Architect (RIAI) - B.Arch, M.Arch
CECILIA BRESSAN / SAMPLES OF WORK
CECILIA BRESSAN / SAMPLES OF WORK
0.0 CONTENTS
CONTECTS
0
SENIOR ARCHITECT AT
1
HENRY J LYONS 1.1
2
HJLA for Kennedy Wilson
p. 3
ARCHITECT AT GARDNER STEWART ARCHITECTS 2.1
2.2
3
COOPERS CROSS COMMERCIAL - DUBLIN D01
ST NICHOLAS HOUSE (MIXED USE DEVELOPMENT) - SUTTON SM1 GSA for St Nicholas House LTD. (MBU Capital)
p. 7
RESIDENTIAL DEVELOPMENT AT LOVES FARM - ST NEOTS GSA for L&Q
p. 10
ARCHITECT/ARCH. ASSISTANT AT HAINES PHILLIPS ARCHITECTS 3.1
3.2
3.3
RESIDENTIAL DEVELOPMENT AT 10-11 DACRE STREET - LONDON (SW1) HPA for Hammersmith Estates Ltd.
p. 12
HAIG HOMES MORDEN ESTATE - LONDON (SM4) HPA for Haig Housing Trust
p. 14
RE-DEVELOPMENT AT 119 ESSEX ROAD - LONDON (N1) HPA for Pembroke Estate
p. 16
Contacts
@
+353 (83)1303155 cecilia.b88@hotmail.it DUBLIN
2
Regeneration Masterplan Proposal for the city of Turin, Italy
1.0 SENIOR ARCHITECT AT HENRY J LYONS
1.1 COOPERS CROSS COMMERCIAL - DUBLIN, D01 Project Title: Coopers Cross Commercial Location: Dublin, D01 Client: Kennedy Wilson Main Contractor: Sisk Procurement Route: Pre-Construction Tender Agreement (PCSA) / Traditional Construction Cost: Confidential Planning Decision: Planning approval granted in January 2020 Software: Revit (BIM Level 2)/AutoCAD/Enscape
BUILDING 1
BUILDING 2
Project Brief: Coopers Cross Commercial is a dynamic new campus style office development located at the heart of the North Docklands precinct. It consists of two new six storey office buildings, with two levels of below ground accommodation. The office spaces are designed for maximum efficiency and flexibility with compact central cores and bright, open floor-plates. The buildings themselves reflect the industrial heritage of the site through the use of colours, metals and forms that have a direct connection to a previous time. Both building volumes are expressed similarly where the East and West facades are enclosed by either an extruded matrix of bronze elements or a series of vertical copper diamond louvers, while the North and South facades are open and fully glazed providing transparency and visual Permeability. The buildings respond to the adjusted landscape and levels, while creating a series of interesting spaces around them. The buildings also act together to project one common expression onto Mayor Street. A dynamic stepped street is introduced between the buildings which cascades down to a lower level, and continues into the building allowing for a tiered town hall space to present itself back out onto the public realm. Glass lifts link between the upper and lower deck, which is occupied by shops, cafes and other uses including a second primary entrance to the commercial building. A unique glass box sits in the centre of the street as an entry point to a large exhibition hall that spans beneath. This acts as a distinctive landmark encouraging people working, living or visiting to explore the campus.
PERSONAL INVOLVEMENT Job Position: Senior Architect Main Tasks: Project team member from late planning to completion with a greater focus on coordination and development of the facade and internal screen design and technical details and delivery on site; responsible for drawing packages coordination with the support of the BIM model. Regularly liasing with design consultants, specialists and subcontractor to deliver the project to its high standard. Stages Involvement: Late Planning to Delivery
MAYOR STREET
35,812sqm OFFICE SPACE
418sqm RETAIL SPACE
467sqm TOWNHALL
36,819sqm TOTAL NIFA
WELL PLATINUM
LEED PLATINUM
BREEAM OUTSTANDING
Illustrative Masterplan: Ground Floor Plan LEGEND: BUILDING 1 BUILDING 2 OFFICE SPACE CAR RAMP
RETAIL
1
. LIGHTWELL
1
URBAN PARK
2
GARDEN STREET MAIN ENTRANCE RETAIL ACCESS SECONDARY ENTRANCE
.
ATRIUM
.
DOUBLE HEIGHT TOWNHALL
.
2
. DOUBLE HEIGHT ATRIUM
FULL HEIGHT ATRIUM
DOUBLE HEIGHT
.
.
.
MAYOR STREET
3
Lower Ground Floor Plan
Typical Floor Plan
CAR RAMP
. .
2
.
.
.
.
.
View of the South frontage from Mayor Street
GARDEN STREET
View of the North frontage from the Urban Park
BUILDING 2
BUILDING 2
URBAN PARK
2
1
4
BUILDING 1
South Facade Detail Design Development
EWS-008 - Unitised Curtain wall System
Initial Design Intent as submitted for Planning
EWS-002 - Stick Curtain wall System with Aluminium feature Fins
EWS-004 - Unitised Curtain wall System with Aluminium feature Fins
EWS-008b - Stick Curtain wall System
Site Development - South West Corner
South East Corner
Facade Subcontractor: Alucraft Main Contractor: Sisk Facade Consultant: BDA Facade System: Schuco Typical full frontage section as part of the tender package at PCSA stage; all details drawings have been developed through the implementation of the BIM model in order to fully coordinate the facades alignments with the structural design. Main Tasks: Package Runner and Coordinator
5
Building 1: from Initial Concept to Site Delivery
Building 2: from Initial Concept to Site Delivery
East Frontage Elevation on Garden Street as per Planning drawings
GARDEN STREET
West Frontage Elevation on Garden Street as per Planning drawings
2
2
6
GARDEN STREET
Garden Street CGI
Garden Street Site Progress
Entrance Atrium CGI
Entrance Atrium Site Progress
Entrance Atrium CGI
Entrance Atrium Site Progress
Townhall CGI
Townhall Site Progress
2.0 PROJECT ARCHITECT / ARCHITECT AT GARDNER STEWART ARCHITECTS 2.1 ST NICHOLAS HOUSE (MIXED USE DEVELOPMENT) - SUTTON, SM1
The proposed redevelopment of the St Nicholas house site will provide a vibrant mix of uses and it will address Council objectives, such as the provision of affordable housing. The proposed scheme will provide a range of significant benefits to this site and the surrounding area, including: • • • • • •
Class A1
CHUR
Class B1/D2 GIA: 566 sqm Class C3 Entrances to Block A & B. Concierge Space. Cleaner’s Storage Space. Sanitary Facilities.
