CHRISTOPHER TOHRU GUIGNON
PROFESSIONAL WORK
CHRISTOPHER
TOHRU
GUIGNON
7127 CARD LANE, PITTSBURGH, PA 15208 • PHONE 617-777-3727 • EMAIL C.GUIGNON@GMAIL.COM
EDUCATION
Massachusetts Institute of Technology, Cambridge, MA February 2010 Master of Architecture, Architectural Design, Sustainable Design University of Pittsburgh, Pittsburgh, PA April 2004 Bachelor of Arts (Honors), Architectural Studies, Minor: Philosophy
REGISTRATION/ ACCREDITATION
Pennsylvania Architectural Registration LEED AP BD+C, US Green Building Council EcoDistricts AP, Ecodistricts
PRACTICE
evolve Environment::Architecture, Pittsburgh, PA 2013-present Associate | Senior Project Manager Project architect and discipline lead for architecture, urban planning, and sustainability consulting firm. Projects include residential and commercial additions and renovations in Pittsburgh and Millvale, PWSA critical infrastructure buildings in Highland Park, air quality monitoring station protoypes for the Triboro Ecodistricts, a 62-unit sustainable pocket neighborhood in Bozeman, MT, and graphic design and architectural representation on award-winning community planning projects in Pittsburgh and regionally. Safdie Architects, Somerville, MA 2010-2013 Junior Architect Designer and research fellow at world-renowned architecture firm of Moshe Safdie. Projects include the Los Morros Master Plan in Cartagena, Columbia; Sky Habitat high-rise in Singapore; and the Altair tower in Colombo, the tallest residential building in Sri Lanka. Other work included management of the Xiqu Centre submission, a global architecture competition for an opera house in Kowloon, and participation in the 2010 Safdie Architects Research Fellowship study on Mobility in Demand. Lubetz Architects, Pittsburgh, PA 2003-2004 Architectural Intern Intern designer. Work included construction documents revisions of the Carnegie Library of Pittsburgh Squirrel Hill branch, and conceptual design of a private residence.
TEACHING
PROFESSIONAL AFFILIATION
University of Pittsburgh Architectural Studies Program, Pittsburgh, PA 2014-present Studio Instructor: Design Studio 1: Context and Architectural Form Making, Design Studio 2: System Based Design, Design Studio 3: Sustainable Strategies for Urban Living, Design Studio 4: Construction Systems and Documentation. American Institute of Architects, Pittsburgh Chapter Member, 2018-current AIA Pittsburgh Design + Research Group Member, 2020-current
SKILLS
Proficiency: AutoCAD, Sketchup, Rhino, Photoshop, Illustrator, Indesign, Microsoft Office, Morpholio Trace, Handsketching Competency: Revit, V-Ray, Cove.Tool, Sefaira
ii
Professional Work
ADDITIONAL EXPERIENCE
AIA Pittsburgh Foundation for Architecture, Leadership Institute for Emerging Professionals; Pittsburgh, PA Class 2018/2019 Participant - Co-lead a team of seven architects in the development of a “Day of Learning” event that explored the relationship between refugees and the City of Pittsburgh. The half-day event included a panel discussion at the City of Asylum with guests from local government and refugee/immigrant-centered non-profits. Thresholds, Journal of Architecture, Art, and Media Culture; Cambridge, MA 2007-2010 Managing Editor - Managed the production and distribution of four 100-page issues with circulation of 900. Organized and completed the digitization of backlog archives spanning ten years. Returned distribution to its proper schedule after major publication lapse prior to 2007 Sweat! Design! Build! Louisiana Lift House; New Orleans, LA Spring 2007 Team Leader - Led a team of four in a one week design-build of a trellis system incorporated into the MIT-designed Louisiana Lift House. Tiled 1000 sf. house on a five member team. JET Programme, Fukuoka, Japan 2004-2006 English Language Instructor - Taught and designed curriculum for Elementary and Junior High School. Conducted weekly adult lessons, and bi-monthly presentations.
