORTS
CLEAN AIR HUB
A community space with indoor air quality improvements that lends air monitoring equipment and educates visitors about ongoing air quality efforts in Millvale. Screens display current air quality information to passersby. MONITOR LENDING LIBRARY
LIVING WALL
THE LIBRARY CLEAN AIR HUB LENDS MONITORING
PLANTED LIVING WALLS CAN FILTER SOME AIR-BORNE POLLUTANTS
AND AIR QUALITY REFERENCE MATERIAL AQ ARTEQUIPMENT SHOWCASE
AIR QUALITY-RELATED ART INSTALLATIONS FROM LOCAL COMPETITIONS ARE SHOWCASED HERE
MILLVALE BENCH MONITOR THIS PARK BENCH MONITORS AIR POLLUTANTS IN REAL-TIME AND MAKES DATA AVAILABLE ONLINE
AIR QUALITY SHOWCASE PARK
A public park that doubles as an outdoor exhibition space for air quality art installations and air pollution mitigation strategies.
AIR CLEANING PLAZA TITANIUM DIOXIDE COATED PAVING REMOVES THE POLLUTANT NITROGEN OXIDE FROM THE AIR
AIR QUALITY BEACON THE MILLVALE WATER TOWER IS REPURPOSED INTO AN ART INSTALLATION THAT VIZUALIZES REAL-TIME AIR QUALITY DATA FROM LOCAL MONITORS
WATER TOWER BEACON
A beacon that displays real-time monitoring data and acts as a landmark for Millvale’s network of hillside hiking trails.AIR TRAILS CLEAN ACCESSIBLE TRAILS UTILIZE THE NATURAL ASSETS OF MILLVALE AND PUT RESIDENTS INTO THE WOODS AND AWAY FROM TRAFFIC
Christopher Guignon
21
5 SECONDS
!
[CREATE AWARENESS]
1 MINUTE user: passive (passerby)
?
5 MINUTES user: active (casual user)
?...
user: active (motivated user)
engagement: sees dashboard, but does not interact
engagement: sees and casually interacts with dashboard
engagement: accesses dashboard and explores content
goal: learns current local AQ status, comes away with a talking point, and piqued curiosity (1st time user)
goal: learns current and regional AQ status, connects with AQ network, shares with social media
input: AirNow SmellPGH Local ramp data
input: AirNow SmellPGH Local ramp data Distributed ramp data Community input
goal: learns current and regional AQ status, connects with AQ network, gets AQ facts and recommendations, logs action or inspired to act
[ENGAGE + SHARE]
input: AirNow SmellPGH local ramp data distributed ramp data community input recommendations/resources
[EDUCATE + ACTIVATE]
CONCEPT + PROCESS Generation of the Air Quality Station concept began with a question of how a project can create meaningful engagement if given only 5 seconds of attention, or 1 minute, or 5 minutes. The answer to this question then had to be balanced against a placemaking proposal—a “bus stop”—that potentially would be made by unskilled community members. The solution was a modest bench with a prismatic view window that would glow with a color associated with the current air quality index of the location.
22
Professional Work
Christopher Guignon
23
FABRICATION + ASSEMBLY Evolving from a community-built installation to a digitally fabricated prototype, the AQ Stations are a mix of craft and technology. Welded steel plate supports and grounds the stations, while a powder-coat aluminum protected MDO box protects the air quality monitor energy source and LED display. Each station has a unique powder-coat accent color and vinyl decals inform the public of the stations purpose and connect smartphone users to air quality resources and data on the custom online AQ Dashboard.
24
Professional Work
Christopher Guignon
25
Location: Colombo, Sri Lanka Office: Safdie Architects Role: project designer Phases: SD>>DD
ALTAIR RESIDENCES
Located in the city of Colombo, Altair is Sri Lanka’s tallest residential building. It sits on a waterfront pedestrian promenade, facing Beira Lake and the Indian Ocean. The parti is a rational stacking of 1-2 units on either side of a vertical core, connected by bridges. This allows natural cross ventilation in all units. The leaning tower allows for stepped balconies facing the lake, playing to Moshe Safdie’s manifesto: “for everyone a garden”.