ST NI CHO LAS W
CH
AY
GIA: 400 sqm
Block A 126 Cycle Spaces. Additional 56 Spaces + 13 Adaptable Spaces located at LGF. 234 Spaces + 9 Adaptable Spaces for Block B located at LGF.
ST NICHOLAS ROAD
N
Commercial Plant Deck Residential Plant Areas located at LGF.
Roof Plan
Ro
of
Block A
Block B
ard
e ns 11th
or Flo
• •
GIA: 187 sqm
G
•
Po d iu m G ard
Redevelopment of an existing, out dated, partly vacant office building to create a mix of uses within the town centre; Providing ground floor active uses along St. Nicholas Road and St. Nicholas Way; Providing 276 new homes within the town centre; Providing 88 affordable homes (32% by unit / 36% by habitable room) on site with a mix of affordable rent and shared ownership; A mix of apartment sizes which includes family accommodation, 90% adaptable and 10% fully accessible wheelchair housing; Provision of a significant new area of landscaped public realm on the corner of St. Nicholas Road and St. Nicholas Way; Heritage benefits which include opening up views of St. Nicholas Church (Grade II Listed building) from the High Street. The Church pre-dates all surrounding townscape, and it needs to be appropriately considered in conjunction within any proposal for St Nicholas House; On-site children’s play space to cater for a broad age range; Delivery of high quality housing: all apartments are designed to meet the Mayor of London’s Design Standards and National Space Standards.
Class A1/A3
HOLA S
Project Brief:
Ground Floor Plan
ST NIC
Project Title: St Nicholas House Location: Sutton, SM1 1EH Client: St Nicholas House LTD (MBU Capital) Procurement Route: D&B Construction Cost: £75M (Estimated) Planning Decision: Proposals submitted for Planning approval in July 2019 Software: Archicad (BIM Level 0-1)/Vectorworks/SketchUp Pro/3Ds Max/V-Ray
en r oo 1st Fl Pu
P ic bl laza
n Grou
dL
N
el
ev
PERSONAL INVOLVEMENT Job Position: Architect Main Tasks: Involvement during the project design development from Inception to Technical Design. Coordination of the project design with other consultants such as Structural Engineers, M&E Engineers and Landscape Architects. Great focus on the internal layout design (apartment layouts, parking and technical areas organisation). BIM model design. RIBA Stages Involvement: 1-2-3-4
7
Typical Apartment Design
Typical Residential Floor Plan (3rd-5th Floor Plan)
B
A
Apartment Type UTA10: 3B/5P
Residential Accommodation
B
8
Apartment Type UTA6: 1B/2P Weelchair Unit
1Bed
184
67%
2Bed
72
26%
3Bed
20
7%
TOT
276
A
Proposed Elevations
Design Development - From Conceptual Design to Planning Proposal
01 - Opportunity for Central Open Space
South Elevation 02 - Massing Configuration
05 - Final Concept: Aerial View from South-East
03 - Relocation of Taller & Lower Elements
West Elevation (Block A)
04 - Improved Church Vista
06 - Final Concept: View from St Nicholas Way
9
2.0 2.0 ARCHITECT ARCHITECTURAL ASSISTANT AT HAINESSTEWART PHILLIPS ARCHITECTS PROJECT/ ARCHITECT / ARCHITECT AT GARDNER 2.2 RESIDENTIAL DEVELOPMENT AT LOVES 9 GOODGE FARMSTREET - ST NEOTS - LONDON, W1T Project Title: Loves 10-11 Dacre Farm Street Location: St London, Neots, SW1H Huntingdonshire 0DJ Client: L&Q Hammersmith Estates Ltd. (Developer) Procurement Route: D&B Traditional Construction Cost: £8M £1.9M (Estimated) Planning Decision: Proposals approved in July May2019 2016by bythe theWestminster City Council Westminster Software: Vectorworks/SketchUp City Council Pro/3Ds Max/V-Ray Software: Vectorworks BIM (BIM Level 0-2) Project Brief:
Illustrative Site Layout
FOX
K
BROO
B B
LL RISE
A
The proposals Project Brief:for the site, as developed by GSA, will provide 41 new homes, including 1 and 2 bed apartments and 3 and 4 Estates bedroom The three storey In June 2014 Hammersmith Ltd. houses. instructed HPA to carry outgabled feasibilityhouses along Cambridge Road will provide strong and frontage, apartment buildings creating focal points at either ends. proposalsafor options for continuous change to the buildingswith on the site; including Windows withofaavertical emphasis are key design elements. was made on incorporation residential use. An application for 3 apartments
DRAMSE
15th June gateway 2015 and conditionally consented 2015. green space will shape an attractive entrance A strong from Dramsell Rise withon a 10th new,August landscaped to the site. A pair of grandthe L-shaped willtomark these corners. These houses have generous After further considerations, client hashouses decided instruct HPAfocal for a second fenestration and animation onscale bothproposal sides. which has been submitted on 1st planning application for a larger March 2016 received consent on 12th May 2016. Thishave latest been proposal consists A variety ofand bricks with brick patterns and detailing used to add interest to the façades. Informal of the partial demolition, alterations extensions with front facadebuilt retention shared surface lanes will create aand positive interface between form to and open space, and aids traffic Dacre Street. calming. The scheme includes change of use from office to residential, use class B1 to
AD
M
BR
ID
G
E
RO
CA
PERSONAL INVOLVEMENT C3. The Ground Floor shop units are to remain, while the office space above will Job Position: Architect be converted to 4Project residential units. The proposals seek to make best use of the Main Site layout and design.forPlanning package drawings/documents list buildingTasks: for the present day, with thebuilding building unsuitable modern office use. preparation and organization of the workload among the different members of the team. During the investigation works, it emerged that the soil composition was poorer Liaising project with other consultants and interacting daily with the than usualand for thecoordinating area. It becamethe necessary to significantly change the structural clients. scheme and consequently the internal layout. The new structural design wouldn’t RIBA Stages Involvement: 0-1-2-3 allow for the preservation of the existing floor construction, nor would it be feasible
A
for the shops to reamain in operation. The proposals, asView developed during RIBA stage 4, consist of a mixed AAfinal - Illustrative of the Entrance Gateway and Foxuse Brook Frontage building, with a retail area at the Ground Floor and 4 Flats at the upper floors (2no. x 2 Bed Flats + 2no. x 3 Bed maisonette Flats).
