The Center for Connected Learning Moffitt Library Renovation | Levels 1-3 University of California, Berkeley Berkeley, California SCHEMATIC DESIGN REPORT 02/19/20
is building positive
ACKNOWLEDGEMENTS This report was assembled for the University of California Berkeley. In addition to Faculty, Staff, and Student participation, the following teams were instrumental in progressing the programming and schematic design for the Center for Connected Learning at Moffitt Library.
CLIENT TEAM
DESIGN TEAM
The leadership of the Center for Connected Learning (CCL) project team reviewed content, coordinated with committees and campus stakeholders, provided critical project oversight and logistical support, and provided direction throughout the process.
BNIM analyzed the existing building and identified transformational opportunities for the future library. BNIM worked closely with a team of design consultants to develop a design concept based on user feedback that is feasible within the existing project budget.
Leadership Team
BNIM
Cini LIttle
Elizabeth Dupuis Jean Ferguson Nicole Brown Sukhjit Johal Nick Morisco
Steve McDowell Matthew Porreca Rohn Grotenhuis Gretchen Holy Adam Weichman Dan Brown Jeff Marsch Matt Lechowicz Ruoxi Cao
Keith Short Theresa Chadwick Lei Anne Pascua
Groups Engaged Office of Sustainability Facility Services UC Berkeley IS&T and Library IT General Assignment Classroom Team EH&S (Fire Marshall) b.makerspace VR@Berkeley Data Science Nexus, Data Peers Instruction Services Division Strada Group (FSM Café vendor) Library Development Office Berkeley Center for New Media Library Security Services Access Services Division Media Resources Center Capital Strategies Library Imaging Services Cal Zero Waste Manager Jacobs Institute for Design Innovation Design Review Committee Tiger Team Library Board Design Review Committee
2 | Robert The Center E. Kennedy for Connected Library, Cal Learning Poly SLO - Moffitt Library, UC Berkeley
Integral Group Tom Simpson Gerry Gaubert Becky Steadman Mudit Srivastava Kevin LaRue Juan Rojas Lynn Wall Mar Structural Design David Mar Patrick Heye Sarah Aher Sandesh Aher
Charles M. Salter Erik Mori Davis Keith Michael Bolduc Craig Gillan Valerie Smith Jake Schpero Jensen Hughes Sanjay Aggarwal Cumming Shawn Koca Ashok Patel Nick Mata
Contents
1
Executive Summary. . . . . . . . . . . . . . . . . . . . . . . 5 Project Overview. . . . . . . . . . . . . . . . . . . . . . . . . . 7 Background. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 Design Concept Statement . . . . . . . . . . . . . . . . 10 Summary of Improvements . . . . . . . . . . . . . . . . 12
2
Existing Conditions Assessment. . . . . . . . . . . . 17 Site Analysis. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 Architectural Analysis. . . . . . . . . . . . . . . . . . . . . . 20 Structural Analysis . . . . . . . . . . . . . . . . . . . . . . . . 34 Mechanical Analysis . . . . . . . . . . . . . . . . . . . . . . . 36 Plumbing Analysis. . . . . . . . . . . . . . . . . . . . . . . . . 38 Electrical Analysis. . . . . . . . . . . . . . . . . . . . . . . . . 40
3
Programming. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43 Project Purpose + Definition. . . . . . . . . . . . . . . . 44 Benchmarking . . . . . . . . . . . . . . . . . . . . . . . . . . . . 46 Engagement Process. . . . . . . . . . . . . . . . . . . . . . 48 Measures of Success . . . . . . . . . . . . . . . . . . . . . . 50 Existing Building Use . . . . . . . . . . . . . . . . . . . . . . 52 Available Area Analysis. . . . . . . . . . . . . . . . . . . . 56 Proposed Space Program. . . . . . . . . . . . . . . . . . 58 Adjacency Diagram. . . . . . . . . . . . . . . . . . . . . . . . 60 Access and 24-Hour Use . . . . . . . . . . . . . . . . . . . 62
4
Design Drawings. . . . . . . . . . . . . . . . . . . . . . . . . . 65 Design Process. . . . . . . . . . . . . . . . . . . . . . . . . . . . 66 Layers of Design. . . . . . . . . . . . . . . . . . . . . . . . . . 68 Conceptual Demolition . . . . . . . . . . . . . . . . . . . . 70 Schematic Stacking and Blocking Diagram . . 76 Schematic Floor Plans. . . . . . . . . . . . . . . . . . . . . 80 Exterior Elevations . . . . . . . . . . . . . . . . . . . . . . . . 86 Building Sections. . . . . . . . . . . . . . . . . . . . . . . . . . 90 Perspectives. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 94 Stereoscopic Panorama. . . . . . . . . . . . . . . . . . . . 110
5
Design Narratives and Analysis. . . . . . . . . . . . . 113 Section Overview . . . . . . . . . . . . . . . . . . . . . . . . . 114 Site Improvements + Recommendations. . . . . 116 Code Analysis + Narrative. . . . . . . . . . . . . . . . . . 118 Structural Narrative. . . . . . . . . . . . . . . . . . . . . . . 126 Mechanical Systems Analysis. . . . . . . . . . . . . . . 128 Technology Narrative . . . . . . . . . . . . . . . . . . . . . . 140 Telecommunications Narrative. . . . . . . . . . . . . 142 Electronic Security Narrative. . . . . . . . . . . . . . . 150 Audiovisual Narrative. . . . . . . . . . . . . . . . . . . . . . 154 Acoustics Narrative. . . . . . . . . . . . . . . . . . . . . . . . 162 Daylight Analysis. . . . . . . . . . . . . . . . . . . . . . . . . . 170 Fire Protection Narrative. . . . . . . . . . . . . . . . . . . 176 Food Service Design + Equipment. . . . . . . . . . . 180
