


























WORKS Revit
--A C D E OPEN OFFICE OPEN OFFICE OFFICE OFFICE OFFICE OFFICE 34 ELAVATOR LOBBY TOILET STORAGE ELAVATOR ELAVATOR MECHANICAL 23 W3 747 Main St, Los Angeles CA 90012 Scale Checked by SOCIAL JUSTICE CENTER Architecture 526 Fall 2023 Designer: Yujing Chen, Yiqin Liu Design Consultant: Roland Wahlroos-Ritter Spring 2022 Michael M. Hricak SEAL AND SIGNATURE FIRM NAME 3/16" 1'-0" 05 TYPICAL FLOOR PLAN No. Description Date 3/16" 1'-0" Level Level 0" Level Level Level Level Level Level Level Level ROOF CORE ROOF UNDERGROUND -12' - 0" 3 80' Shading Device Level Level Level Level Level Level Level Level Level ROOF CORE ROOF UNDERGROUND -12'B G 10' 26' 10' 20' EGRESS ENTRANCE TIMBER COLUMN 747 Main St, Los Angeles CA 90012 Scale Checked SOCIAL JUSTICE CENTER Architecture 526 Fall 2023 Designer: Yujing Chen, Yiqin Liu Design Consultant: Roland Wahlroos-Ritter Spring 2022 Michael M. Hricak SEAL AND SIGNATURE FIRM NAME 1" 10'-0" 10 BUILDING SECTIONS No. Description Date 10'-0" Section 1" 10'-0" Section SELF-ADHERED MEMBRANE 2PLY SBS ROOFING SHEATHING CLADDING VENTILATED AND DRAINED CAVITY PRE-FINISHED METAL FLASHING CONSIST OF EXTRUDED POLYSTYRENE(XPS) PRE-FINISHED METAL FLASHING 747 Main St, Los Angeles CA 90012 Checked SOCIAL JUSTICE CENTER Architecture 526 Fall 2023 Designer: Yujing Chen, Yiqin Liu Design Consultant: Roland Wahlroos-Ritter Spring 2022 Michael Hricak Karen Kensek SEAL AND SIGNATURE FIRM NAME 1" 1'-0" 12 DETAILS Description Date WALL TO ROOF TRANSITION ENCLOSURE SYSTEM GROUND LEVEL FACADE LOUVER SYSTEM
OTHER
Drawings
Models and Handicrafts












