PRESENTATION OUTLINE

 This Model Village Presentation will

take the following Order:

 Project Objectives and General

Properties

 Data Collected  Designs and Renders  Questions and Inputs  Appendices - Maps


PROJECT OBJECTIVES  The main objectives included: 

Clean, clear and removal of all encumbrances from road shoulders, drains and available public reserves

Further upgrades to public infrastructure which includes roads, drains, bridges, utility poles and lighting

Construction of walkways and appropriate road shoulders for pedestrians and residents

General landscaping and streetscaping with planting of trees and road demarcations

Upgrade of existing public spaces as well as the construction of green spaces and vending hubs.


NON PAREIL & MELANIE GENERAL PROPERTIES


NON PAREIL & MELANIE GENERAL PROPERTIES

Area = 470 Acres Total Length of Streets = 27.7km Number of Streets = 73 Public Facilities/spaces include • Four (4) Playground • Melanie Nursery School • NIS Office Melanie • Melanie Health Centre • Melanie Post Office • Melanie Fire Station • Four (4) Churches • Three (3) Potential Green Space • One (1) Temple


DATA COLLECTION

To achieve the necessary objectives a conditional survey was done for the entire community. Data collected included:  Condition of all public infrastructure (roads, culverts, bridges, drains, utility poles and lights)  Identify for removal all encumbrances and illegal structures (shops, stockpiles material and derelicts)  Identify available spaces and reserves for development  Identify public buildings for enhancement  Available reserves for walkways


TYPICAL VIEW Lean Utility Pole School Vegetation in Earthen Drain

Existing Concrete Drain Existing Concrete Bridge


TYPICAL VIEW

Illegal Structure Material Stockpile Concrete Drain

No Road Markings or Signage

Vegetation in Earthen Drain


DRAINAGE ISSUES  Approximately 55km require

cleaning


CONSTRUCTION MATERIAL

Approximately 556 identified


DERELICTS

 Approximately 70 identified


ROAD SIDE VENDING

 Approximately 56 identified


GARBAGE ON ROAD SHOULDERS

 Approximately 100 identified


DESIGNS AND TYPICAL RENDERS


PROPOSED WORKS Clearing of 64,100metres of road shoulders and drains including

the removal of approximately 70 derelicts, 620 garbage and material heaps and 42 encumbrances Construction of 70 culverts and 7 bridges The construction of 32,200metres of harden shoulders,

43,400metres of concrete drains and 26,900 metres of walkways The planting of 423 trees and general landscaping and

streetscaping of 27,700metres of road

The enhancement of all 14 public spaces Installation of additional 122 street lights and correction to 100

utility poles

Installation of 43 Hydrants The development of 3 green spaces for a recreational facilities and

vending hub


TYPICAL OUTLOOK FOR PLAYGROUND, EAST COAST DEMERARA

Existing

Proposed


TYPICAL OUTLOOK FOR A SCHOOL, EAST COAST DEMERARA

Existing

Proposed


ROAD WORKS The following road works were

proposed: Construction of concrete

drains Construction of Concrete

Walkway Construction of Crusher

run shoulders Creation of a utility

corridor


ROAD WORKS Based on available space three options were

designed: 

Option 1 - All available feature

Option 2 - Cover drains

Option 3 - Concrete drains only


MELANIE DAMISHANA, EAST COAST DEMERARA (OPTION 1)

Existing

Proposed


CHERRY LANE, MELANIE DAMISHANA, EAST COAST DEMERARA (OPTION 2)

Existing

Proposed


MELANIE DAMISHANA, EAST COAST DEMERARA (OPTION 3)

Existing

Proposed


TYPICAL RENDERS

Existing

Proposed


TYPICAL RENDERS

Existing

Proposed


TYPICAL OUTLOOK FOR THE GREEN SPACE, EAST COAST DEMERARA

Existing

Proposed


DELIVERY APPROACH A coordinated sequence from enabling works through drainage, access, roads and greening.

STAGE

PRIMARY INTERVENTION

PURPOSE

PRELIM

Utility Coordination

Coordinate GPL / GWI repairs and resolve utility conflicts before civil works.

PHASE 1

Drainage Preparation

Desilt drains and clear shoulders to restore flow and prepare work areas.

PHASE 2

Drainage & Access

Construct reinforced-concrete drains, residential approaches and culverts.

PHASE 3

Pedestrian Access

Build safe, continuous walkways along priority community routes.

PHASE 4

Road Improvements

Repair road surfaces and strengthen shoulders after drainage works.

PHASE 5

Greening

Plant suitable trees to improve shade, appearance and the public realm.


WHAT HAPPENS NEXT 1

2

3

4

5

Today

Your questions and objections are recorded at this meeting, street by street.

Design review

Comments are reviewed against the design. Where a concern affects the layout, the design is adjusted.

Notices issued

Residents and businesses with items on the reserve are contacted directly, with time to move them.

Works begin

Preliminary utility works start first, then desilting and shoulder clearance, then drains.

Ongoing contact

A point of contact stays available for the duration of the works.


QUESTIONS? NON PAREIL & MELANIE


APPENDIX

Typical Summary Sheet


AVAILABLE MAPS

Light Poles

Green Spaces and Public Facilities


AVAILABLE MAPS

Road Network

Proposed


Turn static files into dynamic content formats.

Create a flipbook
Melanie-Non Pariel by Central Housing And Planning Authority - Issuu