G2 GOLDFIELDS GOLD DISCOVERY TEAM VISIONARY PIONEERING
TSXV:GTWO
ACCOUNTABLE FOCUSED
MARCH 2020
COMPANY OVERVIEW
TSXV:GTWO
2
GUIANA SHIELD: The Next Frontier
TSXV:GTWO
3
GUYANA: Location Map GUYANA LEGEND Aurora
Georgetown
Arabagai
Putareng
Kurupung
Aricheng
Kwapau
Mazaralli
Itaballi
Bartica
Bartica
PETERS MINE
Cuyuni-Mazaruni
Higgins
Imbaimadai
Honey Camp Hopes
JUBILEE MINE
0
10
20
30
40
KILOMETRES
TSXV:GTWO
50
Linden
Road
Mines 650000N
Okuwa
Issano Malouf
Chi Chi
Keraha
River Landings
700000N
e
Banana
Fish Fall
Kum aka Serima
Seons
Kamarang
Baganara Isl
erbic
Tum eremg Eping Enachu
Kurupung
Sawari
Oko
Airstrips
ica-B
Rock Labba Kareen
OKO MINE
Demera
Tam akay
Kaow Island
Maha
Aruwai
AREMU MINE
Major Towns
Timehri
Groete River
TOROPARU Gold X (7.1 Moz)
Apaikwa
ra-Mah
AURORA Guyana Goldfields (6.5 Moz) Toroparu
750000N
Ogle
aica
Quartzstone
KAROUNI
Potaro-Siparuni (1.0Troy Moz)
OMAI Iamgold (3.7 Moz) Kum aka
Omai
Upper Demerara
G2 Goldfields Properties
600000N
Potaro
4
OKO Discovery GUYANA 1.1 km strike length open in every direction Significant high-grade intercepts Mineralization in all drill holes Visible gold in majority of holes Drilling continues
TSXV:GTWO
5
OKO Discovery
HOLE OKD-01 6.0m @15.8 g/t Au
272,400 E
272,500 E
704,600 N
High Grade Highlights
272,300 E
704,600 N
272,200 E
704,500 N
704,500 N
HOLE OKD-07 2.7m @15.8 g/t Au 1.7m @30.8 g/t Au
HOLE OKD-07
704,400 N
OKD-27
HOLE OKD-03 24.0m @6.9 g/t Au HOLE OKD-17
4.1 m @ 12.9 g/t Au 1.4 m @ 8 g/t Au
13m @ 4.2 g/t Au 9m @ 1.4 g/t Au
704,300 N
HOLE OKD-06
704,300 N
HOLE OKD-17
2.7m @5.8 g/t Au
TSXV:GTWO
43.6m @1.4 g/t Au 23.3m @0.5 g/t Au
20.0m @2.8 g/t Au 21.0m @2.1 g/t Au
704,400 N
HOLE OKD-03 12.0m @13.8 g/t Au
HOLE OKD-01 27.0m @5.2 g/t Au HOLE OKD-02
HOLE OKD-02 3.0m @4.6 g/t Au
Drill Intervals
HOLE OKD-06 15.0m @1.1 g/t Au
HOLE OKD-04
HOLE OKD-04
1.8m @6.2 g/t Au
7.0m @1.8 g/t Au
HOLE OKD-05
HOLE OKD-05
8.2m @9.1 g/t Au
31.5m @2.9 g/t Au
272,200 E
272,300 E
272,400 E
272,500 E
6
AREMU Mine Area XMAS VEIN
5 KM
258,000 mE
257,000 mE
259,000 mE
260,000 mE
261,000 mE
LEGEND
7.7 g/TAu 2.7 g/TAu grab from 6.1 g/TAu 4.1 g/TAu grab from 10cm black 1.6m channel 1m channel qz stockpile qz vein across 2 qz veins on qz veins
AREMU MINE AREA
Showing Geology and Locations of Veins
Granite
0.9 g/TAu in 8.2m wtd avg 3.3 g/TAu 1.0 g/TAu including grab from grab from 30cm 2.1 g/TAu on 1.5m crusher stockpile qz vein
Mineralized Horizon
grab from 10cm carbonaceous vein 1.6 g/TAu
Underground Development Historic Veins
HEROD VEIN
1.6 g/TAu on 10m including 4.7 g/TAu on 2m
HONEY BEE VEIN
D
BATTFLY VEIN
I VE
W. LUNCH VEIN
N
LUNCH VEIN
100
15
12 Produced 10.828 oz Au 1905 To 1910
200 km 5.6 g/TAu wtd avg on 1.5m true width
7˚N
AREMU VEIN 14
Greenstone Schist PK Saprolite Pit
7,000 ft South to vein
1.1 g/TAu over 5m 2.9 g/TAu 1.3 g/TAu 1.8 g/TAu 4.9 g/TAu across subparallel 1.3m channel 75cm channel 60cm sample 1m channel with qz veins on main qz vein on qz vein on gougy zone 2 qz veinlets
Quartz Float
2.5 KM
AN
0
Aremu Mine Area
Quartz Vein
POWERHOUSE VEIN