26
Professional Work
Christopher Guignon
27
28
Professional Work
26
25
24
13386
23
8355
22
6695
21
3125
4675
20
19
2375
18
5575
17
7650
5400
1 A45-03
2 A51-06
16
15
14
3909
3809
750 3 A45-01
2 A45-01
2 A45-03
13
12
4568
11
10
6157
9
8
7475 325
A40-02
7
6
4844
1359
5
2988
4
2493
3
5479
2
3778
4750
COLOMBO RESIDENTIAL TOWER
1
COLOMBO, SRI LANKA
5200
756
CLIENT INDOCEAN DEVELOPERS (PVT) LIMIT
3 A51-06
2 3 HOUR FIRE-RATED SLAB REQUIRED ABOVE AND BELOW LPG ROOM, 3HOUR FIRE-RATED DEMISING PARTITIONS
Z2
REFRIGERATED GARBAGE ROOM, REFER ALSO TO MECHANICAL
A MECH EXHAUST 8.22 m²
ST 3P
100 2900
MECH DG SYNCH PANEL 27.68 m²
STAFF WC
10450
1625
CONTINUOUS TRENCH DRAIN, REFER ALSO TO PLUMBING
OPEN TO GARAGE BELOW
59
BOH 45.50 m² 1000
5500
LOUVER WALL, REFER TO MECHANICAL
A40-02
ST 4P
1
1 A61-13
MECH LV ROOM 97.39 m²
EL. 0.400 m
STORAGE 5.81 m²
WC 11.49 m²
PARCEL 5.10 m²
1500
WC 15.90 m²
WC 3.10 m²
ALIGN
00 59
52
MECH BMS/FCC 44.83 m²
MECH CEB RMU & METERING 101.16 m²
RETAIL 825.41 m²
OFFICE
D.5
MEETING ROOM 58.78 m²
STOR
1 A22-01
00
ELEV B4
ELEV B5
ELEV B6
ELEV B7
ELEV B8
ELEV A2
SKYLIGHT ABOVE
ELEV A3
1675
1500
LOBBY 256.67 m²
2300
2000
ELEV A4
ELEV A6
BOH JANITOR 8.74 m²
3000
3000
300 F
RA MP
MECH HT BREAKER ROOM 43.21 m²
00
GARAGE FRESH-AIR INTAKE DUCT ABOVE DRIVE AISLE (9m²)
PRECAST CONCRETE (ARCHITECTURAL COLUMNS, TYPICAL, SHOWN WITH DIAGONAL HATCH)
BELOW-GRADE GARAGE ENTRY RAMP 15% RAMP
19653
10% RAMP
5% RAMP
3000
3000
DN
UP
2750 2900
ISSUE 1675 EDGE OF GARAGE BELOW, SHOWN DASHED-DOT
6.25% RAMP
3 A61-15
CONTINUOUS TRENCH DRAIN, EXTERIOR FACE ALIGNED WITH EXTERIOR EDGE OF STRUCTURAL WALL AS SHOWN
2
A40-01
L ELEV E1 1 A51-01
RETAIL LOBBY 22.74 m²
L.5 1514
M.S.L. 5.255 m
ST 5P
GARAGE EXHAUST
3366
200
6 A61-15
CONTINUOUS TRENCH DRAIN, EXTERIOR FACE ALIGNED WITH EXTERIOR EDGE OF STRUCTURAL WALL AS SHOWN
EL. 0.125 m Y1
4 1
DRAINAGE PIPES ABOVE/BELOW, REFER TO PLUMBING
RETAIL 349.48 m²
3 A90-08
5650
1 A90-08
N
M.S.L. 5.130 m
6 A90-01
PARKING GATE ARM, TYPICAL
5650
NOTES
5 M-U LINE OF FLYING BEAMS, ABOVE
5650
45
1
5650
GLAZED ARCADE CANOPY, ABOVE
A40-50
44
1 A51-04
5650
43
Q X1
5650
42
Z3
5650
41 1 5657
1 A51-02
EDGE OF GARAGE BELOW, SHOWN DASHED-DOT
X2
A40-01
39
R
5550
40
9754
5650
38
5650
X3
37
5650
3681
46
P
5280
5650
2850
47
M.5
EL. 0.000 m
5202
48
PARKING ATTENDANT, GUARDBOOTH
3 A51-03
CONTINUOUS GLAZED CANOPY, ABOVE
5650
49
KEY PLAN
M
2252
A65-01
PRECAST CONCRETE (ARCHITECTURAL COLUMNS, TYPICAL SHOWN WITH DIAGONAL HATCH)
3028
6
1 A51-03
EDGE OF SLAB ABOVE
5280
2 A51-03
36
PROJECT NUMBER
DRAWN BY
66600
DS
DATE
CHECKED BY
11/12/12
Checker
PHASE
5650
35
X4
5650
34
DESIGN DEVELOPMENT SUBMISSION
5650
SCALE
33
1 : 200
5650
32
5650
DRAWING TITLE
31
Level 1 Plan
30
SHEET NUMBER
A21-01
Christopher Guignon
D
BALCONY ABOVE, TYPICAL
Y3
Y2
DESCRIPTION
1 X00-107
EL. 0.431 m
ST 6P
NO.