6
Statement of Probable Cost . . . . . . . . . . . . . . . 185 Statement of Probable Cost . . . . . . . . . . . . . . . 186
7
Fundraising, Design and Construction . . . . . . 210 Conceptual Schedule. . . . . . . . . . . . . . . . . . . . . . 212
Appendices 1. Space Program 2. LEED Scorecard 3. Outline Specifications 4. Structural Tier 3 Report 5. Hazardous Materials Report 6. Fire System Pressure Testing Report 7. Cost Estimate Backup 8. Design Development Startup List 9. Furniture Sketches
PROGRAMMING SCHEMATIC + FEASIBILITY DESIGN REPORT STUDY | 3
1 EXECUTIVE SUMMARY
Blank Page
4 | The Center for Connected Learning - Moffitt Library, UC Berkeley
1 EXECUTIVE SUMMARY
1 EXECUTIVE SUMMARY
SCHEMATIC DESIGN REPORT | 5
1 EXECUTIVE SUMMARY
6 | The Center for Connected Learning - Moffitt Library, UC Berkeley
1 EXECUTIVE SUMMARY
PROJECT OVERVIEW BNIM was selected to provide design services for the renovation in the James K. Moffitt Undergraduate Library at University of California, Berkeley. The project scope was defined around the transformation the lower 3 floors of the existing library into the Center for Connected Learning (CCL). Levels 1, 2 & 3 has approximately 100,000 gross square feet of existing space with a total estimated construction budget of 35 million dollars.
Project Goals
The project kickoff identified the goals and aspirations of the Moffitt Library leadership team which had previously developed the initial visioning for the CCL. BNIM has developed the project program which has been a living document throughout the design process. The design for the CCL has progressed to a schematic design level of detail to fully develop the scope of the project transformation. The team assembled a statement of probable cost in confirming the project budget for fundraising which will take place at the conclusion of the schematic design phase. The project will progress into the remaining design phases and be fully executed in construction once sufficient funds are committed to the project.
•
Our team has worked collaboratively with UC Berkeley’s library leadership team and campus stakeholders to develop a design that reflects contemporary pedagogical trends in the evolving nature of libraries, seamlessly integrated into and improving upon the existing building. The design for the CCL captures additional usable square footage by utilizing high efficiency mechanical systems, transforms the interior quality of space by bringing daylight into the lower levels of the building via a courtyard skylight, increased exterior glazing, openings in the floor spanning all three floors. The design unifies the building circulation system and creates a highly visible connection to the Gardner Stacks. The program is organized with public spaces on level 3 and the CCL organized around a new central spine with open stairs to interconnect program spaces visually from floor to floor and provide easy wayfinding on each level for students within the library.
•
Per the project brief, specific goals of the renovation of floors 1, 2, and 3 include but are not limited to: • •
• •
•
• • •
Establish clear circulation / wayfinding throughout the building Facilitate and encourage student engagement with peer-to-peer or expert consultation Provide student connection to the wealth of resources and services across campus libraries Balance open, public access to select areas of the building with security considerations Provide multimedia-rich classroom spaces that allow faculty members to implement new, modern teaching methods Alter the existing cafe on floor 3 to respond to evolving menus, improve circulation, and accommodate public events Integrate outdoor spaces Provide active, collaborative spaces appropriately balanced with introspective, reflective spaces Coordinate and create uniform building infrastructure and systems, taking cues from floors 4 and 5 LEED certification
SCHEMATIC DESIGN REPORT | 7
1 EXECUTIVE SUMMARY
BACKGROUND In 2016, the University began re-envisioning Moffitt Library with the renovation of floors 4 and 5, comprising approximately 38,000 SF. This initiated the transformation of the library to interactive and dynamic modes of learning. A stated goal of the University is that the renovation of floors 1, 2, and 3, comprising of approximately 100,000 SF, should “both capitalize and improve on the foundations presented by the work on floors 4 and 5 toward the creation of a flexible yet culturally and aesthetically harmonized facility.”
Purpose To build on the 2016 project vision created by campus leaders, thinkers, and creators and to reintroduce Moffitt Library as The Center for Connected Learning (CCL); an undergraduate collider space supporting the behaviors of learning, collaborating, making, and reflecting. Analyze Prior to hiring BNIM, lead team members of the CCL worked with focus groups to develop detailed service-level snapshots, or Design Sprints, of the CCL Vision. BNIM assessed/evaluated/synthesized the Design Sprint work to develop an initial space program document.
Engage Throughout our process we’ve collaborated with students, faculty, staff, the campus, and our consultants in a variety of ways to solicit input that informed our recommendations for the project.
