Skip to main content

MOUSER TRAINING - Premier & Centra Ordering Procedures

Page 1

ORDERING PROCEDURES 1


Order Acknowledgement Process & Timeline

Ordering Procedures Submit via Horizon-Web, or print and e-mail Horizon-Web or 20/20 order forms E-mail to Orders@MouserC.com using PDF format ◼ Orders acknowledgements can be expected 7-8 weeks prior to delivery or sooner based on order type ◼ Ship weeks are assigned at time of order but confirmed at time of acknowledgement ◼ Once acknowledgement received, you will have 48 business hours to send in changes/release order

2


Order Acknowledgement Process & Timeline

Ordering Procedures (cont.) ◼

Orders with an optional Technical Review Request • Use “Check Box” on EDI Horizon-Web order form or the Technical Review Request Form, which must accompany the printed Horizon-Web or 20/20 Design orders • An optional Technical Review Request requires a floor plan, appliance brand name and model number, and appliance cut-outs and panel sizes ▪ Elevations are beneficial, but not required • Optional Technical Review will extend shipping time ▪ TR will typically add one week to the posted Shipping Schedule • Orders will have the TR performed and sent with the acknowledgement • In most cases, TR will not need to be returned, but reviewed and Change Order submitted if necessary within the 48 hour time for release 3


Appliance Information Form

4


Order Receipt Notice

Some materials must be purchased at the point of order receipt before the order is acknowledged and cannot be cancelled.

5


Order Hold Notification

6


Centra Order Acknowledgement

7


Premier Order Release Notice

8


Technical Review Sheet (Cover Page)

9


Change Order Request

10


Premier Release Request

11


Urgent Request for Information

12


Change Acknowledgement Confirmation

13


DRAWING APPROVAL FORM

14


Ship Week Notification

16


Production Label Sample

16


Premier Series Ordering Instructions

Allowable Changes & Additions at the Point of Order Release with No Change Order Charge ◼ Add butt doors to any number of cabinets ◼ Reduce cabinet width on up to four cabinets ◼ Allow cabinet’s face frame to be increased in width by use of extended stile(s) or by maintaining the same face frame configuration and just making the cabinet wider. (I.E. same number and configuration of doors, drawer fronts, and vents.) ◼ Add modified overlay on up to four cabinets on full-overlay orders

17


Premier Series Ordering Instructions Allowable Changes & Additions at the Point of Order Release with No Change Order Charge (cont.) ◼ Change hinge direction on any number of cabinets ◼ Change finished ends on any number of cabinets ◼ Add any loose moulding items to the order that do not require extended lead-time ◼ Add loose end panels, appearance boards, fillers, and finished panels with no mitered edges ◼ Add convenience items to existing cabinets. (I.E. Breadbox, Cutlery Dividers, False Front Trays, etc.) ◼ Add any loose merchandise items

18


Order Acknowledgement Process & Timeline Specifications When Combining Premier cabinetry with Centra cabinetry The interiors of Centra cabinets and Premier custom cabinets are exact matches. The available cabinet interiors are: ▪ ▪ ▪ ▪ ▪

Centra cabinets have MapleLam, a simulated maple wood grain interior on plywood Premier also have a MapleLam interior with plywood construction Premier Veneer Clear Interior construction is not available on a Centra order. Both Centra and Premier offer an optional Walnut Veneer Clear Interior on solid color cabinetry. Premier MapleLam and Centra may be ordered with Matching Interior modification, which matches interior wood species and finishes to those on the cabinet exterior 19


Order Acknowledgement Process & Timeline Specifications When Combining Premier cabinetry with Centra cabinetry (cont.) The exposed wall cabinet bottoms of Centra Overlay & Inset cabinets and Premier Overlay & Inset cabinets are different and are finished in this manner: ▪ Centra cabinets have a MapleLam bottom, a simulated maple wood grain exposed ▪ Premier MapleLam and Veneer Clear Interior wall cabinets have exposed bottoms finished to blend with the exterior finishes ▪ The exposed bottoms of all Premier wall cabinets combined with Centra wall cabinets will be MapleLam material to match the exposed MapleLam bottoms of Centra ▪ Centra and Centra Custom wall cabinets can be ordered with the bottom finished to blend with the exterior finish at an up-charge of $244 per cabinet (pg 13-12). ▪ Finished exterior bottoms are standard on both Premier and Centra when optional Walnut Veneer Clear Interior is selected. 20