PUBLICATIONS/ EXHIBITIONS
The Parable of the Glass House. Get It Louder Exhibition, Orange Hall, Sanlitun, Beijing, China, 2014 AIA Center for Emerging Professionals Annual Exhibition, AIA National, Washington, DC., 2013. [Editor] Luna, Rafael, and Dongwoo Yim. I Want to be Metropolitan - Boston Case Study. Ed. Non Arkaraprasertkul. N.p.: Oro Editions, 2012
“The Parable of the Glass House: Independent Study Project.” Testing to Failure: Design & Research in MIT’s Dept. of Architecture. Ed. Sarah M. Hirschman. Cambridge: SA+P, 2011 “Design for Decline: The Bank of Savings and Futures.” Ed. Orkan Telhan. Thresholds 38: Future. The MIT Press Journals, Fall 2010 Guignon, Christopher. The Parable of the Glass House. Little t, Vol. 9. Cambridge: MIT Dept. of Architecture, 2010
AWARDS
evolve Environment::Architecture AIA Pittsburgh Small Project: Certificate of Merit, Winterton Street Residence American Institute of Architects Pittsburgh, Design Awards, 2020 Sustainable Urban Design Plan Award and AIA Pittsburgh Regional + Urban Design Honor Award, Breathe Easy: Millvale Air Quality Planning American Planning Association’s Sustainable Communities Division, Awards for Excellence in Sustainability, 2019 American Institute of Architects Pittsburgh, Design Awards, 2018 AIA Pittsburgh Regional + Urban Design: Certificate of Merit, Busway Futures: Penn Station Transit Plan American Institute of Architects Pittsburgh, Design Awards, 2018
Massachusetts Institute of Technology Merit-based Full Tuition Scholarship (awarded 2 consecutive semesters) Second Place Award Winner, Velux Daylighting Design Competition 2008 University of Pittsburgh Graduated with honors. Summa cum laude Recipient of Faculty Special Commendation Award. Class of 2004 Certificate of Merit, Columbia University Scholastic Press, Gold Circle Awards 2004 Christopher Guignon
iii
iv
Professional Work
PROJECTS 02 WINTERTON STREET RESIDENCE 10 ORTHOPHOSPHATE PAVILIONS 18 DESIGN + REPRESENTATION Green Infrastructure Citywide Evaluation 19 5th + Dinwiddie Plaza 22 Grow Pittsburgh Garden Dreams Greenhouses 24 Centre Avenue Redevelopment Plan 26
28 PAST PROJECTS
Christopher Guignon
01
WINTERTON ST. RESIDENCE
A modest addition and two-car garage set into the hillside creates a series of indoor and outdoor rooms, each with a distinct character and connection to the small site. Using simple extruded forms, the project reconfigures the center of gravity of the original house, improving interior flow. Dramatic views and natural light are prioritized, as is a simple material palette that compliments the existing brick house and neighborhood context. Winner of Design Pittsburgh 2020 Certificate of Merit
02
Professional Work
Christopher Guignon
03
EXISTING ELEVATION
NEW ELEVATION
04
Professional Work
TECTONIC | STEREOTOMIC The Winterton Street Residence explores the relationship of tectonic and stereotomic expression. To define protected outdoor spaces and connect zones for living in the hilly site, two masonry volumes are embedded into the earth. These stereotomic masses are in immediate dialogue with the existing masonry structure. Counterbalancing the heaviness of the masonry, an extruded gable volume (the tectonic frame) perches like a treehouse and gestures to the hillside views and morning sun.
Christopher Guignon
05
PRO
1 A3.0
2 A4.1
1 A4.1
13'-8" 1'-8"
2'-3"
OPEN SHELF AT EXG WINDOW OPENING BEDROOM 2 204 C 3 D B A1.3 A
UP 1
18'-5"
203A
MASTER BATH 206
2'-3"
2 A3.1
MASTER BR
205
7'-9"
EXG HDWD
CLOSET 202
1 A3.1
GWB LAMINATION
206B
TILE
206A
P
2 A4.0
5'-6"
BEDROOM 1
203
P
21'-4"
RECONFIG. CLOSET, N.I.C.
11'-1"
2'-0 1/2" 1'-8"
9"
205A
1 A4.0
DN 206C
200
LANDING
R+S
CLOSET 207
~109'-0"
4'-1 1/2" NEW WINDOW
R+S
P
4'-1 1/2"
C L
8'-1"
EXG BATHROOM SEE OWNER'S SCOPE
1'-8"
BATHROOM 201
BALCONY RAILING
11'-1"
O
J 6 P T C
SECOND FLOOR PLAN
A1.1
SCALE:
A
1/4"=1'-0"
e
1 A3.0
1
5 A4.3
4 A4.3
2 A4.1
REPLACE EXG TILE W/NEW WD FL TO MATCH EXG WD FL
GRADE BEAM NDN (DASHED), RSE REMOVED; TOR TO VERIFY LOCATION, AND N OF EXG FNDN
EXG R.L.
1 A4.1
G
RAIN LEADER
REPAIR WALLS + CLG AS NEEDED
B 4 S T
11'-8" 5'+/-
OTUBE INF.
5 P T F w C
4'-0 1/2"
C L 1'-11"
NEW HEADERS IF REQ'D
UP
104
6" STEP 106
LIVING RM
1
2 A4.0
FAMILY RM C 2 D B A1.3 A
DINING RM
101
106A
NEW WD FL
WD FL. 2 2'
1
17'
1061.5' 2 A3.1
1 A3.1
ALIGN
c
REV
EQ.
1
GRADE BEAM NDN (DASHED), RSE REMOVED; TOR TO VERIFY LOCATION, AND N OF EXG FNDN
PRO
19'-3"
AM WIDENS
G 3/A4.2
N.I.C. REFINISH EXG WD FL
5'-6"
N.I.C. REFINISH EXG WD FL
GRADE
2'-10"
104A
NEW WD ENTRY 100
DN 105A
KITCHEN
103A
WC 103
OTUBE INF.
R+S
9'-0 1/2"+/-
EXG R.L. LAMINATE GWB @ EXG TEXTURED WALL WHERE SHOWN
E:
NEW WINDOW
FURNITURE FOR REFERENCE ONLY, N.I.C.
PIVOT HINGE CLOSET DOORS
VERIFY FIREPLACE FLUE CONFIG IS ABLE TO BE USED IN A 2-SIDED FIREPLACE CONFIG.
1 A4.0
1'-4"
OPEN SHELF IN EXG WINDOW OPENING TRIM FRAME W/PTD 1X RAINLEADER LAMINATE GWB @ EXG TEXTURED WALL
N
NEW STL FIREPLACE HEADER @ FIREPLACE OPENING, ENGIN. BY CONTRACTOR
CONTRACTOR TO VERIFY REQ'D FIRE BOX CONDITION + FLUE
C L
CLOSET 105
EQ.