8 | The Center for Connected Learning - Moffitt Library, UC Berkeley
Measures of Success Our work identified a series of problems and related measure of success that shaped and guided the spaces, services, and design character for Moffitt Library. Program We developed a list of program spaces and services that will fit within the building with future flexibility and the ability to change over time. Architecture We assessed the capacity for the existing building to support future library needs, evaluated ways to maximize usable space, and assessed architectural interventions that will transform the future library. Building Systems Our engineering analysis evaluated and selected a mechanical system for Levels 1 through 3 that would help the campus get closer to their Zero Net Energy and carbon neutrality goals. Sustainability The architectural and engineering analysis identifies an integrated design strategy for the future library that lowers energy usage and operational costs while increasing seat capacity and strengthening the connection to nature. Feasibility Our analysis defines a scope of work and corresponding cost estimate for the project that demonstrated the renovation is feasible within the existing $35 million construction budget.
1 EXECUTIVE SUMMARY
SCHEMATIC DESIGN REPORT | 9
1 EXECUTIVE SUMMARY
DESIGN CONCEPT STATEMENT The reinvention of libraries is enabling campuses to adapt and evolve to meet the rapidly changing needs for every student, faculty member, and school. The library is no longer a place where information is stored in the form of books, but a place where knowledge is generated through collaboration, discovery, and access to the latest digital tools.
Hub for Undergraduates The Center for Connected Learning is an active, dynamic undergraduate hub where students engage in multidisciplinary, multimodal inquiry and creation. Students learn from interactions with peers and experts as they ask questions and seek answers in an environment unbound by disciplines or domain expertise.
The design of the Center for Connected Learning (CCL) at Moffitt Library renovation will transform the undergraduate student experience on the UC Berkeley campus. The design developed is centered around the student experience in creating a diversity of learning studios, peer to peer consultation spaces which are all highly connected while providing student access to technology rich environments to create and access information.
Launchpad for Discovery The Center for Connected Learning shows students at the beginning of their education what’s possible for learning and research in the digital age. Students can discover and experiment with new methods and tools. The services and spaces provide deep connections to the Library’s wealth of scholarly resources and the many other services across Berkeley’s campus.
The design unifies the building circulation system and creates a highly visible connection to the Gardner Stacks with its 2.5 million volumes. The east courtyard transformation into an enclosed space under a new skylight provides a central hub for student services provided by the Moffitt Library staff. The new central spine with open stair connecting levels 1, 2 and 3 transforms these floors into a highly connected environment which promotes student interactions and visibility into all the learning spaces which are provided for students to access. The design transformation is based on the ability to bring natural light into the lower levels through the courtyard skylight, increased exterior glazing and new floor openings to organize the interior circulation systems and simplify wayfinding. The core design goal of the renovation of Floors 1-3 is to create an architectural framework within Moffitt Library that embodies and promotes the following Values and Cultures of the Center for Connected Learning:
10 | The Center for Connected Learning - Moffitt Library, UC Berkeley
Students at the Center The space is for students, by students. They are empowered to influence service and space design, structure, and policies. It is a place students want to be because they can collaborate with novices and experts to make things happen. Students are creators of information, not just consumers.
1 EXECUTIVE SUMMARY
SCHEMATIC DESIGN REPORT | 11
1 EXECUTIVE SUMMARY
SUMMARY OF IMPROVEMENTS Reimagined Student Access •
»
»
In an effort to streamline student access to the building, The Center for Connected Learn will reimagine security protocol to allow for open access for valid student ID holders Automatic “Tap and Go” card activated gates allow easy access for students while deterring the general public from entering the secure space of the library A centrally located information desk offers readily available direction for students and visitors Level 3: Information Desk and Tap and Go Card Readers at Main Entry
Expanded Area for Dining And Public Events »
» » »
To support a growing student population and facilitate collaboration with external organizations, the library will expand its capacity for dining and public events Expanded Free Speech Movement Cafe & Dining Addition of dedicated event space for the Free Speech Movement Cafe Creation of flexible event / learning space in the public area of Level 3 offers a dynamic forum for events and educational activities Level 3: Expanded Free Speech Movement Cafe
Dramatically Improved Wayfinding »
» »
»
The design of the project has centered around improving the ease of use of Moffitt’s bottom three floors Vertical openings between floors create a clear center from which all programs can be seen Expanded glazing areas at the perimeter of the building allow for views to the exterior from most spaces, reinforcing orientation within the space Clear and consistent organization of programs along major circulation paths promotes intuitive navigation throughout the building Level 1: Landing at Base of Communicating Staircase
12 | The Center for Connected Learning - Moffitt Library, UC Berkeley
1 EXECUTIVE SUMMARY
Celebrated Connection to Gardner Stacks » »
»
A goal of the project is to strengthen Moffitt’s connection with Gardner stacks By removing the clutter associated with the existing east wing of Moffitt, the proposed design creates a clear path towards a focal point around the junction between the two buildings Collaboration spaces and library services flank a daylit boulevard that seamlessly links the two libraries, highlighting what has historically been an obscured connection between Moffitt and the larger network of campus libraries Level 3 - Connection to Gardner
Underutilized Courtyard Reimagined as Hub for Library Services »
»
The project proposes to recapture the existing east courtyard exterior space as a daylit indoor courtyard space with a walkable glass roof This space will serve as the main hub for library services provided at Moffitt, handling material circulation and device lending, while providing a variety of space options for one-on-one consultations between students and advisory staff Level 3 - Library Service Courtyard
Collider Space at the Center »
»
»