Order Acknowledgement Process & Timeline

Specifications When Combining Premier Overlay & Inset with Centra Overlay & Inset (cont.) The face frame reveal between Centra Overlay cabinets is 1/2” and the face frame reveal between Full Overlay Premier cabinets is 1/4”. When Premier cabinets are ordered with a Centra order, the Centra reveals will be on those cabinets. Reveals in Inset and EURO are the same between Centra and Premier. Flush Finished Ends with Miter Lock are standard on Centra cabinets and Premier cabinets. 21


Order Acknowledgement Process & Timeline

Specifications when Combining Premier Overlay & Inset with Centra Overlay & Inset (cont.) The face frame reveal between Centra Overlay cabinets is 1/2” and the face frame reveal between Full Overlay Premier cabinets is 1/4”. When Premier cabinets are ordered with a Centra order, the Centra reveals will be on those cabinets. Reveals in Inset and EURO are the same between Centra and Premier.

Flush Finished Ends with Miter Lock are standard on Centra cabinets and Premier cabinets.

22


Order Acknowledgement Process & Timeline

Specifications when Combining Premier Overlay & Inset with Centra Overlay & Inset (cont.) POD’s & POS systems differ from Centra Series to Premier Series - when Premier cabinets are combined with a Centra Cabinet order, the Premier cabinets will automatically receive the following Centra construction features at no additional charge: ▪ Blum soft-close concealed hinges & slides are standard on Centra and Premier ▪ POD upright system will be the Centra adjustable polymer upright system – the X-Series with Blum soft-close slides is optional

23


Expedite Services

• Finish-Up Services ◼ ◼ ◼

48 Hour Quick Ship (Off-the-Shelf Merchandise) 7 – Work Day Shipment 14 – Work Day Shipment

• Extended Production Door Style Finish-Up Service • Express Door versus Sample Door (Page 2-5) Centra Only • Express Door Program to clarify color variations from viewing a sample block versus a full door versus a complete kitchen • Express Doors are not to be returned for color match 24


EXPEDITE SERVICES DELAY/CHANGE/HOLD INITIAL NOTICE

25


Freight & Shipping Delivery Guidelines ◼

Shipping Schedule ◼ ◼

◼

Based off Processable Order Date and Production capacity Premier Orders are not scheduled until Order Release notice is returned releasing for production

Mandatory shipping program ◼ ◼ ◼

Request a ship week at time order is placed You have the option to extend ship week at time Order Release is returned Upon return of Order Release a Ship Week Notification is faxed for Premier orders

26


Freight & Shipping Delivery Guidelines (Page 2-6 – 2-8) ◼ Mouser company truck delivery

◼ ◼ ◼ ◼

◼

Landed Multiplier format very simple to determine your landed cost

◼

Minimum Drop Charge applies to combined deliveries less than $7,500 List Price at a single stop – plus job-site charge if applicable

Blanket wrap is standard Cartons are 3% of the total list price of the order Job site delivery within 30 miles of showroom at $180; no form required Job site delivery 30-60 miles from showroom ◼

Requires “Out of Market Area Delivery” form

◼

Freight rate zone might change and job site fee of $180 applies 27


Freight & Shipping Delivery Guidelines (Page 2-6 – 2-8) (cont.) ◼ Job site delivery 60-90 miles from showroom

◼

◼ ◼

◼

Requires “Out of Market Area Delivery” form

◼

Freight rate zone might change and job site fee of $350 applies

Job site delivery outside 90 miles from showroom ◼

Requires “Out of Market Area Delivery” form

◼

Freight rate zone might change and job site fee of $520 applies

Order requested to ship UPS / FedEx will incur UPS / FedEx charges (Page 2-7) UPS and FedEx claims ◼

Do not discard packaging until after the product has been inspected by the Carrier.

28


Order Acknowledgement Process & Timeline

Centra Series Delivery Cycle Program (posted on Mouser website) ▪ 1 week added for Centra w/Custom or Technical Review ▪ 2 weeks added for Laminate, extended production doors and Premier orders ▪ Lead time increases sent as far in advance as possible via Email blasts

29


Turn static files into dynamic content formats.

Create a flipbook
MOUSER TRAINING - Premier & Centra Ordering Procedures by Cedar Hills Media & Marketing - Issuu