102
DRA
SCA
FIRST FLOOR PLAN
A1.1
SCALE:
1/4"=1'-0"
DRA
CHE
06
Professional Work
PRO
Christopher Guignon
07
08
Professional Work
PROJECT TITLE
RIDGE VENT
PROJECT TITLE
RIDGE VENT
6338 Bryant Street Pittsburgh, PA 15206
WALL SECTION
6338 Bryant Street PERMIT Pittsburgh, PA SET 15206
A.W.M. GUTTER NAILER W/ FLASHING ROOF ASSEMBLY (TYP.) + DRIP EDGE STANDING SEAM MTL ROOFING 1X WD BATTEN + AIR SPACE HALF-ROUND GUTTER + STRAP ADHESIVE WATERPROOF MEMBRANE (A.W.M.) AT FACE
3
environment :: architecture
ROUGH FRAMING
CLADDING EXG HOUSEASSEMBLY BEYOND (TYP.) STANDING SEAM MTL ROOFING 1X WD BATTEN + AIR SPACE A.W.M. AT FACE
CLADDING ASSEMBLY (TYP.) STANDING SEAM MTL ROOFING 1X WD BATTEN + AIR SPACE A.W.M. AT FACE
CASEWORK
12" DEEP 2X FLOOR TRUSS
AIR SEAL @ SILL PLATE SOFFIT HDWD FLOOR 107'-012" V.I.F. 3
ROUGH FRAMING
4"
PLYWD SEE 2/A4.2, SIM.
12" DEEP 2X FLOOR TRUSS WALL ASSEMBLY @ CEDAR CEDAR SIDING 2X RIM JOIST (EXT.) 1X WD FURRING + AIR SPACE 3 / MOISTURE BARRIER AIR " EXT. GR. PLYWD 4 3 CONTINUOUS OVER 4" PLYWOOD BOTTOM CLOSURE FLOOR WALL ASSEMBLY 2X6 STUD+WALL, BATT INSUL. 3 FLASHING W./ DRIP EDGE 4" PLYWOOD VAPOR BARRIER WD BATTEN W/ INSECT SCREEN
INSECT SCREEN 1"
(3) 2x10 LVL BEAM
11 1/2"
1"
(3) 2x10 LVL BEAM
FLOOR
WD TRIM EXISTING FIRST FLOOR 100'-0"
DITION - TOP OF SLAB
FIRST FLOOR ADDITION - TOP OF SLAB 99'-412" 1 4" : 12" SLOPE WD TRIM
2 1/2"
IRONSPOT BRICK VENEER (EXT.) 1" AIR GAP WEEP HOLE @ 24" C.C. HORIZ. AIR / MOISTURE BARRIER 3 GR. PLYWOOD 4" EXT. MTL FLASHING 2X6 STUD WALL, BATT INSUL. 8" LIMESTONE SILL PLATE VAPOR BARRIER PTD GWB (INT.) RIGID INSUL. THERMAL BREAK
INSECT SCREEN @ FURRING STRIP 4" CONC. SLAB W/ 1" RIGIDWWF, INSULATION W1.4XW1.4X6X6 6 MIL POLY VAPOR BARRIER, 4" RIGID INSUL. (R-20) 4" GRAVEL CHOKED / SAND
8" MIN. 18"
DITION - TOP OF SLAB
2X6 WD BLOCKING @ 2'-0", STAPLE INSECT SCREEN TO BEYOND UNDERSIDE BOTTOM CLOSURE GWB FLASHING W./ DRIP EDGE BATT INSULATION WD BATTEN W/ INSECT 2X6 FRAMING SCREEN WALL ASSEMBLY @ BRICK IRONSPOT BRICK VENEER 2X6 WD BLOCKING @ 2'-0", (EXT.) 1" AIR GAP STAPLE INSECT SCREEN AIR / MOISTURE BARRIER TO UNDERSIDE 3 " EXT. GR. PLYWOOD 4 2X6 STUD WALL, BATT INSUL. VAPOR BARRIER PTD GWB (INT.) @ BRICK WALL ASSEMBLY
8"
11 1/2"
LOOR
2 1/2"
WEEP HOLE @ 24"2/A4.2, C.C. HORIZ. SEE SIM. GRADE BEAM, SEE 2/A4.2, SIM. GRADE BEAM MTL FLASHING 1" RIGID INSUL. BEYOND 8" LIMESTONE SILL PLATE
4" CONC. SLAB W/ W1.4XW1.4X6X6 WWF, SEE 2/A4.2, SIM. 6 MIL POLY VAPOR BARRIER, 4" RIGID INSUL. (R-20) 4" GRAVEL CHOKED / SAND
FACE OF BRICK
1'
2" RIGID INSUL.
WALL SECTION @ BRICK SCALE:
1'
1"=1'-0"
FACE OF BRICK
A4.3
WALL SECTION WALL SECTION @ BRICK A4.3
SCALE: SCALE: A4.2 1"=1'-0"
1"=1'-0"
18" MIN.
2" RIGID INSUL.
