Libarnes Architecture Portfolio Vol. 001

Page 1

Portfolio.

MEL BRIAN JACILDO LIBARNES

SELECTED PROJECTS

ARCHITECTURE
2023
ARCHITECTURE
“If you think GOOD DESIGN is EXPENSIVE, you should LOOK at THE COST of BAD DESIGN”
- RALF SPETH

SCHOOL PROJECTS

• Buas Damlag: A Master Development Plan of Brookside Garden Academy

• SIBOL: A Community-Based Recovery Home for Drug Dependents

ARCHITECTURE CONTENT Curriculum Vitae 4 PORTFOLIO VOL. 001 • Proposed Two - Storey Residence 6 • Panaguiton Building 8 • Tanay Rizal Project 10 • Pilada Residence 12 • The S - House 14 • Balay Lag-asan 17 • Learning Hub 18 • Proposed Two - Storey Residence 20 • Hinobaan Chapel 22 • Bañes Residence 24 CABINET WORKS • Overhead Kitchen Cabinets & Display Rack 27 • Cabinets - Vanity Dresser & TV Rack 28 • Kitchen Cabinets & Walk-in Closet 30 • Kitchen Cabinets 31
4 Architecture Portfolio Vol. 001

PORTFOLIO VOL 001

5 Architecture Portfolio Vol. 001

PROPOSED TWO - STOREY RESIDENCE | A’s Architectural Design and Services

Schematic Design - Design Development

2023

Project Team

6 Architecture Portfolio Vol. 001
01 SECTION 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 1 2 3 4 5 6 7 10 Ground Floor 1 Entry Porch 2 Entrance Hallway 3 Living Area 4 Kitchen Area 5 Dining 6 Steps 7 Bedroom 8 T & B 9 Stairs 10 Patio Second Floor 1 Hall 2 Balcony 3 Bedroom 4 Masters Bedroom 5 Common T & B 6 Storage 7 Stair
Ar. Norman Paul Absalon - Principal Architect Mel Brian J. Libarnes
7 Architecture Portfolio Vol. 001
8 Architecture Portfolio Vol. 001
ISOMETRIC VIEW RIGHTSIDE ELEVATION
1 2 2 3 4 4 5 6 1 1 1 1 1 6 1 1 1 1 1 1 7 8 9 9 2 3 4 5 6 1 2 2 3 4 4 5 6 1 1 1 1 1 6 1 1 1 1 1 1 7 8 9 9 2 3 4 5 6 Ground Floor 1 Rentable Stalls 2 Toilet 3 Hallway 4 Stairs 5 Parking Area 6 Garden 1 Typical Residential Unit Layout 2 Living Area 3 Dining Area 4 Sleeping Den 5 T & B 6 Kitchen 7 Hallway 8 Admin Office 9 Stairs Second Floor
FACADE SCHEMES
FRONT ELEVATION
A’s Architectural
02
design - Design Development 2023
PANAGUITON BUILDING |
Design Services
Schematic
Project Team
Ar. Norman Paul Absalon - Principal Architect Mel Brian J. Libarnes

TANAY RIZAL PROJECT | Architects Atelier AIE

Schematic Design - Design Development - Permit Drawings - Construction Documents

2021 - 2022

Project Team

Ar. Jose Ronald Celis - Principal Architect

Mel Brian J. Libarnes

Joemarie P. Sabare Jr.

Description

The project is a residential and partly recreational type. The insipiration for the structure is based on a vernacular house particularly the “Foruy” house of Kalinga and the bahay kubo. With its open plan, we also restricted the design of overall wall enclosure so that it brings ample light and air, and would also maximize the vista for the scenic mountain view.

I was involved from the schematic and design development stage. I took the design conecpt and added elements on the design.

10 Architecture Portfolio Vol. 001
03 DN 1 2 3 3 4 4 5 1 2 6 Ground and Upper Level 1 Dining Area 2 Kitchen Area 3 Toilet 4 Stairs 5 Viewing Deck 6 Steps 1 Multipurpose Hall 2 Steps Lower Level
Design Sketch
11 Architecture Portfolio Vol. 001
• Site and exterior view of the project • Recreational area of the project • Interior space of the project

Schematic Design - Design Development - Permit Drawings - Construction Documents

2021 - 2022

Project Team

Ar. Jose Ronald Celis - Principal Architect

Mel Brian J. Libarnes

Joemarie P. Sabare Jr.

