Project Overview Leonora-Groenveldt is a historic community on the West Coast of Demerara in Region Three. It developed around Plantation Leonora, a large sugar plantation that existed by the late 1700s. The name “Leonora” is traditionally said to have been formed from the names of the plantation owner’s two children, Leo and Nora. This community is particularly special because of its rich sugar-estate history, labour heritage, cultural diversity, close community relationships and its continuing development as a major centre on the West Coast of Demerara. This project aims to enhance the appearance, functionality and sustainability of the Leonora – Groenveldt Community through: • Road & Drainage Networks Upgrades • Proposals for Development of Additional Green Spaces • Planting of Decorative Plants & General Landscaping
• Alignment of Utility Poles & Street Lighting Upgrades
Overview Map
Overview Map
Fire Hydrant Placement Consideration During the assessment exercise, a coordinated approach in collaboration with
the Guyana Fire Service was taken to identify existing fire hydrants and to document proposed locations for additional to be installed. Active Fire Hydrants: 6 No. Proposed Fire Hydrants: 13 No.
The Additional Fire Hydrants when installed will greatly improve fire fighting capabilities.
Security Camera Placement Consideration During the assessment exercise, a coordinated approach in collaboration with the National Data Management Authority was taken to identify existing Security Cameras installed and to identify proposed locations for additional that are scheduled be installed. Security Cameras Installed: 4 No. Security Cameras Scheduled to be Installed : 3 No.
The Additional Security Cameras when installed will greatly improve crime fighting capabilities.
Bus Shed Placement Consideration During the assessment exercise, it was observed that there are currently no Bus
Shed or waiting areas despite the numerous public and private facilities along the public road. Bus Shed to be Installed : 15 No.
The Bus Sheds when installed will greatly improve ease at which our commuters
wait on transportation providers especially school children.
Bus Shed Design Consideration
Bus Shed Design Consideration
Community Based Issues Observed. • During the assessment exercise, it was observed that there are several encumbrances that are along the reserves of the proposed works to be undertaken. Encumbrances ranged from the following: ❖ Derelict vehicles left on road shoulders. ❖ Construction materials stored on shoulders ❖ Commercial activities such as barber shops, wash bay, snackette and mechanical work shops etc. • During the implementation phase of this model city initiative, the Government of Guyana intends to utilize the full reserves available from properties’ boundary lines. Any and all encumbrances will be removed and disposed of accordingly.
Example of Community Based Issues Observed. • Encumbrances: Derelict Vehicles on Road Shoulders
Example of Community Based Issues Observed. • Encumbrances: Construction materials stored on shoulders
Example of Community Based Issues Observed. • Encumbrances: Commercial activities- barber shop
CONCEPT RENDERS
Illustrative design responses for roads, drains, and community spaces
LEONORA NORTH
North, Leonora An Area prone to vehicular traffic due to facilities such as: NIS Post Office Nursery school Hospital Fire Station Police Station Mosque
Cottage Hospital Main Access Road, North, Leonora What we Propose: • Reinforced Concrete Drains (3ft x 4ft) on Both Sides. • Hard Drain Covers that Doubles as a Walkway • Crusher Run Shoulders • Small Palm Trees as Decorative Plants • To Relocate Utility Lines in Drain Walls. • Carriage way from 14ft to 20ft
Before
Cottage Hospital Main Access Road, North, Leonora After
20ft
Main Access Road, Seaspray, North, Leonora What we Propose: • Reinforced Concrete Drains on the Western Side (3ft x 4ft) • To Utilize Hard Covers as Sidewalks • Crusher Run Hard Shoulders • Palm Trees for Decorative Purposes
Main Access Road, Seaspray, North, Leonora
Jib, Leonora
Jib, Leonora This network of roads comprises of three roads, two of which were completed in 2026 and the other in fair condition. However, due to the limited reserves, hard shoulders were recommended for the internal streets whilst the road on the sideline dam will be resurfaced and hard shoulders installed.
Sideline Dam, Jib, Leonora What we Propose: • Resurface Carriageway • Hard Shoulders • Upgrade and Install New Street Lights
• Palm Trees for Decorative Purposes
Before
Sideline Dam, Jib, Leonora After
Seafield, Leonora
Seafield, Leonora This is a Residential Area Containing a mix of roads that were recently paved and roads that were rehabilitated years prior. Notably, Water Pump Street was Completed in June 2026 with both Reinforced Concrete Road and Drains.
Sharp Street, Seafield, Leonora What we Propose: • Reinforced Concrete Drains (2ft x 2ft) on Both Sides • Widening and Resurfacing of Roadway • Crusher Run Shoulders • Palm Trees for Decorative Purposes
Before
Sharp Street, Seafield, Leonora After
Parafield, Leonora
Parafield, Leonora Similar to Seafield, Parafield is also a Residential Area. Contains one Place of Worship (Temple) Contains one Green Space Southern of Parafield These Streets Serve as a Connection to Stewartville for Vehicular Access and is mostly used during the peak hours and during market hours on Fridays and Saturdays
Main Access, Parafield, Leonora What we Propose: • Reinforced Concrete Drains (2ft x 2ft) on Both Sides • Widening and Resurfacing of Roadway • Crusher Run Shoulders on Both Sides
• Upgrade and Install Street Lights • Planting of Palm Trees
Before
Main Access, Parafield, Leonora After
Pasture, Leonora
Pasture, Leonora Contains the Access to a Primary School and Nursery School. Within the Area, Reinforced Concrete Roads and Drains were Completed
in 2026 which saw several pathways upgraded to accesses where vehicles are now able to traverse for the first time.