PERSONAL INVOLVMENT Job Postition: Main Tasks: RIBA Stages Involvment:
10
BB - Illustrative View of the Cambridge Road Frontage
N
Affordable Apartment Block to Cambridge Road - Ground Floor Plan
Affordable Apartment Block to Cambridge Road - 1&2 Floor Plan
CLEANERS STORAGE
PLANT ROOM
KEY Living/Dining/Kitchen
GROUND FLOOR: 2no. x Apartment TYPE A Apt Type A (1b2p) = 50m2 (538.2sqft)
FIRST & SECOND FLOORS: 2no. x Apartment Type B Apt Type B (2b4p) = 74m2 (796.5sqft)
KEY Living/Dining/Kitchen
Double Bedrooms
Double Bedrooms
Bathrooms & Storage Spaces
Bathrooms & Storage Spaces
Affordable Apartment Block to Cambridge Road - Front Elevation
Material Strategy 3
4
1
4
Main Brick:
Bronze Effect
Ivanhoe Multi
Metal Cladding Panels
2
5
2
5
Projecting Brick
Bronze
Headers
Effect Metal Balustrade
1
3
Across Site:
Roof Tiles:
Grey Window
Grey Slate
Frames
Effect
11
2.0 ARCHITECT / ARCHITECTURAL ASSISTANT AT HAINES PHILLIPS ARCHITECTS 2.1 RESIDENTIAL DEVELOPMENT AT 10-11 DACRE STREET - LONDON, SW1 Project Title: 10-11 Dacre Street Location: London, SW1H 0DJ Client: Hammersmith Estates Ltd. (Developer) Procurement Route: Traditional Construction Cost: £1.9M Planning Decision: Proposals approved in May 2016 by the Westminster City Council Software: Vectorworks BIM (BIM Level 0-2)
Technical Design - Ground Floor Plan
OFFICES
E
HIGH AND LOW VENTILATION FOR GAS METER CUPBOARD
D
Scale: 1:20
1
NO. 9 DACRE STREET
Technical Design - Internal Elevation
Elevation C
C
NO. 14 BROADWAY
NO. 16 BROADWAY
OFFICES
FOOD TAKEAWAY
1 WL-02
WL-03
WL-02
IE1
BIN STORE
1116
LANDLORDS ELECTRICITY METER
GF.0.3
3
IW-03
2
3
4
5
6
17
7
16
8
15
9
1500
RWP
1043
A
SVP
14
GF.0.4
13
B
B 12
larger scale building development. The intent is for the Ground Floor shop units
4
SVP
557 Clear Passage
SETTING OUT DATUM POINT: INSIDE CORNER OF EXISTING GROUND FLOOR WALL PIER (ALL DIMS TO STUD / MASONRY / RC WALL LINES)
1
A
902
4061
3086
IW-04 BIN STORE DRAINAGE GULLEY
planning application for 3 apartments was made and approved on August
5414
215
1787
215
1586
10
11
215
1924
215
ACCESS TO SERVICE RISER ABOVE
to remain, while the office space above will be converted to 4 flats.
RWP
SHOP
RWP
WL-03
WL-02
WL-03
MANHOLE TO ACCESS EXISTING DRAINS
During the investigation works at RIBA Stage 4, it emerged that the soil composition was poorer than the usual for the area. This affected the structural
3
SERVICE RISER GF.0.2
APARTMENT ELECTRICITY METERS
a change of use from office to residential (use class B1 to C3). After an initial
2
C
2
2075
4
-0
DG-02
G
D
C HIGH LEVEL VENTILATION TO BIN STORE
RWP
ED-02
Cle 15 0 ar Pa 0 ss ag e
DG-01
RWP
SVP
IW-01
GF.0.1B
INTERNAL POST BOXES
an unlisted building of merit situated within conservation area; it also includes
2015, the client decided to instruct HPA for a second planning application for a
SVP
D
DG-03
GG-01
EW-06
RWP RUNS INTERNALLY BELOW FIRST FLOOR
GF.0.1A
WL-03
EW-07 CDG-01
WATER METERS IN PAVEMENT
The project consists of the partial demolition, refurbishment and extension of
10-11 10-11 DACRE DACRE STREET HOUSE
GAS METER CUPBOARD
D
Project Brief:
Scale: 1:20
H
G
F
Elevation D
SVP
WL-02
3 - Metal perforated decorative concealed fixings to internall wall
SVP
Existing Walls
MANHOLE TO ACCESS EXISTING DRAINS
scheme and consequently the internal layout. The new structural design
E
wouldn’t allow for the preservation of the existing floor construction, nor
F
G
NO. 15-17 DACRE STREET HOTEL PREMIER INN
would it be feasible for the shops to remain in operation. The latest proposed
Internal Elevation 1: Entrance Hall
H
1. Paint finish (NBS M60/170) on San/cement render (NBS M20/110a) 2. Fire Rated metal post boxes 3. Metal perforated decorative concealed fixings to internal wall
scheme consist of a mixed use building, with a retail area at the Ground Floor and 4 contemporary Flats at the upper floors (2no. x 2 Bed Flats + 2no. x 3 Bed GENERAL NOTES
maisonette Flats).
Technical Design - Front Elevation KEY
GF.0.1
1. This drawing is the copyright of Haines Phillips Architects.
GF.0.2 GF.0.3
2. Do not scale from this drawing. Use figured dimensions only.
PERSONAL INVOLVEMENT Job Position: Project Architect Main Tasks: Preparing Production information. Tender Package coordination and preparation (Drawings & NBS Specifications). Design Team coordination. Client Liaison. Liaison with manufacturers, suppliers and contractors. Managing and coordinating BIM model. Internal layout design. RIBA Stages Involvement: 4-5
GF.0.4
CONSTRUCTION NOTES:
Entrance Lobby Bin Store Store for 8 cycles Communal Staircase
DRAWING ISSUE STATUS ISSUE
EXISTING MASONRY WALL (VARIOUS THICKNESSES)
GENERAL NOTES
FOR INTERNAL WALL TYPES AND WALL LINING TYPES REFER TO DA502
1.
