
CONNECTING THE INDUSTRY



It is crucial to correctly dimension all electrical system components, such as switches, fuses, cables, etc. We do this so that in the event of a fault, it does not cause damage to the equipment that could cause a substantial loss.
To do this, first, the maximum value of the current and its behavior during the first fault cycle and several cycles later are calculated. This will determine the value of the current to be interrupted and the stress to which the equipment is subjected during the incident.
CEBSA, offers specialized shortcircuit study services to ensure the safety and reliability of your electrical installations. Our short-circuit studies evaluate your electrical system's ability to withstand short-circuit currents and identify potential weak points that could pose safety risks. Our electrical engineering experts use advanced analysis and simulation tools to calculate and model your system's behavior in the event of a short circuit, to determine the breaking capacity of the protection devices, such as switches and fuses, and to ensure the system‘s design is safe and sufficient to handle these extreme conditions.
CEBSA aims to give you peace of mind and confidence by meeting the strictest safety standards and protecting against the risks associated with short circuits for your operations.