K
ABOVE-GRADE GARAGE ENTRY RAMP
3000
RETAIL 462.25 m²
M.S.L. 5.380 m
© 2012 SAFDIE ARCHITECTS, LLC. J
UP
9268
EL. 0.250 m
2 A90-10 13 03
GARAGE EXHAUST DUCT (6m²)
3000
SERVICE VEHICLE DRIVE GATE, REFER TO LANDSCAPE
12.5% RAMP
2800
PORTE COCHERE
H
M.S.L. 5.130 m
ELEV A7
ELEV A1
EGRESS PATH
A40-50
9500
ELEV B9
2
3000
ELEV B1
EL. 0.000 m
M.S.L. 5.130 m
6.25% RAMP
ELEV B2
1500
ELEV B3
EL. 0.000 m
BRIDGE ABOVE
2600
SE RV IC EV EH IC LE DR IVE
3 A61-17
EL. 0.000 m
3400
M.S.L. 5.130 m
MECH TRANSFORMERS ROOM 177.38 m²
2 A51-05
35 88
UNLESS A PROFESSIONAL SEAL WITH SIGNATURE AND DATE IS AFFIXED, TH DOCUMENT IS PRELIMINARY AND IS INTENDED FOR CONSTRUCTION, REC PURPOSES OR IMPLEMENTATION.
G
1.2%
59
1 A45-01
50
LANDSCAPE ARCHITECT P LANDSCALE CO., LTD. 59/3 SOI SUKHUMVIT 39 SUKHUMVIT ROAD, KLONGTON NUA WATTANA, BANGKOK 10110 T. 662.261.3700.9
E STORAGE
2600
59
2160
1 A45-02
MECH, ELECT, PLUMBING ENGINEER CKR CONSULTING ENGINEERS PVT. L BUILDING NO - 4 GROUND FLOOR MANJOLAI STREET, 1ST MAIN ROAD EKKATTUTHANGAL, CHENNAI - 600 0 T. 91 (44) 435.11690
2 A51-00
MAILROOM
1000
M.S.L. 5.530 m
51
STRUCTURAL ENGINEER DERBY DESIGN DUSSELDORF BUSINESS POINT, AL B P.O. BOX 212170, DUBAI, UAE T 9714.4473404
C
ALIGN
OVERHEAD GARAGE DOOR, TO CONFORM TO RMU REQUIREMENTS, REFER TO MECHANICAL
1 A51-00
D
ALIGN
1 A51-05
53
MECH GSM/TELECOM 28.05 m²
ASSOCIATE ARCHITECT DESIGN TEAM 3 SINGAPORE T 658.499.7168
B.9
5500
80 11
BOTTOM OF RAMP M.S.L. 5.030m EL. -0.100m
00
54
LINE OF SLAB MEZZANINE ABOVE, LOWER HEADROOM
STAFF WC
LOADING DOCK 134.82 m²
DESIGN ARCHITECT SAFDIE ARCHITECTS, LLC. 100 PROPERZIE WAY SOMERVILLE, MA 02143-3740 USA T 617.629.2100 F 617.629.2406
SLOPED CEILING (GARAGE SLAB) ABOVE
LOUVERS ABOVE AT HIGH LEVEL
4.5m CLEARANCE HEIGHT REQUIRED FOR GARBAGE TRUCK
EDGE OF GARAGE BELOW, SHOWN DASHED-DOT RAMP UP TO RMU ROOM GARAGE VENTILATION LOUVER
B.1
EL. 0.000 m
0
CONCRETE SITE WALL GARAGE EXHAUST GRILLE (SERVING LEVELS BELOW,19m²)
1 A45-04
3 A61-10
