Skip to main content

Hopetown WCB-Model Village

Page 1

Infrastructural Upgrade Assessment Project Overview

Infrastructural upgrade assessment | Hopetown model community

HOPETOWN


Hopetown Community Profile

Infrastructural upgrade assessment | Hopetown model community

HOPETOWN


Map Showing Public Facilities/Spaces

Infrastructural upgrade assessment | Hopetown model community

HOPETOWN


Map Showing Existing Road Network

Infrastructural upgrade assessment | Hopetown model community

HOPETOWN


Map Showing Utility Pole Assessment

• Fair (Green) – One Hundred and Five (105) Poles • New (Orange) – Thirty-One (31) Poles Infrastructural upgrade assessment | Hopetown model community

HOPETOWN

• Relocation (Red) – Five (5) Poles


Map Showing Existing Drainage Network

Infrastructural upgrade assessment | Hopetown model community

HOPETOWN


Map Showing Bridges & Culverts Assessment

Infrastructural upgrade assessment | Hopetown model community

HOPETOWN


Map Showing Bridges & Culverts Assessment

Infrastructural upgrade assessment | Hopetown model community

HOPETOWN


Red Design Concept 1 Main Street, Section-1 Existing Condition

Infrastructural upgrade assessment | Hopetown model community

Proposed Upgrade

HOPETOWN


Red Design Concept 1 Main Street, Section-2 Existing Condition

Infrastructural upgrade assessment | Hopetown model community

Proposed Upgrade

HOPETOWN


Red Design Concept 1 Church Street Existing Condition

Infrastructural upgrade assessment | Hopetown model community

Proposed Upgrade

HOPETOWN


Orange Design Concept 2 James Street Existing Condition

Infrastructural upgrade assessment | Hopetown model community

Proposed Upgrade

HOPETOWN


Green Design Concept 3 Mc Pherson Lane Existing Condition

Infrastructural upgrade assessment | Hopetown model community

Proposed Upgrade

HOPETOWN


Yellow Design Concept 4 King Gillis Drive, West Existing Condition

Infrastructural upgrade assessment | Hopetown model community

Proposed Upgrade

HOPETOWN


Yellow Design Concept 4 King Gillis Drive, East Existing Condition

Infrastructural upgrade assessment | Hopetown model community

Proposed Upgrade

HOPETOWN


Blue Design Concept 5 Back Street Existing Condition

Infrastructural upgrade assessment | Hopetown model community

Proposed Upgrade

HOPETOWN


Proposed Greenspace Community Centre Ground Existing Condition

Infrastructural upgrade assessment | Hopetown model community

Proposed Upgrade

HOPETOWN


Proposed Greenspace Community Centre Ground

Infrastructural upgrade assessment | Hopetown model community

HOPETOWN


Removal of Encumbrances from Reserves

HOPETOWN

Reclaiming Government reserve by addressing encroachments Infrastructural upgrade assessment | Hopetown model community


Removal of Derelicts from Roadway

HOPETOWN

Removal of old and abandoned vehicles from road shoulders Infrastructural upgrade assessment | Hopetown model community


Phased Implementation Programme

Infrastructural upgrade assessment | Hopetown model community

HOPETOWN


What Happens After Tonight

HOPETOWN

How Your Comments Feed Into The Final Design 1

Tonight

Your questions and objections are recorded at this meeting, street by street.

2

Design review

Comments are reviewed against the design. Where a concern affects the layout, the design is adjusted.

3

Notices issued

Residents and businesses with items on the reserve are contacted directly, with time to move them.

4

Works begin

Preliminary utility works start first, then desilting and shoulder clearance, then drains.

5

Ongoing contact

A point of contact stays available for the duration of the works.

Nothing on your property is touched without notice. If in doubt, ask. Infrastructural upgrade assessment | Hopetown model community


HOPETOWN

Thank You!

HOPETOWN VILLAGE REGION#5

ONE PEOPLE ONE NATION ONE DESTINY Infrastructural upgrade assessment | Hopetown model community


Turn static files into dynamic content formats.

Create a flipbook
Hopetown WCB-Model Village by Central Housing And Planning Authority - Issuu