3. This drawing must not be used for land transfer purposes, or for construction purposes unless accompanied by an Architect's Instruction.
This drawing is the copyright of Haines Phillips Architects.
2.
Do not scale from this drawing. Use figured dimensions only.
3.
This drawing must not be used for land transfer purposes, or for construction purposes unless accompanied by an Architect's Instruction.
STATUS
REVISIONS COMMENT
FOR DOOR TYPES REFER TO DA4XX P PL
PRELIMINARY PLANNING
BR T C
BUILDING REGS TENDER CONSTRUCTION
FC L
FINAL CONSTRUCTION LEGAL
For comment and review Planning/Listed Building Application Building Regs Application For pricing purposes only For procurement & construction Record drawings on completion Conveyancing or other legal purposes
REV
DATE
NOTES
DRAWING ISSUE Preliminary STATUS 1 7/7/17 Tender issue ISSUE
2 STATUS 21/7/17
Revised Preliminary Tender Issue COMMENT
P PL
PRELIMINARY PLANNING
BR T C
BUILDING REGS TENDER CONSTRUCTION
FC L
FINAL CONSTRUCTION LEGAL
File name: 3858 - GA3XX 4XX 5XX 9XX.vwx
PHILLIPS Technical Design - Rear Elevation HAINES ARCHITECTS HAINES
JOB TITLE
REVISIONS
10-11 DACRE STREET, SW1
REV
NOTES TITLE DRAWING
DATE
DRAWN
DATE
SCALE
CB
July 2016
1:50@A1, 1:100@A3
JOB NR
DRAWING - ISSUE - REVISION
3858
GA-302-T-2
JOB TITLE
10-11 DACRE STREET, SW1
PHILLIPS ARCHITECTS
Ground Floor Plan
For comment and review Planning/Listed Building Application Building Regs Application For pricing purposes only t For procurement & construction f Record drawings on completion e Conveyancing or other legal purposes
DRAWING TITLE
Entrance Hall/Lobby Elevations t f e
File name: 3858 -DA2XX.vwx W3-01
Proposed Header level
W3-02
D3-01
W3-03
D3-02
DRAWN
DATE
SCALE
CB
May 2017
1:20@A3
JOB NR
DRAWING - ISSUE - REVISION
3858
DA-204-T-1 Proposed Head level
W3-04
11314
11301
Proposed Third Floor Extension
Proposed Third Floor Extension Proposed Sill level Top of Parapet
Proposed Sill level Top of Parapet
9852
9591
9591
Third Floor Proposed FFL 9208
9797 Third Floor Proposed FFL 9208
Top line of existing brickwork
Proposed Head level
Top line of existing brickwork (to be confirmed on site)
8460
Proposed Sill level 7185 Top of Parapet
Second Floor Proposed FFL W1-02
W1-02
W2-04
6288
D2-01
W1-02
6516
Second Floor Proposed FFL 6288
D2-02
Proposed Head level 5533
Proposed Sill level 4258 W1-02
First Floor Proposed FFL
W1-02
W1-04
W1-06
Top of Parapet
Top of Parape
3591
3591
3368
3368
W1-03
First Floor Proposed FFL
Existing shopfronts to Ground Floor commercial units generally unaltered
D1-01
D1-02
Existing shopfronts to Ground floor commercial units generally unaltered
As Existing Front Elevation to be retained
GENERAL NOTES 1. This drawing is the copyright of Haines Phillips Architects. 2. Do not scale from this drawing. Use figured dimensions only.
Ground Floor Existing Floor Level
Ground Floor Existing FFL
0
0 GG-01
0
12
SHOP
DRAWING ISSUE STATUS
1
Front Elevation COMMENT
ISSUE
STATUS
P PL
PRELIMINARY PLANNING
BR T C
BUILDING REGS TENDER CONSTRUCTION
Scale: 1:50 For comment and review Planning/Listed Building Application Building Regs Application For pricing purposes only For procurement & construction
REVISIONS REV
DATE
NOTES
1
20/7/17
Preliminary Tender Issue
3
4
5
HAINES PHILLIPS ARCHITECTS
6
7
8
9
10 M
JOB TITLE
10-11 DACRE STREET, SW1 DRAWING TITLE
As Existing
2
Rear Elevation Scale: 1:50
3
Side Elevation Scale: 1:50
W1-01
Technical Design - Typical Details
D1-06
W1-06
CD1-03
CD1-02
W1-05 D1-07
4
D1-0
D1-03
D1-02
W1-02
D1-08
D1-05
D1-09
CD1-04
A
PARTL1B - STANDARD U VALUE 1. ROOF MIN U VALUE: 0.18 W/M2K
A
CD1-01
CD1-05
D1-10 CD1-08
D1-01
B
D1-1
D1-16
B
D1-11
W1-03
5
W1-04
D1-14 CD1-07 D1-13
D1-12
GENERAL NOTES: 1 - STRUCTURAL ELEMENTS TO STRUCTURAL ENGINEER DETAILS. 2 - ALL LEAD JOINTS/GUTTER LINING DESIGN AS PER LEAD SHEET ASSOCIATION GUIDELINES.
LIFTING BEAMS BUILT INTO THE WALL. DIMENSIONS TBC.
