Skip to main content

CFI Companies Company Brochure

Page 1


CFI COMPANIES, INC., CORPORATE HQ | 10370 RICHMOND AVE., STE. 1450, HOUSTON, TX 77042 | HARRIS COUNTY (281) 809-7532, FAX (281) 809-7536

CFI COMPANIES, INC. DALLAS OFFICE | 500 N. AKARD, STE. 2300, DALLAS, TX 75201 | DALLAS COUNTY (469) 501-2360, FAX (469) 371-6035

CFI COMPANIES, INC. AUSTIN OFFICE | 401 S. 1ST ST., STE. 600, AUSTIN, TX 78704 | TRAVIS COUNTY (512) 489-7331

TYPE OF LEGAL ENTITY

S Corp

AGE OF FIRM 14 years

3

(includes 3 PMs)

CFI Companies is a consulting engineering firm, established in 2010, that provides mechanical, electrical, plumbing and low voltage engineering design services as well as commissioning services for healthcare, laboratory, academic, commercial, religious and residential markets.

MISSION

We achieve our vision through an untiring pursuit to be a leader in engineering quality our clients can trust, providing reliable superior service and thought leadership for our clients, and maintaining an atmosphere of excellence in a first-rate workplace. We care about giving clients solutions to fit their needs, helping the project stay in budget, and meeting the project goals and deadlines through coordination and collaboration.

Quality control starts the moment the project begins. We formally track internal review milestones, and those milestones are tracked through our Incentive Compensation Plan. We put our money where our mouth is and hold paramount our commitment to quality.

We do not believe that a phone message should wait until tomorrow to be returned. CFI will make sure we not only have the staff, but the right staff to provide our clients with a high level of service throughout the project. We will make certain we are responsive, provide a timely flow of information, collaborate with the team and meet project schedules. We want to make sure our work is done so that both we and our clients can spend time with those that are most important to us.

We believe a workplace is a safe and respectful environment where people not only come to work, but to be inspired. We provide an atmosphere where our staff can come to learn, grow and teach while enjoying industry-leading salaries and benefits. We can do this and still be competitive with our fees because we have a culture that creates a sense of urgency to meet deadlines and we hire people with a passion for what they do, of high integrity and strong moral character, who believe that:

“ENGINEERING IS NOT JUST WHAT WE DO — IT’S WHO WE ARE.”

(includes 1 PMs)

The quality of our work relies on several factors that give our work a high level of quality that our clients should come to expect and that will precede us in reputation.

1. Expertise – Be leaders in our disciplines and stimulate the desire for our team to have a high level of technical knowledge.

2. Creativity – To keep an open mind and fresh approach on each project.

3. Commitment – High level of excellence and consistency in our project documentation.

4. Incentive – We put our money where our mouth is with a Performance-based Incentive Compensation Plan.

We believe that proactive planning and staffing of projects allows us to have the appropriate time to dedicate to our work. We believe that not returning phone calls or emails within a day or less is unacceptable and our goal is to respond to RFI’s and submittals within three days or less.

CFI Companies hires only those people who fit our culture of providing quality work and service.

Cody French, P.E., LEED AP President & CEO

PRODUCTION MANAGEMENT

Tim Martin Vice President & Sr. Project Manager

Jovan Garcia

Associate Vice President & Sr. Project Manager

Tom Franklin, P.E.

Mechanical Department Manager

Gilbert Hinojosa

Associate Vice President & QAQC Manager

Magan Harding Sr. Project Manager

Mike Walsh, P.E.

Electrical Department Manager

SUPPORT MANAGEMENT

Gregory Borg Controller

Carroll Accounting Manager

Rebecca French Smith Director of Marketing

ONE TEAM

our model is a “One Team” approach. The same MEP engineering team who starts the design on the project will also be the team that follows it through the construction phase. Other CFI Companies staff will review the project during quality control procedures, but the One Team will be responsible for a project from beginning to end.

