Heavy restructuring of an office building, Paris p.3-6
Heavy restructuring of a highschool, Cachan, France p.7-8
Competition for school construction, Senegal p.9-10
Studio renovation, Paris p.11-12
House renovation, Paris p.13-14
Collective housing, Montreuil, France p.15-16
Competition for collective housing, Bagnolet, France p.17-18
Competition for semi-pro hockey players, Cergy, France p.19-20
Building permit for 80 housing units, Bondy, France p.21-22
Health center, Lagny-sur-Marne, France p.23-24
CURRICULIM VITAE
EMPLOYMENT HISTORY
Capucine GARCIN
31 years old Driver’s license
656/49 Cách Mang Tháng 8, Phuong 11, District 3, HCMC
capucine.garcin@gmail.com
+33 6 32 74 92 18
2024 | Freelance - Design and interior planning of esports virtual reality gaming rooms, (concept to detail design) 15 rooms in France / 3 rooms in Europe - Middle East / From 1000 to 1500m2
Heavy restructuring of an office building (drawing and construction supervision) / Restructuring of a highschool
2020 - 2021 | Container house, Wooden cabans, project of a bus renovation (Working and holiday visa in New - Zealand)
2017 - 2019 | Junior Architect at Atelier d’architecture et d’urbanisme
Myriam Szwarc (Paris, France)
Construction supervision of a house / collective housing / competition for semi-pro hockey players building / competition for collective housing / building permit
Building permit for modular school building / Renovation of Télécom school / Health center / Competition for the renovation of a town hall / Call for bids
2016 | Internship at Kompass Ingénierie
Construction supervision / judicial expertise
2015 | Internship at Atelier Choiseul Architectes
Renovation of a large housing complex / Urban model / Call for bids
2014 | Internship at Opus Ingénierie
Digitalization of a building with economists / Site visits and construction meeting
EDUCATION
2016-17
2015-16
2014-15
2013-14
2011-13
2011
HMONP (french diploma) at ENSA Montpellier (France)
Master 2 ENSA Paris - Val de Seine Final project «Cultivate the art of living», Montreuil (France)
Master 1 ENSA Paris - Val de Seine Renovation of a large housing complex, housing
Bachelor’s 3rd year in Erasmus exchange in Florence (Italy) Police barracks, restoration lessons
Bachelor’s 1st and 2nd at ENSA of Montpellier (France) Project of 3 houses (stone, wood, steal)
Baccalaureate in Science with Chinese as an optional subject
SKILLS
BIM / CAD
Suite Adobe Suite office
3D / Render
LANGUAGUES
English C1
French Mother tong
Vietnamese A1
Italian B2
Spanish A2
Chinese A1
Revit Autocad Archicad
Photoshop Indesign Illustrator
Word | Powerpoint Excel
Sketchup Artlantis
HEAVY RESTRUCTURING OFFICES PARIS
PRELIMINARY DESIGN DETAILED DESIGN BIDDING CONSTRUCTION
Acquired through successive acquisitions, the former EDF site, which was first renovated by the agency in 2005, is undergoing a new restructuring, this time focusing on the ground floor and terraces.
Creation of a unique ground floor with a monumental staircase connecting the two levels on the street.
Removal of cooling equipment on the roof thanks to the switch to Climespace.
Development of roof terraces into accessible terraces.
Elevation of a building to create a new office level.
Recovery of PC plans with integration of technical constraints.
Exchange with structural, fluid and facade engineering offices.
Modelling of the entire roof terrace and elevation section on Revit for BIM work.
Program : Heavy restructuring + elevation + roof development for an office building Calendar : Construction in progress
Client : INVESCO Budget : NC
HIGHSCHOOL RESTRUCTURATION CACHAN
PRELIMINARY DESIGN
PERSPECTIVE 3
Following the departure of the ENS School, the two high schools in Cachan are being reunified.
The location of the two retained buildings leaves a central land base allowing for the establishment of a core centered on a central artery that will penetrate the entire project.
The central building will house programs that benefit everyone (school life, conference room, library, creativity room, etc.).
The two existing buildings are largely
retained and present simple geometries, after demolition of unnecessary protrusions. Streamlined, the two existing buildings are thus integrated into the overall composition.
Work on modularity for possible conversion of the high school.
Site leveling for access to all buildings.
Reflection on the passage of fluids, made difficult due to the existing restrictive structure.
Program : Highschool of 28 000 students
Restructuring and creation of a new building
Calendar : Study in 2021
Client : Région Ile de France.
Cost : 46M€.
Surface : 15 000m² SU.
Perspective from the courtyard
Perspective section of the main building
SCHOOL BUILDING | SENEGAL
COMPETITION
The challenge of the competition is to design a pleasant and conducive place for teaching while taking into account the site, local construction practices, and the budget.
10 classrooms, 1 multipurpose room, offices, and toilets, as well as a reflection on the treatment of outdoor spaces. The whole project will be carried out in 5 phases.
A sober and systemic architecture with a real thought about the implementation on site, for a truly feasible project;
Schoolyard perspective
The reflection started from the dimension of a classroom, from which a grid of 8x8m was derived, where we included the different elements of the program so that they could interact.
Two classrooms as a unit.
With the principle of modularity, the plan can be adapted during construction or in the future.
Program : School of 10 classrooms, a multi-purpose room, offices, bathroom, to build in 5 phases
Calendar : Competition in 2022
Client : Région Ile de France.
Cost : 15000€.
Surface : 1000m² SU.