1'-9"
RIGID INSUL. THERMAL BREAK 2'
EXG FOUNDATION, CONTRACTOR TO VERIFY GRADE BEAM, SEE 2/A4.2, SIM. CONFIGURATION, LOCATION, EXG FNDN BEYOND, TOP 1" RIGID INSUL. AND DIMENSION OF EXISTING COURSE REMOVED, FOUNDATION CONTRACTOR TO VERIFY CONFIG., LOCATION, AND 1 UPDATED ASSEMBLIES DIMENSION 2' EXG FOUNDATION, CONTRACTOR TO VERIFY CONFIGURATION, LOCATION, AND DIMENSION OF EXISTING FOUNDATION
1
1 UPDATED UPDATED ASSEMBLIES ASSEMBLIES
1
UPDATED FOUNDATION
Jessica Trybus & Anthony Lacenere
6338 Bryant Street Project Team Pittsburgh, PA 15206 T 412.901.6950
Contact: Jess Trybus OWNER: Jessica Trybus & Anthony Lacenere
ARCHITECT:
6338 Bryant Street MTL RAILING W/ WIRE MESH GUARD Pittsburgh, PA 15206
evolve LLC
T 412.901.6950 5530 Penn Avenue Contact: Jess Pittsburgh, PATrybus 15206 T 412.362.2100 ARCHITECT: F 412.291.1582 www.evolveEA.com evolve LLC 2X BLOCKING Contact: Christine Mondor 5530 Penn Avenue 3 4" PLYWOOD Pittsburgh, PA 15206 SHEATHING GENERAL CONTRACTOR: T 412.362.2100 PTD PVC TRIM Malcolm FBrendan 412.291.1582 423 Oliver Rd. www.evolveEA.com SECOND FLOOR - ROUGH FRAMING SECOND FLOOR - ROUGH FRAMING1 Sewickley, PA 15143 Contact: Christine Mondor 108'-11 2" V.I.F. 7" 108'-1112" V.I.F. T 412.303.7947 1'-
GENERAL PTD PVC TRIM Brendan MTL FLASHING
SECOND FLOOR - ROUGH FRAMING 108'-1112" V.I.F.
PROFESSIONAL SEAL PTD PVC TRIM
SOFFIT 107'-0" V.I.F.
PATIO DOOR THRESHOLD HDWD FLOOR, 3 4" PLYWOOD
12
CONTRACTOR: 8
Malcolm 423 Oliver Rd. 2X FRAMING @ RAKE Sewickley, PA 15143 INSULATION T 412.303.7947
12" DEEP 2X4 WD TRUSS INSULATE TO 3' FROM EXTERIOR
SOFFIT 107'-012" V.I.F.
PTD GWB (2) 2X10 HEADER PTD MDO SOFFIT PROFESSIONAL SEAL
SOFFIT 107'-0" V.I.F.
c
1X PTD WD TRIM CONT. AIR SEAL @ ALL WINDOW EDGES
evolve LLC 2016
REVISIONS
1 EXISTING FIRST FLOOR 100'-0"
c
29 JULY 16
evolve LLC 2016
EXISTING FIRST FLOOR REVISIONS 100'-0"
FIRST FLOOR ADDITION - TOP OF SLAB 29 JULY 16 FIRST FLOOR ADDITION1 - TOP OF SLAB 99'-412" 99'-412" 1 4" : 12" SLOPE SLOPE EXISTING FIRST FLOOR 100'-0" LIMESTONE BLOCK FIRST FLOOR ADDITION - TOP OF SLAB 1" RIGID INSUL. 99'-412"
SLOPE 1" RIGID INSUL.
FINISH FLOOR
4" CONC. SLAB W/ W1.4XW1.4X6X6 WWF, 6 MIL POLY VAPOR BARRIER, 4" RIGID INSUL. (R-20) 4" GRAVEL CHOKED W/ SAND
WALL SECTIONS
DRAWING TITLE
DATE NEW FOOTER, VERIFY CONDITION IN AS NOTED FIELD ANDSCALE CONFIRM CONFIGURATION CTG ENG. WITH STRUCTURAL
22 JUNE 2016 12"
WALL SECTIONS
DRAWN BY DRAWING TITLE
CKM CHECKED BY 18" O.D. SONOTUBE PIERS DATE W/REINFORCEMENT AT NOTED 14-411 CORNERS AS SCALE PROJECT NO.
CTG CKM CHECKED BY
GRADE BEAM BEYOND EXG FNDN BEYOND, TOP COURSE REMOVED, CONTRACTOR TO VERIFY CONFIG., LOCATION, AND DIMENSION
A4.3 22 JUNE 2016
SHEET NUMBER
DRAWN BY
A4.3
WALL SECTION
SCALE: A4.2 14-411
PROJECT NO.
Christopher Guignon
AIR SEAL PATIO DOOR UNIT
OWNER:
2X RIM JOIST 3 4" EXT. GR. PLYWD CEDAR SIDING OVER CONTINUOUS FLOOR + WALL ASSEMBLY PTD GWB
WD TRIM
HEAD FLASHING
8"
WALL ASSEMBLY 1 2" PTD GWB 2X6 WD FRAMING R- INSUL. SECOND FLOOR - ROUGH FRAMING 3 4" PLYWD1 108'-11 2" V.I.F. CASEWORK INSECT SCREEN AIR SEAL @ SILL PLATE WALL ASSEMBLY 1 2" PTD GWB HDWD 2X6 WDFLOOR FRAMING R3 INSUL. 4" PLYWD 3 4" PLYWD
AIR SEAL, TYP.