Dianna

SERVICES WE PROVIDE

• Heating, Ventilation, and Air-Conditioning

• Building Automation and Controls

• Electrical

• Communication Technologies

• Plumbing

• Fire Protection

• Master Planning

• Energy Modeling

• LEED

• Sustainable Design

• Commissioning

• Assessments

MARKETS WE SERVE

• Central Utility Plant Design

• Clinical Build-Out

• Commercial

• Corporate Build-Out

• Healthcare

• High-Rise Office

• High-Rise Residential

• Higher Education

• Industrial

• Liturgical

• Research/Laboratory

• Retail

Abel Design Group

BSA Architects

BSA Life Structures

Brown McGregor Architects

Corgan

Curry Boudreaux Architects

Dewberry

DSGN Associates

Energy Architects

Element Architects

eStudio Architects

EYP

Akzo Nobel

Baker Hughes

Camp for All

CHI / St. Luke’s Hospital

Christus Health

Cigna

Dow Chemical

Enterprise Products

Greystar

Healthcare Corporation of America

Houston Museum of Natural Science

Huntsville Memorial Hospital

Ineos

Integrated Real Estate Group

JPS Health

STATE LICENSURE

Gensler

Harrell Architects

HDR

Heitkamp Swift Architects

Huitt Zollars

Identity Architects

Inventure Design

Kaim Associates

Kirksey Architects

Lamoureux Associates

m Architects

Mark W. Todd Architects

Lincoln Harris

Lonza

McKesson

MD Anderson

Memorial Hermann

Methodist Hospital

MetroNational

Midway

Oak Bend Hospital

Providence Hospital

Rice University

Salvation Army

Schlumberger

Slate Real Estate Partners

Starpak

MCS Architects

Meeks + Partners

Page

Patterson Architects

PDG Architects

Perkins & Will

Philo Wilke Partnership

Polkinghorn Group Architects

United Design Architects

W Partnership

Sun Behavioral Hospital

Texas A&M University

Texas Children’s Hospital

Thy Collection

TOPS Surgical Specialty Hospital

Transwestern

University of Houston

University Health Systems

UT Physicians

Valero

Victory Healthcare

Weatherford

Wise Regional

This 16,500 SF freestanding two-story clinic offers a full pharmacy, lab, OB/GYN and pediatrics unit, general primary care practice, dental, vision, behavioral health and 19 exam rooms. The project was designed using rooftop variable air volume systems with energy recovery units to meet LEED requirements. CFI designed plumbing and electrical infrastructure to accommodate facility expansion to nearly double in size.

SIGNIFICANT PROJECT FEATURES

= LEED Certified

= Emergency power provided to operation critical equipment and life safety systems.

= Redundant HVAC system for pharmacy.

= Energy recovery utilized on variable air volume systems.

= Featured in Healthcare Design Magazine, October 2017.

COMPLETION DATE

March 2017

AREA

Approximately 16,000 SF

CONSTRUCTION COST

$2.4M

PROJECT ARCHITECT

Kirksey Architecture

GENERAL CONTRACTOR

Harvey Builders

REFERENCE

Mr. David Lynn McLemore

AIA, ACHA, LEED AP

Exec. Vice President, Kirksey Architects

6909 Portwest Dr., Houston, TX 77024

W 713-426-7512, davidm@kirksey.com

NORTHEAST TEXAS CANCER & RESEARCH INSTITUTE TYLER, TEXAS

CFI Companies provided MEP services for a 90,000 SF shell medical office building (MOB) that incldued a 240,000 SF parking garage. CFI also provided MEP services for two tenant clinical build-outs: a 25,000 SF suite for Christus Health and a 65,000 SF suite for Texas Oncology.

