Kaneville EBD-Model Village

Page 1

WHAT WE WILL COVER TONIGHT SEVEN PARTS — WITH TIME FOR YOUR QUESTIONS AT THE END

01

What we are proposing

02

What this means for your property

03

The maps

04

Concept designs

05

Next steps and how to raise a concern

06

Appendices

Objectives, the full package of works and the delivery phases

Road reserve, encumbrances, private bridges and access during works

Boundary, roads, drainage, culverts, poles, hydrants and facilities

Four streets shown before and after, with the works listed

What happens after tonight and who to contact

Cross-sections, consultation record and field data


WHO IS DELIVERING THIS WORK A MULTIDISCIPLINARY TEAM SUPPORTING ASSESSMENT, DESIGN AND DELIVERY

01

02

Project coordination

Field assessment & GIS

Community engagement

Civil design & costing

Programme oversight, priorities and delivery alignment

Asset surveys, boundary validation and spatial analysis

Resident input, design communication and follow-up

Road, drainage, utility and public-realm solutions

K AN E V I L L E C O M M U N I T Y E N H AN C E M E N T P R O G R AM M E

03

04


PROJECT OBJECTIVES

Three priorities for a safer, more resilient Kaneville A coordinated upgrade focused on movement, drainage resilience and community quality.

SAFER MOVEMENT Targeted road repairs, walkways and street lighting.

EFFICIENT DRAINAGE 7.3 km of new drains plus culvert and bridge works.

BETTER PUBLIC REALM Tree planting and clearer community signage.

One coordinated programme • Three visible outcomes


SECTION 02

What this means for your property The road reserve, what has to be moved, private bridges and culverts, and how access will be managed while the work is underway. P L E AS E R AI S E AN Y C O N C E R N I N T H I S S E C T I O N T O N I G H T


THE ROAD RESERVE EXPLAINED WHY WORK MAY EXTEND BEYOND THE EDGE OF THE EXISTING ROAD

What the reserve is •

The road reserve is the full strip of public land between property boundary lines — not just the paved surface you drive on.

•

It normally includes the shoulders, the verge, the drain and the space where utility poles stand.

•

Drains, walkways and shoulders are built inside this reserve.

•

The reserve is public land. It is not part of the house lot, even where it has been in private use for many years.

What this means in practice •

The works will use the full reserve available from the property boundary line.

•

Anything standing in the reserve will need to be moved before construction reaches that street.

•

Buildings and fences on private land are retained — the concept designs are drawn to keep them in place.

•

Where the reserve is narrow, the design is adjusted rather than the boundary moved.

If you are unsure where your boundary line falls, ask at the desk tonight and it can be checked against the survey.


WHAT WILL NEED TO BE MOVED ENCUMBRANCES IDENTIFIED ON THE RESERVE DURING THE FIELD ASSESSMENT

During the assessment, a number of items were recorded standing on the road reserve. These will need to be cleared before construction reaches that street.

Derelict and parked vehicles

Building materials

Vehicles standing on the shoulder or verge, including vehicles under repair.

Sand, stone, blocks and lumber stored on the shoulder outside the property line.

Commercial activity on the reserve

Heavy equipment

Wash bays, mechanic and body-work areas, snackettes and stalls set up on the shoulder.

Machinery and trailers parked on the shoulder where drains and walkways are to be built.

Notice will be given before anything is moved Residents and businesses will be contacted ahead of works on their street so items can be relocated onto private land. Where owners cannot be identified, items will be removed and disposed of. If something of yours is on the reserve, please speak to us tonight rather than waiting for the machines.


PRIVATE BRIDGES, CULVERTS AND APPROACHES THE PART OF THE WORK THAT TOUCHES EVERY HOUSE

Phase 2 includes residential approaches. Every driveway bridge over the roadside drain is affected.

Why private bridges matter •

• •

The NDC consultation linked flooding in Kaneville to failed culverts and to privately built drains laid at the wrong invert level. A bridge or culvert set too high or too low blocks the flow for everyone upstream, not only that property. Rebuilding approaches to a common level is what makes the new drainage actually work.

What happens at your gap •

Existing approaches will be assessed, then rebuilt to match the new drain level.

•

Temporary access will be maintained while the approach is out — see the next slide.

•

Where an approach was privately built to a different standard, it will be reset to the design level.

•

If you have already paid for a bridge recently, tell us tonight so it can be recorded.


SECTION 03

The maps Boundary and area profile, the road network, drainage, culverts and bridges, community facilities, utility poles and fire hydrants. F I N D Y O U R S T R E E T — AS K AN D W E W I L L P O I N T I T O U T


DRAIN AGE PROGRAM M E

The largest single part of the programme •

Earthen roadside drains are replaced with reinforced concrete drains.

•

Drains are covered with concrete slabs with side inlet openings, so water still enters.