LOW HEADROOM (2400 CLEAR)
1.0m
5750
M.S.L. 5.130 m
M.S.L. 5.030m EL. -0.100m
MECH GENERATOR ROOM 329.67 m²
1.0m
4000
LINE OF VEHICLE TURNING PATH SIMULATION
WASTE MANAGEMENT EQUIPMENT, SIZING TO BE CONFIRMED BY MANUFACTURER
3550
INSULATED OVERHEAD GARAGE DOOR
2550
B RETAIL LOBBY 25.74 m²
58
BOH GARBAGE ROOM 71.89 m²
55
3400
ST 3P
ELEV D2
50
ELEV D1
3850
BOH LPG 100.42 m²
4585
LPG VAPORIZER AREA
LPG CYLINDER STORAGE
LPG CYLINDER BANK
1165
N REF LP UEL G IN TAN G KE LO R CAT IO
56
29
25
1 A61-14
Y2
COLOMBO RESIDENTIAL TOWER
25
25
COLOMBO, SRI LANKA
25
D
D
1 A61-14
D
ALIGN
BEAM
1 A61-14
OPEN TO BELOW 1100
CLIENT INDOCEAN DEVELOPERS (PVT) LIMITED
D
100
1100
1 A61-14
450
DESIGN ARCHITECT SAFDIE ARCHITECTS, LLC. 100 PROPERZIE WAY SOMERVILLE, MA 02143-3740 USA T 617.629.2100 F 617.629.2406
UP
UP 1925 = 7 EQ. TREADS AT 275MM
1100
OPEN TO BELOW UP
DN EL. 11.200 m T.O. LANDING
STRUCTURAL ENGINEER DERBY DESIGN DUSSELDORF BUSINESS POINT, AL BARSHA P.O. BOX 212170, DUBAI, UAE T 9714.4473404 MECH, ELECT, PLUMBING ENGINEER CKR CONSULTING ENGINEERS PVT. LTD. BUILDING NO - 4 GROUND FLOOR MANJOLAI STREET, 1ST MAIN ROAD EKKATTUTHANGAL, CHENNAI - 600 032 T. 91 (44) 435.11690
Y2
DN
DN
EL. 8.400 m
Y1
Y1
LANDSCAPE ARCHITECT P LANDSCALE CO., LTD. 59/3 SOI SUKHUMVIT 39 SUKHUMVIT ROAD, KLONGTON NUA WATTANA, BANGKOK 10110 T. 662.261.3700.9
UP
ALIGN
EL. 2.790 m
1050
ALIGN
1100
1100
ALIGN
1100
450
1150
Y1
100
E
50
E
E
ALIGN
E
EL. 12.600 m T.O. LANDING
4
ALIGN
1925 = 7 EQ. TREADS AT 275MM
1100 LANDING
Y2
ASSOCIATE ARCHITECT DESIGN TEAM 3 SINGAPORE T 658.499.7168
EL. 4.200 m
EL. 1.400 m
1925 = 8 EQ. TREADS AT 275MM
Y2
2 A61-14
2350
ALIGN WITH EDGE OF BEAM BELOWREFER TO STRUCTURE
1100 LANDING
OPEN TO BELOW
54
1925 = 7 EQ. TREADS AT 275MM
Y1 54
2 A61-14
275
54
ALI GN
2949 2 A61-14
1925 = 7 EQUAL TREADS AT 275MM
1100 LANDING
EL. 9.800 m T.O. LANDING
2 A61-14
1100 LANDING
54
F
F
G
G
Enlarged Plan - Stair No. 4P Level 3 1 : 50
© 2012 SAFDIE ARCHITECTS, LLC.
