Skip to main content

caam-portfolio-part a

Page 1

m e w i l

portfolio

Claudio Aravena Mesias

+61 430 117 400 artefact32.claudio@gmail.com artefactworkshop.com instagram.com/caam_alejo/ linkedin.com/in/claudio-aravena-mesias NSW Reg. No. 10099


Projects

.0

1


Projects [ AW ]

.0

2


A

Sir John Monash Centre 4050

The Sir John Monash Centre is one of Cox’s most significant projects. This project will represent the ANZAC experience on the Western Front.

810

2510

810

50

1790

520 GUTTER

150 1400 METAL EAVES

210

01 SIM

01

180

165 50

800

170

50

770

640

'SCHÖCK' THERMAL BREAK AND INSULATION AS REQUIRED

400 140 CONC. WALL

C/L

160

175

120 75

300

OPERABLE DOUBLE GLAZED SASH WINDOW SYSTEM WITH ACTUATOR FOR NIGHT PURGING BRONZE PLATED STEEL ANGLES FORMING SUB-SILL STEEL FRAMING WITH INSULATION AS REQUIRED / AIR SEAL / WATERPROOFING LINING CABLE TRAYS: POWER

C/L

770 EQ

This project has the added challenge of international design standards, code requirements and language challenges.

EQ

450 COLUMN

15 150 50 200 330

415

2540 125

2415

25

CABLE TRAYS DATA

INSITU OFF-FORM CONCRETE PLINTH (WALL) CLASS 1C WHITE STEEL FORMWORK

975

REMOVABLE ACOUSTIC PANELLING (ACP01) STRUCTURAL INSITU OFF-FORM CONCRETE COLUMN WITH BRONZE SPHERIC CONNECTION TOP AND BOTTOM

1050

INTERNAL SUBSTRATE LINING

INSITU OFF-FORM CONCRETE CLASS 2C WHITE WASHED FINISH 50

125

5500 COLUMN

250

200

60 DIA. BEACON OVER EACH DISPLAY MONITOR/ SPEAKER AS REQUIRED

250

REMOVABLE PRE-FINISHED PERFORATED METAL CLADDING (MTL02) ON PLYWOOD SUBSTRATE CABLE TRAYS: MONITORS / DEVICES INSITU OFF-FORM CONCRETE ROUGH SAWN AND DRESSED TIMBER FORMWORK WATERPROOF MEMBRANE WITH PROTECTIVE BOARD INSITU OFF-FORM CONCRETE CLASS 1C WHITE STEEL FORMWORK UNISTRUT CHANNELS FOR MOUNTING MONITORS

200

15

150

50

RECESSED DISPLAY MONITOR 200

2090 145

1800 CLEARANCE

145

42 DIA BRONZE ROUND PRE-BRAZED TO ROD / FLAT PLATE WITH INTEGRATED CONTINUOUS LINEAR LED FIXTURE

BRONZE FLAT PLATE CONTINUOUS KERB PRE-WELDED TO CAST-IN FIXING

1000

BRONZE TWIN PLATE BALUSTER FIXED TO BASE SPIGOT

02

4006

EXTERNAL GRADE STONE PAVER (STN02) ON CONCRETE BEAMS WITH INFILL

50

150

WATERPROOF MEMBRANE WITH PRESSURE SEAL AT WALLS

700 SERVICES ZONE

250

180

230

Underneath a ‘floating field’ roof (taking inspiration from old sacrifice and new technology to tell the story of the Anzacs on the Somme), the centre begins with a trench-like entrance into a foyer where a light shaft gives a glimpse of the tower above.

355

4102

145

4006

530

The interpretive centre is set to join the lasting legacy of the current memorial by Sir Edwin Lutyens (opened in 1938) and is visited by some 7,000 visitors every ANZAC Day and some projected 90,000 visitors annually.