Three-story voids at the center of the building create the “Collider” space that is at the heart of the Center for Connected Learning’s mission Students have access to layers of interaction from open, to semi-enclosed, to enclosed collaboration spaces, classrooms, and learning spaces of all varieties from a single vantage point Open circulation and a central communicating staircase allow students to see and be seen, fostering the opportunities for chance encounter and cross-disciplinary interaction that are emblematic of the Berkeley student experience
Level 2 - Collaborative Collider Space
SCHEMATIC DESIGN REPORT | 13
1 EXECUTIVE SUMMARY
Dynamic Learning Environments on Display »
»
One of the principal architectural moves of the project is the creation of a prominent “central spine”, a showcase wall housing the library’s most dynamic educational environments that is visible from all points throughout Levels 1-3. Starting with the new 100+ person flexible event space on Level 3, this spine is the first indicator of the learning experiences available within the library, serving as a guiding element for students as they embark on their voyage of discovery of what the library has to offer Level 3: Entry to the Collider Space with Central Spine on Right
»
»
»
Educational laboratory environments comprise a significant portion of the Center for Connected Learning program These introductory laboratory environments are intended to offer low-pressure educational experiences that introduce students to the vast array of technologies available throughout the broader university Supporting staff are on hand to guide students through the use of these tools and eventually direct them to the next step on campus
of im sp m ag ac ak e e er
Places to Make
Level 1: Maker Space + Gallery with View of Renovated Courtyard Beyond Layers of Collaboration & Consultation »
»
»
»
One of the most consistent needs we heard from students throughout the process was the need for more seating and collaborative workspace The proposed design for Levels 1-3 substantially expands the library’s capacity for open and enclosed collaboration space A variety of environments are available to accommodate user groups ranging from individuals to large teams These spaces double as places for consultations with library staff, offering a mix of meeting environments with varying levels of privacy and formality
14 | The Center for Connected Learning - Moffitt Library, UC Berkeley
Level 3: Collaboration + Consultation Space
1 EXECUTIVE SUMMARY
Updated General Assignment Classroom Environments »
»
Furthering the University’s shift towards active learning environments, the project will add three General Assignment active learning classrooms of varying sizes The largest of these will accommodate approximately 130 students, making it the second largest active learning classroom on campus and providing a much need asset in the University’s ecosystem of learning environments
Level 1: Large Active Learning Classroom Fiat Lux! Improved Daylighting and Connection to Nature »
»
In order to improve daylighting throughout the building and reestablish visual connections to nature from the interior, the project proposes to replace the majority of the existing precast panels at the building perimeter with high performance vision glazing Daylighting studies conducted by Integral Group’s engineers show a significant increase in interior daylighting, reducing the building’s dependence on artificial lighting and promoting health and wellbeing among the student population Level 1: View from West End to Renovated Courtyard
Enhanced Building Performance »
»
The upgrade of building systems on Levels 1-3 push Moffitt closer towards the University’s sustainability goals of net zero energy and carbon neutrality Upgraded mechanical equipment and lighting, coupled with the replacement of precast panels with high-performance glazing contribute to a 25% reduction in energy use for Levels 1-3, while simultaneously doubling the amount of users in the building Current Versus Proposed Seat Count and Energy Use Intensity
SCHEMATIC DESIGN REPORT | 15
2 EXISTING CONDITIONS
Blank Page
16 | The Center for Connected Learning - Moffitt Library, UC Berkeley
2 EXISTING CONDITIONS
2 EXISTING CONDITIONS ASSESSMENT
SCHEMATIC DESIGN REPORT | 17
2 EXISTING CONDITIONS
SITE ANALYSIS Connection to Campus Gateways Centrally located in the middle of the campus, Moffitt Library acts as a gateway to the surrounding campus. Located along three major circulation paths, the new Center for Connected Learning will allows students and faculty to conveniently access amenities such as open and private collaboration spaces, study spaces, maker spaces, and industry leading technology in an effort to encourage hands on collaborative learning. GATEWAY
Network of Libraries As a part of one of the largest campus library networks in the country, the Center for Connected Learning will build upon decades of collaborative learning efforts and student focused education. A central node within the vast network of thirty-two campus libraries, Moffitt will act as centerpiece for student engagement. Easily accessible from any portion of UC Berkeley’s campus, students will have access to many of the resources offered by the network of inter connected libraries Campus Circulation Residing in the center of the Campus, the Center for Connected learning acts as both a bridge between the east and west portions of campus, as well as a node within the campus circulation network. Due to it’s centralized location, Moffitt Library bridges the east and west portions of the campus. The renovated library will also act as a technological bridge that incorporates traditional library elements, as well as new technology, creating a bridge between old and new modes of learning
LIBRARIES
Moffitt will be the first point of Discovery Campus Connections
18 | The Center for Connected Learning - Moffitt Library, UC Berkeley
CAMPUS CIRCULATION
2 EXISTING CONDITIONS
Green Space Residing in a dense urban campus, the site location affords a unique opportunity; a connection to green space. The memorial glade extends from the east through Moffitt to the west, while a large green parkway leads up to western entrance. These visual connections to nature inspired interior interventions that both visually connect many of the spaces to nature, as well the concept of an internal courtyard that brings nature within the building. CONNECTION TO NATURE
Campus Views Nestled into a sloped site, the existing five story library is situated to provide varying views of the surrounding campus. Levels 4 -5 enjoy expansive eastern views overlooking the Memorial Glade, while levels 1 - 3 afford western views directed through campus leading up to the Springer Gateway. Many of the interior spaces on levels 2 - 3 are surrounded by large evergreen trees, putting users directly in line with the tree canopies and providing views to the adjacent campus context. Solar Orientation Moffitt Library’s longitudinal east/ west orientation allows for passive daylighting strategies to be utilized with the building. A new interior courtyard, spanning levels 1 - 3 allows natural daylight to penetrate to the lowest levels of the library. Three central voids in the floor plate allow refracted daylight from level 3 to permeate throughout the building and fills the lower levels with natural light. Level 1 takes advantage of low western daylight, filling the ground floor with natural light.