A
C
FR-02
CD1-06
Mansard Roof Ridge/Flat Roof Flat Roof Type 2 (FR-02) - Refer to: DA511 CODE 5 Lead flashing lapped with flat roof membrane to manufacturer recommendations NBS H71/315
FR-02
Third Floor Proposed Window Head 11314
3F.0
3F.4.7
9683
STORAGE
3F.4.6
3F.0 3F.0
Top of Parapet
LIFT
LIFT
9591
Third Floor Proposed FFL
3F.4.7 3F.4.7
Third Floor Proposed FFL
9679
12 11
+8113
10
+7930.5
9
B
2F.4.3 +7018
4
+6835.5
3
+6653
2
2F.4.5
14
+5740.5
13
+5558
12
12
+8295.5
11
+8113
10
+7930.5
9
+7748
8
+7565.5
7
+7383
6
+7200.5
LIFT
1F.0
F-02
+4463
6
+4280.5
5
+4098
4
+3915.5
3
+3733
2
+35560.5
1
+1871.11
10
+1684
9
+1496.89
8
+1122.67
7
+1122.67
6
1F.2.5
STORAGE
1F.2.4
1F.2.7
FR-01
First Floor Proposed FFL
18 +3180.89
17
+2993.78
16
+2806.67
15
+2619.56
14
14 13
+5558
12
+5375.5
11
LIFT
+935.56
5
+748.44
4
TENDER CONSTRUCTION CONSTRUCTION
AB
AS-BUILT
L
8 +4645.5
FINAL CONSTRUCTION LEGAL
For comment and review For comment and review Planning/Listed Building Planning/Listed Building Application Building Regs Application Application For pricing purposes only Forprocurement pricing purposes only For & construction For procurement & Record drawings on completion construction Conveyancing or other legal purposes drawings on Record
This drawing must not be used for land transfer purposes, or for construction purposes unless accompanied by an Architect's Instruction.
ISSUE STATUS
completion Conveyancing or other legal purposes
LEGAL
DRAWING ISSUE STATUS
150mm PIR insulation between dormer roof joists NBS P10/190.2
SK
+4463
REV
DATE
NOTES
1
18/7/17
Preliminary Tender Issue
5 4
SKETCH PRELIMINARY PRELIMINARY PLANNING PLANNING
BR T T C
BUILDING REGS TENDER TENDER CONSTRUCTION
C
CONSTRUCTION
AB
AS-BUILT
L
LEGAL
FC L
For comment and review For comment and review Planning/Listed Building Planning/Listed Building Application Building Regs Application Application For pricing purposes only Forprocurement pricing purposes only For & construction For procurement & Record drawings on completion construction Conveyancing or other legal purposes Record drawings on
FINAL CONSTRUCTION LEGAL
completion Conveyancing or other legal purposes
REVISIONS
6
+4280.5 +4098
COMMENT
PL
P P PL
100mmMin
1F.2.4
7
First Floor Proposed FFL
3210
First Floor Proposed SFL
3210
REV
DATE
NOTES
1
19/7/17
Preliminary Tender Issue
+2432.43 13 12
+2245.32
HOTEL PREMISES
SHOP
3
Ground Floor Proposed SFL
2
+374.22 +187.11
3.
+2058.22 11
GF.04
F-01
BUILDING REGS TENDER
C
3368
PARTY WALL HEIGHT TO BE CHECKED ON SITE.
+561.33
0
1F.0
Do not scale from this drawing. Use figured dimensions only.
Clipped soffit edge welted to soffit lining
Code 5 lead on plywood on 150X50mm timber joists NBS H71/150
COMMENT
SKETCH PRELIMINARY PRELIMINARY PLANNING PLANNING
REVISIONS
9 +4828
This drawing is the copyright of Haines Phillips Architects.
2.
11829mm 6130
Second Floor Proposed SFL
10
+5010.5
1
SHOP
Ground Floor FFL 0
SHOP
10
HAINES PHILLIPS ARCHITECTS
SHOP
GF.04
F-01
HAINES PHILLIPS ARCHITECTS
150°
First Floor Proposed SFL -163
Min
-163
+1871.11
SERVICE DUCT
SHOP
Second Floor Proposed FFL
F-02
3368 First Floor Proposed SFL
MIN. 250mm CLEAR CEILING VOID REQD. TO GROUND FLOOR ENTRANCE HALLWAY
Ground Floor FFL
1F.2.1
SERVICE DUCT
STORAGE
1F.2.7
7
SK P P PL PL
Level 6288
+5923
+5740.5
+5193
+4645.5
4
1.
Timber fillet supports to lead flashing/breather membrane
Natural silicone seal to edge window opening ISSUE STATUS
FC L
15
+6105.5
GENERAL NOTES
DRAWING ISSUE STATUS
BR T T C
Timber fillet supports to lead flashing/breather membrane
6130
Mansard roof/dormer junction M Roof Type 1 (MR-01) - Refer to: DA511
in
2F.4.3
16
Second Floor Proposed SFL
This drawing must not be used for land transfer purposes, or for construction purposes unless accompanied by an Architect's Instruction.
mM
0m
15
9050
5
+7018
6288
1
+6470.5
15
+5923
+8478 +8478
2F.0 flashing at roof angle Code 5 Lead changes
Second Floor Proposed FFL
16 +6105.5
2F.4.1
1984
+8478 +8295.5
2F.0
Min ceiling height 19000
LIFT
Third Floor Proposed SFL
Crancked steel and timber joists/rafters struture to Structural Engineer details SERVICE DUCT
STORAGE
2F.4.5
Do not scale from this drawing. Use figured dimensions only.
3.
Code 5 lead to dormer fascia
9797
9208 9050
This drawing is the copyright of Haines Phillips Architects.
Third Floor Proposed Window Cill Level
Raised SFL
9208 Third Floor Proposed SFL
1.
75mmMin
STORAGE
SERVICE DUCT
3F.4.6 Top of Parapet
GENERAL NOTES
2.
mm
t
150
f e
t f
JOB TITLE
e
10-11 DACRE STREET, SW1
C - REAR DORMER WINDOW AND TERRACE DETAILS
Section BB Scale: 1:50
DRAWING TITLE
Mansard Roof Hip and Ridge Mansard Roof Type 1 (MR-01) - Refer to: DA511
13
Roof Details Junction of mansard and flat roofs
KEY
GENERAL NOTES
2. Do not scale from this drawing. Use figured dimensions only. 3. This drawing must not be used for land transfer purposes, or for construction purposes unless accompanied by an Architect's Instruction.