Description

The project is a proposed four bedroom - two story residence located at the San Esteban village in Bago city. With the goal to make it stand out on its vicinity, the facade and roof were made to appear pointy and sharp, and accentuated with dark tone and with wpc to amplify its magnificence harmoniously.

As one of the staff member for the porject , I was involved in the schematic design, design development and processing of building permit.

Responsibilities

• Analyizng the project design and priorities, and implenting it.

• Coordinating with the consultants and suppliers

• Preparation of permit drawings and construction documents.

• Processing documents for building permit.

12 Architecture Portfolio Vol. 001
04
PILADA RESIDENCE | Architects Atelier AIE
13 Architecture Portfolio Vol. 001 1 D 2 D 7 D 8 D 6 D 5 D 3 D 4 D 4 D 1 W 2 W 3 W 4 W 11 W 10 W 9 W 8 W 7 W 6 W 3 W 12 W NOTE: ELEV. 00 = +0.55 FROM THE HIGHEST ROAD LEVEL or the NGL, WHICH EVER IS HIGHER ELEV. -0.40 ELEV. +0.00 ELEV. -0.45 ELEV. +0.00 ELEV. +0.00 ELEV. -0.02 ELEV. +0.00 ELEV. +0.00 ELEV. +0.00 ELEV. -0.02 ELEV. -0.25 16 W 5 W 1 W 10 D 9 D 13 W 14 W 10 W 10 W 10 W 10 W 10 W 15 W 15 W 3 W 17 W ELEV. +3.20 ELEV. +3.20 ELEV. +3.18 9 D 9 D 4 D ELEV. +3.20 ELEV. +3.20 ELEV. +3.18 Ground Floor Plan Second Floor Plan

THE S - HOUSE | Architects Atelier AIE

Schematic Design - Design Development - Permit Drawings - Construction Documents 2021

Project Team

Ar. Jose Ronald Celis - Principal Architect

Mel Brian J. Libarnes

Joemarie P. Sabare Jr.

Description

The project is a proposed bachelor’s pad located at Villa Cristeta, Bario Ma-ao. The aim for this structure is to make it distinct from its surroundings. Most of the enclosures is structured with glass for natural light to enter and seamlessly integrates with its surroundings and emphasizing mountain view; louver (jalousy) windows were also used to accumulate airflow inside the structure; The elevated base and overhanged porch is designed to make it appear floating from afar. Then, the minimal designation of its form corresponds to its sultry individuality.

As one of the project team, I was responsible for the schematic design and concept, and part of the design development and estimating phase for rebars cutting list, also processing of building permit.

Responsibilities

• Analyizng the project design and priorities, and implenting it.

• Preparing of rebar cutting lists

• Coordinating with the consultants

• Preparation of permit drawings and construction documents.

• Processing documents for building permit.

14 Architecture Portfolio Vol. 001
2 1 3 4 5 6 7 8 9 2 1 3 4 5 6 7 8 9 1 Ground Floor Roof Deck 1 Entry Porch 2 Living Area 3 Kitchen & Dining Area 4 Bedroom 1 5 Guest Room 6 Common Toilet 7 Dirty Kitchen 8 Parking Area 9 Stair
15 Architecture Portfolio Vol. 001 05
ELEVATION
16 Architecture Portfolio Vol. 001 2 4 1 3 5 6 7 8 9 10 11 12 13 14 15 15 15 15 16 1 2 3 4 5 6 2 4 1 3 5 6 7 8 9 10 11 12 13 14 15 15 15 15 16 1 2 3 4 5 6 1 Entry Porch 2 Living Area 3 East Porch 4 Dining Area 5 West Porch 6 Kitchen 7 Masters Bedroom 8 Masters T & B 1 Hallway 2 Balcony 3 Bedroom 1 4 Bedroom 2 5 Common T & B 6 Stair 9 Dirty Kitchen 10 Swimming pool 11 T & B 12 Parking Area 13 Stair 14 Existing Store 15 Garden 16 Driveway Ground Floor Plan Second Floor Plan

SECTION

BALAY LAG-ASAN | Architects Atelier AIE

Schematic Design - Design Development

2021

Project Team

Ar. Jose Ronald Celis - Principal Architect

Mel Brian J. Libarnes

Description

The project is a proposed three bedroom - two storey residence situated at Barangay Lag-asan, Bago city. It is a contemporary tropical house focuses on the functionality at the core of the design. Providing a collective sense of openness, Balay Lag-asan mirrors tranquility and beauty. With its soft and simple color palette and wood accents, thus blends naturally to its environment.