CAMPUS VIEWS
E
W
S
SOLAR ORIENTATION
SCHEMATIC DESIGN REPORT | 19
02 EXISTING CONDITIONS ASSESSMENT
2 EXISTING CONDITIONS
ARCHITECTURAL ANALYSIS
ARCHITECTURAL ANALYSIS
The Moffitt Library was designed by the office of John Carl Warneke in the late 1960’s. Consulting engineers were TY Lin, Kulka, Yang & Associates for Structural Engineering, G.L. Gender & Associates, Inc. for Mechanical and Electrical Engineering, and Kirker, Chapman & Associates for Civil Engineering. The design and drawings were completed July 20, 1967 and the building was constructed and opened around 1968 as a “cutting edge library for undergraduates”. Today it remains a library focused on undergraduate study.
It is a five-story building with the main entrance on the south side of Level 3. In section, the building is tucked into the hillside such that the lower three floors are partially submerged into the ground. Since the building occupies a key central position within the historic memorial glade, and visually interrupts the vista from east to west, the idea to minimize the overall height of the structure seems fitting. In profile and elevation, the poured-in-place concrete structure is horizontally banded with balconies on every exposed elevation, some significant cantilevers in order to accentuate the horizontal nature of the building.
In 1992 a seismic strengthening effort took place adding four poured-in-place concrete “towers” extending to the roof in each of the four corners. This intervention changed the aesthetic language of the building drastically as the towers interrupted the horizontal lines of the original architectural design.
20 | The Center for Connected Learning - Moffitt Library, UC Berkeley
SCHEMATIC DESIGN REPORT | 69
THE CENTER FOR CONNECTED LEARNING
2 EXISTING CONDITIONS
Then in 1997, the Free Speech Movement Café was added to the southwest corner of the third floor. This successful coffee and food venue contains graphics and noteworthy written commentary memorializing the Free Speech Movement demonstration on campus in 1964. The café is open to the public.
Also in 1992, a significant new building, Gardner Stacks, was constructed east of Moffitt Library and connected to it on Levels 2 and 3. Gardner Stacks is a structure that is mostly below grade and contains 2.5 million volumes of books and research material. Further east it connects to Bancroft and Doe Library and creates a chain of four interconnected libraries at the core of campus. This significantly changed the way circulation within the library works and its role on campus. In 2005 a canopy was added to the west exterior balcony to shade the seating area. It continues to be a popular seating area, but added yet another design language to the building.
The building has also gone through many more minor remodeling and upgrades over the last 50 years including a new circulation desk, some systems upgrades and restroom accessibility remodeling.
Most recently, floors 4 and 5 were extensively renovated and completed in 2016. The design project contained within this brief is the completion of the transformation of Moffitt Library into the Center for Connected Learning for the remaining floors 1 through 3. The renovation was mostly interior, but also included re-glazing the building on the west façade, converting balcony space to captured usable interior space, and adding a new exterior coffee kiosk named 'Press'. These renovations added several different architectural
70 | University of California Berkeley, Moffitt Library Renovation Floors 1-3
SCHEMATIC DESIGN REPORT | 21
2 EXISTING CONDITIONS
02 EXISTING CONDITIONS ASSESSMENT
languages to the overall building that only occur on the east elevation. The existing conditions of Moffitt Library contain many different architectural languages and styles which compete and contradict one another. All of these languages visually clutter ones view in appreciating the strong bones the original building celebrated when it was initially opened for use. Roofing There are two types of roofs on the structure: 1) the main roof above level 5, and 2) the waterproof decks and balconies. The largest and uppermost roof deck is poured-in-place structural concrete. The original roofing was a rock ballasted, built-up system on 7”-10” of sloping cellular concrete fill with slope to drain. Metal copings were low-profile parapets with an exposed concrete face on the roof edges. In 1992, when the seismic shear walls were added, the coping was replaced with a full coping cap covering the top exposed concrete edge. The roofing was likely repaired or replaced at this time as well. The added seismic shear walls have a parapet that extends about 3-4’ above the existing roof. An extensive roof replacement project took place in 2014. The original roof was removed along with the original cellular fill. The roofing was replaced with nonballasted, PVC membrane roof over ½” Densdeck protection board and sloping polyisocyanurate rigid insulation over a vapor barrier on the original concrete roof deck. The R-value of this new roof is unknown. New full metal copings with related PVC flashings were also installed on all roof edges. The roof is drained by four equally spaced internal roof drains and adjacent overflow drains.
22 | The Center for Connected Learning - Moffitt Library, UC Berkeley
SCHEMATIC DESIGN REPORT | 71
THE CENTER FOR CONNECTED LEARNING
2 EXISTING CONDITIONS
The balconies and other waterproof concrete decks comprise the second type of roofing on the building. They were originally constructed of a poured-in-place concrete deck with a waterproof membrane below a sloping concrete topping slab sloped to drain. To our knowledge this original system is still in place in most places except at the plaza edge on the east side of level 4. In 2016, the concrete topping was removed. The waterproofing was replaced along this edge when the envelope of the building was extended and new window wall was installed. The insulative value of the new and existing waterproof deck systems is unknown, but it appears as though there is no additional insulation, even below the structural deck, beyond the mass of the concrete. Precast concrete railings surround the balconies. They are of sufficient height to be code compliant, but there is a space larger than 4” between the pre-cast railing and the curb of the balcony. If the balconies are to become occupiable space after the renovation, this space will need to be filled with a member or material for code compliance.
