Skip to main content

Town Pulse: Infrastructure & Development - May 2026

Page 1


Town Pulse Infrastructure & Development

DEVEL

S: CODE ENFORCEMENT

Code Enforcement opened an estimated 35 new cases during June, with 69 individual violation items documented across those cases. Several properties had multiple violations listed, which accounts for the difference between the number of cases opened and the total number of violation items

The majority of new violations were related to duty to maintain premises, overgrown weeds or noxious plants, rubbish, trash, debris, and inoperable vehicles These categories represented the primary code enforcement activity for the month and reflect continued staff focus on visible property maintenance issues throughout the community

CODE CASES: CLOSED

Code Enforcement closed 48 cases during June. The largest share of closed cases involved weeds and property maintenance, which accounted for approximately 71 percent of the cases closed during the month

Other closed case categories included lighting complaints, trash and debris, vehicle, trailer, and RV related issues, business license or home occupation concerns, and general complaints. The average case was open for approximately 39 days, with a median of 34 days, showing that most cases were resolved within roughly one month

CODE ENFORCEMENT

JUNIPER DRIVE CODE ENFORCEMENT CASE

Code Enforcement recently closed a property cleanup case on Juniper Drive. When the case was opened, the property had a significant amount of outdoor accumulation, including household trash, discarded materials, a vehicle, a boat hull, overgrown weeds, dead vegetation, and general debris throughout the yard Staff worked with the property owner through the compliance process, and a roll off dumpster was brought in to complete the cleanup The case was brought into compliance in approximately 30 days.

This was a solid Code Enforcement success The property went from being visibly distressed to substantially cleaned up in a short period of time, without the case dragging on for months It is a good example of Code Enforcement doing what it is supposed to do: address problem properties, work toward compliance, and improve neighborhood conditions.

BEFORE AFTER DUMPSTER ARRIVES

AS A WISE PURPLE DINOSAUR ONCE SAID

BUILDING SAFETY

BUILDING INSPECTIONS COMPLETED

Building staff completed or processed 239 inspections during June Most inspection activity was associated with residential building permits, which was consistent with the overall permit activity for the month

Inspection activity included structural and rough building inspections, final inspections, plumbing, gas, and water inspections, foundation, concrete, and grading inspections, electrical inspections, setback inspections, and demolition inspections Of the inspections completed or processed, 191 passed, 25 failed, and the remaining inspections were cancelled, partial, incomplete, completed, or pending

BUILDING PERMITS ISSUED

The Building Division issued 53 permits during June Residential building permits made up the majority of permit activity, with 45 residential permits issued, representing approximately 85 percent of all permits issued for the month.

Permit activity included new single family residences, electrical work, plumbing work, solar permits, garages, mechanical permits, land use permits, right of way permits, and commercial building permits June included 13 new residential units, consisting of 12 single family residences and 1 manufactured home

PUBLIC WORKS - ENGINEERING

WELCOME TO CHINO VALLEY, RYAN!

PUBLIC WORKS - STREETS

Pothole Patching: Crews patched 12 tons of cold mix throughout town

Ditching: Crews completed ditching operations in preparation for the chip seal project

Sign Maintenance: Crews fabricated and installed end-of-road barricades on Rodeo

Mowing & Vegetation Management: Crews mowed throughout town, applied 300 gallons of herbicide, and chipped 8 tons of trees from the Town right-of-way

Community Support: Three crew members assisted with Free Dump Day operations and the Touch-a-Truck event

PUBLIC WORKS - FLEET

GENERAL ACTIVITY

Fleet has had an average of 4 work orders per day for the month

40% of the work orders were repairs

60% were PM’s (Preventive Maintenance)

The percentage of PM’s and repairs moved down slightly this month This was due to the multiple absences for staff taking various PTO

Fleet closely tracks PM compliance This is defined as: the percentage of the total Fleet that is not overdue for service

Our goal was 80% PM compliance

Although we beat that goal in April at 87%, for the month of May we have ticked down slightly to 83% PM compliance We will monitor this number and work to improve PM Compliance.

ACCOMPLISHMENTS

Recently Fleet decided to place extra focus on safety We have conducted a Weekly Fleet Safety Meeting This meeting covered several topics including Work Bay Safety, Machine guarding, and Heat Related Injury This was chosen due to the summer months ahead The link is here https://acnsc org/workplace-heat-safety/

Fleet also decided to assign a Shop Safety Representative This representative is responsible for conducting a weekly shop and yard safety inspection Our safety self-evaluation was used to form the check sheet The sheet covers Fleet specific areas The last section of the sheet is areas for action If found, action items are assigned and given a timeframe for completion Todd Lindeburgh is our Shop Safety Representative

Fleet also coordinated Combination Truck training on the new VacCon This was conducted at Utilities We received good feedback

Fleet also worked with streets department compiling specifications on future new equipment This will help us be ready to meet future Town needs

PUBLIC WORKS - WATER

MONTHLY PRODUCTION FLOW DATA

Replaced service line valves on Lots 95 and 95 in Country West

Updated software at both fill stations

Consumer Confidence Reports distributed

Replaced chlorine injectors at Yavapai College well and Bright Star

Construction meeting with contractors at Perkinsville 44.

Ordered 2 new hydrant meters for contractor lease program

PUBLIC WORKS - WASTEWATER

MAY UPDATE

Maintenance on Blower 2 – replaced belts

Received new Vac Truck

Monthly compliance samples.

Fine screen 2 – VFD faulting out

Removed vegetation from recharge basins

Clean in place - all membranes

Scarified recharge basins 1, 2 & 3.

Launched sewer cleaning program

Assisted with grave openings/closings

AVERAGE MONTHLY FLOW DATA (MAY 2026)

LAB DATA (MAY 2026)

PUBLIC WORKS - WASTEWATER

Turn static files into dynamic content formats.

Create a flipbook
Town Pulse: Infrastructure & Development - May 2026 by Town of Chino Valley, AZ - Issuu