As the primary staff for this project, I was invloved in the site feasiblity and analysis, schematic design and design development.

Responsibilities

• Site analysis and feasibility of the project

• Analyizng the project design and priorities

• Coordinating with the client

• Creates concepts and presentations

17 Architecture Portfolio Vol. 001
• Living Area • Kitchen Area
06

Schematic Design - Design Development - Permit Drawings - Construction Documents

2021

Project Team

Ar. Jose Ronald Celis - Principal Architect

Mel Brian J. Libarnes

Joemarie P. Sabare Jr.

Description

The project is a proposed library hub and book cafe. The concept of the structure is stacked books. The vertical louvre window type is used to provide large scale of ventilation and natural lighting. The vision for this project is to portray minimal elements on the outside and playful spirit on the interior space. Socially catalytic space were also applied in the plan intended for individual use or group use.

Responsibilities

• Site analysis and feasibility of the project

• Analyizng the project design and priorities, and implenting it.

• Coordinating with the consultants

• Preparation of permit drawings and construction documents.

• Processing documents for building permit

18 Architecture Portfolio Vol. 001
HUB | Architects Atelier AIE 2" X 2" WOOD 2" X 2" WOOD 12 MM THK PLYWOOD (PAINTED FINISH); RAL 9010 PURE WHITE 12 MM THK PLYWOOD (PAINTED FINISH); RAL 2007 LUMINOUS BRIGHT ORANGE 12 MM THK PLYWOOD (PAINTED FINISH); RAL 2007 LUMINOUS BRIGHT ORANGE CONCRETE WALL 12 MM THK PLYWOOD (PAINTED FINISH); RAL 9010 PURE WHITE 12 MM THK PLYWOOD (PAINTED FINISH); RAL 9010 PURE WHITE 2" X 2" WOOD 2" X 2" WOOD 12 MM THK PLYWOOD (PAINTED FINISH); RAL 9010 PURE WHITE 12 MM THK PLYWOOD (PAINTED FINISH); RAL 2007 LUMINOUS BRIGHT ORANGE 12 MM THK PLYWOOD (PAINTED FINISH); RAL 2007 LUMINOUS BRIGHT ORANGE CONCRETE WALL 12 MM THK PLYWOOD (PAINTED FINISH); RAL 9010 PURE WHITE 12 MM THK PLYWOOD (PAINTED FINISH); RAL 9010 PURE WHITE 07
LEARNING
• Second floor reading area • Ground floor reading area • Wall mounted seat Details • Wall mounted seat Details
19 Architecture Portfolio Vol. 001 READING AREA CIRCULATION WF-1 WF-3 WF-4 SECTION PORCH FIREWALL ENTRY CIRCULATION AREA BOOKSHELVES AREA 1 D ELEV. +0.10 2 D 8 W 7 W 9 W 1 W 2 W 3 W 4 W ELEV. +0.20 ELEV. +0.20 ELEV. +0.30 TOILET ELEV. +0.30 UP DN ONLINE HUB AREA ELEV. +0.20 11 W BOOKSHELVES AREA READING AREA 10 W 3 D ROOF LINE 5 W 6 W ROOF LINE RAILING PORCH FIREWALL ENTRY CIRCULATION AREA BOOKSHELVES AREA 1 D ELEV. +0.10 2 D 8 W 7 W 9 W 1 W 2 W 3 W 4 W ELEV. +0.20 ELEV. +0.20 ELEV. +0.30 TOILET ELEV. +0.30 UP DN ONLINE HUB AREA ELEV. +0.20 11 W BOOKSHELVES AREA READING AREA 10 W 3 D ROOF LINE ROOF LINE 5 W 6 W ROOF LINE RAILING Ground Floor Plan Second Floor Plan

PROPOSED TWO - STOREY RESIDENCE | Architects Atelier AIE

Schematic Design - Design Development

2021

Project Team

Description

The project is a proposed residence in Brighton Bacolod. It is a contemporary mediterranean design based on the general theme of the subdivision. The colors of the building exterior are limited only to sunny natural colors. Also, the roof is cladded by clay or concrete tiles or it can be stone coated tiles or metal tiles.

