Road improvements that will repair portions of the existing pavements to reset the deterioration process. The Public Works Department will be focusing on the following areas:

• Falcon Ct, Falcon Rd, and Ascot Pl

• County Road 134

• Lake Dr

• Saddle Horn Ct

• Bridle Bend

The Public Works Department will Crack Seal over 40,000 linear feet along Heritage and Preston 455 where they will put an adhesive sealant into cracks in the concrete to prevent the infiltration of moisture and non-compressible materials.

ROAD & SIDEWALK PANEL REPLACEMENTS

The Public Works Department identified several areas throughout Celina that would need to go through the concrete panel replacement process. In these areas, the concrete from the road is removed with heavy machinery then the area is prepped and ready for new concrete. The crew will make any necessary upgrades to the area before the new concrete is poured. Concrete Panel Replacement will occur in the following area:

• Tolleson Estates

• Winn Rd

• Heritage Trail

• Greenway Ave

• Preston 455

• Sycamore St

Sidewalk Panel Replacements follow a very similar process as our roads. Once the areas are identified, the crew will remove all of the damaged sidewalk panels, make any necessary repairs, and pour new concrete. Sidewalk Panel Replacements are scheduled in the following developments:

• Carter Ranch

• Heritage

• Greenway

• Mustang Lakes

• Sutton Fields