Perspective section of the main building
Phasing
Axonometry
STUDIO RENOVATION | PARIS
FEASIBILITY STUDY PRELIMINARY DESIGN | DETAILED DESIGN BIDDING
CONSTRUCTION
Renovation of a studio under the eaves. Maximizing the reduced surface area of the apartment to create a comfortable living space.
39 rue de la Folie-Méricourt - Paris 01 PLANS ET COUPES
Playing with lights to showcase the different areas. Using noble materials to keep the charm of the old.
Program : Renovation
Calendar : 2022
Client : SCI du Lac
Cost : 35 000€.
Surface : 19,5m² SU.
Personnal photos
RENOVATION CHAURÉ HOUSE PARIS
FEASIBILITY STUDY PRELIMINARY DESIGN | DETAILED DESIGN BIDDING CONSTRUCTION
House renovation project for a client wishing to be able to live at home for as long as possible.
Redistribution of the plan following the addition of a lift on the garden facade.
Technical project with total refurbishment of plumbing, electricity, and heating system changed to fan convection. Implementation of a covered swimming pool and a lift in a very restricted space.
Call for tenders from companies and analysis of offers.
Visiting selected showrooms with project management.
Site supervision (construction, electricity, plumbing, partitioning, writing weekly reports, validation of situations, approval of subcontractors, additional quotes following changes by project management.
Program : Heavy restructuring of a house + Elevator on the facade
Calendar : 2019
Client : Private client
Cost : 1,6M€.
Surface : 285m² SU.
Maison de Mme KAPEL - MARCOVICI
13 rue du Lieutenant Chauré 75 020 PARIS
Rénovation intérieure
28 janv. 2019
Véranda _ Façade existante et perspective ascenseur
Photo-realistic insert for administrative document
Section, project
Photo of construction site
LOGEMENTS COLLECTIFS MONTREUIL
DETAILED DESIGN | SALES PLANS
Project for 40 housing units divided into two buildings that was submitted for a building permit in December 2016.
The project owner wanted to launch the marketing a little later, when the purge of appeals was nearing its end.
I assisted the project manager on:
1. finalizing the DCE (plans, details, joinery schedule, hall book, choice of luminaires, floor coverings for material board)
2. creating sales plans according to the project owner’s requests.
Program : Construction de 40 logements sur un niveau de sous-sol
Calendar : Livré en 2021
Client : Nexity
Cost : NC Surface : 2 386m² SU.
South elevation - Building permit
Section CC Hall B
Ville de Montreuil-sous-Bois (93)
80 HOUSING BAGNOLET
COMPETITION
Competition in partnership with a developer for the construction of 80 new housing units in an urbanizing area. The project is located on a plot that is part of a master plan and has a lot sheet already drawn.
Working in collaboration with a project manager.
Production of graphic documents for the competition submission.
Design of the site plan, floor plans, sections, and diagrams.
Program : Competition of 80 housing units
Calendar : 2018
Client : Logis Transport et Altarea Cogedim
Cost : NC
Perspective
Creation of a 3D model for submission to the perspective artist. Supervision of the production of perspectives.
- Selection of relevant viewpoints
- Selection of desired material colors and textures
- Exchange with the perspective artist
Writing of the architectural and landscape description with illustrations for the submission of the graphic documents.
Plan and axonometry (access and lighting)
HOCKEY PLAYERS RESIDENCE | CERGY
COMPETITION
Housing project for semi-professional hockey players next to the new Cergy ice rink.
The project had to be able to be converted into rental housing in case the owner changed the tenant.
Due to the very limited budget, the construction mode had to be modular in order to limit the cost.
The project had been sketched for two years, in parallel with the project management. When I took over, I had to:
- Rework the plan to make the project profitable
- Produce all the graphic documents
- Collaborate with the company to find viable economic solutions
I participated in the first phase and negotiation phase of the competition’s oral presentation.
Program : Construction of 28 living units + shared common area
Calendar : Competition in 2018
Client: Ville de Cergy et Osica
Cost : 2,4 M€.
Surface : 1 100m² SDP.
Ground floor plan
80 COLLECTIVE HOUSING | BONDY
COMPETITION
Construction of 80 new housing units on a plot located next to a project that had just been completed and at the edge of the SNCF tracks.
I took over the project during the sketch phase with the site plan and cut-out templates already established.
I designed the layout of the housing units according to the developer’s specifications. I then had to draw the housing unit’s plan.
As my first collective housing project, I worked with the disable and fire safety regulations I learned during my HMONP training that same year.
I then had to draw the sections, elevations, and documents for the building permit application to the city hall.
Initially alone on the project, part of the agency assisted me in submitting an express permit before the summer holidays.
Program : Construction of 80 housing units
Calendar : Building permit in 2017
Client : Spirit
Cost : NC.
Surface : 6 388m² SDP.
Photo-realistic insert for administrative document
Garde-corps tôle perforée
Menuiserie PVC plaxé gris Toiture bac
Enduit blanc gratté fin
Briques de parement mat Couleur: blanc
HEALTH CENTER | LAGNY-SUR-MARNE
DETAILED DESIGN
The city wanted to rehabilitate an existing industrial building to transform it into a health center. However, reusing it proved impossible due to significant technical and structural constraints.
The project management still wanted to retain the original building’s form for the future construction.
I started following the project during the APD phase where we encountered some problems related to the curtain wall structure and the placement of rainwater
Then, I assisted in the production of the PRO phase where I was responsible for drawing technical details regarding the curtain wall and the fastening of the windows on the cladding.
I also produced all the ceiling and floor plans to help the companies with their pricing.
Program : Health center
Calendar : 2020
Client : Communauté d’agglomération de Marne et Gondoire