450 460

540

.0

3


Sir John Monash Centre

.0

4


Sir John Monash Centre

.0

5


Parramatta Powerhouse Under construction. Powerhouse Parramatta is one of the world’s most significant new museum projects. Community, industry and collection will intersect to create a dynamic culturally engaged program that will redefine museums, within one of Australia’s fastest growing and most diverse communities. Powerhouse Parramatta is designed so that the superstructure is a celebrated architectural feature that is used to articulate the building facades. The buildings are designed with three scales of steel lattices as an exoskeleton to the buildings that provide column free large volume spaces. POWERHOUSE PARRAMATTA RL 2800

RL 2700

CLIENT:

WESTERN LAWN

Polished concrete floor END USER:

1 1

RL 3250

A-102004

A-102005

RL 2900

A2

A3

A4

A5

A6

A7

A8 CONTRACTOR:

FALL

A1

1:3.8

TBC DESIGN TEAM: LEAD DESIGNER:

1000

Aa

MOREAU KUSUNOKI 5 rue de Nemours, 75011 Paris, France

T +33 1 84 16 48 10

6791

W-05 42000

LOCAL ARCHITECT:

RL 2800

3910

6000

EASTERN EMBANKMENT

GENTON

1

Ground Floor, 71 York Street Sydney NSW 2000

A-102003

Ab

T+ 612.9696.5002

External balustrade by Landscape Architect

MULTIDISCIPLINARY ENGINEERING (SCMEP and SPECIALISTS):

ARUP

1900

6000

1

1:4. 1 FAL

L

Exoskeleton corner base future design development to meet anticlimbing requirements.

FFL 7275

MEZZ ABOVE

Level 5 , Barrack Place, 151 Clarence St, Sydney NSW 2000

T: +61 2 9320 9320

A-650101

DESIGN SUBCONSULTANTS:

FFL 7500 23233

6000

200 Concrete slab Door access post

6000

FW

53065

Slab to have integrated falls to waste outlets

H02 GAS METER & REGULATOR 0003 16 m²

6000

FR02.2 (TYPE A) 0.55x1.6m

W-10 6000 42000

STAIR E2 S006 46 m²

FR01b 1.0x1.0m

6000

W-11

12000

750

9100

1000

FOH L5 L008 14 m²

10850

GRC finish, door flush with facade.

Bb REVISION

Bc

F05 1.0x1.2m

FOH L4 L007 Redundant Room

E-03

W-09

6000

ACCES TO PUMP ROOM 2.0x3.8m

CIRCULATION 0060 23 m²

HR.05 0.8x1.2m

ELEC ROOM 0062 14 m²

MR02-E-2 1x1.4m

FB1

FB1

FB1

FB1

FB1

HR03 1.0x1.2m

FB1

Sacrificial lightweight fire rated wall for access to MR02 riser, 800x2200mm, refer to Arup documentation.

PRESENTATION SPACE 1 0050 2172 m²

ER05-E-2 1.0x2.5m

Bd

E1 STAIR PRESS E1 STAIR PRESS

3900

FLOOR CIRC. DISTRIBUTOR 0051 12 m² 0052 11 m²

Egress doors concealed with dummy removable panels, flush with inner face of PS wall, finish to match precast panels

Sliding door, railing detail to allow for flush with inner face of PS wall

Make-upToilet Air exhaust 1.0x1.2m1.0x1.1m

3

SIM

FB1

6000

6000

B2

6000

B3

BOOSTER ASSEMBLY 0056 9 m²

Linear 500mm grill above 450mm heaing trench

A-601001

B1

TRUCK ACCESS 0054 31 m²

ELECTRICAL ROOM 0057 4 m²

RETAIL 0058 100 m²

1000

FB1

6000

B4

6000

B5

FB1

6000

B6

6000

B7

6000

B9

6000

B10

4 02/04/2021 Tender Addenda 3 15/03/2021 Issue for Tender 2 13/11/2020 Issue for Tender 1 23/10/2020 Issue for Tender No. Date

Description

Bf

6000

B11

POWERHOUSE PARRAMATTA 34-54 Phillip Street Parramatta, NSW 2150

ARCHITECTS

LEAD DESIGNER:

Bh

7000

B12 3

LOCATION GRC finish, flush with facade

Bg

FIRE CONTROL ROOM 0055 31 m²

FB1

6000

B8

Be

FR01-E 1.0x1.0m

FB1

E-11 6000

HR03-E 1.0x2.0m

HR02 2x1m

6000

FB1

E-12

FB1

6001

FB1

Retail "warm shell" provision only

E-06 EXISTING GE BUILDING

C06 1.0x1.0m

FB1

STAIR E1 S005 45 m²

2979

E-05

FR02.2 (TYPE B) 0.55x0.6m

E-10 6000

FB1

FR01-E 1.0x1.0m

PLANT 0053 3 m²

7500

PRESS RELIEF. 1.60x2.45m

FIRE RATED WALL

E-04

FR02.2 (TYPE D) 0.55x0.6m

MR02-E-1 1.0x1.85m

FIRE/ DEPLOYABLE ELEMENT

FIRE RATED PARTITION

SUBSTATION

BOH L4 L010 9 m²

FR01-E1 1.0x1.0m

FOH 0059 59 m²

6000

FIRE/ DEPLOYABLE ELEMENT

RL 6700

2975

6000

Linear 500mm grill above 450mm heating trench

5900

6000

FOH LIFT 6 L009 7 m²

FB1

HR03-E 1.0x2.0m

E-07

750

FB1

FFL 7500

FB2

7500

RL 7500

7000

FB1

FOH PS1 0061 111 m²

FFL 8441 STAIR W3 S003A 21 m²

FB1

WT.04.02

E-15

FOH L3 L006 8 m²

STORE

H01 COLD WATER PLANT 0004 FR02.2 (TYPE B) 31 m² 0.55x0.6m

Slab to have integrated falls to waste outlets with coved skirting and epoxy floor finish

Delivery/services entrances

Retail "warm shell" provision only

E-13 6000

BOH L2 L002 8 m²

HR-W-S02 0.7x1m

Compactor Base build

WASTE ROOM 0005 51 m²

FOH L2 L005 8 m²

C02-W 0.8x0.3m

Ba

Double glazed single hoist door

E-14 6000

BOH L1 L001 8 m²

E-01

800 6325

6000

W-08

750

Fuel pump riser 0.5x0.5m

1.5x0.6m

FOH L1 L004 8 m²

BOH L3 L003 30 m²

Egress exits

A-102004

Arrival joinery included in base build (provisional sum)

E05 ER-W-2

HR-W-S02 0.7x1m

HO.01

HO.01

PLANT 0006 FW 8 m²

Slab setdown of 30mm, for Residencies Garden - 130mm, for Residencies bathroom - 80mm

2

A-102003

FB2

3700

ER-W-1 1.5x1m

ER-W-1 CIRC 1.5x1m 0008 3 m² DOCK MASTER / SECURITY ER-W-1 0007 1.5x1m 7 m²

Riser to be coordinated

Site boundary

2

Cloakroom joinery and desk included in base build (provisional sum)

2975

SUBSTATION

SUBSTATION

Ak

2F, Kobayashi building 2-26-3, Higashiazabu, Minato-ku, Tokyo, 106-0044, Japan T: +81 3 6441 0914

Public entrances

HR01.2 0.6x1.5m

LOADING DOCK 0009 94 m²

120 Walker Street 7th Floor East New York, New York 10013, USA T: +1 212 255 4463

NOTES/LEGEND

PS1 LAWN

SKYLIGHT

CLOAKROOM 0022 40 m²

MR05-W-2.3 0.35x0.7m

2000

RL 3000

Concierge joinery included in base build (provisional sum) FB2

FFL 7500 11300

MR05-W-2.4 0.35x0.7m

1000

A-102002

falls to waste outlets

ACCESS HATCH 0.9x0.9m

Forklift parking

4825

Diesel fill point 0.35x0.6m

6000

1

7200

PARENTS RM 0020 19 m² Tiled Floor on Screed with

E-02

3600

CHANGING PLACE 0019 CONCIERGE 12 m² Tiled Floor on Screed with 0002 falls to waste outlets 599 m²

JUN SATO

RETAIL STAFF 0021 10 m²

falls to waste outlets

W-02

1400 400

FR01-W 1.0x1.0m

Aj

AMENITIES M 0015 19 m² Tiled Floor on Screed with

22250 3850

Ai

EXISTING SUBSTATION

E05 DB CIRC 0017 0018 7 m² 4 m²

falls to waste outlets

C02 FLOOR DISTRIBUTOR 0011 9 m² LOADING DOCK 0010 162 m²

EXISTING SUBSTATION

Sliding or sectional door for loading dock to be flush with facade, GRC finish. Detail design and coordinationsubject to future design development