SIGNIFICANT FEATURES

Christus Health

 MEP design for imaging equipment including X-ray, MRI, Nuclear Camera, PET/CT scanner

Texas Oncology

 MEP design for 4 linear accelerators, CT scanner

PROJECT ARCHITECTS

Shell MOB: Harris Craig Architects

Christus Health: Harris Craig Architects

Texas Oncology: Corgan

PROJECT COMPLETION DATE

August/October 2022

CONSTRUCTION COST

Shell MOB: $24.1M

Christus Health: $4M

Texas Oncology: $18.3M

GENERAL CONTRACTOR

McCarthy Building Companies

CHI ST. LUKE’S HEALTH, TWH-SURGICAL SUITE RENO AND CATH LAB ADDITION THE WOODLANDS, TEXAS

Renovation of the existing Cath Lab area to include three new Cath Labs, one operating room, expanded central sterile area and an expansion for new staff locker and support areas.

SIGNIFICANT PROJECT FEATURES

= New roof-mounted, chilled water air-handling unit to serve the new locker room area that included an energy recovery wheel.

= Design and construction phasing to allow hospital to maintain as much functionality within their surgical suite as possible.

COMPLETION DATE

March 2019 AREA

Approximately 10,000 SF

CONSTRUCTION COST

$4.5M

PROJECT ARCHITECT

HDR

GENERAL CONTRACTOR Forney Construction

REFERENCE

Ryan Herr, CHC Project Manager

CHI St. Luke’s Health

Planning, Design, Construction (PDC) 3100 Main St, Suite 802, MC 5-311 Houston, TX 77002

W 832.355.3263 | C 832.967.7054 rherr@stlukeshealth.org

CFI provided MEP engineering services for the build-out of a unique full-service restaurant at William P. Hobby Airport. Just one of several restaurants for AREAS, The Spot Restaurant replaced a coffee bar and abandoned restaurant at the West Wing of Hobby. One major challenge regarding the space was limited access to airport customs directly below the proposed kitchen and bar. On-site coordination and drafting of the existing space below made for successful floor cores and timely construction timelines.

Utilization of existing MEP systems by researching equipment age and life expectancy helped offset budget cost for the owner. Overall, the project was successful with GC involvement of advising on alternate site options and client directives in design and on-site.

SIGNIFICANT FEATURES

= Houston Airport System approved stacked transformers. Variance approval process with airport authority.

= BIM coordination with design consultants.

PROJECT ARCHITECT

eStudio Architects

PROJECT COMPLETION DATE February 2024

ESTIMATED CONSTRUCTION COST

$1M

GENERAL CONTRACTOR

Premier Interior Development, Inc.

Kirby Ice House is a unique sports bar with three distinct areas, each appropriate for different times of the day and year. The typical interior 6,000 SF area is served by two 18-ton DX rooftop units, single zone VAV. This area also has ceiling fans and track lighting over the bar. Adjacent to the interior area is a 2,500 SF covered area with ceiling fans and string lighting. Both areas have television screens suspended over the seating area. The last area is an uncovered, 3,000 SF space with an astroturf ground covering within a fenced area. This area has tables with numerous televisions mounted along the fencing. Provisions are there for a food truck. The back of the house consists of restrooms, offices and a walk-in cooler. A prep area is served by a five-ton DX rooftop unit.

COMPLETION DATE

June 2020

CONTRUCTION COST

$2,002,000

PROJECT ARCHITECT

Energy Architects

GENERAL CONTRACTOR

Morgan Group Development, LLC

Constructed in 1929, the historic Heights Theater has gone through several renovations. This latest renovation involved replacing the existing MEP infrastructure with new to support the new occupancy and use as a music and performing arts venue. A new second floor was added within the existing structure along with a new kitchen, bars, accessible restrooms and support for theatrical lighting and sound systems at the new stage.

SIGNIFICANT PROJECT FEATURES

= New MEP infrastructure for kitchen and entertainment spaces in very limited plenum space.

COMPLETION DATE

November 2016

PROJECT ARCHITECT

DSGN Associates, Inc.

PROJECT RECOGNITION

2018 Preseration Texas Honor Award

COMPLETION DATE

June 2020

CONSTRUCTION COST

$3M

PROJECT ARCHITECT

Abel Design Group, Darayus Kolah

GENERAL CONTRACTOR

Level Construction Inc.