Enlarged Plan - Stair No. 4P Level 1m
2
RE: 1/A21-03
1 : 50
UNLESS A PROFESSIONAL SEAL WITH SIGNATURE AND DATE IS AFFIXED, THIS DOCUMENT IS PRELIMINARY AND IS NOT INTENDED FOR CONSTRUCTION, RECORDING PURPOSES OR IMPLEMENTATION.
ISSUE
RE: 1/A21-01M
NO.
DESCRIPTION
DATE
DN EL. 14.000 m
25
1100
ALIGN
25
D
D
KEY PLAN
ALIGN
EL. 15.400 m DN
LOUVER
5
Enlarged Plan - Stair No. 4P Level 4 1 : 50
1 A61-14
1 A61-14
RE: 1/A21-04
COLOMBO RESIDENTIAL TOWER
NOTES
H
1100 LANDING
90.000°
LOUVER, REFER TO MECHANICAL
EL. 5.600 m
ALIGN
1675
DN
Y1
ALIGN
CLIENT INDOCEAN DEVELOPERS (PVT) LIMITED
EL. 0.000 m
UP
PROJECT NUMBER
YA
DATE
CHECKED BY
11/12/12
Checker
DESIGN DEVELOPMENT SUBMISSION
ST 4P
MECH TRANSFORMERS ROOM 177.38 m²
DRAWN BY
66600
PHASE
1375
Y2
COLOMBO, SRI LANKA
1925 = 8 EQ. TREADS AT 275MM
ALI GN RIV E
00 11
ST 4P
UP
Y1
54
ED
Y2
2 A61-14
EL. 7.000 m
VIC
1925 = 7 EQUAL TREADS AT 275MM
RE: 1/A21-04M
SER
2 A61-14
Enlarged Plan - Stair No. 4P Level 4m 1 : 50
1100 LANDING
54
6
ALIGN
SCALE
1 : 50 1200
1100
200
1400
DRAWING TITLE E
3
Enlarged Plan - Stair No. 4P Level 2 1 : 50
E
1
RE: 1/A21-02
Enlarged Plan - Stair No. 4P Level 1 1 : 50
RE: 1/A21-01
Stair No. 4P Plans
SHEET NUMBER
A61-13
DESIGN ARCHITECT SAFDIE ARCHITECTS, LLC. 100 PROPERZIE WAY SOMERVILLE, MA 02143-3740 USA T 617.629.2100 F 617.629.2406 ASSOCIATE ARCHITECT DESIGN TEAM 3 SINGAPORE T 658.499.7168 STRUCTURAL ENGINEER DERBY DESIGN DUSSELDORF BUSINESS POINT, AL BARSHA P.O. BOX 212170, DUBAI, UAE T 9714.4473404
PODIUM COORDINATION Altair is a mixed-use residential project. The two towers are its defining feature but its podium base provides the ground-level interface with the public. I was responsible for the design development coordination of programmatic spaces of the podium (lobby, retail, extensive parking, loading docks, and mechanical areas). Characteristic of many of Safdie’s designs, negotiating program and circulation with atypical geometries become mini design challenges in themselves.
MECH, ELECT, PLUMBING ENGINEER CKR CONSULTING ENGINEERS PVT. LTD. BUILDING NO - 4 GROUND FLOOR MANJOLAI STREET, 1ST MAIN ROAD EKKATTUTHANGAL, CHENNAI - 600 032 T. 91 (44) 435.11690 LANDSCAPE ARCHITECT P LANDSCALE CO., LTD. 59/3 SOI SUKHUMVIT 39 SUKHUMVIT ROAD, KLONGTON NUA WATTANA, BANGKOK 10110 T. 662.261.3700.9 UNLESS A PROFESSIONAL SEAL WITH SIGNATURE AND DATE IS AFFIXED, THIS DOCUMENT IS PRELIMINARY AND IS NOT INTENDED FOR CONSTRUCTION, RECORDING PURPOSES OR IMPLEMENTATION. © 2012 SAFDIE ARCHITECTS, LLC. ISSUE NO.