ELEVATION

20 Architecture Portfolio Vol. 001
MASTER BEDROOM (A= 14.50 OPEN TO BELOW T&B (A=1.26 T&B (A=1.20 T&B (A=3.06 MAID'S QUARTER (A= 5.88 OFFICE/QUARANTINE ROOM (A= 5.35 BEDROOM 2 (A= 8.55 LIVING (A= 11.40 DINING (A= 14.50) KITCHEN (A= 7.11 D. KITCHEN (A= 4.60 CARPORT (A= 14.55) PORCH (A= 2.95 STAIR STAIR T&B (A=1.80) T&B (A=5.97 WIC (A=4.30 MASTER BEDROOM (A= 14.50 BEDROOM 1 (A= 11.52 HALLWAY (A=8.77 BALCONY (A=15.00 OPEN TO BELOW T&B (A=1.26 T&B (A=1.20 T&B (A=3.06 MAID'S QUARTER (A= 5.88 OFFICE/QUARANTINE ROOM (A= 5.35 BEDROOM 2 (A= 8.55 LIVING (A= 11.40 DINING (A= 14.50) KITCHEN (A= 7.11 D. KITCHEN (A= 4.60 CARPORT (A= 14.55) PORCH (A= 2.95 STAIR STAIR Ground Floor Plan Second Floor Plan Landscapes Entry Points Access
• Living Area • Kitchen Area
21 Architecture Portfolio Vol. 001 08

HINOBAAN CHAPEL | Architects Atelier AIE

Schematic Design - Design Development

2021

Project Team

Ar. Jose Ronald Celis - Principal Architect

Mel Brian J. Libarnes

Description

The project is a proposed chapel located in Hinobaan. This structure is inspired by the Cycladic architecture of Santorini, Greece. The aim for this project is to make it ooze with peace and purity fronting the beachscape of Nabulao bay.

As the primary member of this project, I was involved in site analysis, design feasibility, schematic design and design development of the project.

Responsibilities

• Site analysis and feasibility of the project

• Analyizng the project design and priorities

• Coordinating and meeting with the client

• Creates concepts and presentations

09
23 Architecture Portfolio Vol. 001 1 2 6 3 3 4 4 5 7 8 9 9 9 Ground Floor Plan 1 Nave 2 Altar 3 Seating Area 4 Toilet Rooms 5 Sacristy 6 Stair to Roof Deck 7 Garden 8 Entry 9 Pathwalks •
• Front elevation
Left side elevation

BAÑES RESIDENCE | Architects Atelier AIE

Schematic Design - Design Development - Permit Drawings - Construction Documents

2020

Project Team

Ar. Jose Ronald Celis - Principal Architect

Description

The project is a renovation and addition of new space for the Bañes residence. With the design objectives of making it light and airy, and spacious; the building is conceptualized with an image suited with harmony to its environment. Large windows were implented on the orientation were the prevailing winds are abundant. Organized the spaces too achieved seamless traffic flow.

I was involved from the site analysis, design feasibility studies, schematic design and design development stage. I also produce construction documents for costing.

Responsibilities

• Analyizng the project design and priorities, and implenting it.

• Coordinating and meeting with the client

• Coordinating with the consultants and suppliers

• Preparation of permit drawings and construction documents.