72 | University of California Berkeley, Moffitt Library Renovation Floors 1-3
SCHEMATIC DESIGN REPORT | 23
2 EXISTING CONDITIONS
02 EXISTING CONDITIONS ASSESSMENT
Overhangs and soffits Most of the exposed overhanging areas of the building consist of exposed cast-in-place concrete structure that seems to be in good condition. There are small horizontal soffit areas between exposed exterior beams and window wall headers that consist of stucco on metal lath with metal framing. According to the original documents, there appears to be no insulation on either side of the exterior envelope at this location. These appear to be original to the building except possibly where patching has occurred in 1992 when the seismic upgrade was constructed. Building Envelope The primary structural foundation wall system is comprised of 8” thick poured-in-place concrete with 2” furring strips and gypsum drywall on the interior. There does not appear to be any additional insulation within the system or added to the wall system over the years.
24 | The Center for Connected Learning - Moffitt Library, UC Berkeley
SCHEMATIC DESIGN REPORT | 73
THE CENTER FOR CONNECTED LEARNING
2 EXISTING CONDITIONS
Fenestration Window wall that are original to the building on the north, west, and south sides of the building consist of a combination of full precast concrete panels and precast concrete frames with single-pane glazing windows integrated into the concrete. Glazing is noted to be ¼” thick and gray tinted but performance criteria is not noted.
74 | University of California Berkeley, Moffitt Library Renovation Floors 1-3
SCHEMATIC DESIGN REPORT | 25
2 EXISTING CONDITIONS
02 EXISTING CONDITIONS ASSESSMENT
New window wall constructed in 2016 on the east side of levels 4 and 5 as part of the renovation consist of an aluminum frame with custom structural steel supports. Glazing is called out in the documents to be a 1” insulated unit. Field conditions seems to state otherwise as it appears to be a single pane of glass and not an IGU per the construction documents.
26 | The Center for Connected Learning - Moffitt Library, UC Berkeley
SCHEMATIC DESIGN REPORT | 75
THE CENTER FOR CONNECTED LEARNING
2 EXISTING CONDITIONS
On floors 1 through there are baseboard heaters installed at all perimeter glazing.
76 | University of California Berkeley, Moffitt Library Renovation Floors 1-3
SCHEMATIC DESIGN REPORT | 27
2 EXISTING CONDITIONS
Flooring There are several types of flooring used throughout. The original building had vinyl tile installed in most areas and is still existing in several areas of the building.
02 EXISTING CONDITIONS ASSESSMENT
consists 4’x4’ panels with a 1’ intermediate grid containing recessed strip fluorescent light fixtures. It is suspended at approximately 9’-0” to match the bottom of the concrete beams. At grid line this beam is exposed with a margin or reveal giving each structural bay its own ceiling element. Other spaces with the original ceiling, like the elevator lobbies, have 1x1 concealed spline ceiling that is still in place. Within the Café, the ceiling is a black painted 2’x2’ suspended tile with accent lighting.
In 1997 as part of the Free Speech Movement Café project, slate (or ceramic tile mimicking slate) was installed in the Level 3 Lobby and Circulation area. This same tile is also used throughout the Café.
Carpet tile is also used in select areas of the building. The renovated levels 4 and 5 have a combination of carpet tile and lighted polished and sealed concrete floors. Ceilings and soffits Aside from the Free Speech Movement Café, the open spaces on Levels 1 through 3 have the original suspended lay-in tile ceiling still in place. This ceiling 28 | The Center for Connected Learning - Moffitt Library, UC Berkeley
SCHEMATIC DESIGN REPORT | 77
THE CENTER FOR CONNECTED LEARNING
2 EXISTING CONDITIONS
on Level 3 have wood wall panels to match. The new doors and woodwork on Levels 4 and 5 appear to be quarter-sawn white oak.
Interior Lighting Throughout the lower three floors of the building a 1’x4’ recessed fluorescent light has been used in an acoustical ceiling system. The current lighting controls are very limited, on or off, in most locations.
Interior walls and doors Interior walls are typically metal stud construction with gypsum wallboard finish. The doors appear to be medium stained red oak with sealed finish. Some areas
78 | University of California Berkeley, Moffitt Library Renovation Floors 1-3
Stairs There are four main stairs interior to the building and one staircase on the exterior.
SCHEMATIC DESIGN REPORT | 29
2 EXISTING CONDITIONS
02 EXISTING CONDITIONS ASSESSMENT
Each of the stairs were found to have several different deficiencies in meeting current building code requirements for egress. The includes rise/run dimensions, proximity to adjacent occupied space without protection, and a lack of stand pipes in some cases. The “central stair” across from the elevators is pouredin-place concrete with rubber nosings and extends the full height of the building and to the roof deck as well. It currently has uneven risers which are also slightly taller than the 7” than code allows making the stair noncompliant. In the renovation of Levels 4 and 5, the risers on those levels were patched and shaved to make the risers of uniform height, but the higher than allowed situation still exists. The handrail/guardrail is also noncompliant due to the profile of the handrail and the larger than 4” spacing and height of the guardrail. This stair currently serves as the main egress route from all levels of the building.
