01 DENSITY WITHOUT DEMOLITION 127 Mill Road, Cambridge, UK
Hydroponic Education Centre | Year 2
Located in Cambridge, Mill Road is known as the ‘melting pot’ of the city, filled with smallrun businesses. The site was situated on a street corner and has been derelict for the last five years. Thus, the design became an important
project in exploring what demolition meant for the heritage of the site, combining the new and old. The design also tested how the hierarchy of space through boundaries and density changes of both materials and people utilise a space.
Left Street perspective drawings, displaying sight lines and privacy walls
Right Concept collage, representing the hydroponic education centre for young children.
01 DENSITY WITHOUT DEMOLITION - 127 MILL ROAD
Left Red represents the removal of non-structural walls and sections of the roof.
Bottom Adapted floorplan (basement, ground floor, 1st floor greenhouse).
Right Sections of the back of house and basement.
01 DENSITY WITHOUT DEMOLITION - 127 MILL ROAD
9
Left Mixed-media collage showing key historical buildings along Mill Road. Red/yellow shows the initial houses in the 18th century.
Right Section highlights the vegetable growers.
01 DENSITY WITHOUT DEMOLITION - 127 MILL ROAD
Expanding down the high street, the abandoned Tesco has laid empty for multiple years. Shut down due to the highstreets public outcry, going against the ethos of small businesses along the street. Creating an urban farming garden and education centre, bringing together
the community and promoting healthy eating. Council planning set parameters to not change the existing facade and width of the building, resulting in a design focused on vertical expansion. Utilizing the unused flat roof was crucial in transforming the high street skyline.
01 DENSITY WITHOUT DEMOLITION - 163-167 MILL ROAD
Users contributing the the cycle of buiding.
01 DENSITY WITHOUT DEMOLITION - 163-167 MILL ROAD
17
Bottom Front and back elevations, the ground floorplan for the existing building before the retrofit. Right Concept collage represents the interventions and societal views of the history of the building.
01 DENSITY WITHOUT DEMOLITION - 163-167 MILL ROAD
Bottom Front and back elevations, show the additional steel frame roof greenhouses. Right Street sight lines section throughout the floors, change in ceiling heights, accentuating the central courtyard.
01 DENSITY WITHOUT DEMOLITION - 163-167 MILL ROAD
21
Bottom Adapted floorplans with voids creating light shafts highlight the different hydroponics. A section shows the kitchen and staff zones. Section showing the kitchen and staff zones. Right Perspective viewpoints.
01 DENSITY WITHOUT DEMOLITION - 163-167 MILL ROAD
Roof 1st Floor
Ground Floor
Stepping out onto the roof.
Sorting and distribution, connecting the staff to the visitors.
Looking down into the dropped learning space, surrounded by bamboo, creating a semiprivatised area.
23
Top Different growers, dispersed throughout the building.
Left Model image of the roof structures, existing steel framing intersecting with the mushroom growing room (half floor).
Right Model image of the water system, green wire representing the pipes.
01 DENSITY WITHOUT DEMOLITION - 163-167 MILL ROAD
25
Focusing on structural and construction detailing, comparing building envelopes depending on environmental impacts, airtightness, fossil fuel costs, longevity and extreme weather conditions. Below is the human interaction with the mushroom growing facility,
utilising recycled refrigerated containers due to their capacity for airtightness and their strong moisture barrier. Machinery filtering out O2 and CO2 from the internal/external environments.
01 DENSITY WITHOUT DEMOLITION - CONSTRUCTION
Adapted skylights, greenroof and sunlight lines to utalise the south facing building.
1. 2mm Aluminium
2. 60mm Polyurethane
3. Air Pocket
4. 3mm Stainless Steel
5. 250mm C25 Concrete
6. 100mm C25 Concrete
7. Water Tank and Pump
8. Ultrasonic Humidifier
9. Circulation Fans
10. Extractor Fans
11. Water Pipes from Water Tank
12. Tables for Cultivation
13. O2 Intake Pipe
14. CO2 Extractor Pipe
15. Solar Panels
16. Stainless Steel Trusses (Powder Coated Green)
17. Lever Windows (Automatic Depending on Moisture and CO2 Levels)
01 DENSITY WITHOUT DEMOLITION - CONSTRUCTION
Top Model angles of the mushroom growing facility and the central structural courtyard.
Left Detail of the mushroom growing room, leading into the projection room, changing densities, through light and ceiling heights.
Right Analysis of engineered bamboo columns and beams, when adding extra structure and support, highlighted in blue below.
29
Discovering what type of existing foundation, using soil type and surrounding trees.