DESCRIPTION
DATE
KEY PLAN
NOTES
Amenity Level
Residential Parking
Residential Parking Residential Parking Loading Dock Retail Parking Generator Room
Retail
Arcade Retail Lobby
Residential Parking
PROJECT NUMBER
DRAWN BY
66600
DS
DATE
CHECKED BY
11/12/12
Checker
PHASE DESIGN DEVELOPMENT SUBMISSION SCALE
Residential Parking DRAWING TITLE
Axon - Northeast
1
AXON - PARKING RAMP CUTAWAY SHEET NUMBER
A41-04
30
Professional Work
All renderings by Neoscape | Safdie Architects
Christopher Guignon
31
Location: Cartagena, Colombia Office: Safdie Architects Role: project designer Phases: masterplan>>SD
SERENA DEL MAR
Serena del Mar, or the “Dreamed City”, is a 350-acre masterplan in Cartagena, Colombia. Housing, offices, retail, and a new medical center are clustered around a new manmade waterway called “El Gran Canal”. The effort consisted of careful development of the masterplan, schematic planning and massing of five housing types, a large-scale model and hand watercolored renderings.
32
Professional Work
Christopher Guignon
33
27
14 26
21
15 25 19 20 24
16
22
23
17
18
11
LOCATION MAP
1
34
Professional Work
PROGRAM AREAS 1. ENTRANCE TO SERENA DEL MAR FROM HIGHWAY 2. HIGHWAY SITE OFFICE COMPLEX 1 3. CANAL FRONT OFFICE COMPLEX 2
4. NORTH LAKE 5. NORTH MARINA 6. MEDICAL CENTER 7. PIAZZA
3
8. HOTEL 9. MEDICAL OFFICE BUILDINGS 10. BOULEVARD HOUSING 13
11. DECK HOUSING 12. PEDESTRIAN RETAIL STREET 5
4
13. EL GRAN CANAL 14. OFFICE PARK MARINA 15. SOUTH MARINA 16. MESA CREEK PARK 17. SCHOOL/ PUBLIC AMENITY
6
18. TOWER HOUSING 19. PEDESTRIAN BRIDGE
7
12
20. CANAL HOUSING 21. RETAIL MARINA 11
22. DIVERSION CULVERT 8
23. SOCIAL HOUSING 24. SPORTS STADIUM MASTER PLAN
25. WATERFRONT PROMENADE
10
26. REGIONAL RETAIL CENTER
9
27. CONNECTION TO CARIBBEAN SEA
0 10 20 0 50 100
50
100 M 300 FEET
200
12
BUILDING TYPE
GFA
BD: BUSINESS DEVELOPMENT
246, 176 SQ.M.
OC: MEDICAL OFFICES
39,180 SQ. M.
HD: RESIDENTIAL DEVELOPMENT
BD-3
HD-A: CANAL HOUSING
52, 992 SQ.M.
BD-5
BD-3 BD-7
HD-B: DECK HOUSING
BD-5
108, 566 SQ.M.
BD-9
BD-13
BD-11
BD-8
HD-E-F: SOCIAL HOUSING
BD-12 BD-10
MU-6
HD-B1
MU-5
HD-B10
HD-A4
HD-B9
HD-C16
H: HOTEL
HD-C19
MU-5
HD-C19
HD-B10
HD-C17
HD-C15
HD-B8
HD-B8
HD-C15
HD-B7
HD-E2
HD-C13
PA-3
HD-C14
HD-C18
HD-D5
HD-C11 MU-1
PA-3
PA-2
PA-2
HD-B6
HD-B5
HD-B4
BD: HD-C2
OC:
HS-2
HD-B6
HD-B5
HD-C20
HD-D5
HD-C18
HD-C14
HD-C5
19, 000 SQ.M.
HD-B4
HD-C2
H
H
HD-C5 HD-D3
HD-D2
HD:
HD-C10
HD-C12
HD-C8
HD-C7
HD-D4
HD-C3
HS-2 Boulevard Park
HD-C6
8, 500 SQ.M.
HD-C3
HD-C4
OC-2
OC-1
HD-D1
HD-D4
HD-D3
HD-C10
HD-C12
SC: SPORTS COMPLEX HD-D2
H
BD-3
Boulevard Park
HD-C20 HD-E1
83, 840 SQ.M.