A new single-story 20,000 SF Montessori School serving an age range of toddlers to third grade students, totaling approximately 216 students. MEP systems designed to meet clients requirements for school application.

SIGNIFICANT PROJECT FEATURES

 Mechanical systems utilized DX cooling with electric heating for independent controls of each space.

 Electrical utilized specialty LED lighting and controls per latest energy code; electrical power distribution was designed to latest NEC requirements and required life safety systems per most recent NFPA.

 Plumbing utilized high efficient tankless water heater with recirculating water loop for instant hot water to each fixture.

 Special fixture heights in toddler spaces were specified to meet user needs.

Brockman Hall classroom 120 is a new 2,000 SF build-out for a new teaching laboratory in a first-generation speculative laboratory classroom building. The space was designed for maximum flexibility using movable lab tables and power, data and laboratory vacuum infrastructure at the ceiling so the lab equipment could be used throughout the space as needed. There were also sections of the room that were designed to be separated using black-out curtains to allow laser table experiments while still using the rest of the space.

SIGNIFICANT PROJECT FEATURES

= Flexible power, data and laboratory vacuum locations.

= Lighting controls to control light levels in the “dark room” spaces while maintaining natural light available from the windows.

= Special power needs for laboratory equipment.

COMPLETION DATE

2016

CONSTRUCTION COST

$300,000

PROJECT ARCHITECT Energy Architects

GABLES REPUBLIC TOWER — AUSTIN, TEXAS

Republic Square is a 24-story, 732,114

SF mixed use project that contains 221 apartment units and 159 Hotel ZaZa guest rooms.

SIGNIFICANT PROJECT FEATURES

= The hotel includes a seventh-level pool and cabanas, restaurants, spas and ballroom.

= The apartments also include their own pool, plus amenity areas that include a fitness center and lounge area.

= The MEP design for the hotel included a Daikin VRV system, a provent plumbing system for both the apartments and hotel and a central boiler system for each.

COMPLETION DATE

August 2019

PROJECT ARCHITECT

Ziegler Copper Architects

GENERAL CONTRACTOR

Gilbane Building Company

Renovation of approximately 100,000 SF of an existing five-story office building for the new corporate office of Neighbors Emergency Centers. CFI Companies helped with the build-out and also provided solutions to many existing base building issues that needed to be resolved.

SIGNIFICANT FEATURES

= Additional hot water heating to meet the needs of the upper floors.

= Troubleshooting the existing domestic water system to provide required pressure on upper floors.

COMPLETION DATE November 2016

PROJECT ARCHITECT

Architech Design & Development

HARVEST BIBLE CHURCH — CYPRESS, TEXAS

CFI Companies provided MEP services for this new 35,000 SF addition to the existing church for a new sanctuary, administration and classroom building. The new 1,000-seat sanctuary was provided with two HVAC units that served one ductwork system to provide maximum flexibility in load. The project also included a new commercial-style kitchen for the church that can be used for school or church functions.

SIGNIFICANT PROJECT FEATURES

= Innovative HVAC design.

= Commerial kitchen HVAC and plumbing design.

COMPLETION DATE

March 2013

CONSTRUCTION COST

$3.1M

PROJECT ARCHITECT

Roy Harper AIA Associates

GENERAL CONTRACTOR

Wayne Stokes

FLOTEK LABORATORIES — HOUSTON, TEXAS

LABORATORIES, RESEARCH

CFI provided consulting engineering services for this “showcase” laboratory totaling 28,000 SF with an additional 17,000 SF of office space. Lab included Variable Air Volume supply and exhaust for once through air systems for lab and fume hoods, natural gas emergency power generator for essential systems and plumbing systems for the laboratory to include acid dilution and water treatment systems.