Nursery School Street, Pasture, Leonora What we Propose: • To Construct Reinforced Concrete Drains, 3ft x 3ft Drain on the Northern Side, 2ft x 2ft Drain on the Southern Side • Hard Covers for Drains on both sides which will double as Sidewalks • Widening and Resurfacing of Roadway • Crusher Run Shoulders on Both Sides • Upgrade and Install Street Lights • Planting of Palm Trees
Before
Nursery School Street, Pasture, Leonora After
Turn-Key Housing Scheme, Leonora
Turn-Key Housing Scheme, Leonora During the assessment exercise, the roadways in this area were found to be actively under construction by CH&PA. As such, based on information provided by executing agency the construction of reinforced concrete drains and hard shoulder works will have to be done in this area after the roads are completed.
Turn-Key Housing Scheme, Northern Road Leonora What we Propose: • Construction of Reinforced Concrete Drain on Both Sides, 2ft x 3ft Drains • Construct Hard Shoulders on Both Sides, • Upgrade and Install Street Lights • Planting of Palm Trees
Before
Turn-Key Housing Scheme, Northern Road Leonora After
New Housing Scheme, Leonora
New Housing Scheme, Leonora During the assessment exercise, the roadways in this area were found to be recently under construction by CH&PA & MoPW between 2023 to 2025. However, it was observed that the construction of reinforced concrete drains and hard shoulder works will have to be done nonetheless in this area.
New Housing Scheme, Leonora What we Propose: • Construction of Reinforced Concrete Drain on Both Sides, 2ft x 3ft Drains • Construct Hard Shoulders on Both Sides, • Upgrade and Install Street Lights • Planting of Palm Trees
Before
New Housing Scheme, Leonora Before
Groenveldt
Groenveldt During the assessment exercise, it was observed that the roads were recently overlayed by MoPW. However, the drains in this area are very inconsistent, whilst some streets are very narrow, not allowing much upgrades to be done, however, this project will benefit this area by the
construction of standardized reinforced concrete drains to improve overall drainage in the community The area contains a Church, Temple, hospital, shopping mall, government service centre and an bank amongst other facilities.
Main Road, Groenveldt What we Propose: • Standardized Drains on both Sides of the road, (2ft x 2ft) • Widening and Resurfacing of Roadway • Construct Hard Shoulders on Both Sides • Planting of Palm Trees • Streetlights to be Upgraded
Before
Main Road, Groenveldt After
Wine Bush, Groenveldt
Wine Bush, Groenveldt During the assessment exercise, it was observed that the roads were recently overlayed by MoPW. However, the drains in this area are very inconsistent, whilst some streets are very narrow, not allowing much upgrades to be done, however, this project will benefit this area by the
construction of standardized reinforced concrete drains to improve overall drainage in the community
1st Street, Wine Bush, Groenveldt What we Propose: • Standardized Drains on both Sides of the road, (2ft x 2ft) • Widening and Resurfacing of Roadway • Construct Hard Shoulders on Both Sides • Planting of Palm Trees
• Streetlights to be Upgraded
Before
1st Street, Wine Bush, Groenveldt After
Public Road, Leonora
Public Road, Leonora What we Propose: • Upgrade Northern Drains to 5ft x 6ft Reinforced Concrete Drain • Upgrade Southern Drains to 3ft x 4ft Reinforced Concrete Drain • Removable Hard Cover on drains which double as a sidewalk • Upgrade earthen shoulders to concrete walkway due to the volume of Public & Private Facilities in the vicinity.
Before
Public Road, Leonora After
Completed Projects of Similar Scope
Leonora Market Road ( Before. Images Taken in 2022)
Leonora Market Road ( Before. Images Taken in 2022 –Minor Crusher Run Maintenance Works)
Leonora Market Road ( After. Images Taken in 2026)
Leonora Market Road ( After. Images Taken in 2026)
Leonora Market Road ( Potential Further Enhancement )
Water Pump Street, Seafield, Leonora ( Before. Images Taken in 2025)
Water Pump Street, Seafield, Leonora ( After. Images Taken in 2026)
Water Pump Street, Seafield, Leonora ( After. Images Taken in 2026)
Water Pump Street, Sea Field, Leonora (Potential Further Enhancement )
Green Spaces
Parafield, Leonora What we Propose: • Construct Pedestrian
Walkway • Small Gazebos • Retain Existing Trees
Before
• Benches
After
Old Estate Compound, Leonora What we propose: • Multifunctional Sports Ground
• Decorative Trees • Shaded Seating Areas
Before
• Basketball Court • Volleyball Court • Cricket Field with Pitch • Floodlights
After
Groenveldt Public Road (Jib) What we propose: • Urban Landscaped Garden • Palm Trees and other Natural Decorative Plants to Enhance Visual Appeal • Welcome Sign to Leonora
Before
After
Kowsilla Park, Leonora Upgrades: • Planting of Additional Decorative Plants • Restore Damaged Gazebos • Decorative Metal Fence
Before
After
GREEN SPACE UNDER CONSTRUCTION Turn-Key Housing Scheme Green Space, Leonora
Existing Park in Good Condition Zia’s Play Park, Seaspray, Leonora
Cemetery • During the assessment only one Cemetery was identified Before
After
THE END