• Processing documents for building permit

24 Architecture Portfolio Vol. 001
25 Architecture Portfolio Vol. 001 DINING LIVING KITCHEN DIRTY KITCHEN FAMILY AREA MASTER BEDROOM BEDROOM 1 BEDROOM 2 T&B T&B PDR. RM 1 D 6 D 5 D 2 D 2 D 3 D 3 D 3 D 4 D W 1 W 1 W 2 W 2 W 4 W 4 W 3 W 4 W 5 W 6 W 7 W 8 W 6 07 A-2 06 A-2 WF-2 MOULDINGS F WF-2 100mm 200mm CONCRETE COLOR:WHITE WF-3 WF-1 10 A-2 09 A-2 3 D W 4 WF-5 WF-5 D:\00 START\WORK\AA\aa ppt JPG.jpg REPUBLIC ACT 545 SECTION 25(4 ) THESE DRAWINGS AS INSTRUMENTS OF SERVICE, ARE THE PROPERTY AND DOCUMENTS OF THE ARCHITECT. IT SHALL BE UNLAWFUL FOR ANY PERSON WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT OR AUTHORS OF THE SAID DOCUMENTS, TO DUPLICATE OR COPY THE SAID INSTRUMENTS. PRC NO.: PTR NO.: IAPOA NO.: DATE ISSUED: TIN: PLACE ISSUED: ARCHITECT PROJECT TITLE: LOCATION: C:\Users\ASUS\Downloads\WhatsApp Image 2020-09-09 at 4.32.10 PM.jpeg JOSE RONALD C. CELIS PROPOSED BUNGALOW RESIDENTIAL LOT 312-C, PSD-06-060333, 0048339 1992570 SEPT. 14, 2020 45278 299960 102120 925-221-709-000 BAGO CITY 01 A-2 FLOOR PLAN SCALE: 1:100 MTS 02 A-2 FRONT SCALE: 04 A-2 REAR SCALE: 06 A-2 CROSS SCALE: 08 A-2 MASTERS T & B SCALE: 1:50 MTS 09 A-2 ELEVATION SCALE: 1:50 MTS 10 A-2 ELEVATION SCALE: 1:50 MTS F F F WF-2 WF-1 WF-1 F F F F F WF-2 F F F F F F F F WF-2 WF-1 F F F F WF-1 WF-2 100mm 200mm CONCRETE F WF-3 WF-1 F F F F F F WF-4 WF-1 100mm SKIRTING COLOR; BROWN WF-1 WF-1 A-2 REPUBLIC ACT 545 SECTION 25(4 ) THESE DRAWINGS AS INSTRUMENTS OF SERVICE, ARE THE PROPERTY DOCUMENTS OF THE ARCHITECT. SHALL BE UNLAWFUL FOR ANY PERSON WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT OR AUTHORS OF THE SAID DOCUMENTS, DUPLICATE OR COPY THE SAID INSTRUMENTS. PROJECT TITLE: LOCATION: PROJECT OWNER/S: Drafted by: MBJL Date: DEC. 10, 2020 Checked by: MBJL Date: Revisions: Approved by: AR. CELIS SHEET CONTENTS: DRAWING & SHEET NO.: FLOOR PLAN FRONT ELEVATION RIGHT-SIDE ELEVATION LEFT-SIDE ELEVATION REAR ELEVATION CROSS SECTION LONGITUDINAL SECTION PROPOSED BUNGALOW SINGLE DETACHED RESIDENTIAL PROJECT LOT 312-C, PSD-06-060333, BRGY. POBLACION, BAGO CITY MR.ROLANDO BAÑES AND MRS.MELANIE BAÑES 02 A-2 FRONT ELEVATION SCALE: 1:100 MTS 03 A-2 LEFT-SIDE ELEVATION SCALE: 1:100 MTS 05 A-2 RIGHT-SIDE ELEVATION SCALE: 1:100 MTS 04 A-2 REAR ELEVATION SCALE: 1:100 MTS 06 A-2 CROSS SECTION SCALE: 1:100 MTS 07 A-2 LONGITUDINAL SECTION SCALE: 1:100 MTS & B 1:50 MTS EAVES OVERHANG EAVES OVERHANG OVERHANG EAVES OVERHANG OVERHANG EXISTING EAVES OVERHANG LONG SPAN ROOF EXISTING EAVES OVERHANG EXISTING EAVES OVERHANG LONG SPAN ROOF EAVES OVERHANG EAVES OVERHANG EAVES OVERHANG 18 Ø HOLE NGL 10mm Ø STIRRUPS 1 @ 50mm, REST @ 200mm O.C. 9-12mm Ø BAR BOTHWAYS 12MM THK. GYPSUM BOARD (PAINTED FINISH); P- 01 1" x 2" METAL FURRING FRAME CHB WALL ANCHOR CONCRETE POST NGL LONG SPAN G.I SHEET (RIB ROOF) JPG.jpg REPUBLIC ACT 545 SECTION 25(4 ) THESE DRAWINGS AS INSTRUMENTS OF SERVICE, ARE THE PROPERTY AND DOCUMENTS OF THE ARCHITECT. IT SHALL BE UNLAWFUL FOR ANY PERSON WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT OR AUTHORS OF