THE NEWARK EXPERIENCE: Envisioning the Post-Covid Airport

Page 1

THE NEWARK EXPERIENCE

ENVISIONING THE POST-COVID AIRPORT

BRADLEY WINOGRAD | SENIOR PROJECT 2023

DON JONES

ACELA ACELA ACELA ACELA ACELA ACELA ACELA ACELA ACELA SECAUCUS HAMILTON ALEXANDRIA CHARLOTTESVILLE LYNCHBURG ROANOAKE WASH. UNION PETERSBURG RICHMOND STAPLES MILL RICHMOND MAIN ST STN WILLIAMSBURG NEWPORT NEWS NORFOLK BALTIMORE PENN STN WILMINGTON BWI AIRPORT NEW BRUNSWICKEDISONMETUCHEN REDMIDDLETOWNHAZLETMATAWANABERDEEN BANKLITTLESILVERLONGBRANCH LINDENELIZABETHN.ELIZABETHRAHWAY WOODBRIDGE AVENEL PERTH AMBOY S. AMBOY METROPARK NEWROCHELLESTAMFORDBRIDGEPORTNEWHAVEN PROVIDENCEBOSTONBACKBAYBOSTONSO.STN AIRPORT CITY NEWARK NEWARK PENN MOYNIHAN STN PENN STN TRENTON PHILADELPHIA LANCASTERHARRISBURG PRINCETONJCT HARRISON SQUAREJOURNAL GROVE STREET EXCHANGE PLACE HARTFORDSPRINGFIELD WTC AIRPORT CITY NEWARK AIRTRAIL TERMINAL 2 (INTERNATIONAL) TERMINAL 1 TERMINAL 3 TERMINAL4ADMINMUSEUM NORTH STN PORT SOUTHSTN AMTRAK / NORTHEAST CORRIDOR AMTRAK / KEYSTONE NJ TRANSIT / NORTHEAST REGIONAL NJ TRANSIT / N. JERSEY COASTLINE PANYNJ / PATH TRAIN PANYNJ / EWR AIR TRAIN PANYNJ / EWR PARK LINE PANYNJ / EWR TERMINAL LINE AIRPORT CITY AIR TRAIL AMTRAK / ACELA STATION INTERCHANGE TRAIN STATION SUBWAY STOP WALKING CONNECTION AIRPORT CITY NEWARK TRANSIT MAP
ATCT ARFF FUELING AIRTRAIN MAINTENANCE TRANSIT HEADHOUSE REGIONAL RAIL STATION AIRPORT OP. HQ BREWSTER AVIATION MUSEUM FBO GENERAL AVIATION PARKING BALL PARK PARKING AREA PARKING AREA 4 L 4 C 4 R 22 R 22 C 22 L 29 11 CARGO PARKING CARGO PARKING TERMINAL 2 (INTERNATIONAL)
1 (DOM/CONTINENTAL) TERMINAL 3 (FLAGSHIP) TERMINAL 4 (REGIONAL)
01CONTEXT 02REGIONAL PLANS 03PROGRAM 04SWOT ANALYSIS 05PRECEDENTS AIRPORT PLANNING URBAN DESIGN INFRASTRUCTURE 06VISION PLAN 07TERMINAL DESIGN MASS TO FORM ROOF DEVELOPMENT USER EXPERIENCE + MENTAL HEALTH BIOMETRIC TECHNOLOGY SUSTAINABILITY AIR PURIFICATION + GREENERY 08FINAL REVIEW MASTER PLAN TERMINAL DESIGN REFLECTION
TERMINAL
TABLE OF CONTENTS

STATEN ISLAND

BRONX EWR NECNER NYP WTC PATH LGA
BROOKLYN
MANHATTAN
JFK
QUEENS
CONTEXT

Newark Liberty International Airport over its 95 year long history has helped pave the history of aviation being the serving as a leading example of the

. Opened on paved airstrip. Newark Metropolitan Airport as referred to back then years and and the Airports.

HOW CAN NEWARK LIBERTY INTERNATIONAL AIRPORT BECOME A

LEADING EXAMPLE FOR THE 21ST CENTURY?

. Many think of Newark Airport negatively

--to establish Newark airport city that leads the way for A Newark that leads again...