2.6 g/TAu 10.2 g/TAu grab from 10cm grab from qz vein at pit wall qz stockpile
INDEX MAP
Geological Boundary
MOOM VEIN
ANTIGODLIN VEIN
L OT SC
SHEPHERD VEIN
G2 Mapped Veins
POWIS VEIN DONICKER VEIN
7,500 ft South
GOODHOPE VEIN
7˚N CUYUNI RIVER
IVER
SADDLE VEIN
B. MASTER VEIN B ERB ICE RIV ER
DEMERARA R
VE R
I RI
E SSEQUIBO RIVE R
MAZ ARU N
CREEK VEIN
GEORGETOWN
SHORT VEIN
1,000 500
5˚N
TSXV:GTWO
59˚W257,000 mE
57˚W
500
1,000
2,000
SCALE IN FEET
5˚N 61˚W
0
258,000 mE
259,000 mE
260,000 mE
261,000 mE
7
se Ve in
260,800 E
LEGEND Quartz vein zones Graphitic sediments Main Aremu zone
2.5 g/TAu 3.25m channel in graphitic shear with qz
ein eV
us ho
712,300 N
6.2m @1 g/TAu including 2.2m @1.5 g/TAu
260,750 E
260,700 E
1.4 g/TAu Grab Powerhouse vein
r we Po
Aremu Historic Mine Area
Po we rh ou
260,650 E
260,600 E
260,550 E
260,500 E
AREMU Historic Mine
712,300 N
6m @0.7 g/TAu including 1.8m @1.7 g/TAu
Surface Grabs g/TAu > 3.0
1.6 g/TAu 2.6m grab
3.9 g/TAu 2.10m in qz vein
1.0 to 3.0 0.5 to 1.0
7.6m @0.8 g/TAu including 3m @1.6 g/TAu
712,250 N
u Zone
rem Main A
0.1 to 0.5
712,250 N
4.9 g/TAu 1.5m channel
< 0.1
Surface Channels g/TAu > 3.0 1.0 to 3.0
TSXV:GTWO
260,750 E
260,700 E
Are mu Zon e 260,800 E
Ma in
1.2 g/TAu Grab crusher tailings 260,650 E
260,600 E
1.5 g/TAu Grab from narrow graphitic shear with qz 260,550 E
260,500 E
712,200 N
1.3 g/TAu Grab 6m @6.2 g/TAu from qz vein including 2m @12.6 g/TAu
0.5 to 1.0
712,200 N
0.1 to 0.5 0 to 0.1
0
25m
50m
8
PURUNI DISTRICT Peters Mine: Guyana’s first gold mine in 1905 Most developed and highest-grade deposit in Guyana prior to opening of Omai Mine (1993)
Jubilee Mine: Operational open pit Samples of up to 9 oz Au/ton
TSXV:GTWO
9
JUBILEE MINE Option to earn 100% interest Undrilled asset – never been subjected to drilling Historic workings: one vertical shaft, several open pits
TSXV:GTWO
10
CANADA – Sandy Lake District
TSXV:GTWO
11
SANDY LAKE COMPILATION Targeting +5 million ounce deposits in a large unexplored district True district-scale discovery in Northern Ontario Two high-grade gold discoveries and counting 60 km of prospective Banded Iron Formation (BIF)
TSXV:GTWO
12
SANDY LAKE DISCOVERY – GEOLOGY, DRILLING W1-W3 ZONES Sandy Lake, Geology, Geophysics, Drilling W1,2,3 Zones (January 2020)
SD-19-22 60.48m @0.83 g/t Au
SD-19-19 7.54m @1.13 g/t Au SD-19-20 3.31m @1.84 g/t Au
SD-19-21 13.5m @1.5 g/t Au
474,000 mE
W2 ZONE
SD-19-18 2.4m @1.25 g/t Au SD-19-14 0.73m @450.4 g/t Au SD-19-16 2.46m @1.2 g/t Au SD-19-12 1.4m @11.85 g/t Au / 2.5m @1.19 g/t Au
2020 Drill Targets SD-19-19 350
300
100
SD-19-20
250
150
100
50
0
50
100
150
200
SD-19-18 SD-19-16 SD-19-17 SD-19-21 SD-19-14 SD-19-12 SD-19-13 SD-19-15 50
100
200
50 50
150
SD-19-22
W3 Zone
Drill Fan
VTEM Anomaly
Intrusive in fold nose
Current Drilling Area
150 50 50
0
Drill Pads
473,000 mE
W3 ZONE 5,881,000 mN
Drilling Grab Samples
472,000 mE
0 10
50
50 0
230m
Weak Mag Fabric
5,880,000 mN
Folded Meta-Sediments
5.2 ppm Au
3.1 ppm Au
m
600
SD-19-02
Meta Volcanics
Lake Water Historical grab sample outcrops have been relocated and resampled. Assays are pending.
