bowenislandundercurrent.com
SCREENING GREEN: Why You Suck at Golf & its Bowen movie stars
Thursday, January 28, 2021 • A1
$1.50
PAGE 16
inc. GST
THURSDAY, JANUARY 28, 2020
JANI BUCKE PHOTO
RARE SIGHTING
VOL. 47 NO. 04
BIUndercurrent
BowUndercurrent www.bowenislandundercurrent.com
Blue jay & boreal owl spotted on Bowen PAGE 3
When will the community centre be built? MINOR PROJECT REDESIGNS, DELAY FOR COMMUNITY CENTRE
BRONWYN BEAIRSTO
Editor@bowenislandundercurrent.com
UNDERCURRENT PHOTO
Claudia Schaefer has taken on one of Bowen’s longstanding institutions: the gold pages (also known as the Bowen Island Phone Book). Former publisher Barbara Wiltshire sold the business after more than 30 years of producing what one Facebook commenter called ‘the only phone book I read cover to cover.’ See the story on pages 17 and 18.
Summer 2023. If the modified community centre timeline comes to fruition, the long-anticipated building will open in two and a half years. Bowen Island Municipality unveiled the slightly modified project and timeline at the council meeting Monday. Codes and standards have changed since BIM issued the building permit for the community centre in fall 2018 and the design team had to reacquaint themselves with what had been a project in stasis, council heard. “There’s been a lot of work rebooting the team and making sure that we’re going to be able to receive the grant funds,” said project manager Sam Collins, “and that this facility will be able to be complete [to] design and then turned into an operating facility.” The revised design includes adapting the building to step three of the BC Energy Step Code (which BIM adopted in Oct. 2020), COVID-19 considerations in air circulation and space use and enhancing accessibility features. Wider corridors, vestibule modifications and refigurations in the municipal layout are among the changes. The 2018 design didn’t account for municipal staff consolidating under one roof (with the exception of outdoor public works staff ) or future growth said a press release. A “very modest increase” in space and considering shared workspaces and work-from-home schedules for the future are among BIM’s solutions. CONTINUED ON P. 20
Vaune Kolber, Realtor® ~ Bowen’s Bridge to the City Ready to downsize? Whether staying on Bowen or moving to the Mainland, I can help.
BetteronBowen.com 604-506-7534 kolber@dexterrealty ty.com y