10000ft CARGOEXPANSION 8000ft 4600ft 2800ft 5500ft 19000ft AIRPORT ZONE AIRPORT CITY Runway Airport Footprint 1928 72.5 acres 1947 Union/Essex County Line 1,319 acres 1957 2093 acres 1978 2,000 acres 2000 2,207 acres
REGIONAL ECONOMIC GROWTH TRANSIT CONNECTIVITY AIRPORT TECHNOLOGY SUSTAINABILITY + RESILIENCE PASSENGER EXPERIENCE

REGIONAL PLANS

AirTrain Replacement Program Regional Plan Association

and the ongoing anticipation for of Newark Airport has been investigated across many stakeholders who strongly the region.

phase was to compile all of the accomodates the best across all while incorporating new ideas that

Airport City Newark
117.0 m Stratolaunch 16.5 m Stratolaunch 73.0 m Stratolaunch 97.5 m 66.6 m 24.2 m Spruce Goose Hughes H-4 Spruce Goose Hughes H-4 Spruce Goose Antonov An-225 Mriya 88.4 m 84.0 m An-225 18.1 m Antonov An-225 Mriya Airbus A380-80079.8 m 72.7 m 24.1 m A380-800 Airbus A380-800 Boeing 747-8 76.3 m 19.4 m B747-8 Boeing 747-8 68.4 m 0 SCALE 24610 m8 29% 36% 35% 25% 71% 4% Domestic Aircraft Size Commuter Narrow BodyWide Body International Aircraft Size PROGRAM

UNDERUTILIZED LAND

Prior to design, I performed a program inventory of the existing airport and a SWOT analysis to design process.

The existing international terminal leave little to allow the parking of wide-body aircraft became the international terminal.

NEWARK ELIZABETH STATEN ISLAND BAYONNE HARRISON NEWARK BAY TH ISLAN N T E B BA A N ATTEN Z N BET BE E ABE A AB ZAABET O ON YON Y NNNE I ELLIIZ RK WAARK WAR NEEWAR NEW ON ISONRRIS R RRISON RISO RRISO I ARRRISON A HA H WARK RK AY
S W O T S W O T S W O T S WOT SW O T S WO T S W OT S W OT S WO T SW O T RAIL PROXIMITY NEW CONSTRUCTION PORT INDUSTRY HIGHWAYS TERMINAL COMPLEX RUNWAYS GEOGRAPHY
SWOT ANALYSIS

PRECEDENTS AIRPORT PLANNING

design was to establish a regional master plan that encompasses the airport and the airports and cities to decide the appropriate

based on their highway access, terminal arrangement, and

The airport city was within the footprint of also considered in assisting the design of the new road network.

and mid-density city airport city.

HUB AND SATELLITE ATL
DFW MIA
AMS COMPACT HIGHWAY BISECT INTERNAL LOOP
DBX SEA
SIN

PRECEDENTS

URBAN DESIGN

URBAN DENSITY

URBAN CHARACTER

MIDTOWN MANHATTAN BARCELONA
LE PLESSIS ROBINSON AMSTERDAM
CENTER CITY PHILADELPHIA

PRECEDENTS INFRASTRUCTURE

RENDERING DEPICTING GREENSPACE ABOVE ROZELLE HIGHWAY INTERCHANGE

SYDNEY, AUSTRALIA

LOS ANGELES, CALIFORNIA

HIGHWAY BUFFER

INDUSTRY CARGO RESIDENTIAL RESIDENTIAL PARK
HIGHWAY BUFFER CEMETERY HOTEL PARKING BELOW SUPPORT SUPPORT SUP. SUP. ADM ATC FBO MID-HIGH DENSITY MIXED-USE MID-LOW DENSITY MIXED-USE MID-HIGH DENSITY MIXED-USE TRAIN STATION AVIATION MUSEUM CEM. INTL TERMINAL DOMESTIC TERMINAL AIRFIELD DOMESTIC TERMINAL AIRPORT SUPPORT BOUND CREEK DOMESTIC TERMINAL RESIDENTIAL VISION
PLAN

TERMINAL DESIGN MASS TO FORM

ENTRY COURT CONCESSIONS SECURITY CORE GREEN COURT ATTRACTION LOUNGE HOLDROOM HOTEL ENTRY HALL

TERMINAL DESIGN ROOF DEVELOPMENT

LATE FALL EARLY WINTER

EARLY SPRING

was more more . The idea of

TERMINAL DESIGN

USER EXPERIENCE + MENTAL HEALTH

PASSENGER STRESS THROUGHOUT THE AIRPORT EXPERIENCE

PASSENGER EXPERIENCE PRECEDENTS:

RELAXATION ROOM

SENSORY ROOM

AIR TRAVEL EXPERIENCE

HIGH TRIP PREPAIRPORT ARRIVALCHECK-INSECURITYPOST-SECURITYIMMIGRATIONLAYOVERBAG CLAIMAIRPORT DEPARTURE LOW MODERATE

TERMINAL DESIGN BIOMETRIC TECHNOLOGY

PASSENGER BOARDING

SECURITY SCREENINGIMMIGRATION / CUSTOMS

NOW
FUTURE FUTURE
BAG
CLAIM LOUNGE ENTRY NOW

TERMINAL DESIGN SUSTAINABILITY

Substation

healthy and thriving ecological beyond.

PORT AUTHORITY CITY OF NEWARK

Geo Exchange Wells

Airport City

Distribution Piping

Substation

Sanitary Heat Exchange

DISTRICT

Airport

LIVINGBUILDINGCHALLENG

HANDWASHING PLANTER FILTRATION STATION

PLACE

Restoring a healthy relationship between nature, place, and community

WATER

Creating developments that operate within the water balance of a given place and climate

ENERGY

Relying on renewable resources

HEALTH +HAPPINESS

Fostering environments that optimize physical and psychological health and well-being

MATERIALS

Building with products that are safe for all species through time

EQUITY

Supporting a just, equitable world

BEAUTY

Celebrating design that uplifts human spirit

E
GEO EXCHANGE SYSTEM

TERMINAL DESIGN

AIR PURIFICATION + GREENERY

calming and cleaner environment. Whereas plantings provide pandemic, the demand for breathable air became a concern. Landscaping provides an systems.

what does the breathable post-

In my design, I integrate some of

FINAL REVIEW

NEWARK 2023

SITE PLAN

NEWARK 2065+

AIRPORTCITYNEWARK

SITE PLAN
NEWARK CARGOAIRPORT

TERMINAL DESIGN : SECTIONS

INTERNATIONAL GARDENS INTERNATIONAL CONCOURSES SECURITY + CUSTOMS DEPARTURES ARRIVALS CURBSIDE PICKUP CONNECTION BRIDGE AIRTRAIN + TRANSIT HUB LOCAL TRANSIT CURB HOTEL NEWARK AIRPORT CITY NEWARK NEWARK AIRPORT STATION NEW DAYTON WEEQUAHIC PARK
INTERNATIONAL GARDENS DOUBLE CONCOURSE TERMINAL HEADHOUSE AIRPORT CITY SINGLE CONCOURSE
INTERNATIONAL GARDENS DINING LOUNGE LOUNGE LOUNGE LOUNGE LOUNGE LOUNGE LOUNGE LOUNGE AIR TRAVEL EXPERIENCE SENSORY + QUIET SPACE BAGGAGE CLAIM CUSTOMS DEPARTURES HALL DEPARTURES CURB CONCOURSE RETAIL + DINING CONCOURSE CONCOURSE CONCOURSE RETAIL+DINING RETAIL + DINING RETAIL + DINING CONCOURSE RETAIL + DINING CONCOURSE RETAIL + DINING 2 5 HOTEL NEWARK 3 INTERNATIONAL GARDENS RECOMPOSURE CBP OFFICES SECURITY IMMIGRATION IMMIGRATION TICKETING CONCESSIONS CONCESSIONS CONNECTION BRIDGE ARRIVALS CORRIDOR ARRIVALSCORRIDOR ARRIVALS CORRIDOR ARRIVALS CORRIDOR ARRIVALS CORRIDOR ARRIVALS CORRIDOR INTERNATIONAL GARDENS ARRIVALS HALL ARRIVALS CURB AIRCRAFT SUPPORT AIRCRAFT SUPPORT AIRCRAFTSUPPORT SUPPORTAIRCRAFT BAGGAGE HANDLING SYSTEM 1
TERMINAL DESIGN : PLANS

TERMINAL DESIGN : PERSPECTIVES

DEPARTURES CURB

RECOMPOSURE / INTERNATIONAL GARDEN

CONCOURSE / HOLDROOM

REFLECTION

BRADLEY WINOGRAD

Email: bradleywinograd1@gmail.com

Phone: (845) 608 9201

Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.