PRESENTATION OUTLINE
This Model Village Presentation will
take the following Order:
Project Objectives and General
Properties
Data Collected Designs and Renders Questions and Inputs Appendices - Maps
PROJECT OBJECTIVES The main objectives included:
Clean, clear and removal of all encumbrances from road shoulders, drains and available public reserves
Further upgrades to public infrastructure which includes roads, drains, bridges, utility poles and lighting
Construction of walkways and appropriate road shoulders for pedestrians and residents
General landscaping and streetscaping with planting of trees and road demarcations
Upgrade of existing public spaces as well as the construction of green spaces and vending hubs.
NON PAREIL & MELANIE GENERAL PROPERTIES
NON PAREIL & MELANIE GENERAL PROPERTIES
Area = 470 Acres Total Length of Streets = 27.7km Number of Streets = 73 Public Facilities/spaces include • Four (4) Playground • Melanie Nursery School • NIS Office Melanie • Melanie Health Centre • Melanie Post Office • Melanie Fire Station • Four (4) Churches • Three (3) Potential Green Space • One (1) Temple
DATA COLLECTION
To achieve the necessary objectives a conditional survey was done for the entire community. Data collected included: Condition of all public infrastructure (roads, culverts, bridges, drains, utility poles and lights) Identify for removal all encumbrances and illegal structures (shops, stockpiles material and derelicts) Identify available spaces and reserves for development Identify public buildings for enhancement Available reserves for walkways
TYPICAL VIEW Lean Utility Pole School Vegetation in Earthen Drain
Existing Concrete Drain Existing Concrete Bridge
TYPICAL VIEW
Illegal Structure Material Stockpile Concrete Drain
No Road Markings or Signage
Vegetation in Earthen Drain
DRAINAGE ISSUES Approximately 55km require
cleaning
CONSTRUCTION MATERIAL
Approximately 556 identified
DERELICTS
Approximately 70 identified
ROAD SIDE VENDING
Approximately 56 identified
GARBAGE ON ROAD SHOULDERS
Approximately 100 identified
DESIGNS AND TYPICAL RENDERS
PROPOSED WORKS Clearing of 64,100metres of road shoulders and drains including
the removal of approximately 70 derelicts, 620 garbage and material heaps and 42 encumbrances Construction of 70 culverts and 7 bridges The construction of 32,200metres of harden shoulders,
43,400metres of concrete drains and 26,900 metres of walkways The planting of 423 trees and general landscaping and
streetscaping of 27,700metres of road
The enhancement of all 14 public spaces Installation of additional 122 street lights and correction to 100
utility poles
Installation of 43 Hydrants The development of 3 green spaces for a recreational facilities and
vending hub
TYPICAL OUTLOOK FOR PLAYGROUND, EAST COAST DEMERARA
Existing
Proposed
TYPICAL OUTLOOK FOR A SCHOOL, EAST COAST DEMERARA
Existing
Proposed
ROAD WORKS The following road works were
proposed: Construction of concrete
drains Construction of Concrete
Walkway Construction of Crusher
run shoulders Creation of a utility
corridor
ROAD WORKS Based on available space three options were
designed:
Option 1 - All available feature
Option 2 - Cover drains
Option 3 - Concrete drains only
MELANIE DAMISHANA, EAST COAST DEMERARA (OPTION 1)
Existing
Proposed
CHERRY LANE, MELANIE DAMISHANA, EAST COAST DEMERARA (OPTION 2)
Existing
Proposed
MELANIE DAMISHANA, EAST COAST DEMERARA (OPTION 3)
Existing
Proposed
TYPICAL RENDERS
Existing
Proposed
TYPICAL RENDERS
Existing
Proposed
TYPICAL OUTLOOK FOR THE GREEN SPACE, EAST COAST DEMERARA
Existing
Proposed
DELIVERY APPROACH A coordinated sequence from enabling works through drainage, access, roads and greening.
STAGE
PRIMARY INTERVENTION
PURPOSE
PRELIM
Utility Coordination
Coordinate GPL / GWI repairs and resolve utility conflicts before civil works.
PHASE 1
Drainage Preparation
Desilt drains and clear shoulders to restore flow and prepare work areas.
PHASE 2
Drainage & Access
Construct reinforced-concrete drains, residential approaches and culverts.
PHASE 3
Pedestrian Access
Build safe, continuous walkways along priority community routes.
PHASE 4
Road Improvements
Repair road surfaces and strengthen shoulders after drainage works.
PHASE 5
Greening
Plant suitable trees to improve shade, appearance and the public realm.
WHAT HAPPENS NEXT 1
2
3
4
5
Today
Your questions and objections are recorded at this meeting, street by street.
Design review
Comments are reviewed against the design. Where a concern affects the layout, the design is adjusted.
Notices issued
Residents and businesses with items on the reserve are contacted directly, with time to move them.
Works begin
Preliminary utility works start first, then desilting and shoulder clearance, then drains.
Ongoing contact
A point of contact stays available for the duration of the works.
QUESTIONS? NON PAREIL & MELANIE
APPENDIX
Typical Summary Sheet
AVAILABLE MAPS
Light Poles
Green Spaces and Public Facilities
AVAILABLE MAPS
Road Network
Proposed