SIGNIFICANT PROJECT FEATURES

= 8 70-ton 100 percent outside air rooftop units and 2 60-ton tooftop units for office areas utilizing main supply air headers

= Acid waste and dilution tank/laboratory gasses

= Variable volume laboratory exhaust of over 40 fume hoods and laboratory snorkels

= Emergency generator & power for essential laboratory and life safety systems

COMPLETION DATE

August 2016

CONSTRUCTION COST

$15M

PROJECT ARCHITECT

Energy Architecture

GENERAL CONTRACTOR

Harvey Builders

DEBEERS, GALLERIA — HOUSTON, TEXAS

In an approximately 1,128 SF store with only 787 SF of sales and display area, this 13-year-old store had a major overhaul. CFI provided an all new electrical system, state-of-the-art lighting controls at each VIP space, lighting UPS systems, updated chilled water unit and new plumbing systems. Continuous collaboration with the European design group CAP and local architect Abel Design Group made the project a success even during the onset of early COVID. Contractor Hirsch Construction was selected as the GC and made great strides to deliver the project on time and budget. The challenge for this small space was all the electrical systems, millwork controls and lighting.

COMPLETION DATE

October 2020

PROJECT ARCHITECT

Abel Design Group

GENERAL CONTRACTOR

Hirsch Construction

This new three-story, 60,000 SF neurorehabilitation facility offers a specialized, comprehensive environment of care for its patients. Its collaborative, sustained therapeutic plans and surrounding environment allows for the greatest opportunity for patients to reengage in every way possible within typical life and work activities. The success it has achieved as an organization at its original location and the toll of time and extensive use of the original facilities has revealed a need to both expand, relocate and modernize in a new home. This new campus is one of several keys to further insure that it can continue to pursue its original goals and expand upon the vision to better serve even more patients and their families.

SIGNIFICANT FEATURES

= Air-Cooled Chillers with VAV airhandling systems

= Natural gas generators to back up entire facility

= Domestic water storage system to provide water during utility outtages.

= Increased air filtration to improve indoor air quality.

PROJECT ARCHITECT

Kirksey Architecture

PROJECT COMPLETION DATE

October 2023

CONSTRUCTION COST

$30M

GENERAL CONTRACTOR

JW Kelso Construction

SUPERIOR ENERGY CONSOLIDATED — HOUSTON, TEXAS

The Superior Energy Consolidated project consisted of a 64,000 SF build-out of the second floor of a new shell building for typical office space with two MDF rooms with 24-hour A/C. Design included all VAV terminals for the floor and many conference rooms, open office areas and private office areas.

SIGNIFICANT PROJECT

FEATURES

= Coordination with the A/V consultant and architect to verify all requirements were provided including power and A/C for two large MDF rooms with dry pipe sprinkler systems.

= Worked quickly on the 64,000 SF build-out to meet the tight schedule.

COMPLETION DATE

August 2015

CONSTRUCTION COST

$3.06M

PROJECT ARCHITECT

Abel Design Group

GENERAL CONTRACTOR

O’Donnell/Snider Construction

CAMERON IRON WORKS is an historic industrial building located in Houston’s East End neighborhood. The building was the original location of oil field manufacturing company, Cameron Iron Works. As such, the developer worked with the historical preservation society to give the space new life while respecting the history of the structure. It is one of the first developments that features the conversion of shipping containers into both workspace and retail pop up opportunities.

SIGNIFICANT FEATURES

 CFI Companies worked with a glass manufacturer calculate modern U values to reduce solar heat gain (SHG) while retaining the historic clear look.

 Historic preservation also requred HVAC to be “hidden” with line of sight requirements. No ductwork sits lower than 18 feet, and units are centralized on the roof and on the ground so they are not visible from the street.

 More than 20 interior shipping containers feature fans that circulate air in and out of the smaller enclosed spaces.

TOTAL AREA

60,000 SF

PROJECT ARCHITECT

Kaldis Development Interest

PROJECT COMPLETION DATE 2023

Turn static files into dynamic content formats.

Create a flipbook