Skip to main content

ARE Genesis

Page 1

ALEXANDRIA BIOTECH CENTER AT

Next Generation Manufacturing | Delivering Q4 2022

E AST CO R NWA LLIS ROA D AT NC HWY 1 47 R ESE A R C H TRIA N GLE PA RK , NC


Technology, R&D, & Manufacturing CAMPUS FEATURES BIO-MANUFACTURING • Bio-Manufacturing Footprint up to 755,800 SF • 36’ Clear Height • 4 Dock Doors • 8,000 Amps 277/480 Volt Power • 2:1000 parking OFFICE/LAB (PHASE I) • Approx. 410,000 SF (divisible) • 8” Reinforced Concrete Slab • 8” Fire Main • 3.3/1,000 Parking Ratio • Estimated TI Delivery — Q4 2022

ALEXANDRIA BIOTECH CENTER AT


DOWNTOWN RALEIGH

Aerial

Umstead State Park

RDU INTERNATIONAL AIRPORT

GL

E

D OO W N

AV

U E/

0 S7

ALEXANDRIA BIOTECH CENTER AT

Brier Creek

AN

DE

RD

R

NC HWY 147/DURHAM FREEWAY

TW

S RD

EX

AL EX AN DE R

RNW ALLI

AL

DR

E CO

TW

© Mapbox, © OpenStreetMap


proposed master site plan Welcome to a thriving technology and life science campus truly unlike

PHASE 2

BUILDING 1 201K SF

any other. Designed to take full

BUILDING 2 209K SF

advantage of the beautiful RaleighDurham seasonal climate. Offering

VIEW FROM NORTH TORREY PINES ROAD Conceptual rendering (subject to change)

unparalleled opportunities for indoor/outdoor work and play, BUILDING 3 113K 227K SF

across 100 beautiful acres connected by a sprawling network of amenities. ALEXANDRIA REAL ESTATE EQUITIES, INC. Confidential and Proprietary. Do Not Copy or Distribute. All Rights Reserved © 2020

We are taking next generation manufacturing to a new level.

BUILDING 4 122K 244K SF

BUILDING 5 142K 285K SF

BUILDING 6 DPR


Alexandria Next-gen manufacturing

ALEXANDRIA BIOTECH CENTER AT

CLEAR HEIGHT

36’

WET UTILITIES

8” Fire Main

ROOF R&D/OFFICE 2ND FLOOR SLAB ON GRADE MEZZANINE AMENITIES

80# Load, Metal Deck w/Structural Steel 100# Load, 10’0” Ceiling & Full Floor 8” Ability to Double the Building Footprint ARE Network + On-Site


PERMITTING + DESIGN

Construction Timeline

1-3 MONTHS

PRE-CONSTRUCTION & PROCUREMENT 1-3 MONTHS

SITEWORK/INFRASTRUCTURE 2 MONTHS

VERTICAL CONSTRUCTION 5 MONTHS

BUILDING UPFIT

shell completion in 9 to 11 months full upfits in 13 to 15 months

2 MONTHS

PUNCH-LIST & FINAL INSPECTION 2 MONTHS

NOTICE TO PROCEED

MONTH

1

PERMIT APPROVAL COMPLETED

2

3

PROCUREMENT & EARTHWORK

4

5

BUILDING UPFIT PUNCH LIST & FINAL INSPECTION

VERTICAL CONSTRUCTION

6

THIS IS ESTIMATED BASED ON PRIOR EXPERIENCE WITH SIMILAR PRODUCT TYPE

7

8

9

10

11

12

SUBSTANTIAL COMPLETION

13

14


ALEXANDRIA BIOTECH CENTER AT

conceptual rendering


16

Alexandria’s Raleigh-DUrham Portfolio

17

ALEXANDRIA BIOTECH CENTER AT

15

RTP 10 CHAPEL HILL

MAP

PROPERTY

1

5 Laboratory Drive

2

6 Davis Drive

3

407 Davis Drive

4

601 Davis Drive

5

7010/7020/7030 Kit Creek Road

6

2525 Hwy 54

7

5 & 7 Triangle Drive

8

100 Capitola Drive

9

800 & 801 Capitola Drive

10

6101 Quadrangle Drive

11

108, 110, 112, and 114 TW Alexander Drive

12

6040 George Watts Hill

13

9 Laboratory Drive

14

8 Davis Drive

15

14 TW Alexander

16

2400 Ellis Road

17

Alexandria Center for Life Science-Durham

14

6

1

2 13

7 8

11

9

3 4

5

12


ALEXANDRIA BIOTECH CENTER AT

BROKER CONTACTS BRIAN CARR Executive Vice President T +1 919 831 8256 brian.carr@cbre-raleigh.com LEE CLYBURN Executive Vice President T +1 919 831 8266 lee.clyburn@cbre-raleigh.com


Turn static files into dynamic content formats.

Create a flipbook
ARE Genesis by CBRE|Raleigh Marketing Team - Issuu