Project Team
3'-6"
WALL ASSEMBLY @ CEDAR RAINLEADER BEYOND CEDAR SIDING (EXT.) 2X WD FURRING + AIR SPACE EXG HOUSE BEYOND AIR / MOISTURE BARRIER 3 WINDOW UNIT 4" PLYWOOD 2X6 STUD WALL, BATT INSUL. VAPOR BARRIER CEDAR SIDING (INT.) RAINLEADER BEYOND
5530 Penn Avenue Pittsburgh, PA 15206
(3) 2X6 W/1" RIGID INSUL. T 412.362.2100 F 412.291.1582 www.evolveea.com THERMAL BREAK
MIN. 18"
1"
J-BEAD + 2" REVEAL
CEILING ASSEMBLY (TYP.) VAPOR BARRIER PAINT, AIR SEAL @ ALL JOINTS + CHANGES IN MATERIAL 1 2" GWB 2X10 WD FRAMING R-40 INSUL. 3 4" PLYWD ADHESIVE WATERPROOF MEMBRANE
5530 Penn Avenue Pittsburgh, PA 15206 T 412.362.2100 F 412.291.1582 www.evolveea.com
evolve
INSECT SCREEN WRAPPING BOTTOM OF BATTENS WINDOW VERT. MTLUNIT CLOSURE TRIM BEYOND
CONT. AIR SEAL
1/2"
environment :: architecture
PTD PVC TRIM
2X HEADER W/FOAM INSUL. PTD WD TRIM
1'-3
evolve
WINDOW UNIT
INSECT SCREEN @ VENT INSECT SCREEN WRAPPING BOTTOM OF BATTENS (TYP.) CLADDING ASSEMBLY STANDING MTL TRIM ROOFING VERT. MTL SEAM CLOSURE BEYOND 1X WD BATTEN + AIR SPACE A.W.M. AT FACE
1
2"
PLYWD
FLASHING
GUTTER NAILER W/ FLASHING CLADDING ASSEMBLY (TYP.) +STANDING DRIP EDGE SEAM MTL ROOFING 1X WD BATTEN + AIR SPACE HALF-ROUND GUTTER + STRAP A.W.M. AT FACE
1"
4"
2X BLOCKING
INSECT SCREEN @ VENT A.W.M.
CHANGES IN MATERIAL INSECT SCREEN 2X HEADER W/FOAM INSUL. 1 2" GWB 1 2X10 WD+ FRAMING J-BEAD 2" REVEAL R-40 INSUL. 3PTD WD TRIM 4" PLYWD ADHESIVE CONT. AIR WATERPROOF SEAL MEMBRANE
PERMIT SET
PTD PVC TRIM
11 1/4"
CEILING ASSEMBLY (TYP.) VAPOR BARRIER PAINT, AIR SEAL @ ALL JOINTS + CHANGES IN MATERIAL 1 2" GWB SEE 2/A4.2, SIM. 2X10 WD FRAMING R-40 INSUL. SEE 2/A4.2, SIM. 3 4" PLYWD CEILING ASSEMBLY (TYP.) ADHESIVE WATERPROOF VAPOR BARRIER PAINT, AIR TRIM + MTL FLASHING MEMBRANE SEAL @ ALL JOINTS +
7 1/4"
1"=1'-0"
PTD PVC TRIM
6"
SCALE:
KNIFE EDGE OVERHANG (2" BEYOND FASCIA; HOLD BACK 1ST BATTEN, PAINT EDGE TO MATCH ROOF)
ROOF ASSEMBLY (TYP.) STANDING SEAM MTL ROOFING 1X WD BATTEN + AIR SPACE ADHESIVE WATERPROOF MEMBRANE (A.W.M.) AT FACE
WALL SECTION
A4.3
ROOF ASSEMBLY (TYP.) STANDING SEAM MTL ROOFING 1X WD BATTEN + AIR SPACE ADHESIVE WATERPROOF MEMBRANE (A.W.M.) AT FACE
1"=1'-0"
MIN. 42" BELOW FINISH GRADE
SCALE:
7 1/2"
A4.3
1"=1'-0"
1
UPDATED ASSEMBLIES
SHEET NUMBER
09
ORTHOPHOSPHATE PAVILION
PWSA’s Orthophosphate Pavilions distribute lead-preventative chemicals into 2/3 of the city water supply. Sited adjacent to Reservoir #1 and the Membrane Filtration Plant, they occupy greenspaces in a vibrant public park. The pavilions are small pieces of city infrastructure that must feel welcoming to pedestrians and visitors to Highland Park.
10
Professional Work
Christopher Guignon
11
ORTHOPHOSPHATE BUILDING CONCEPT
PAVILION CONVERSION CONCEPT
SECOND-LIFE ADAPTABILITY Because the chemical distribution purpose of the Orthophosphate Pavilions will be obsolete in 10-15 years, the structures were designed to convert into full park shelters, reclaiming the entire footprint of the building when the walls of the chemical room are removed. In its second life, the panelized ceiling can be removed to reveal the full extent of the timber roof structure and cedar tongue and groove deck. Stack bond brick indicates where walls are non-structural and can be removed.