There is an additional egress just east of this stair and it is of the same construction type and finish. It extends from Level 1 to 3 and serves to egress the lower east side of levels 1 and 2. This stair has the same code deficiencies as the central stair. The added peculiarity with this stair is that it is the only public access, besides the small elevator, to the classrooms on the east side of Level 1. On the west side of the building and central to the footprint between Levels 1 and 2 is an internal communicating stair. This stair once served as an open pathway between these two levels. Sometime in the past, due to security of staff spaces on Level 2, this stair has been walled off and disconnected from Level 1.
30 | The Center for Connected Learning - Moffitt Library, UC Berkeley
SCHEMATIC DESIGN REPORT | 79
THE CENTER FOR CONNECTED LEARNING
2 EXISTING CONDITIONS
Eleators There are two elevators in the main core of the building that serve all five floors. The cabs and controls for these were replaced 2016 and meet all standards and accessibility requirements at the time they were constructed. The current elevator size is large enough to accommodate a gurney. It should be noted that the control system does not include a card reader. There is one additional elevator that was installed sometime after the original building was built. This was done to serve the classrooms located on the east side of level 1. This elevator cab is very small and does not meet current accessibility standards. Restrooms There are very few restrooms in the building. The lower level does not have any, possibly due to the need for a lift station for sewage. The finishes appear to be primarily original to the construction of the building with miscellaneous fixture and faucet upgrades. The walls are ceramic tile with a ceramic tile base. Toilet stalls are painted steel.
On the very east end of the building there are two more stairs, one interior between Levels 1 and 3, and one exterior between Levels 3 and 4. The interior stair is enclosed and not accessible to the public unless in case of a emergency event. These stairs currently work in tandem as the second means of egress from the Level 1 Classrooms. The exterior stair and space around it is currently secured and off-limits. These stairs do not include stand pipes and the exterior stair is not protected from the adjacent occupied space as required by code.
Exterior spaces On the west side of Level 1 there is a sunken courtyard that was at one time most likely a reading courtyard. This exterior space is currently closed to patrons of the library due to security concerns. There has been a consistent problem with the two small floor drains clogging up with landscape debris. Over the duration of this Schematic Design effort, a heavy rain event caused backed up these drains and caused water to run into the building, flooding the entire first floor. It
80 | University of California Berkeley, Moffitt Library Renovation Floors 1-3
SCHEMATIC DESIGN REPORT | 31
2 EXISTING CONDITIONS
On the west side of the building is a sunken courtyard with a concrete exterior stair. This courtyard is currently secured and off limits, to use. The existing site stairs are very narrow and do not comply with current egress dimension requirements. The courtyard that aligns with Level 4 of the building was improved during the renovation of floors 4 and 5. In this location is also a separate structure that serves as a small coffee shop called Press Café.
32 | The Center for Connected Learning - Moffitt Library, UC Berkeley
02 EXISTING CONDITIONS ASSESSMENT
On the south edge of the building is the main entrance and in this location is also a separate entrance for the Café. The plaza space in front of the main entry is also the location of a daily display newspapers from around the world. This was added to the plaza in 2007. At this time an accessible path was constructed to the main
SCHEMATIC DESIGN REPORT | 81
THE CENTER FOR CONNECTED LEARNING
2 EXISTING CONDITIONS
entrance from the southwest. This entry plaza connects the accessible routes on campus from the west and the east through this exterior space.
A loading dock connects to the building on the north side of the building at Level 2. This dock serves not only Moffitt Library but also the connecting libraries Doe, Bancroft, and Gardner Stacks. It is very important that this dock and the connecting corridor to Gardner stays in operation during construction.
82 | University of California Berkeley, Moffitt Library Renovation Floors 1-3
SCHEMATIC DESIGN REPORT | 33
2 EXISTING CONDITIONS
STRUCTURAL ANALYSIS Summary Moffitt Undergraduate Library was designed in 1967 by T.Y. Lin, Kulka, Yang & Associates and then seismically retrofitted in 1992 by Rutherford & Chekene. In 1997, based on a Tier 1 checklist evaluation per the UC Seismic Safety policy, the building was rated as good (Level III). The purpose of the Tier 3 analysis was to determine if the building rating needs to be changed from what was determined in 1997. Section analyses and 3D non-linear static pushover analyses were performed for the Tier 3 evaluation. Using sectional analyses and a portal frame analysis, it was determined that the columns are shear critical. Based on the results of pushover analyses it was confirmed that the columns reached their existing shear capacity at drifts much smaller than the target displacements for the site-specific spectral accelerations. Based on these findings, it was recommended that the building be down-rated to very poor (Level VI). Original Structure The reinforced concrete structure was designed per the 1964 Uniform Building Code. The building has five levels, with a total area of around 132,000 sf. The lower three levels are partially set within the hillside to the east. The floor-to-floor height is 14’. The floor plates and roof follow a 36’-4” x 36’-4” column grid. The primary girders form a two-way grid of 54” deep post-tensioned beams, supported on reinforced concrete columns. Secondary beams also form a two-way grid between the girders. They are 14” deep post-tensioned beams spaced at 9’-1” centers. 6” thick two-way slabs frame to the beams. The columns throughout the building are square in plan and tapered along their height, measuring 27” at the top and 39” at the base. The shape remains constant, but the reinforcement varies throughout the building. The ground floor at the east end of the building is set three levels into the hillside. The ground floor is open to the west. The north and south elevations are partially embedded up to three levels. The reinforced concrete exterior walls below grade are integral to the floor framing. Reinforced concrete drilled piers were part of the original shoring system. The piers are connected to the perimeter walls and extend below the walls.
