Parfaite Harmonie - Model Village WBD

Page 1

West Bank of Demerara, Region # 3 Guyana

MODEL VILLAGE Parfaite Harmonie West Bank of Demerara, Region # 3


Presentation Content Item

Description

ACCOUNTED FOR IN PROPOSED BILLS OF QUANTITIES

1

Community Profile

Roadways & Sidewalks

Patch potholes, cracking and edge defects; reinstate markings.

Road Shoulders

Regrade and compact; construct concrete shoulders & sidewalks.

2

Proposed Works

3

Implementation Program

4

obstructed drains; upgrade earthen drains to RCIssues to Address Desilt lined.

5

Road and ShoulderClear Upgrade materials, debris, refuse and obstructing

Drainage

Encumbrances

6

Drainage Network

7 8

vegetation.

REQUIRES APPROVAL BEFORE PROCEEDING

Utilities

Fire Hydrants

Street Lighting

Inspect & replace deficient poles; coordinate GWI mains.

Replace failed luminaires; extend lighting to unlit streets.

Bus Stops

Public Facilities

Trees & Benches

Six access points; four along the East road bus route.

Plant trees and install park benches along East embankment.

9

Renders


Community Profile Item

Beneficiary

No.

ACCOUNTED FOR IN PROPOSED BILLS OF QUANTITIES

1

Area (Acreage) Patch potholes, cracking and edge defects; reinstate

Roadways & Sidewalks

2

3

sidewalks.

19,620

Residents (House Holds)

937

Desilt obstructed drains; upgrade earthen drains to RClined.

Encumbrances

5

Schools

Clear materials, debris, refuse and obstructing vegetation.

REQUIRES APPROVAL BEFORE PROCEEDING

6

Utilities

Health Center

Street Lighting

Inspect & replace deficient poles; coordinate GWI mains.

Replace failed luminaires; extend lighting to unlit streets.

Bus Stops

Trees & Benches

7

61

Length of Existing Roads (m)

Drainage

4

markings.

No. of RoadsRegrade and compact; construct concrete shoulders &

Road Shoulders

245

Religious Place

8

Businesses

9

Green Spaces

Six access points; four along the East road bus route.

Plant trees and install park benches along East embankment.

1 1

2 29 4


Proposed Works Item

Description

Total

ACCOUNTED FOR IN PROPOSED BILLS OF QUANTITIES

1

Area (Acre)

Roadways & Sidewalks

245

Patch potholes, cracking and edge defects; reinstate markings.

2

Length of Road to be upgraded (m)

3070

3

Regrade and compact; concrete shoulders Length of Shoulder to beconstruct upgraded (m) &

28464

Road Shoulders

4 Drainage

sidewalks.

Length of Drains (m) Desilt obstructed drains; upgrade earthen drains to RClined.

24471

5

Planting of Trees (No.)

103

6

Construction Culverts (No.) Clearof materials, debris, refuse and obstructing

45

Encumbrances

7

vegetation.

Installation of Fire Hydrants (No.)

REQUIRES APPROVAL BEFORE PROCEEDING

8

Utilities

Construction of Entrance Signs (No.)

Bus Stops

10

2

Street Lighting

Replace failed luminaires; extend lighting to unlit Electrical Works - Street Lights, streets. Relocation, Modification of Network

-

Miscellaneous

-

Inspect & replace deficient poles; coordinate GWI mains.

9

150

Trees & Benches

Six access points; four along the East road bus route.

Plant trees and install park benches along East embankment.


Implementation Program Stage

Item

Description

ACCOUNTED FOR IN PROPOSED BILLS OF QUANTITIES

Coordinate GPL/GWI repairs and resolve utility conflicts before civil works

Roadways & Sidewalks

Patch potholes, cracking and edge defects; reinstate markings.

Road Shoulders

Regrade and compact; construct concrete shoulders & sidewalks.

Prelim

Phase 1

Utility Coordination

Drainage Preparation

Desilt obstructed drains; upgrade earthen drains to RClined.

Drainage

Phase 2 Encumbrances

Desilt drains and clear shoulders to restore flow and prepare work area

Drainage &Clear Access Construction of RC Drains, residential approaches and culverts materials, debris, refuse and obstructing vegetation.

Utilities

Construction of safe contentious walkways along priority community routes Street Lighting

Inspect & replace deficient poles; coordinate GWI mains.

Replace failed luminaires; extend lighting to unlit streets.

Bus Stops

Trees & Benches

REQUIRES APPROVAL BEFORE PROCEEDING

Phase 3 Phase 4

Pedestrian Access

Road Improvements

Six access points; four along the East road bus route.

Phase 5

Greening

Repair road surfaces and strengthen shoulders

Plant trees and install park benches along East embankment.

Planting of sustainable trees to improve shade, appearances of the community


Issues to Address Encumbrances

SECTION A

Roadway upgrade

SECTION B

Roadway

JUNCTION

Independence Junction


Issues to Address Drainage

SECTION B

JUNCTION

Independence Junction


Roads Layout DRAWING OF ROADS BY TYPE

SECTION A

Roadway upgrade

GREEN – MAIN ACCESS ROAD

SECTION B

Roadway

RED – PRIMARY ROAD

JUNCTION

Independence Junction

PURPLE- SECONDARY ROADS


Drainage Network

KEY • Red• Purple – • Blue -

Primary Drains Secondary Drains Canals


Fire Hydrant Locations

KEY • Red-

Proposed location for installation of Fire Hydrant


Public Facilities

KEY • Entrances • Nursery School • Health Center • Green Spaces


Renders TYPICAL MAIN ACCESS ROADS

SECTION A

Roadway upgrade

SECTION B

Roadway

JUNCTION

Independence Junction

Proposed Works • Construction of hard shoulder and sidewalks on both side of the road • Construction of concrete drains • Planting of Trees • Installation of street lighting • Installation of Fire Hydrants


TYPICAL PRIMARY ROAD

Proposed Works • Construction of hard shoulder and sidewalks on either side of the road • Construction of concrete drains • Planting of Trees • Installation of street lighting • Installation of Fire Hydrants


TYPICAL SECONDARY ROAD

Proposed Works • Construction of hard shoulder and sidewalks on either side of the road • Construction of concrete drains • Planting of Trees • Installation of street lighting • Installation of Fire Hydrants


ENTRANCE 1

SECTION A

Roadway upgrade

SECTION B

Roadway

Proposed Works • Construction of Welcome to Community Sign • Planting of Trees • Installation of street lighting

JUNCTION

Independence Junction


PARFAITE HARMONIE HEALTH CENTER

Proposed Works • Construction of hard shoulder and sidewalks • Construction of covered concrete drains • Installation of street lighting • Installation of Fire Hydrants


PARFAITE HARMONIE NURSERY SCHOOL

Proposed Works • Construction of hard shoulder and sidewalks • Construction of covered concrete drains • Implementation of drop off lane for the school facilities • Installation of street lighting • Installation of Fire Hydrants


PARFAITE HARMONIE NURSERY SCHOOL

Before

Proposed Render


INDEPENDENCE JUNCTION

Before

Proposed Render


GREEN SPACE 2 - RECRECATIONAL PARK

Before

Proposed Render


GREEN SPACE 1

Before

Proposed Render


GREEN SPACE 3 - RECRECATIONAL PARK

Before

Proposed Render


THE END

ONE PEOPLE ONE NATION ONE DESTINY SPECIAL THANKS TO THE RESIDENTS OF LA PARFAITE HARMONIE