GF.04
GROUND FLOOR Communal Staircase
2F.0 2F.4.3
1F.0 1F.2.4 1F.2.5 1F.2.7
FIRST FLOOR Communal Staircase Flat 2: Bedroom 2 Flat 2: Showeroom (Ensuite) Flat 2: Living/Dining
2F.4.5
3F.0 3F.4.6 3F.4.7 3F.4.8
DRAWING ISSUE STATUS
FOR FLOOR AND FLAT ROOF TYPES REFER TO DA511
ISSUE
STATUS
COMMENT
FOR STRUCTURAL ELEMENT DIMENSIONS REFER TO STRUCTURAL ENGINEER
P PL
PRELIMINARY PLANNING
BR T C
BUILDING REGS TENDER CONSTRUCTION
FC L
FINAL CONSTRUCTION LEGAL
For comment and review Planning/Listed Building Application Building Regs Application For pricing purposes only For procurement & construction Record drawings on completion Conveyancing or other legal purposes
DRAWINGS
THIRD FLOOR Communal Staircase Flat 4: Bedroom 2 Flat 4: Bedroom 3 Flat 4: Bathroom (Jack and Jill)
REVISIONS REV
DATE
NOTES
1
7/7/17
Preliminary Tender issue
2
21/7/17
Revised Preliminary Tender Issue
JOB TITLE
HAINES PHILLIPS ARCHITECTS
10-11 DACRE STREET, SW1
CB
t
JOB NR
f
3858
e
DATE
SCALE
July 2016
GA-401-T-2
Mansard wall/roof junction E Wall Type 3 (EW-03) - Refer to: DA501
Support angle to gutter insulation Air Brick NBS F30/160
Casement window in dormer W Type 8 (W-08) - Refer to: DA435
JOB NR
DRAWING - ISSUE - REV
3858 D-521a-T-1
This drawing is the copyright of Haines Phillips Architects. Do not scale from this drawing. Use figured dimensions only.
Timber fillet supports to lead flashing/breather membrane
3.
GENERAL NOTES: 1 - STRUCTURAL ELEMENTS TO STRUCTURAL ENGINEER This drawingDETAILS. must not be used for land transfer purposes, or for construction 2 - ALL LEADWORK IN ACCORDANCE WITH LEAD SHEET purposes unless accompanied by an Architect's Instruction. ASSOCIATION GUIDELINES.
GENERAL NOTES
Frameless Glass Balustrade NBS L30/560
ISSUE STATUS
SK P P PL
Perpend joint weep holes NBS F30/132
COMMENT
SKETCH PRELIMINARY PRELIMINARY PLANNING PLANNING BUILDING REGS TENDER
C
TENDER CONSTRUCTION CONSTRUCTION
AB
AS-BUILT
L
LEGAL
FC L
75mmMin
9571mm
1.
This drawing is the copyright of Haines Phillips Architects.
2.
Do not scale from this drawing. Use figured dimensions only.
3.
This drawing must not be used for land transfer purposes, or for construction purposes unless accompanied by an Architect's Instruction.
FINAL CONSTRUCTION LEGAL
For comment and review For comment and review Planning/Listed Building Planning/Listed Building Application Building Regs Application Application For pricing purposes only Forprocurement pricing purposes only For & construction For procurement & Record drawings on completion construction Conveyancing or other legal purposes Record drawings on
Code 5 lead flashing below and turned up behind window cill
Casement window in dormer W Type 8 (W-08) - Refer to: DA435
completion Conveyancing or other legal purposes
Mastic Sealant
Floor finishes on acoustic floor system 18mm ply deck over SW DRAWING ISSUE STATUS platform ISSUE STATUS COMMENT joist structure to SK SKETCH structural engineer details P PRELIMINARY For comment and review For comment and review P PRELIMINARY PL
PLANNING
PL
PLANNING
BR T T C
BUILDING REGS TENDER
C
TENDER CONSTRUCTION CONSTRUCTION
AB
AS-BUILT
L
LEGAL
FC L
FINAL CONSTRUCTION LEGAL
300mmMax
REV
DATE
NOTES
1
18/7/17
Preliminary Tender Issue
Planning/Listed Building Planning/Listed Building Application Building Regs Application Application For pricing purposes only Forprocurement pricing purposes only For & construction For procurement & Record drawings on completion construction Conveyancing or other legal purposes Record drawings on
completion Conveyancing or other legal purposes
REVISIONS
100mmMin
Hardwood timber cill
DRAWING ISSUE STATUS
BR T T C
Level
Casement window in dormer W Type 8 (W-08) - Refer to: DA435
1. AS PROPOSED ROOF U VALUE: 0.18 W/M2K
1. 2.
150mmMin 100mm PIR Insulation NBS P10/191
1:5@A3
150mmMin
Firring battens to form box gutter fall (25x50mm min at lowest point of gutter) 75x50mm Timber base frame (interrupted around air bricks)
February 2017
SCALE
GENERAL NOTES PARTL1B - STANDARD U VALUE
Crancked steel and timber joists/rafters struture to Structural Engineer details
PL
Two courses of creasing tiles below brick on edge parapet coping NBS F30/760 Code 8 Lead-lined stepped parapet box gutter (fall of 1:80). Lead sheet turned into brickwork to form flashing wedge min 25mm NBS H71/230
DATE
CB
DRAWING - ISSUE - REV
° 69
GENERAL NOTES: 1 - STRUCTURAL ELEMENTSTO STRUCTURAL ENGINEER DETAILS. 2 - ALL LEAD JOINTS/GUTTER LINING DESIGN AS PER LEAD SHEET ASSOCIATION GUIDELINES. 3 - UNDERFLOOR HEATING SYSTEM AS SERVICES ENGINEERS DETAILS. 4 - AS EXISTING WALL DIMENSIONS TO BE CHECKED ON SITE.
DRAWN
3. DORMER MIN U VALUE: 0.18 W/M2K 1:5@A3
B - TERRACE AND REAR PARAPER WALL DETAILS
1100mmMin
PARTL1B - STANDARD U VALUE 1. EXTERNAL EXISTING WALL MIN U VALUE: 0.30 W/m2K 2. ROOF MIN U VALUE: 0.18 W/M2K
2. NEW WINDOW MIN U VALUE: 1.6 W/M2K SCALE JOB NR
GENERAL NOTES: 3858 D-502-T-1 1 - STRUCTURAL ELEMENTS TO STRUCTURAL ENGINEER DETAILS. 3 - ALL LEAD JOINTS/GUTTER LINING DESIGN AS PER LEAD SHEET ASSOCIATION GUIDELINES.