1. Pre-Grown Blanket
80mm Substrate Layer
Filtration Fleece
Drainage and Reservoir Board
VPC
100mm Blue Roof Geocell
Waterproofing Membrane
150mm Polystyrene Insulation Boards
Protection Sheet
Modified Bitumen Waterproofing
Membrane
120mm Concrete Mesh Slab
Steel Structural System with services incorporated
100mm Rockwool Insulation
2 x 15mm Plasterboard and Finishes
2. Linconshire Full Red Brick Cladding
90mm Cavity Air Space
DPC
50mm Rigid Insulation Board
80mm Rockwool Insulation
Concrete Masonry Blocks
Continuous Bond Beam
2x 15mm Plasterboard and Finishes
3. Reclaimed Wooden Flooring
Timber Sleepers
20mm Sound Accoustic Insulation
100mm Woodfibre Insulation
3-Layer CLT
Steel Structure and Services
Sections with adapted wall enveloped for higher rainfall, longer and hotter summers.
01 DENSITY WITHOUT DEMOLITION - CONSTRUCTION
1 2 3 A B A B
1. Cherry Wood Decking
Tapered Sleepers
EPDM Protection Sheet
Waterproof Membrane
50mm High Density
Protection Board
Rigid Fiberglass-faced
Insulation
VPC and Roof Sheathing
Metal decking
Sloped Framing
Steel Framed System
Integrated Service Layer
Service Cavity
Haning Ties
120mm Rockwall Insulation
2 x 15mm Plasterboard and Finishes
Sections with adapted wall enveloped for longer lifespan and higher sustainability.
31
1
03 ADDITIONAL WORK Hand Drawing
Wolfson Collage Maintenance Office, Cambridge | Year 1
These places within an institution are often forgotten. Sitting in the back of Wolfson Collage this once temporary building is being used as permanent. Redesigning this building so that the staff that reside in these buildings have a say was a huge part of the project. Learning
to balance the plausible and the wants of the user was crucial to the success of this project. Turning a crowded and messy room into a sunlit insulated office was due to window placements, thickness of the walls and re-adjusting the interior layouts.
Left Exploded axonomtric of the basic layout of the proposed side office.
37
A building is so much more than its boundaries and walls. It exists at a multiplicity of scales from the single unit of the brick to its larger figure within the urban landscape. They are at once the background and the mirror of our lives, making up the spaces we share every day. Throughout
this project, we were introduced to surveying and orthographic drawing techniques. Focusing on hand drawing and material research. The materiality of the building is what we are first greeted with. Its forgotten nature of scrapes and holes might not reflect what is behind it.
03 ADDITIONAL WORK - Hand Drawings - Doors
Left Absolution room, studying light penetration.
Right Model perspective photos, eploring key moments within the fragment of the building.
39
Hodson Folly, Cambridge, Outside Theatre Design, A Rasin in the Sun | Year 1
What happens to a dream deferred?
Does it dry up
Like a raisin in the sun?
Or fester like a sore—
And then run?
Does it stink like rotten meat
Or crust and sugar over— Like a syrupy sweet?
Maybe it just sags
Like a heavy load. Or does it explode?
LANGSTON HUGHES
03 ADDITIONAL WORK - Living Theatre
Below Night viewpoint of the setup of the play, showing the ‘sail’ like facade, creating privacy and shadows accrross the river.
Left Analysis of Scene I of the play resulting in visual photgraphic responses, which would be situated on the stage.
Right Photgraphy triptic of the three acts, highlighting the use of loose garments, relating to anxiety and emotion throguhout the scenes.
Below Section displaying the repetative noiton fo layering through the supports of the outside stage.
03 ADDITIONAL WORK - Living Theatre
43
Left Perspective viewpoints fom the audience and cast within the structure.
Right The night illuminates the stage, changing shadows and projections with each scene.
03 ADDITIONAL WORK - Living Theatre
45
147 Bemerton Gardens, Kirby Cross
Frinton-on-Sea
Essex
CO13 0QE
Contacts
07701072719
jane.hardy3101@gmail.com www.linkedin.com/in/carla-hardy-4201152a7
Currently a second-year undergraduate Architecture student at the University of Cambridge. My studio work has focused on the potential of existing buildings through reuse and precise interventions. I have gained more critical awareness of a site’s physical, social, cultural, economic and environmental contexts to integrate the user’s needs and the wider street-scape. Group collaboration has been vital in proposing architectural concepts within a collaborative setting, highlighting the importance of visual and verbal communication skills.
Education
September 2022 - Present
The University of Cambridge Architecture BA
September 2020 - June 2021
Central Saint Martins, UAL
Foundation Diploma in Art and Design
Distinction
Proficiencies
Digital
Rhino, AutoCad, SketchUp(Basic)
Adobe Phtoshop, Illustrator, InDesign, Premier Pro, Procreate (Basic)
Microsoft Office Suite
Windows
Mac OS
Analogue
Model Making,
Hand Sketching
Rendering
Photography
47