HD-C13 MU-2
MU-1
HD-C7
HD-C11
PA: PUBLIC AMENITIES
MU-2
HD-C9
PA-1 PA-4
Mesa Creek Easement
HD-E1 PA-4
HD-C17
BUI
HD-C1
HS-1
PA-1 Mesa Creek Easement
HD-B7
HD-C9 HD-E3
HD-C16
HS: MEDICAL DEVELOPMENT (HOSPITAL)
HD-C21 SC
HD-B9 MU-3
Fresh Water Lake
Fresh Water Lake
HD-B1
MU-3
66, 000 SQ.M.
HD-C21
HD-A3
HD-B2
HS-1
HD-C1
HD-A4 MU-4
RM: REGIONAL MALL
HD-A5
HD-E2
HD-A3 HD-B2
HD-B3
El Gran Canal
SC
MU-6
Water Lake Fresh HD-B3 MU-4
92, 680 SQ.M.
El Gran Canal
HD-A5
BD-10
HD-E3
37, 500 SQ.M.
HD-A1
2
HD-A
MU (R): RETAIL WITHIN MIXED-USE
MU-7
HD-A1
2
HD-A
El Gran Canal
Mesa Creek Easement MU-7 BD-12
BD-1
El Gran Canal
43, 840 SQ.M.
Mesa Creek Easement
BD-14 RM
BD-1
BD-8
BD-6 BD-14
RM BD-15 MU-8
134, 160 SQ.M.
BD-2
BD-4
BD-9BD-15 BD-11
HD-D: TOWERS
BD-2
BD-6
BD-7
HD-C: BOULEVARD HOUSING BD-13 MU-8
BD-4
HD-C8
HD-C6
HD-D1
TOTAL
22, 000 SQ.M.
HD-C4
OC-2
OC-1
H
954,434 SQ.M.
BD-5
H BD-13
BD-1
MU-8
H
BD-7 BD-4
BD-9
BD-13
RM
BD-1
BD-2
BD-15
H
MU-8
Mesa Creek Ease BD-14
BD-11
MU-7
RM
BD-6
MU
BD-12
BD-10
HS-2
RM:
MU-7
HD-A5 MU-6
BD-8
BD-15
HS:
Mesa Creek Easement
HD-B10
SC
HD-A1
MASTER PLAN PARCEL DIAGRAM
HD-A4
HD-C21
MU-8
OC-2
El Gran Can
SC
El Gran Canal
HD-B9
Fresh Water Lake
2 HD-A
BD-14
H: H
HD-C19
HD-C17
HD-E2
HD-E3
HD-E1 PA-4
RM 0 10 20 0 50 100
50 200
0
HD-E2
HD-E3
BD-10
HD-B3
HD-B2
HD-B1
HD-C18
HD-E1 HD-D5
HD-C1
MU-4
24
MU-7
HD-A5
HS-1
HD-A3 MU-3
HD-A4
MU-5
MU-2
HD-C21 HD-B10 HD-B9
HD-C16
HD-C15
HD-B8
HD-C17
PA-1
HD-C13
HD-C11
PA-3
PA-2
HD-B6
HD-C9 PA-4
HD-E2
HD-C18
HD-E1 HD-D5
HD-B5
HD-B4
HD-C2
HS-2 H
HD-C7
HD-C5
HD-C3
Boulevard Park
HD-C2 0 HD-E3
MU-1
HD-B7
Mesa Creek Easement HD-C19
HD-D4
HD-C14
HD-C12
HD-D3
HD-D2
HD-C10
HD-C8
HD-C6
HD-C4
OC-1
OC-2
HD-D1
23
Christopher Guignon
SC: HD-D4
TOT
El Gran Canal
MU-6
SC
PA:
HD-C2
BD-12
100 M 300 FEET
35
11M
2.5M
3M
8M
3M
3M
HOUSING
3M
HOUSING
3M
HOUSING
3M
HOUSING
3M
PARKING
12M
47M
15M
47M
DECK HOUSING
REAR GARDENS
DECK HOUSING
Section Through Deck Housing
DECK HOUSING
1:200
Safdie Architects
HOUSING TYPOLOGY June 2011
While the Los Morros development contains a regional hospital, hotel, retail center and office park, it is primarily a residential neighborhood. Five housing types (canal, deck, boulevard, mixed-use, and tower) were developed to provide roughly 400,000 sq.m. of residential square footage. The typology study set masterplan design guidelines for scale, massing, access and parking, and created a vision for a vibrant neighborhood.