DRAWING - ISSUE - REVISION
A - FRONT PARAPET AND MANSARD ROOF DETAILS
Roof Details Dormer Window Head
MIN U VALUE: CB1. ROOF February 2017 0.18 W/M2K
Section AA/BB DRAWN
DRAWING TITLE
DRAWN DATE- STANDARD U VALUE PARTL1B
DRAWING TITLE
REVISIONS REV
DATE
NOTES
1
20/7/17
Preliminary Tender Issue
Mansard wall/dormer junction E Wall Type 3 (EW-03) - Refer to: DA501
Cavity tray
SFL 9050mm
Brick Tie to Concrete slab To S.E. details
HAINES PHILLIPS ARCHITECTS 100x100mm Roof membrane reinforcment Strip at junction upstand (to manufacturers recommendation)
t f
HAINES PHILLIPS ARCHITECTS
e t
JOB TITLE
f
10-11 DACRE STREET, SW1
e
JOB TITLE
10-11 DACRE STREET, SW1 DRAWING TITLE
Existing retained front wall
Roof Details Front Parapet Gutter
DRAWN
DATE
CB
February 2017
SCALE
1:5@A3 JOB NR
DRAWING - ISSUE - REV
3858 D-501-T-1
File name: 3858 -D1XX D3XX D5XX.vwx
File name: 3858 - GA3XX 4XX 5XX 9XX.vwx
SECOND FLOOR Communal Staircase Flat 4: Bedroom 1 Flat 4: Living/Dining
10-11 DACRE STREET, SW1
DRAWING TITLE
Roof Details Typical Parapet Detail
DRAWN
DATE
CB
February 2017
SCALE
1:5@A3 JOB NR
DRAWING - ISSUE - REV
3858 D-531-T-1
File name: 3858 -D1XX D3XX D5XX-Backup-20170724112458.vwx
1. This drawing is the copyright of Haines Phillips Architects.
CONSTRUCTION NOTES:
JOB TITLE
File name: 3858 -D1XX D3XX D5XX.vwx
2
File name: .3858 -D1XX D3XX D5XX-VWTMP.vwx
Section AA Scale: 1:50
9°
1
SFL 9050mm
PARTL1B - STANDARD U VALUE 1. ROOF MIN U VALUE: 0.18 W/M2K 2. NEW WINDOW MIN U VALUE: 1.6 W/ 3. DORMER MIN U VALUE: 0.18 W/M2K
GENERAL NOTES: 1 - STRUCTURAL ELEMENTS TO STRU DETAILS. 3 - ALL LEAD JOINTS/GUTTER LINING SHEET ASSOCIATION GUIDELINES.
13
3.0 ARCHITECT / ARCHITECTURAL ASSISTANT AT HAINES PHILLIPS ARCHITECTS 3.2 MASTERPLAN PROPOSAL FOR THE “HAIG HOMES MORDEN ESTATE” DEVELOPMENT - LONDON, SM4 Project Title: Haig Homes Morden Estate Location: London, SM4 Client: Haig Housing Trust Procurement Route: D&B Construction Cost: £12.5M Planning Decision: Proposals approved in October 2016 by the Merton Council Software: Vectorworks BIM (BIM Level 0-2) Brief: Haines Phillips Architects were appointed by Haig Housing Trust in January 2015 to carry out a Feasibility Study to explore the development potential of their existing estate in Morden. A comprehensive Masterplan for the future development of the Estate was consecutively prepared to enable consultation with the Local Authority and other interested parties.
The project accommodation mix will include: •
33% 1-bed flats for service leavers;
•
33% 2-bed flats for under-occupiers;
•
33% 2, 3 and 4-bed flats and houses for families.
1. As Built Aerial View 2. Proposed Ground Floor Site Layout and Landscape Plan as approved in October 2016
PERSONAL INVOLVEMENT Job Position: Architectural Assistant (Part 2) Main Tasks: Preparation of the Detail Planning Application Package as part of the design team. Preparing presentations for the client and for Public Consultations. Masterplan design, Landscape design, site appraisal and feasibility. RIBA Stages Involvement: 0-1-2-3
The initial Masterplan Proposals accompanied a Pre-Application Submission made in July 2015 to the London Borough of Merton Planning Department. The proposals were initially including a Community Centre, Recreational Spaces and 118 Residential Units. The project was reduced in size to accommodate the revised client’s requirements. The project as submitted for planning included 68 Residential Units and generous Open Spaces to serve the community.
HI
LL
TO
PC
OU
HILL TOP COURT
RH
HILL TOP
RT
O CO DES UR MO TG O AR RHO DE US NS E
HI
LL
TO
P
The project is aiming to provide accommodation to different veterans groups such as single service leavers who need transitional support and a secure residence, current HHT Tenants whose needs have changed and new veteran families seeking housing assistance.
RHODES MOORHOUS E COURT GARDENS
N
1
2 14
Site Perspective: View from West
Site Perspective: View from South
RHODES MOORHOUSE COURT GARDENS
HILL TOP
HILL TOP COURT
HILL TOP COURT
HILL TOP
Illustrative Site Sections
B
Section A
A
Rhodes Moorhouse Court Gardens
Hill Top Court
Hill Top
Section B
N Rougemont Avenue
Hill Top Court
Rhodes Moorhouse Court Gardens
15
3.0 ARCHITECT / ARCHITECTURAL ASSISTANT AT HAINES PHILLIPS ARCHITECTS 3.3 RE-DEVELOPMENT OF 119 ESSEX ROAD - LONDON, N1 Project Title: 119 Essex Road Location: London, N1 2SN Client: Pembroke Estates LLP Procurement Route: Traditional Contract Value: £1.6M Planning Decision: Proposals approved in June 2015 by the Islington Council Software: Vectorworks BIM (BIM Level 0-2)
119 Essex Road before the refurbishment
119 Essex Road at works completion
Main Elevation on Essex Road at completion
Elevation on Astey’s Row
Project Brief: The development is located on a prominent corner of Essex Road in Islington, facing the South Library, a large red brick Grade II Listed Building. The proposals consist of the partial demolition of the existing building, down to first floor level. The existing steel frame and building foundations were retained and lightweight construction introduced above for the new upper floors and roof. The existing first floor elevation along the angled corner of the site, addressing the South Library building, is also extended by one floor, but with an elevation set back from the existing and incorporating banding and cornice details in Portland stone in order to respect the detail, materials and formality of the north eastern elevation of the South Library as it addresses the pedestrian link space between the two buildings. Six contemporary flats are arranged over 4 floors above the Costa coffee shop that remained operational throughout the construction works. The accommodation within the top part of the mansard roof is arranged around an internal terrace that abuts the flank party wall of the adjoining building. Conservation rooflights are proposed in a discrete and subservient arrangement to provide dual aspect daylight and sunlight and ventilation. The works commenced on site in June 2016 and were completed in September 2017.
