Skip to main content

2025 Fall Newsletter

Page 1


C2 CELEBRATES SCHENECTADY COUNTY RINK RENOVATION RIBBON-CUTTING CEREMONY

C2 attended the ribbon cutting of the Schenectady County Ray Wemple Memorial Rink renovation project

We provided architectural design services for an expansion and addition to the existing Schenectady County Recreational Facility (SCRF)

The expansion includes the addition of 4,660 square feet of space for four new locker rooms, an additional changing room, expanded restroom facilities, and a new and larger front entrance It also includes a new exterior modern façade, a new room for activities, and extends the parking lot approximately 30 spaces

Located at the County Airport in the Town of Glenville, the rink currently supports more than a dozen youth hockey association teams, several adult hockey leagues, and two high school teams The rink hosts hundreds of hockey games every year and offers a wide range of programs from ice skating to hockey, and learn-to-skate programs

ON THE BOARDS

miSci Building Study & Renovation

In 2024, C2 was selected to perform a comprehensive review of the miSci building, to determine the most costefficient ways to improve the structure, enhance the museum experience, and protect miSci’s extensive collections and archives,

The study also confirmed the building structural soundness and outlined necessary upgrades with the followin phased approach.

Phase 1: Existing Building Renovations

Demolition Work

Replace Roof

Update Interior Finishes

New Bathroom Layout & Fixtures

New Entry Canopy

MEP Upgrades

Phase 2: New Construction Addition

Building addition (new walls, ceilings, doors, storefront, windows, roofs, exterior siding, interior finishes)

MEP work

Y Schenectady, Center for Science & nology Renovation

providing architectural design services e renovation to the 2,500 SF existing eria kitchen space, back of kitchen, and serving area Café and the gathering area n Elston Hall.

cope of work includes refreshing the ng interior finishes for this space to e it more inviting for students. improvements include new ceilings, lighting, epoxy flooring, kitchen equipment with new hood, makeup air system, freezer cooler. The existing sprinklers were ated. Fire alarm devices, new floor drains, make-up air and exhaust equipment for hood, sanitary and water piping were all ced.

TEXAS LIGHTING SHOWROOM VISIT

Architectural designer, Jordan Kacur and interior designer, Kaitlynn Darvid had the opportunity to attend an in-person tour of the WAC’s showroom in Dallas, Texas with Point Source Lighting

The tour offered a first-hand look at downlights, landscape, colorscaping, short break, pixels, dweLED, Limited, VENTRIX, and Round Table products A full day training session provided additional details about each product and their design capabilities

The group also spent time networking over dinner and exploring part of

C2 WELCOMES NEW TEAM MEMBERS

C2 Design Group welcomed Kira Lohre, and Kaitlynn Darvid to the team

KIRA LOHRE

Kira joined the C2 team as a receptionist/ administrative assistant with more than 12 years of experience providing highlevel support for firms across an array of industries

KAITLYNN DARVID

Kaitlynn joined C2 as an Interior Designer She brings over 10 years of experience leading design projects across the commercial, healthcare, and high-end residential sectors Her expertise and creative vision make her a valuable addition to our growing team

C2 MENTORS INTERN

SARAH RUSSO

Sarah joined C2 as a summer intern from May thru the middle of August. She completed her third year at South Dakota State University prior to starting.

Over the summer, Sarah visited numerous job sites across the Capital District, learned about documenting existing conditions, and expanded her Revit knowledge.

SARAH RUSSO

C2 CELEBRATES 6 ANNUAL C2 WEEK TH

MONDAY

Culture has always been at the heart of who we are long before it became a buzzword. C2 Week is our way of celebrating the traditions, team spirit, and connections that make our workplace unique.

This year’s festivities started with surprise C2 swag and a build-your-own acai + yogurt bowl bar because culture is about creating moments that bring us together (and yes, good food helps!).

TUESDAY

Every year, we turn to Trey, our Deputy Assistant Culture Advocate, to lead a creative team-building event and he never disappoints! Trey’s challenge: a Rock, Paper, Scissors Tournament. The stakes? Raffle tickets toward some amazing prizes. Safe to say, our competitive spirit was in full swing!

Client-Collab: C2 & Scotia Sweets

Our team got to swap Revit models for sweet treats in a surprise cookie taste testing break. Best. Meeting. Ever.

NESDAY

art of C2 Week, our team took a tour of outhern Saratoga YMCA project in n Park, NY. Seeing Phase 1 renovations plete and Phase 2 construction underway o learn from each other’s nd see how thoughtful ms spaces for community these help us grow m while advancing designs ection and growth.

p Fat Boys Ice Cream in putt putt and ice cream! birdies, and a few surprise weetest win was soaking n (and the ice cream)

FRIDAY

We wrapped up our 6th annual C2 Week with the best kind of finale—a summer celebration with our team, families, and friends!

From pickleball rallies to cornhole battles to some seriously intense Jenga showdowns, the games were strong but the memories made were even stronger. ��

We fired up the grill with burgers, hot dogs, and all the fixins and capped it off with raffle prizes that had our staff winning big this year! ����

The perfect recipe for closing out summer and an inspiring, fun-filled week together!

WE'RE HIRING

We work toward a shared purpose to create spaces that support our client's goals and make an impact. When we work together, great designs happen. At C2, your ideas are valued, experiences are shared, and opportunity is endless.

JOIN THE C2 TEAM

JOIN THE C2 TEAM

Visit our website to learn more about open positions!

Turn static files into dynamic content formats.

Create a flipbook