TSXV:GTWO
5,879,000 mN
3.1 ppm Au
0
1 KILOMETRE 2020 Drill Targets 471,000 mE
472,000 mE
473,000 mE
474,000 mE
5,879,000 mN
Intrusive in fold nose
3.6 ppm Au
INTERSECTION (m) GRADE g/t Au 4.5m
9.4
4.0m
23.1
4.0m
7.3
0.5m
536.37
1.64m
49.83
W1 ZONE HOLE NUMBER
INTERSECTION(m) GRADE g/t Au
19-05
0.6m
81.59
19-06
6.33m
17.37
19-07
6.23m
4.85
5.21m
5.02
1.94m
7.05
BK-14-07
3.90m
18.69
BK-14-05
3.50m
12.45
BK-14-16
6.83m
8.59
BK-14-11
5.47m
6.71
BK-14-12
7.03m
6.76
BK-14-03
1.15m
70.23
BK-14-23
3.85m
10.89
19-09
SD-19-03
Meta Sediments
Mag Destruction in Fold Nose
W2 Zone W1 Zone
Ground Mag Survey Line
Serpentine / Ultramafic
BK-14-18
7.5 ppm Au
Mag Fabric
Granite
BK-14-17
19-04
5,880,000 mN
Basement Structure
HOLE NUMBER
2020 Drill Targets
50 50
VTEM anomalies
BIF
5,881,000 mN
LEGEND
471,000 mE
13
WHY INVEST? Strong Leadership, Bold Vision: Guyana projects show widespread gold mineralization, majors are beginning to make their presence felt in the region Sandy Lake Gold Project is in a district scale gold system that is almost completely unexplored, where access was restricted until 2014 Significant opportunity to generate >5M ounce resources in virgin greenfield projects Management fully aligned with shareholders
Experienced Exploration Team with Past Success: Guyana Goldfields: 6.5M oz Au Gold Eagle: Sold to Goldcorp for $1.5B in 2008 Navidad: Sold to Pan American Silver for $630M in 2009 Historic high gold grades in systems with widespread gold mineralization TSXV:GTWO
14
CORPORATE SHARE CAPITAL Capital Structure – MARCH 2020 Common Shares Outstanding
103,888,987
Shares Fully Diluted
132,166,717
Fully Diluted Insider Shareholding Directors’ Private Placement Participation
TSXV:GTWO
55,733,962 C$ 4,655,000.00
15
CONTACT CORPORATE HEAD OFFICE 141 Adelaide Street West Suite 1101 Toronto, ON. Canada M5H 3L5
Patrick Sheridan Chairman +1 (416) 628-5904 p.sheridan@g2goldfields.com
TSXV: GTWO (Get The Word Out) TSXV:GTWO
16
FORWARD LOOKING STATEMENTS Forward-looking statements relate to future events or the anticipated performance of G2 Goldfields Inc. (the “Company”) and reflect management’s expectations or beliefs regarding such future events and anticipated performance. In certain cases, forward-looking statements can be identified by the use of words such as "plans", "expects", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "believes", or variations of such words and phrases or statements that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved", or the negative of these words or comparable terminology. By their very nature forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual performance of the Company to be materially different from any anticipated performance expressed or implied by the forward-looking statements. Important factors that could cause actual results to differ from these forward-looking statements include risks related to failure to define mineral resources, to convert estimated mineral resources to reserves, the grade and recovery of ore which is mined varying from estimates, future prices of gold and other commodities, capital and operating costs varying significantly from estimates, political risks , uncertainties relating to the availability and costs and availability of financing needed in the future, changes in equity markets, inflation, changes in exchange rates, fluctuations in commodity prices, delays in the development of projects, conclusions of economic evaluations, changes in project parameters as plans continue to be refined, uninsured risks and other risks involved in the mineral exploration and development industry. Although the Company has attempted to identify important factors that could cause actual performance to differ materially from that described in forward-looking statements, there may be other factors that cause its performance not to be as anticipated. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements. These forward-looking statements are made as of the date of this presentation and the Company does not intend, and does not assume any obligation, to update these forward-looking statements. Dan Noone, Director of G2 Goldfields Inc., is the Qualified Person, within the meaning of NI 43-101 and has reviewed the technical content of this presentation.
TSXV:GTWO
18