THE SAID DOCUMENTS, TO DUPLICATE OR COPY THE SAID PRC NO.: PTR NO.: DATE ISSUED: TIN: PLACE ISSUED: ARCHITECT PROJECT TITLE: PROJECT OWNER/S: Drafted Date: Checked Date: Approved PM.jpeg JOSE RONALD C. CELIS 0048339 1992570 SEPT. 14, 2020 925-221-709-000 BAGO CITY ROOF PLAN SCALE: 1:100 MTS 03 A-3 REFLECTED CEILING PLAN SCALE: 1:100 MTS 10 A-3 METER POST SCALE: 02 A-3 CONCRETE CANOPY PLAN SCALE: 1:100 MTS 05 A-3 CEILING DETAIL SCALE: NTS PROPOSED BUNGALOW SINGLE DETACHED RESIDENTIAL PROJECT GARAGE ROOF PLAN AND ELEVATION 1:100 MTS 09 A-3 FOOTING AND PEDESTAL SCALE: NTS 07 A-3 EAVES DETAIL SCALE: 1:20 MTS MR.ROLANDO BAÑES JR. AND MRS.MELANIE BAÑES 12 A-3 CONC. MOULDING DET. SCALE: 1:20 MTS EXISTING EAVES OVERHANG EAVES OVERHANG EAVES OVERHANG 12MM THK. GYPSUM BOARD (PAINTED FINISH); P- 01 1" x 2" METAL FURRING FRAME CHB WALL 03 A-3 REFLECTED CEILING PLAN SCALE: 1:100 MTS 04 A-3 FLOOR FINISH LAYOUT SCALE: 1:100 MTS 02 A-3 CONCRETE CANOPY PLAN SCALE: 1:100 MTS 05 A-3 CEILING DETAIL SCALE: NTS 10 1 2 THK. GYPSUM BOARD PAINTED FINISH CF-1 1 2 THK. MOISTURE RESISTANT GYPSUM BOARD PAINTED FINISH CF-2 100mm WIDE PVC SPANDREL CF-3 PAINT FINISH; (PT-01) WHITE WF-1 PAINT FINISH; (PT-02) YELLOW WF-2 PLAIN CEMENT FINISH WF-3 300 x 600 CERAMIC WALL TILES; (TL-05) BROWN WF-4 203 X 203 x 31mm NON-SKID MOSAIC TILES FF-1 400mm X 400mm CERAMIC FLOOR TILES FF-2 600mm X 600mm GRANITE FLOOR TILES; WHITE FF-3 600mm X 600mm WOOD-LIKE PORCELAIN TILE; MATTE FINISH FF-4 LEGEND: 12MM THK. GYPSUM BOARD (PAINTED FINISH); P- 01 1" x 2" METAL FURRING FRAME CHB WALL CHB WALL 1" x 2" METAL FURRING FRAME 12MM THK. GYPSUM BOARD (PAINTED FINISH); P- 01 12MM THK. GYPSUM BOARD (PAINTED FINISH); P- 01 PROVISION FOR 12MM THK. GYPSUM BOARD COVED CEILING (PAINTED FINISH); P- 01 1" x 2" METAL FURRING FRAME STRIP LIGHTING; COOL WHITE 12MM THK/ GYPSUM BOARD (PAINTED FINISH); P- 01 DROPPED CEILING 3.00 M HEIGHT 2.85 M HEIGHT 600 X 1200mm CONCRETE PATHWALK; PLAIN STAMPED CONCRETE FINISH 1200 X 2000mm CONCRETE PATHWALK; PLAIN STAMPED CONCRETE FINISH 17.40 SQ. M. CEILING FLOORING 1" BLACK SCREW 1 4" MDF BOARD L-SHAPED CUT 3 4 PLYWOOD SPACED AT 300 MM O.C. 1 4 MDF BOARD 1" BLACK SCREW PURLINS APPLY STICKWELL 3 4 OR 1 2 MDF BOARD 1" BLACK SCREW 4-12mm Ø BAR W/ 10mm Ø STIRRUPS @ 200mm O.C, 18 Ø HOLE NGL 10mm Ø STIRRUPS 1 @ 50mm, REST @ 200mm O.C. 9-12mm Ø BAR BOTHWAYS 18 Ø HOLE A-3 BUNGALOW SINGLE DETACHED RESIDENTIAL PROJECT Veterans Ave. Bagumbong, Novaliches, Caloocan City PROJECT OWNER/S: MR. & MRS. LAZARO SHEET CONTENTS: DRAWING & SHEET NO.: REFLECTED CEILING PLAN FLOOR FINISH LAYOUT SCHEDULE OF DOORS AND WINDOWS CEILING DETAILS VERTICAL LOUVRE DETAIL METER POST DETAIL CEILING DETAIL 1 SCALE: NTS 4 A-3 CEILING DETAIL 2 SCALE: NTS 5 A-3 CEILING DETAIL 3 SCALE: NTS 7 A-3 VERTICAL LOUVER DETAIL SCALE: NTS FLOOR FINISH LAYOUT SCALE: 1:100MTS 8 A-3 METER POST DETAIL SCALE: 1:20 MTS Drafted by: Mel Brian J. Libarnes Date: Oct. 10, 2020 Checked by: Ar. JMNF Date: Oct. 12, 2020 Revisions: 00 Approved by: Ar. JMNF • Vertical Louver Details • Ceiling Details • Concrete Moulding Details