Watchman’s Tower
12
Professional Work
Membrane Filtration Plant
Orthophosphate Pavilion Schematic Rendering
SERVICE DRIVE EXISTING SEWER MANHOLE ELECTRICAL + FIBEROPTIC TRAILHEAD PLAZA
EXISTING 66” DIA. WATER MAIN 12’X12’ VAULT WITH 30” MANHOLE ACCESS
Christopher Guignon
13
14
Professional Work
2 A4.3 3 A4.0
2 A4.0
EXHAUST OPENING/FAN BEYOND ALUMINUM CAP FLASHING, BLACK
POLYCARBONATE RIDGE SKYLIGHT RIDGE SKYLIGHT BEYOND
SLATE ROOF 2X6 CEDAR DECKING 14.2
12 1 A4.3
STEEL CABLE COLLAR TIE
RAFTERS BEYOND 1 RAFTERS AND T&G DECKING A4.0 BEYOND W/GALVANIZED FASTENERS
RIDGE SKYLIGHT, BLACK
RAFTERS + T&G DECKING BEYOND
FROSTED POLYCARBONATE OR TEMPERED GLASS SKYLIGHT, ALUMINUM COMPRESSION FRAME VERTICAL MEMBERS ONLY, BLACK
2X10 WOOD CEILING FRAMING @ 20" C.C., DOUBLED @ PANEL SEAMS
WOOD BLOCKING COPPER FLASHING AND DRIP EDGE
GLASS SECURITY WINDOW (40"X32") CMU WALL
9'-6" B.O. BEAM
FIBERGLASS DECK (SEE ENG. DWGS)
8"H CONCRETE BASE
CONTROL JOINTS @ BRICK STACK BOND RUNNING BOND BRICK BRICK SOLDIER COURSE W/ WEEPS
CONTAINMENT SUMP (SEE ENG. DWGS)
1 A4.1
3'-4"
3'-4"
3'-4"
1 A4.2
A4.0
SCALE:
2 A4.2
3'-4"
LONG SECTION
1
3
STEEL KNIFEPLATE CONNECTION, SEE A4.4
4X12 GLULAM BEAM
CONCRETE SLAB W/ TURNDOWN FOOTERS TO FROST LINE (SEE ENG. DWGS)
A4.0
GLULAM POST
HP LAMINATE PANEL CEILING W/ 41 REVEAL, EXPOSED SEX HEAD CONNECTORS, COLOR TO MATCH PANEL (BLACK)
9'-5" CLG HEIGHT
9'-6" B.O. BEAM
CMU BOND BEAM LINTEL SEE ENG. DWGS. FOR GROUTING AND STRUCTURE
GLULAM BEAM STEEL KNIFEPLATE CONNECTION, SEE A4.4
VENT AND FLASHING BEYOND
CONCRETE SLAB W/ TURNDOWN FOOTERS TO FROST LINE
1/4"=1'-0"
CROSS SECTION - PICNIC SHELTER
evolve LLC
1/4"=1'-0"View SCALE: Gateway
Plaza 1600 West Carson Street 1 Pittsburgh, PA, 15219-1031 A4.0 T (412) 497 2900 F (412) 497 2901 W www.mottmac.com/americas
REGISTERED ARCHITECT # 01
evolve
COPPER CAP FLASHING
environment :: ar
SLATE ROOF
6020 Broad Street Pittsburgh, PA 1520 T 412.362.2100 F 4 www.evolveea.com
2X6 T&G CEDAR DECKING
RAFTER BEYOND
12
A
12/07/18
Rev STEEL CABLE COLLAR TIE Date (SEE 1/A1.3 FOR PREFERRED LOCATIONS) SEE ENG. DWGS.
10.8 Z:\400 Projects\17-409 PWSA Highland Park PS\04_Orthophosphate\02_2D-3D Drawings\ORTHO - PRINT SHEET - SHELTER.dwg Dec 7, 2018 11:08AM Chris
CTG
ISSUED TO CONTRACTOR
Drawn
Description
CKM Ch’k’d App’d
Project Number
18-408
RAFTERS + T&G DECKING BEYOND W/ GALVANIZED FASTENERS 2X WD. FRAME CLG., 34" EXT. GR. PLYWD. TOP & UNDERSIDE GLULAM BEAM ON CMU BOND BEAM
9'-6" B.O. BEAM
9'-5" CLG HEIGHT
WD BLOCKING CMU BOND BEAM LINTEL (SEE ENG. DWGS FOR GROUTING AND STRUCTURE)
GLASS SECURITY WINDOW (40" X 32" R.O.)
VENT DAMPER FIBERGLASS DECK (SEE ENG. DWGS)
4 A4.2
2 A4.0
1/4"=1'-0"
Designed
XXX
Drawn
CTG
environment :: architecture
Dwg check
CKM
6020 Broad Street Pittsburgh, PA 15206 T 412.362.2100 F 412.291.1582 www.evolveea.com
Scale at ANSI D
lve LLC
evolve
Christopher Guignon
18-408
B/O
CONTAINMENT SUMP
CROSS SECTION - ORTHOPHOSPHATE FACILITY
SCALE:
TERED ARCHITECT # 015371
mber
FRAMED WALL FOR CHEMICAL TANK INSTALLATION/REMOVAL
CONCRETE SLAB W/ TURNDOWN FOOTERS TO FROST LINE
1 A4.1, SIM.
Total
XXX
XXX
XXX XXX
10/19/18 Approved
Status
AS NOTED
Drawing Number
Eng check
10/19/18 Coordination XXX
A4.0
Rev
XXX
XXX
Security
PWSA CORROSION CONTROL CHEMICAL STORAGE & FEED SYSTEMS PROJECT SYCAMORE GROVE SITE BUILDING SECTIONS
15
CONCRETE FOOTER W/ STEEL ANCHOR (SEE A4.4), TYP.
SOLDIER CS. BRICK
SOLDIER CS. BRICK
1 A4.1
ELEVATION - SOUTH
4 A3.0
SCALE:
2 A4.1
3 A4.2, SIM.
1/4"=1'-0"
GLULAM BEAM
STEEL ANGLE EDGE ROOF EXHAUST FANS GOOSENECK VENT W/ BIRD SCREEN
POLYCARBONATE RIDGE SKYLIGHT
CHEMICAL FILL CONTROL PANEL, RECESSED INTO FRAMING, COLOR TO MATCH HP LAMINATE PANELS
EQ.
EXT. GR. PLYWOOD, COLOR TO MATCH HP LAMINATE PANEL CHEMICAL FILL STATION CONTROL PANEL, RECESSED INTO FRAMING, COLOR TO MATCH HP LAMINATE PANELS
1'
7'H DOOR
MITRED HIPS. . SLATE ROOF
PERF. METAL SCREEN
EQ.
