News that Stands Out
THE KNIGHT TIMES Official Student Newspaper of Episcopal High School
February 2019
4650 Bissonnet, Bellaire, Texas 77401
www.ehshouston.org
Volume 33, Issue 7
Rising to the Top
Plans begin for construction of fine arts center
Multiple teams compete in Winter SPC Finals
CARSON SHERMAN Staff Writer Episcopal High School is in the early stages of its next building project as administrators and arts faculty meet with architects in discussion of design and location. Present plans look to remodel the west end of the Convent Building, extending new construction to the area where the Band Hall now resides, and continuing into unused grounds to the north. The hallmark of the design is an additional
A portion of the new fine arts building will be built where the band hall currently resides. Photo by Lauren Porter. two-level theatre for the performing arts, along with expanded dressing rooms, costume rooms, and vocal and instrumental music areas. The meetings thus far have allowed EHS representatives to discuss their needs and wants while architectural designers have imparted their vast knowledge on construction of this type. At the forefront of conversation is the need for the new building to accommodate the growth of the EHS student body while creating a unified approach so that all performing and visual arts classes are centered around a “quad” like, all-inclusive design. The Visual Arts additions will see new studio areas for ceramics, painting, mixed media, and the like while expanding areas in the media arts and publications. With ongoing conversations about the need for the building’s flexibility for the entire community’s use, leadership is also keeping in mind the future changes that time will bring to the campus so the structure is as strong and effective as possible.
INSIDE Ballers vs. Scholars Teachers continue winning streak
PAGE 2
Fiddler on the Roof Renovated theater to host spring musical
PAGE 7 Features ........................ 2 Culture ......................... 5 Entertainment .............. 6 Arts .............................. 7 Opinion ........................ 10 Sports ........................... 11
The boys soccer team celebrated their fourth consecutive SPC Championship during the 2019 Winter Sports SPC Tournament. Photo by Gigi Gaetti. ELLIOTT JONES Staff Writer
The boys soccer team won their fourth consecutive SPC championship and boys basketball and wrestling place runners-up. On the girls side of the winter season, soccer placed fourth, their highest placement in over a dozen years, and the basketball team captured fifth. The swim teams set personal records while paving the way for future success. Learn more about Winter SPC on Sports Page 11
Track replacement, theatre remodel completed NICK HELD Staff Writer While the new Underwood Student Center construction was coming to its completion, other areas of the campus were getting a makeover as part of multiple updates to existing areas. The Simmons Field track on the east end of campus was totally revamped as crews completed a new surface in midJanuary. This surface and its foundation are collegiate level in quality. The track & field teams have already been practicing and are impressed with the change. Something new that most tracks do not have is a team’s ability to run the 100-meter dash and 110-meter hurdles on opposite sides of the track simultaneously. With the addition of extended chutes on the track, EHS offers something rare in competitive surfaces in the Houston area. As for the renovated theatre, the space will surprise veterans of the campus as a new look has emerged. All new seats, a renewed lighting and sound control booth, new flooring, paint on the walls (no more wood paneling), paint on the ceiling, aisle lighting, sound system features throughout, new drapes, and new wiring for A/V and data are some of the notable elements
The renovated Underwood Theatre is complete, as well as the track replacement on Simmons Field. Photo by David Framel. of the remodeled arts space. The Fiddler on the Roof rehearsals began in the Underwood while a few small
items were left to complete. The grand opening will take place the opening night of the spring musical March 1.