CABINET WORKS

26 Architecture Portfolio Vol. 001
• This is a proposed mobile library intended to be launched in barangay Caridad, Bago City, Negros Occidental.

OVERHEAD KITCHEN CABINET & DISPLAY RACK | Architects Atelier AIE

Design Development - Construction Documents

2021

Project Team

Ar. Jose Ronald Celis - Principal Architect

Mel Brian J. Libarnes

27 Architecture Portfolio Vol. 001 EXISTING WALL EXISTING WALL 3 3 4 4 5 5 6 7 8 2 1 01 1 OVERHEAD CABINET SCALE: 1:20 MTS CEILING HEIGHT FFL EXISTING WALL 01 1 DISPLAY RACK SCALE: 1:20 MTS 02 1 DISPLAY RACK 2 SCALE: 1:20 MTS GLASS WINE HOLDER 1 X 1" STEEL TUBE 1 X 1" STEEL TUBE 6MM Ø STEEL BAR CEILING HEIGHT FFL BAR COUNTER EXISTING WALL 01 1 DISPLAY RACK SCALE: 1:20 MTS 02 1 DISPLAY RACK 2 SCALE: 1:20 MTS GLASS WINE HOLDER 1 X 1" STEEL TUBE 1 X 1" STEEL TUBE 6MM Ø STEEL BAR CEILING HEIGHT FFL BAR COUNTER
Overhead kitchen cabinets for Brava residence
Display Rack
Brava Residence
for

CABINETS - VANIITY DRESSER & TV RACK | Architects Atelier AIE

Design Development - Construction Documents

2021

Project Team

Ar. Jose Ronald Celis - Principal Architect

Mel Brian J. Libarnes

• Three door wardrobe Design 1 • Three door wardrobe Design

28 Architecture Portfolio Vol. 001 7 8 4 4 4 9 5 6 1 10 3 5 7 6 7 a 3 DOOR WARDROBE LAYOUT 3 DOOR WARDROBE ELEVATION ISOMETRIC VIEW A-1 DRAWING & SHEET NO.: A-1 PTR NO.: DATE ISSUED: PLACE ISSUED: Drafted by: Checked by: Date: Approved by: DRAWING & SHEET NO.: 09/11/2020 5 5 6 9 01 3 DOOR WARDROBE LAYOUT 01 3 DOOR WARDROBE ELEVATION 03 ISOMETRIC VIEW DRAWING & Drafted by: DRAWING & 3 2 5 7 7 9 01 3 DOOR WARDROBE LAYOUT 01 3 DOOR WARDROBE ELEVATION 03 ISOMETRIC VIEW
2
29 Architecture Portfolio Vol. 001 01 1 TV RACK ELEVATION SCALE: 1:20 MTS 02 1 PERSEPECTIVE SCALE: NTS 7 7 7 6 6 5 4 4 3 2 1 1 1 a e e 7 7 7 6 6 5 3 4 4 2 1 1 1 e e a f h g g f b c d DRESSER LAYOUT DRESSER ELEVATION DRAWER 1 DRAWER 2 BACKING • TV Rack • Vanity
Dresser