•

Where the design allows, those covers double as a walkway.

•

Culverts and driveway approaches are rebuilt to a common level so the whole line drains.

The yellow lines on the map show where new drains are planned.


Satellite imagery: Esri World Imagery


SECTION 04

Concept designs Four streets shown as they are today and as they would look once the works are complete, with the list of works for each. F O U R C O R R I D O R S • B E F O R E AN D AF T E R


TOUCAN DRIVE

EXISTING CONDITION

WHERE IT IS • HOW IT LOOKS TODAY

★ The star marks where the photograph and the concept view were taken from.

The street as it is today.


TOUCAN DRIVE PROPOSED — HOW THE STREET WOULD LOOK

CONCEPT VIEW

BEFORE

Illustrative concept view. Final detail may vary with site conditions and the width of reserve available.


7TH FROM BACKSTREET WHERE IT IS • HOW IT LOOKS TODAY

★ The star marks where the photograph and the concept view were taken from.

The street as it is today.

EXISTING CONDITION


7TH FROM BACKSTREET PROPOSED — HOW THE STREET WOULD LOOK

CONCEPT VIEW

BEFORE

Illustrative concept view. Final detail may vary with site conditions and the width of reserve available.


MAHAGONY DRIVE

EXISTING CONDITION

WHERE IT IS • HOW IT LOOKS TODAY

★ The star marks where the photograph and the concept view were taken from.

The street as it is today.


MAHAGONY DRIVE PROPOSED — HOW THE STREET WOULD LOOK

CONCEPT VIEW

BEFORE

Illustrative concept view. Final detail may vary with site conditions and the width of reserve available.


CLAY BRICK ROAD

EXISTING CONDITION

WHERE IT IS • HOW IT LOOKS TODAY

★ The star marks where the photograph and the concept view were taken from.

The street as it is today.


CLAY BRICK ROAD PROPOSED — HOW THE STREET WOULD LOOK

CONCEPT VIEW

BEFORE

Illustrative concept view. Final detail may vary with site conditions and the width of reserve available.


KANEVILLE P HAS E D I M P LEM ENTATI O N P RO G RAM M E

DELIVERY APPROACH A coordinated sequence from enabling works through drainage, access, roads and greening.

S TAG E

P R I M AR Y I N TE R V E N TI O N

PURPOSE

PRELIM

Utility Coordination

Coordinate GPL / GWI repairs and resolve utility conflicts before civil works.

PHASE 1

Drainage Preparation

Desilt drains and clear shoulders to restore flow and prepare work areas.

PHASE 2

Drainage & Access

Construct reinforced-concrete drains, residential approaches and culverts.

PHASE 3

Pedestrian Access

Build safe, continuous walkways along priority community routes.

PHASE 4

Road Improvements

Repair road surfaces and strengthen shoulders after drainage works.

PHASE 5

Greening

Plant suitable trees to improve shade, appearance and the public realm.

Kaneville Community Enhancement Programme


WHAT HAPPENS AFTER TONIGHT HOW YOUR COMMENTS FEED INTO THE FINAL DESIGN

1

2

3

4

5

Tonight

Design review

Notices issued

Works begin

Ongoing contact

Your questions and objections are recorded at this meeting, street by street.

Comments are reviewed against the design. Where a concern affects the layout, the design is adjusted.

Residents and businesses with items on the reserve are contacted directly, with time to move them.

Preliminary utility works start first, then desilting and shoulder clearance, then drains.

A point of contact stays available for the duration of the works.

Nothing on your property is touched without notice. If in doubt, ask.


SECTION 05

Appendices Street cross-sections, the consultation record with the Neighbourhood Democratic Council, and the field data collection method. TECHNICAL REFERENCE


STREET CROSS-SECTIONS EXISTING REFERENCE SECTION AND PROPOSED SECTION — PART 1 OF 2

Unit labels on these drawings are under correction — the reference sections are dimensioned in feet, so read all widths as feet.

Toucan Drive

7th from Backstreet


STREET CROSS-SECTIONS EXISTING REFERENCE SECTION AND PROPOSED SECTION — PART 2 OF 2

Unit labels on these drawings are under correction — the reference sections are dimensioned in feet, so read all widths as feet.

Mahagony Drive

Clay Brick Road


APPENDIX A • NDC CONSULTATION

Consultation identified support, engagement needs and drainage concerns 01

Support for proposals The NDC agreed with the proposed community enhancement projects.

02

Resident engagement Public consultation is required to address possible objections and disruption during works.

03

Street naming The naming exercise is ongoing; the completed proposal will be submitted.

04

Drainage concerns Flooding was linked to failed culverts and incorrect inverts in some privately constructed drains. NDC consultation session • Grove

Source: consultation notes and photograph provided by the project team.