Case study

QATAR WORLD CUP STADIUMS In 2021, Bradbury Group supplied HBK Contracting Co. W.L.L with over 600 M2M2 and M2M3 doors, for the FIFA World Cup stadiums in Qatar.

ABOUT THE PROJECT

THE CHALLENGE

The 2022 FIFA World Cup was the first tournament to be held in an Arab region. It took place across eight stadiums within a 21 mile radius, making it the only tournament where visitors could attend more than one match in a day.

Bradbury Group was approached by HBK Contracting Co. W.L.L. to supply over 600 doors with high levels of security and additional fire integrity.

The stadiums are linked by a Metro system and have a total capacity of just under 400,000 people, with each having their own different striking designs and features, such as solar forms for power, cooling systems or outdoor air conditioning.

The project required a quick turn around with a total requirement of 649 doors across the different stadiums; 422 SR2 Doors and 227 SR3 Doors, to be supplied directly to Qatar for installation. Due to the number of doors required, shipment was required via containers, which couldn’t be undertaken in-house due to restrictions on space.

“It was great to have played a part in such a pivitol global project. Seeing the stadiums come to fruition over the past year has been really exciting for the entire team.” Rosie McRobbie, International Business Development Manager, Bradbury Group


THE SOLUTION

PROJECT FACTS Client

HBK Contracting Co. W.L.L

Location

Qatar

Duration

6 Months

Products

M2M2 & M2M3 Doors

Production of the doors began almost immediately from order, with a total of 20 leaves produced each day and 80-100 doors each week. A quick turn around on paint was required, with both the pre-coat and top coat applied in the same day. A third-party was recruited to crate the doors ready for shipment. In total, the project took 6 months to complete, with the doors supplied in a range of colours.

ABOUT M2M DOORS

ABOUT BRADBURY GROUP

M2M doorsets are designed for premises requiring high levels of security and provide certified security and fire integrity for a wide range of applications.

Bradbury Group is a family owned business with over 30 years expertise in physical security solutions.

Bradbury Group’s M2M bespoke range of doorsets are approved to BRE LPS 1175: Issue 7 up to SR4. They come with additional certified fire integrity up to 240 minutes, depending on the application, approved through both the CERTFIRE and to external CE/UKCA standards EN 16034 and BS EN 143651-1.

We are one of the leading manufacturers, suppliers and installers of steel doors, operating from our 135,000 sq ft facility in North Lincolnshire, UK.

bradbury-group.com Qatar World Cup Case study, 13-01 GB, 12-22


Turn static files into dynamic content formats.

Create a flipbook
Case Study: 2022 Qatar World Cup Stadiums by Bradbury Group - Issuu