COPPER SNOW. GUARDS
VENT DAMPER (HIDDEN)
COPPER FLASHING.
EQ.
EQ.
EQ.
HP LAMINATE PANELS W/ APPLIED SIGNAGE (BY OTHER) STL PERF. METAL PANEL, SEE A4.1 FOR DETAIL
EQ.
VENT DAMPER (HIDDEN) RUNNING BOND BRICK
1" TYP. 44
SOLDIER CS. BRICK
BLAST RESISTANT DOORS (SEE ENG. DWGS) WITH HP LAMINATE PANELS, APPLIED TO BE FLUSH WITH ADJACENT PANELS
PANEL GAP AT DOOR FRAME
5 A3.0
5
ELEVATION - NORTH
2 A3.0
SCALE:
A3.0
1/4"=1'-0"
1" 92
ELEVATION - PERFORATED METAL PANEL
SCALE:
3/4"=1'-0"
DETAIL Designed
evolve LLC
XXX
XXX
Eng check
XXX
XXX
PWSA
CORROSION CONTROL CHEMICAL Familiar materials coupled with contemporary detailing celebrate the historic context and lends a tactile quality evolve STORAGE & FEED SYSTEMS PROJECT to the experience of the pavilion. Custom cut perforated metal louvres evoke imagery of flowing water and allude SYCAMORE GROVE SITE to the building’s function as a critical piece of the city’s water infrastructure. Custom steel timber connectors EXTERIOR ELEVATIONS celebrate the exposed structure. Reveals in the steel plate connectors offer a lightness to the structure that 18-408 A3.0 balances the heaviness of the slate roof. REGISTERED ARCHITECT # 015371
12/07/18
CTG
ISSUED TO CONTRACTOR
Date
Drawn
Description
16
2" TYP.
N
v
WALL PTD TO MATCH PANEL COLOR
9'-3"
ROOF EXHAUST FAN
CKM
Project Number
Ch’k’d App’d
Professional Work
Drawn
CTG
environment :: architecture
Dwg check
CKM
6020 Broad Street Pittsburgh, PA 15206 T 412.362.2100 F 412.291.1582 www.evolveea.com
Scale at ANSI D
B/O
AS NOTED
Total
Drawing Number
10/19/18 Coordination XXX 10/19/18 Approved
Status
Rev
XXX XXX
XXX
Security
2"
1" 14
T.O. BEAM EL 110'-514"
FLUSH
B.O. BEAM EL 109'-6"
1" 22
B.O. BEAM
10"
B.O. BEAM
2"
B.O. BEAM EL 109'-6" 2"
2"
1" 12
10"
EDGE FLUSH W/ POST
BEAM 1"
10" FLUSH
2"
1" 22
1" 22
2"
B.O. BEAM EL 109'-6"
T.O. BEAM EL 110'-514"
1" 14
EDGE FLUSH W/ POST
1" 12
10"
2"
T.O. BEAM EL 110'-514"
FLUSH
10"
2" 2"
10"
1" 14
EDGE FLUSH W/ POST
BEAM
BEAM
BEAM
BEAM
PLAN
ELEVATIONS
PLAN
PLAN
ELEVATIONS
ELEVATIONS
MARK DESCRIPTION
CUSTOM/PREFAB*
A B C1 C2 C3 D E F G
CUSTOM CUSTOM/PREFAB CUSTOM CUSTOM CUSTOM CUSTOM CUSTOM/PREFAB CUSTOM/PREFAB CUSTOM/PREFAB
POST BASE RAFTER TO BEAM POST TO BEAM (CORNER) POST TO BEAM (2 BEAM) POST TO BEAM (3 BEAM) BEAM CORNER TO HIP RAFTER HIP RAFTER TO RAFTER RIDGE TO HIP RAFTER RIDGE TO COMMON RAFTER
NOTES:
NOT TO SCALE - SHOWN FOR REFERENCE
NOT TO SCALE - SHOWN FOR REFERENCE
C1 - KNIFEPLATE CORNER POST - BEAM CONNECTOR
3
SCALE:
A4.4
1" = 1'-0"
4 A4.4
SCALE:
*WITH APPROVAL BY ARCHITECT
NOT TO SCALE - SHOWN FOR REFERENCE
C2 - KNIFEPLATE POST - 2 BEAM CONNECTOR
5
1" = 1'-0"
A4.4
STRUCTURAL TIMBER CONNECTORS TO BE GALVANIZED STEEL, POWDER-COATED, BLACK.
C3 - KNIFEPLATE POST - 3 BEAM CONNECTOR
SCALE:
1" = 1'-0"
SEE ENGINEERING/FABRICATOR DRAWINGS FOR FINAL LOCATIONS + SIZING OF STRUCTURAL STEEL CONNECTORS AND FASTENERS. F
T.O. RAFTER
GLULAM POST
EDGE FLUSH
141" MIN.
EDGE FLUSH W/ POST
B 2/A4.4 (TYP.) G (TYP.)
10"
1'
E
LONG EDGE RAFTERS
PLAN
T.O. BEAM EL 110'-514"
E
10" 1" 14
10"
CONC. POST BASE BELOW
F
SHORT EDGE RAFTERS
T.O. BEAM
EMBEDDED IN CONC. POST BASE
PLAN
ELEVATIONS
C3 5/A4.4
D B.O. BEAM EL 109'-6"
B 2/A4.4 (TYP.)