34
N
(M
36 37
Professional Work
3M
3M
6M
6M
3M
3M
3M
HOUSING
3M
HOUSING
3M
HOUSING
3M
HOUSING
5M
RETAIL/ OFFICE
3M
PARKING LEVEL 2
3M
DECK HOUSING
30M
22M
10M
22M
BOULEVARD
HOUSING
PEDESTRIAN RETAIL STREET
HOUSING
Section Through Pedestrian Retail Street 1:200
Safdie Architects June 2011
19.5M
PARKING LEVEL 1
20M BOULEVARD
DECK HOUSING
PEDESTRIAN RETAIL STREET
36
All watercolors by Michael McCann | Safdie Architects Christopher Guignon
37
MEDICAL OFFICE BUILDINGS
5
38
Professional Work
NORTH LAKE
MEDICAL CENTER
HOTEL
NORTH MARINA
ENTRY FROM SERENA DEL MAR HIGHWAY
BOULEVARD HOUSING
DECK HOUSING
HO
CANAL OUSING
PEDESTRIAN RETAIL STREET
TOWER HOUSING
CANAL FRONT OFFICE COMPLEX
Christopher Guignon
BOULEVARD
PEDESTRIAN PROMENADE
MESA CREEK PARK
SOUTH MARINA
OFFICE COMPLEX
SCHOOL
OFFICE PARK MARINA
PEDESTRIAN BRIDGE
39
Location: Pittsburgh, PA Office: evolveEA Role: project designer Phases: concept
DESIGN + REPRESENTATION
Clear communication of the architectural idea relies on compelling and descriptive imagery. Many projects in early stages of design require that special attention is paid to the development of a narrative over the depiction of finished architecture. Each of the following images was developed to describe and “sell” an architectural or urban design concept.
40
Professional Work
Christopher Guignon
41
Reverse: Heth’s Avenue green infrastructure proposal render
42
Professional Work
GREEN INFRASTRUCTURE CITYWIDE EVALUATION As part of a team tasked with identifying green infrastructure opportunities through a city-wide evaluation of combined sewer overflow priority sheds, we produced a series of aerial renderings. These renderings feature conceptual designs for six priority sewersheds and identify where green infrastructure would provide significant benefits. They are meant to be diagrammatic in nature, highlighting connectivity, green space opportunity and development sites. Christopher Guignon
43
44
Professional Work
5TH + DINWIDDIE PLAZA This perspective rendering was produced to sell the concept design and conceptual massing of a mixed-use development in Pittsburgh’s Uptown neighborhood. Because many aspects of the building design were as yet unresolved, the visualization focuses on the protected nature of the plaza, the connectivity across Dinwiddie and Fifth Ave. and the potential for vibrant activity in the plaza. The team was awarded the project.
Christopher Guignon
45
46
Professional Work
GROW PITTSBURGH - GARDEN DREAMS GREENHOUSES In 2019, Grow Pittsburgh was gifted the Garden Dreams urban farm in Wilkinsburg. We completed a planning and visioning study to demolish a large dilapidated Victorian and reconfigure the site around three large greenhouses. This aerial rendering shows the campus concept of the layout, positioning the public open space in the protected interior of site. Work is ongoing on the interior renovation of a Garden Dreams office in an adjacent house.
Christopher Guignon
47
48
Professional Work
CENTRE AVENUE REDEVELOPMENT PLAN This project reimagines the Hill District Centre Avenue Corridor as a meeting place for residents, a welcoming place for visitors, a sharing place for institutions, and a place of exchange for businesses. The rendering emphasizes proposed green infrastructure while suggesting yet-to-be-designed architectural interventions. Views are specially chosen to be identifiable by residents as the project had a robust community engagement scope. Winner of Design Pittsburgh 2015 Certificate of Merit Christopher Guignon
49
Professional Works Sampled
Christopher Guignon