Capital Improvement Project Updates

The City of Celina is committed to being smart and strategic in how we grow. One of the ways that we show our commitment is through Capital Improvement Projects, which are partnerships between the City and local contractors for roadways, waterlines, sanitary sewers, and drainage improvements.

Facilities

Under Construction

• Celina Police Headquarters

• Downtown Parking Improvements on S Ohio Dr and N Louisiana Dr

• Senior Center at Bobcat Stadium Complex

Fire Station 3 (Sutton Fields)

• Public Works Administration Building Improvements

Parks

Under Study

• Phase 1 of feasibility study for Ousley Park

Under Design

• New playground at Old Celina Park

• Wilson Creek Park Master Plan

• Preston Rd Green Ribbon from FM 455 to Legacy Rd

Under Construction

• Construction of the Downtown Alley Patio Project

Sewer

Under Design

• Downtown Wastewater Reclamation Plant Expansion to 3 MGD

Under Construction

• Installing Sewer Line from E Ash St to Preston Rd along S Oklahoma Dr

• Installing Sewer Line along S Oklahoma Dr to Sunset Force Lift Station

• Installing Sewer Line in Downtown Square as part of Downtown Patio Project

• Sunset Lift Station

• Legacy Hills Wastewater Reclamation Plant Expansion to 0.95 MGD Phase 1

WATER

Under Study

• Feasibility Study for Southeast Water Ground Storage, Pump Station, and Transmission Pipeline

Under Design

• Dallas Pkwy 54”, 42”, and 36” Waterline from Celina Rd Pump Station to J. Fred Smith Pkwy

• N Preston Rd 24” and 18” Waterline from Marble St to Public Works Administration Building

• 12” waterline on Frontier Pkwy from Preston Hill Cir to Coit Rd

Under Construction

• Louisiana 18” Waterline Phase 1B - CR 95 to CR 99

• Construction of a new six-million gallon water ground storage tank along Celina Rd and FM 428

• Celina Rd Pump Station Phase 3

Roads

Under Design

• FM 428 (Glendenning Pkwy) Expansion to a six lane divided from Dallas Pkwy to Preston Rd

• Preston Rd Lighting Phase 4 - N Legacy Dr to Marilee Rd

• CR 53 Improvements - Doe Branch to Glen Crossing

• Parvin Rd Asphalt Improvements - Asphalt Reconstruction from Bothwell Blvd to N Legacy Dr

• Parvin Rd Schematic Phase 1 - Expansion to four lanes from FM 1385 to Dallas Pkwy

• S Arizona Dr and S Colorado Dr Improvements from W Ash St to W Cedar St – storm drain, water, sewer, and roadway improvements

• Dallas Pkwy and Collin County Outer Loop Eastbound Frontage Rd temporary traffic signal

• Ownsby Pkwy - Expansion to four lanes from Preston Rd to Coit Rd

• Coit Rd - Construction of two lanes of concrete from Vest Lane to north of Punk Carter Blvd.

• Celina Pkwy Schematic Design - CR 52 to FM 428

• Preston Rd Lighting Phase 3 - Lynn Stambaugh Pwky to Legacy Dr

• Frontier Pkwy from Preston Rd to Custer Rd

• Choate Pkwy from Kinship Pkwy to Custer Rd

Under Construction

• Preston Rd Street Lighting Phase 2 - Glendenning Rd to Lynn Stambaugh Pkwy

• Downtown Inner Loop Phase 1 - Improvements to storm drain system, roadway, water, sewer, lighting, and landscaping on Colorado Dr, Beech St, Ohio St, and Pecan St.

• Maryland St and Lakeview Way - Improvements to drainage system and roadway panel replacements

• Outer Loop Eastbound Frontage Rd from Preston Rd to Custer Rd

• Frontier Pkwy from Preston Rd to Dallas Pkwy

• Doe Branch Creek bank stabilization along S Arkansas Dr between E Oak St and E Ash St

This article is from: