Skip to main content

Portfolio- Camila Calderón

Page 1

CAMILA CALDERÓN

ARCHITECTURAL PORTFOLIO


SINGLE LIVING ACCOMMODATION (SLA) LOCATION: BURNHAM MILITARY CAMP, CHRISTCHURCH BUILDING TYPE: ACCOMMODATION BUILDING COST: $65,000,000 NZD ROLE ON PROJECT TEAM: ARCHITECTURAL DESIGNER RESPONSIBLE FOR PRODUCING GA DRAWINGS IN PRELIMINARY AND DEVELOPED DESIGN AND DETAILING FOUNDATION, ENVELOPE, WINDOWS, DOORS AND PRODUCING SCHEDULES DURING DETAILED DESIGN. PARTICIPANT IN THE WEEKLY INTERDISCIPLINARY COORDINATION MEETINGS TO RECEIVE THE UPDATES OF THE PROJECT PROGRESS. DATE OF COMPLETION: BC SUBMITTED- CONSTRUCTIONS WORK ON HOLD PROJECT DESCRIPTION: THE SLA ARCHITECTURAL DESIGN RESPONSE WILL ALIGN WITH THE OBJECTIVES AND DESIGN PRINCIPLES SET OUT IN THE BURNHAM CAMP INFRASTRUCTURE MASTER PLAN (IMP), USER REQUIREMENTS (URS), NZDF ACCOMMODATION, MESSING AND DINING MODERNIZATION (AMDM), NZDF BUILT ENVIRONMENT WORKSHOP FEEDBACK, NZDF SUSTAINABILITY MANUAL AND SUSTAINABILITY INFRASTRUCTURE STANDARDS. THE SLA FACILITY HAS BEEN DESIGNED AS TWO, FOUR-STOREY BUILDINGS CONNECTED BY A CENTRAL CIRCULATION AND AMENITIES CORE. BUILDING ONE HAS BEEN TREATED AS RIGID AND REGULAR WITH ALL WINDOWS ALIGNED, UNIFORM. THE FACADES REFERENCES BURNHAM'S WHITE ACCOMMODATION BUILDINGS THAT HAVE COME BEFORE. BUILDING TWO PRESENTS A CONTRASTING DESIGN LANGUAGE WITH ALL WINDOWS UNIFORM IN SIZE, BUT IRREGULAR / STAGGERED IN ALIGNMENT. THE FAÇADE IS A MONOLITHIC EARTHEN TONE THAT LENDS ITSELF TO BURNHAM SURROUNDING CHARACTER AND PROVIDES VISUAL CONTRAST TO BUILDING ONE. THE CENTRAL GLAZED ATRIUM ACTS AS A SPINE CONNECTING THE TWO WINGS PROVIDING AMENITY AND NATURAL LIGHT TO THE CIRCULATION CORE AND COMMUNAL SOCIAL SPACES ON EACH FLOOR. THE FUNCTIONAL SPACES WERE IDENTIFIED WITHIN THE USER REQUIREMENTS AS PER BELOW: § 61 ACCOMMODATION ROOMS WITH AN ENSUITE (SHOWER, TOILET AND SINK PROVISIONS), KITCHENETTE AND INDIVIDUAL STORAGE SPACE. 24 M2 NET INTERNAL AREA § PROVISION FOR A LOUNGE / SHARED LIVING SPACES WITH COUCHES, TVS, TABLES, CHAIRS AND AREAS FOR GAME / ACTIVITY STORAGE § PROVISION OF A SHARED KITCHEN WITH FRIDGES, MICROWAVES, DISHWASHERS, TEA, AND COFFEE MAKING FACILITIES § OUTDOOR COMMUNAL SPACE TO BE PROVIDED WITH SPACE FOR SEATING AND RECREATION. THIS AREA MUST BE SEPARATED FROM THE SIGHT OF THE WIDER CAMP PERSONNEL. SPACE TO BE LARGE ENOUGH TO FACILITATE USE AT 8 AM AND 4 PM PEAK USER LOAD. § COMMUNAL LAUNDRY WITH WASHING AND DRYING FACILITIES § PROVISION FOR STORAGE AND OVERFLOW STORAGE § PROVISION FOR BIKE PARKING § EXTERIOR PLANT BUILDING AND ASSOCIATED ANCILLARY SUPPORT FUNCTIONS.


ARCH HANGARS LOCATION: ROYAL NEW ZEALAND AIR FORCE WHENUAPAI BASE, AUCKLAND BUILDING TYPE: HANGARS REFURBISHMENT COST: $43,794,000 NZD FOR HANGAR 1 AND 2 COMBINED ROLE ON PROJECT TEAM: ARCHITECTURAL DESIGNER RESPONSIBLE FOR DOING GA DRAWINGS FOR DEVELOPED DESIGN; DETAILING WINDOWS AND DOORS, ENVELOPE, INTERNAL WALLS AND STAIRS FIRE DETAILS AND PRODUCING SCHEDULES DURING DETAILED DESIGN. IN CHARGE TO REPORT THE ARCHITECTURAL PROGRESS AND ENQUIRIES IN THE INTERDISCIPLINARY COORDINATION MEETINGS. cURRENTLY RESPONSIBLE FOR THE CONSTRUCTION MONITORING. DATE OF COMPLETION: CONSTRUCTIONS WORK JUST STARTED PROJECT DESCRIPTION: THE AGREED SCOPE OF THE ARCH HANGAR REFIT PROJECT IS A REGENERATION UPGRADE TO MEET ALL REGULATORY COMPLIANCE STANDARDS (HEALTH AND SAFETY, SPECIFIC ENGINEERING WORKPLACE REQUIREMENTS, DEFENSE ORDERS ETC.) TO MAINTAIN HANGAR 1 AND HANGAR 2 FOR THEIR REMAINING USEFUL LIVES. HANGAR 1 IS SCHEDULED FOR REMOVAL AT THE END OF THIS DECADE, AND AS A RESULT HAS BEEN DEEMED TO NEED A LIGHT REFIT UPGRADE. HANGAR 2 IS SCHEDULED TO BE IN SERVICE FOR THE FORESEEABLE FUTURE AND AS SUCH HAS BEEN DEEMED AS REQUIRING AN INTENSIVE REFIT UPGRADE. THE HANGARS ARE REGISTERED BY NZDF AS A CATEGORY A BUILDING, WHEREBY THE WHOLE BUILDINGS HAVE BEEN AFFORDED THE HIGHEST LEVEL OF HISTORICAL SIGNIFICANCE. THE HANGAR BUILDINGS SHOULD THEREFORE BE MAINTAINED IN ACCORDANCE WITH THE REQUIREMENTS OF THE NZDF HERITAGE MANAGEMENT PLAN (HMP). STAKEHOLDER CONSULTATION HAS BEEN ALSO A FUNDAMENTAL DRIVER AND HAS BEEN RECOGNIZED AS KEY TO DEVELOPING A SUCCESSFUL DESIGN. THE REQUIREMENTS FOR THE ARCHITECTURAL SCOPE WERE: § ACOUSTIC WINDOW DETAILING WITHIN THE OFFICE SPACES TO THE HANGARS FOR BOTH ACOUSTIC SECURITY AND ENVIRONMENTAL REASONS. AS HERITAGE WAS ONE OF THE MAIN CONSIDERATIONS A SECONDARY WINDOW SYSTEM WAS APPLIED TO INSIDE OF EXISTING WINDOWS WITH MINIMUM 100MM AIR GAP TO PROVIDE REQUIRED SOUND REDUCTION INDEX. § VENTILATION LOUVRES (MINIMIZED FOR HERITAGE) INCORPORATE ACOUSTIC ATTENUATORS TO MINIMIZE AIRCRAFT NOISE INTRUSION INTO THE DUCT AND CEILING VOID ABOVE OFFICE SPACES. § ADDITIONAL MASS TO PARTITIONS BETWEEN OFFICE SPACES TO IMPROVE ACOUSTIC AND PRIVACY. SELECTING MATERIALS, COLOURS AND FINISHES FOR THE WORKS. § DOORS (E.G. SOLID CORE WITH ACOUSTIC SEALS, PROPRIETARY ACOUSTIC RATED DOORS) TO BE APPLIED TO ACOUSTIC SECURE MEETING ROOMS AND TO MINIMIZE AIRCRAFT NOISE INTRUSION THROUGH THE BUILDING ENVELOPE TO SENSITIVE SPACES. § INTERNAL RAMP DESIGN AMENDMENTS FOR ACCESSIBLE ACCESS FROM THE HANGAR FLOOR PER NZBC D1. § INTERNAL AND EXTERNAL FIRE EGRESS STAIR DESIGN IN COORDINATION WITH THE FIRE ENGINEERING AND STRUCTURAL DESIGN TEAMS.


SPLIT LEVELS DWELLING- 4 BEDROOMS LOCATION: 551 KRIPPNER ROAD, PUHOI, AUCKLAND. BUILDING TYPE: RESIDENTIAL HOUSE IN RURAL PRODUCTION ZONING COST: $735.000 NZD ROLE ON PROJECT TEAM: PREPARING ARCHITECTURAL DRAWINGS AND TECHNICAL DOCUMENTATION FOR BUILDING CONSENT: GATHERING SITE PLAN INFORMATION, SETTING UP PLANS, ELEVATIONS AND SECTIONS, DESIGNING TIMBER SUB FLOORS, CALCULATING LINTEL SIZES, BRACING AND H1 CALCS, AS PER NZ 3604 AND NZBC REQUIREMENTS. DEALING WITH GEOTECHNICAL AND STRUCTURAL ENGINEER, TRUSS DESIGNER, CLIENT AND COUNCIL’S RFI. DATE OF COMPLETION: JUNE 2021 PROJECT DESCRIPTION: WE WERE ENGAGED FOR RC & BC SERVICES FOR A 10,000M² SITE, LOCATED IN A RURAL PRODUCTION ZONE WITH SLOPES DOWN FROM MAIN ROAD. AS PER GEOTECHNICAL REPORT RECOMMENDATION, EARTHWORKS WERE REQUIRED TO CLEAR THE EXISTING VEGETATION AND REMOVE TREES AND ROOT SYSTEMS, TO BE ABLE TO BUILD A STABLE BUILD PLATFORM. OTHER DESIGN REQUIREMENTS WERE THE PROPOSAL OF A WASTEWATER TREATMENT AND A STORMWATER MITIGATION SYSTEM, AS PART OF THE DISTRICT PLAN REQUIREMENT FOR THIS SPECIFIC ZONE. RESOURCE CONSENT WAS REQUIRED FOR THE FOLLOWING REASONS: § INFRINGEMENT TO COVENANT RULE OF MAXIMUM OVERALL HEIGHT OF 4M FROM EXISTING GROUND LINE § AUCKLAND UNITARY PLAN – STORMWATER MANAGEMENT AREA § INFRINGEMENT OF MAXIMUM PERMITTED EARTHWORKS THE HOUSE FLOOR AREA WAS 267M² AND WAS SPLIT IN TWO LEVELS, DISTRIBUTED IN 4 BEDROOMS, 3 BATHROOMS, ATTACHED DOUBLE GARAGE AND TIMBER RETAINING WALLS. THE BLACK COLOURSTEEL CLADDING AND ROOFING WAS PROPOSED TO BE CONSISTENT WITH THE CHARACTER AND SCALE OF THE LOCAL VICINITY.


MAIN & MINOR DWELLINGS ATTACHED WITH 4 & 3 BEDROOMS LOCATION: 117 KAREPIRO DRIVE, STANMORE BAY, WHANGAPARAOA, AUCKLAND. BUILDING TYPE: RESIDENTIAL HOUSE IN MIXED HOUSING URBAN ZONE. COST: $780.000 NZD ROLE ON PROJECT TEAM: PREPARING ARCHITECTURAL DRAWINGS AND TECHNICAL DOCUMENTATION FOR BUILDING CONSENT: GATHERING SITE PLAN INFORMATION, SETTING UP PLANS, ELEVATIONS AND SECTIONS, DESIGNING TIMBER SUB FLOORS, CALCULATING LINTEL SIZES, BRACING AND H1 CALCS, AS PER NZ 3604 AND NZBC REQUIREMENTS. DEALING WITH GEOTECHNICAL, STRUCTURAL, FIRE ENGINEER, CLIENT AND AND COUNCIL’S RFI. DATE OF COMPLETION: NOVEMBER 2020 PROJECT DESCRIPTION: WE WERE ENGAGED FOR RC & BC SERVICES FOR A 900M² SITE, LOCATED IN A MIXED HOUSING URBAN ZONE OF A NEW SUBDIVISION DEVELOPMENT. AS PER GEOTECHNICAL REPORT, A SPECIFIC DESIGN ZONE FOR SLOPE AREAS AND A NO BUILD ZONE WERE APPLIED ON THE SITE ON THE BASIS OF POTENTIAL INSTABILITY. RESOURCE CONSENT WAS SUBMITTED BECAUSE STORMWATER MANAGEMENT WAS REQUIRED TO MEET HYDROLOGICAL STANDARD AS PER E10.6.1 AND E10.6.4.1 . THIS WAS GRANTED BY PROPOSING A STORMWATER DISCHARGE ENGINEERED SYSTEM DESIGNED TO ACCOMMODATE THE DEVELOPMENT AND SUBSEQUENT IMPERVIOUS AREAS ON THE SITE, RETAINING THE STREAM NATURALNESS, THE MAIN HOUSE AREA WAS 177M² DISTRIBUTED IN 4 BEDROOMS, 2 BATHROOMS AND ATTACHED DOUBLE GARAGE. THE MINOR DWELLING AREA WAS 60M² AND 4 BEDROOMS AND 1 BATHROOM. BOTH WERE SINGLE LEVEL. A FIRE ENGINEER WAS ENGAGED BY THE CLIENT TO OUTLINES THE MINIMUM FIRE SAFETY REQUIREMENTS REQUIRED TO ACHIEVE COMPLIANCE. EACH HOUSEHOLD UNIT HAD TO BE FIRE SEPARATED FROM ONE ANOTHER, WITH FIRE SEPARATIONS OF NO LESS THAN 30/30/30 FRR IN THE INTERTENANCY WALL. THE STRUCTURAL ENGINEER DESIGNED THE CONCRETE RAFT SLAB, SOME LINTELS THAT WERE OUTSIDE THE SCOPE OF Nz3604 AND A GARAGE PORTAL FRAME. I WAS RESPONSIBLE OF DESIGNING THE TIMBER FRAMING WALLS, SMARTCLAD BEVEL BACK TIMBER WEATHERBOARDS AND VERTICAL SHIPLAP CLADDINGS AND ASPHALT SHINGLE ROOFING, WALL BRACINGS, LINTELS AND H1 CALCS, AS PER Nz3604 AND NZBC.


TERRAZAS DE MAYO- SHOPPING MALL LOCATION: BUENOS AIRES, ARGENTINA. BUILDING TYPE: SHOPPING MALL. COST: $40,000,000 NZD ROLE ON PROJECT TEAM: ASSISTANT ARCHITECT SUPPORTING THE ARCHITECTURAL DESIGN TEAM DURING CONSTRUCTION MONITORING STAGE (CM-5). SOME OF THE DAILY TASKS ON SITE DURING THE CONSTRUCTION OF THE MALL WERE: TO CHECK THE PROGRESS AND QUALITY OF THE WORKS ON SITE, TO PARTICIPATE IN WEEKLY MEETINGS REPORTING POTENTIAL ISSUES AND COORDINATING WITH THE MAIN CONTRACTOR AND SUB CONSULTANTS, TO ANSWER PROJECT MANAGER’S RFI AND TO UPDATE AS BUILT PLANS. DATE OF COMPLETION: DECEMBER 2014. PROJECT DESCRIPTION: THE PROJECT INCORPORATED A SHOPPING, GASTRONOMIC AND LEISURE CENTER TO AN EXISTING CARREFOUR HYPERMARKET IN THE WEST OF BUENOS AIRES, PROVIDING THE LOCAL AREA WITH A NEW AND NECESSARY REFERENCE CENTER. THE SHOPPING CENTER IS LOCATED AT THE INTERSECTION OF TWO ROUTES, ON A VAST PROPERTY WITH A LARGE TREE PRESENCE THAT WAS RESPECTED AND INCORPORATED INTO THE PROJECT, THROUGH LARGE WINDOWS, TERRACES, SKYLIGHTS AND COURTYARDS ESTABLISHING A CONTINUOUS DIALOGUE BETWEEN THE INTERIOR AND EXTERIOR, AND WHICH ENDS IN A GASTRONOMIC TERRACE WITH VIEW OF CAMPO DE MAYO. THE PROJECT HAD MORE THAN 120 COMMERCIAL PREMISES AND INCLUDED A PROGRAM OF INTERNAL CARREFOUR OFFICES AND A PARKING LOT FOR MORE THAN 1,600 VEHICLES. THE MATERIALS USED WAS CONCRETE STRUCTURE; STEEL FRAMING AND BLOCK WALLS WITH PLASTER AND AND STEEL ROOF STRUCTURE WITH METAL ROOFING. TOTAL BUILT AREA: 48.000 M² COVERED AREA: 30.000 M². PARKING AREA: 18.000 M².


Turn static files into dynamic content formats.

Create a flipbook
Portfolio- Camila Calderón by camila.calde.arch - Issuu