• Kitchen Cabinets

• Walk-In Closet for Girls bedroom

30 Architecture Portfolio Vol. 001
OVERHEAD CABINET LINE
KITCHEN CABINETS AND WALK IN CLOSET| Architects Atelier AIE

Design Development - Construction Documents

2022

Project Team

Ar. Jose Ronald Celis - Principal Architect

Mel Brian J. Libarnes

31 Architecture Portfolio Vol. 001 KITCHEN CABINETS | Architects Atelier AIE E-X REPUBLIC ACT 9266 SECTION 20(4 ) THESE DRAWINGS AS INSTRUMENTS OF SERVICE, ARE THE PROPERTY IT SHALL BE UNLAWFUL FOR ANY PERSON WITHOUT THE WRITTEN PRC NO.: TIN: ARCHITECT PROJECT TITLE: PROJECT OWNER/S: Drafted by: -Date: -Checked by: SHEET CONTENTS: DRAWING & SHEET NO.: LIGHTING LAYOUT POWER LAYOUT JOSE RONALD C. CELIS 0048339 925-221-709-001 E-X REPUBLIC ACT 9266 SECTION 20(4 OF SERVICE, THE PROPERTY AND DOCUMENTS OF THE ARCHITECT. IT SHALL BE UNLAWFUL FOR ANY PRC NO.: ARCHITECT PROJECT TITLE: PROJECT OWNER/S: Drafted by: -Date: -Checked by: SHEET CONTENTS: DRAWING & SHEET NO.: LIGHTING LAYOUT POWER LAYOUT JOSE RONALD C. CELIS 0048339 925-221-709-001
• Kitchen cabinets for second floor renovation of Fregil residence

SCHOOL PROJECTS

32 Architecture Portfolio Vol. 001

PROJECTS

33 Architecture Portfolio Vol. 001

BUAS DAMLAG: A MASTER DEVELOPMENT PLAN OF BROOKSIDE GARDEN ACADEMY |

Thesis project 2018-2019 |

Proponent : Mel Brian J. Libarnes

34 Architecture Portfolio Vol. 001 01
35 Architecture Portfolio Vol. 001

• This thesis project is about future proofing the institution in 15 years projection. Making it an environment conducive for learning; The school environment focuses on how to attain an environment conducive for learning. Considering the factors on building function, and aesthetics that has an effect to the students learning stimuli. The organization of spaces are planned efficiently. The planning concept adapted is cluster planning, since this spatial organization is about the sharing and relating of spaces with same proximity that can generate flexibility within.

The site is be divided into areas where such consideration are observed especially on the school buildings of secondary and elementary level, since these educational levels shared the same site. On building aesthetics the theory of multiple intelligence developed by Howard Gardner in the late 1970’s is applied as one of the design source for this project. This multi intelligence comprises with linguistic, logical-mathematical, spatial, musical, naturalist, bodily kinesthetic, interpersonal and intrapersonal. Individuals draw on these intelligences, individually and corporately, to create products and solve problems that are relevant to the societies in which they live. This implies that architecture used on the built environment must convey and nurture learning.

36 Architecture Portfolio Vol. 001
• Administrative building

The value of each intelligence must coincide with the aesthetic, like for example in the musical part, the design must taken into account the harmony, and rhythm. For logical or mathematical, geometrical forms would appropriate. These valuable features of multiple intelligence could suffice the environment as conducive for learning. This theory could also be used on the building function part. Also, putting into considerations the psychology of colors, using natural daylight and acoustics.

37 Architecture Portfolio Vol. 001
• Common ground clustered by the library, and elementary level and secondary level classrooms.

Description

This project is a proposed recovery home for drug dependent juveniles. The design concept for this project is inspired by bahay kubo. Bahay kubo is commonly seen here in the Philippines which of course emblematize our “Pambansang Tirahan”. Bahay Kubo became an inspiration for this design because of its natural features that gaves a large impact to the structure itself. This features are most likely the passive cooling and natural lighting. Bahay kubo also possesses an inpendency on interactions or communication flow, which develop a strong sense and value of community to its occupants.

38 Architecture Portfolio Vol. 001 SIBOL : A COMMUNITY-BASED RECOVERY HOME FOR DRUG DEPENDENT | ARCHINEXT 2018 Design Competition 02
39 Architecture Portfolio Vol. 001
• Classroom and Workshop buliding • Entry view for the Administrative building and the Housing Unit