PERSONAL INVOLVEMENT Job Position: Architectural Assistant (Part 3) Main Tasks: Preparing production information and tender package with the other members of the technical design team. Liaising with the other consultants, specialists and manufacturers. Internal layout design and technical design. Attending site meetings and site visits. RIBA Stages Involvement: 4-5-6
16
Technical Design - Proposed Elevation to Essex Road
Technical Design - Proposed Front Elevation
Copper dormer roofs and cheeks to match the existing. H73
Conservation type metal frame rooflight centred on dormer, flush with roof slates. L10 & H62
Copper flashing to match the existing. H73 Roof Top Level
Roof Top Level
15088
15088
New mansard roof on footprint of existing, set back at corner, details including dormer windows, to match the existing. L10 & H62
Conservation type metal frame rooflight centred on dormer, flush with roof slates. L10 & H62 Copper flashing to match the existing. H73
Stone balustrades to match stone used in library opposite. F22
Third Floor Window Head Level
New painted timber windows. L10
Fourth Floor Level
Fourth Floor Level
12231
12231
Third Floor Window Head Level
11759
11759
Third Floor Window Cill Level
Third Floor Window Cill Level
10411
10411
Second Floor Window Head Level
Third Floor Level
Third Floor Level
9431
9431
New mansard roof on footprint of existing, set back at corner, details including dormer windows, to match the existing. L10 & H62
Dormer roof and cheek in copper to match the existing. Painted timber French doors. H73 & L20 Stone balustrades to match stone used in library opposite. F22
Second Floor Window Head Level
9000
9000
Second Floor Window Cill Level
Second Floor Window Cill Level
7190
7190
New painted timber windows. L10
New second floor in brickwork to match existing with stone string course and coping. F10 & F22. Stone string course. F22
First Floor Window Head Level
New first floor in brickwork to match the existing with stone string course and coping. F10 & F22
Second Floor Level
Second Floor Level
6631
6631
First Floor Window Head Level
6150
New second floor in brickwork to match existing with stone string course and coping. F10 & F22.
Stone string course. F22
6150
Ground floor fabric retained as existing and repaired First Floor Window Cill Level
Painted recycling store extension brickwork to match existing ground floor to recycling store. Existing wall raised in height with painted brick on edge coping. F10
4340
C3
First Floor Level
Existing to be retained
3831
First Floor Existing Slab Level
Existing to be retained
3750
First Floor Window Cill Level
First Floor Existing Slab Level
First Floor Level
New first floor in brickwork to match the existing with stone string course and coping. F10 & F22 C3
4340
3831
3750
Ground floor fabric retained as existing and repaired
Astey's Row Entrance Level
Astey's Row Entrance Level
1041
1041
Ground Floor Level
Essex Road Enrance Level
0
-463
Progress on Site 1
1
Elevation 1
1
Scale: 1:50
Elevation 2 Scale: 1:50
Elevation 1 Scale: 1:50
NOTES
wing is the copyright of Phillips Architects .
scale from this drawing. Use dimensions only.
wing must not be used for nsfer purposes, or for ction purposes unless anied by an Architect's on.
ENCE: 3876-HPA-00-M3-A-G-GA-SO
DRAWING ISSUE STATUS
REVISIONS
ISSUE
STATUS
COMMENT
REV
DATE
NOTES
SK P PL T C AB L
SKETCH PRELIMINARY PLANNING TENDER CONSTRUCTION AS-BUILT LEGAL
For comment and review Planning/Listed Building Application For pricing purposes only For procurement & construction Record drawings on completion Conveyancing or other legal purposes
1
11/4/16
LAYOUT UPDATED TO ACCOMODATE EXISTING STRUCTURE AND REVISED SURVEY.
2
2/8/16
Window cill levels added, model updated
3
8/11/16
First floor window cill and head level amended
GENERAL NOTES
HAINES This drawing is the copyright of PHILLIPS Haines Phillips Architects . 2. ARCHITECTS Do not scale from this drawing. Use
1.
figured dimensions only.
3. Tankerton This drawing must not be used for Works land transfer purposes, or for 12 Argyle Walk construction purposes unless London WC1H 8HA accompanied by an Architect's Instruction. 020 7833 9324 t f
020 7837 2864
e
office@hainesphillips .co.uk
JOB TITLE
117-119 Essex Road, N1 DRAWING TITLE
Elevation 1 As Proposed DRAWN
DATE
SCALE 1:50@A1; 1:100@A3
JOB NR
DRAWING NR
ISSUE
FM/DR
3876
FEB 2015
GA501
C
DRAWING ISSUE STATUS
REVISIONS
ISSUE
STATUS
COMMENT
REV
DATE
NOTES
SK P PL T C AB L
SKETCH PRELIMINARY PLANNING TENDER CONSTRUCTION AS-BUILT LEGAL
For comment and review Planning/Listed Building Application For pricing purposes only For procurement & construction Record drawings on completion Conveyancing or other legal purposes
1
11/3/16
LAYOUT UPDATED TO ACCOMODATE EXISTING STRUCTURE AND REVISED SURVEY.
2
2/8/16
Window cill levels added, model updated
3
8/11/16
First floor window cill and head level amended
HAINES PHILLIPS ARCHITECTS Tankerton Works 12 Argyle Walk London WC1H 8HA
REVISION
3
t
020 7833 9324
f
020 7837 2864
e
office@hainesphillips .co.uk
JOB TITLE
117-119 Essex Road, N1 DRAWING TITLE
Elevation 2 As Proposed DRAWN
DATE
JOB NR
DRAWING NR
FM/DR
3876
FEB 2016
SCALE 1:50@A1; 1:100@A3
GA502
C
ISSUE
HPA FILE REFERENCE: 3876-HPA-00-M3-A-G-GA-SO
Typical Bathroom Arrangement
Top Floor Maisonette
Typical Kitchen Arrangement
17
REVISION
3