SKYLIGHT

W-01

6000

W-07 6000

7400

7125

Ah

AMENITIES F 0013 23 m² Tiled Floor on Screed with

ACC T RH 0014 5 m²

MR05-W-4.3.2 1x1.5m

MR05-W-2.1 HR-W-S02 1x1.3m 0.7x1m

RETAIL ACCESS 0016 18 m²

300

Slab to have integrated falls to waste outlets FR03-W 0.6x0.6m

EXISTING SUBSTATION

Retail joinery to "warm shell" provision - Base build (provisional sum item)

300 6200

CLEANER 0026 10 m²

STAIR W1 S001B 34 m²

CIRCULATION 0012 13 m²

STAIR W1 S001A 16 m²

EGRESS 0024 17 m²

Ag

EXOSKELETON:

DEP

DISCLAIMER

W-03

6000

7500

6000

1A-102001 ---

L'OBSERVATOIRE INT.

KINETIC STRUCTURE:

Do not scale from this drawing. Use given dimensions only Check all dimensions on site before proceeding and prior to commencement of all shop drawings or fabrication Any discrepancies are to be referred to the Architect/Engineer/Designer prior to commencement of work All rights reserved. This work is copyright and cannot be reproduced or copied in any form or by any means graphic, electronic or mechanical, including photocopying unless prior written approval by Moreau Kusunoki and Genton and the Principal. Any licence, expressed or implied, to use this document for any purpose whatsoever is restricted to the terms of the PSC agreement or implied agreement between Moreau Kusunoki and Genton, and the Principal. This drawing must be read in conjunction with all relevant contracts, specifications and drawings

ER-W-5 0.45x0.6m

Af Facade at the egress stair to be revised

ARCH. LIGHTING:

McGREGOR COXALL

13 Rue du Béal, 38400 Saint-Martin-d'Hères, France T: +33 4 76 62 84 54

SKYLIGHT

Under-escalator barrier in champagne gold stainless steel height 150mm

FFL 7500

LANDSCAPE ARCHITECTS: Suite 101, Level 1, 39 East Esplanade, Manly, NSW, Australia T: +612 9188 7500

29720

Ae

Sliding or sectional door for loading dock to be flush with facade, GRC finish. Detail design and coordination subject to future design development

SKYLIGHT

FB2

W-04

Ad

CANTEEN 0001 678 m²

SKYLIGHT

FFL 5596

FIRE/ DEPLOYABLE ELEMENT

EXHAUST DUCT ZONE OVER

Ac

Egress doors concealed with dummy removable panels to inside and outside. Inside flush with inner face of PS wall, finish to match precast panels. Outside flush with outer face of PS wall, finish to match GRC panels

MOREAU KUSUNOKI LOCAL ARCHITECT:

GENTON

B13

SIM

West Building A

A-601001

East Building B

EXISTING BUILDING

TITLE

PLAN GROUND

RL +7500

SCALE: 1 : 200 @ A0

STATUS

TENDER DOCUMENTATION NOT FOR CONSTRUCTION

JOB NO.

2001

DATE

02/04/2021

DWN

CHKD

Author

1:200

2

4

Approver

REVISION.

A-200100 0

APPD

Checker

DRAWING NUMBER

4

6

8

10 m

.0

6


Parramatta Powerhouse

.0

7


161 Sussex Street Designed to increase the calibre of hotel accommodation in the area, the redevelopment improved convention facilities, functionality for front and back of house areas and public amenities around the site. The 27-storey tower responds to its prominent gateway and corner position with a carefully shaped veil that opens the view from Market Street to Pyrmont Bridge. The curved facade responds to the tower’s role as an urban marker on the Pyrmont Bridge alignment, while maximising views over Darling Harbour. The convention facility’s façade addresses the Darling Harbour silhouette and

reinforces the horizontal ROUND GROUND FLOOR FLOOR PLAN PLAN nature of the Western Distributor. The sawtooth roof

form compliments surrounding heritage roofs, both current and demolished. Refurbished public domain and Sussex Street frontage provide prominent and legible building entry with positive use of the streetscape.

161 SUSSEX 161 STREET SUSSEX REDEVELOPMENT STREET REDEVELOPMENT SYDNEY SYDNEY

0

0

20m

20m

40m

40m

.0

8


161 Sussex Street

.0

9


Turn static files into dynamic content formats.

Create a flipbook
caam-portfolio-part a by caam-32 - Issuu