E
ELEVATIONS
B 2/A4.4 (TYP.) E
D E
A 1/A4.4
C1 3/A4.4
C3 5/A4.4
E
5/A4.3
A 1/A4.4
1 A4.4
A - KNIFEPLATE POST BASE
SCALE:
1" = 1'-0"
Gateway View Plaza 1600 West Carson Street Pittsburgh, PA, 15219-1031 T (412) 497 2900 F (412) 497 2901 W www.mottmac.com/americas Z:\400 Projects\17-409 PWSA Highland Park PS\04_Orthophosphate\02_2D-3D Drawings\ORTHO - PRINT SHEET - SHELTER.dwg Dec 7, 2018 11:08AM Chris
Christopher Guignon
A 1/A4.4
C1 3/A4.4 D
NOT TO SCALE - SHOWN FOR REFERENCE
NOT TO SCALE - SHOWN FOR REFERENCE
C2 4/A4.4
B 2/A4.4 (TYP.)
A 1/A4.4
E 2 A4.4
B - RAFTER - BEAM CONNECTOR
SCALE:
A4.4
SCALE:
evolve LLC
REGISTERED ARCHITECT # 015371
evolve
environment :: architecture 6020 Broad Street Pittsburgh, PA 15206 T 412.362.2100 F 412.291.1582 www.evolveea.com
A
12/07/18
CTG
ISSUED TO CONTRACTOR
Rev
Date
Drawn
Description
A 1/A4.4
CONNECTION LOCATOR DIAGRAM
1" = 1'-0"
CKM Ch’k’d App’d
Project Number
18-408
B/O
NOT TO SCALE
A 1/A4.4
Designed
XXX
XXX
XXX
Drawn
CTG
10/19/18 Coordination XXX
XXX
Dwg check
CKM
10/19/18 Approved
XXX
Scale at ANSI D
XXX
Status
AS NOTED
Total
Drawing Number
A4.4
Eng check
Rev
XXX
Security
PWSA CORROSION CONTROL CHEMICAL STORAGE & FEED SYSTEMS PROJECT SYCAMORE GROVE SITE STEEL CONNECTION DIAGRAMS
17
DESIGN + REPRESENTATION
Clear communication of the architectural idea relies on compelling and descriptive imagery. Many projects in early stages of design require that special attention is paid to the development of a narrative over the depiction of finished architecture. Each of the following images was developed to describe and “sell” an architectural or urban design concept.
18
Professional Work
Christopher Guignon
19
Reverse: Heth’s Avenue green infrastructure proposal render
20
Professional Work
GREEN INFRASTRUCTURE CITYWIDE EVALUATION As part of a team tasked with identifying green infrastructure opportunities through a city-wide evaluation of combined sewer overflow priority sheds, we produced a series of aerial renderings. These renderings feature conceptual designs for six priority sewersheds and identify where green infrastructure would provide significant benefits. They are meant to be diagrammatic in nature, highlighting connectivity, green space opportunity and development sites. Christopher Guignon
21
22
Professional Work
5TH + DINWIDDIE PLAZA This perspective rendering was produced to sell the concept design and conceptual massing of a mixed-use development in Pittsburgh’s Uptown neighborhood. Because many aspects of the building design were as yet unresolved, the visualization focuses on the protected nature of the plaza, the connectivity across Dinwiddie and Fifth Ave. and the potential for vibrant activity in the plaza. The team was awarded the project.
Christopher Guignon
23
24
Professional Work
GROW PITTSBURGH - GARDEN DREAMS GREENHOUSES In 2019, Grow Pittsburgh was gifted the Garden Dreams urban farm in Wilkinsburg. We completed a planning and visioning study to demolish a large dilapidated Victorian and reconfigure the site around three large greenhouses. This aerial rendering shows the campus concept of the layout, positioning the public open space in the protected interior of site. Work is ongoing on the interior renovation of a Garden Dreams office in an adjacent house.
Christopher Guignon
25
26
Professional Work
CENTRE AVENUE REDEVELOPMENT PLAN This project reimagines the Hill District Centre Avenue Corridor as a meeting place for residents, a welcoming place for visitors, a sharing place for institutions, and a place of exchange for businesses. The rendering emphasizes proposed green infrastructure while suggesting yet-to-be-designed architectural interventions. Views are specially chosen to be identifiable by residents as the project had a robust community engagement scope. Winner of Design Pittsburgh 2015 Certificate of Merit Christopher Guignon
27
PAST PROJECTS
Past projects at Safdie Architects in Boston focused on large-scale architecture and urban design work in Asia and South America. Starting as a research fellow exploring architectural implications of mobility-on-demand, I quickly moved on to mixed-use residential projects, masterplanning, and an international design competition. My involvement in these projects were largely in the concept design, schematic design, and design development phases.
28
Professional Work
CAPITAMALL LUONE ALTAIR RESIDENCES Residential Tower + Retail; Colombo, Sri Lanka; 140,000 sq.m. Revit-based project; SD and DD phases. Developed 7-story retail + parking podium.
EL GRAN CANAL Masterplan and schematic design; Cartagena, Colombia; 1.9 million sq.m. Responsible for all drawings, schematic design studies and coordination of presentation materials, including scale model and professional watercolors.
Christopher Guignon
Retail Complex and Office Tower; Shanghai, China; 180,000 sq.m. Conducted design studies and progressed drawings from Concept Design through DD.
XIQU OPERA HOUSE International Design Competition; Hong Kong, China; 52,000 sq.m. Responsible for all sectional and geometric studies, production of 3D model, coordination of renderings and large-scale physical models.
29
Professional Works Sampled
Christopher Guignon