34 | The Center for Connected Learning - Moffitt Library, UC Berkeley
1992 Structural Retrofit The structure was seismically retrofitted per the 1988 California Building Code. The original design primarily relied on lateral resistance from frame action between the concrete columns and girders. The presumption is that the resistance was found to be inadequate for strength and displacement capacity. The retrofit added four “L” shaped concrete walls, symmetrically placed near the corners of the building. The east-west legs of the walls are dowelled into and extend above the east-west retaining walls. The north-south legs of the walls are five stories tall. They are founded on shallow piers or shallow footings at one end and connected to the perimeter walls at the other. The north-south legs are tied to the diaphragm with horizontal collector beams at each level. The retrofitted building was rated as good (level III), per the UC Seismic Safety Policy in 1997, based on using a Tier 1 checklist evaluation. However, we recommended that the building be down-rated, per the findings of the Tier 3 evaluation. The reasons for the rating change are due to a better understanding of the expected displacements during a major earthquake. The changes in understanding are consistent with advances in knowledge that have occurred over the past twenty years within the engineering community. The walls add strength, stiffness, and reduce torsion. The structure in its current configuration is expected to perform well when subject to small and moderate levels of shaking, due to the strong and stiff walls added in the 1992 retrofit. Tier 3 Structural Analysis The structural analyses consisted of two components. First, a series of section and joint analyses of critical columns, beams, and walls was performed using the analysis program XTract. Secondly, a non-linear 3D model of the building was created using the analysis program CSI Perform 3D. Non-linear static pushover analyses were performed following target displacement methodology per ASCE 41-17. The material properties were derived from nominal values from the original and retrofit drawings, with modifications for expected strengths per ASCE 41. The
2 EXISTING CONDITIONS
1992 retrofit walls were modeled with non-linear fiber elements and an inelastic tri-linear shear material with strength loss. The columns and beams were modeled based on the section analyses output from Xtract. The columns were modeled in the retrofitted condition to eliminate shear failures. Their shear demands were tracked and compared to their capacities during the pushover analyses. The foundation and soil interaction with the site walls were modeled using compressiononly soil springs. Refer to the Tier 3 analysis report dated February 25th, 2019 for a complete list of modeling assumptions and results. Tier 3 Analysis Findings Summary The findings of the section analyses, portal frame checks and the results from the non-linear pushover analysis are as follows – 1.
The columns throughout the structure are shear critical. The tie spacing is greater than half the column depth. Thus, the columns have little effective shear reinforcement.
2.
A pushover of a typical column/beam portal frame induced shear failures in the columns at each level. Shear failures in columns constitute a loss of gravity load carrying capacity. These findings indicated that the building needed to be down-rated.
3.
The columns and beams did not satisfy strong column/weak beam relationships at the roof and the 5th floor levels.
4.
Strong column/weak beam relationships occur at the 2nd through 4th levels. The beams were not found to be shear critical.
5.
Beam-column joints were found to be adequate.
6.
The east-west legs of the structural walls were found to be shear critical. Presuming that columns are retrofitted to undergo the required displacements; a single-story mechanism would form above the 3rd floor.
7.
A significant number of columns exceeded their shear capacity at target drifts for all levels of seismic performance defined in the UC Seismic Safety Policy, including for Level V.
Conclusion Based on the findings above regarding the expected column failures we recommended that the structure be down-rated to Level VI. The SRC concurred and the current rating is very poor (Level VI). We recommend the columns be retrofitted with fiber reinforced polymer (FRP) wrapping. The retrofit is needed on all columns on Level 3 and above and for some westernmost columns on Levels 1 and 2. The column retrofit locations are shown on the structural drawings. The retrofit of the structural walls is being developed in collaboration with the peer review team.
SCHEMATIC DESIGN REPORT | 35
2 EXISTING CONDITIONS
MECHANICAL ANALYSIS Chilled Water System The original chiller and cooling tower system was removed in 2016 and replaced with two air-cooled, 120 Ton chillers. New chilled water pumps were installed at this time. A cooling tower is located on the roof of Moffitt. This tower serves the chiller located in the Gardner Stacks and it must remain in service. Steam-HW System Steam is provided to the building by the campus steam distribution system at 100 PSI with pumped condensate return. The high-pressure steam supply is 4” and the pumped condensate return is 2”. See site utility drawing below.
STEAM & CONDENSATE PIPES
During the 2016 mechanical upgrades, new pressure reducing valves and heating hot water heat exchanger were installed (existing heating hot water HX was also retained in parallel with the new HX). A new flash tank was installed but the pumped condensate return system, domestic hot water heat exchanger and air separator were retained. Four new heating hot water pumps were installed, and two existing pumps were retained. The HW pumps are manifolded together and serve four HW perimeter radiation zones and reheat coils. The heating HW risers located in the shaft adjacent to the elevators must remain in service to feed the reheat coils on Levels 4 and 5. See 2016 mechanical renovation plan snapshot. Air Handling System There are two main variable volume AHU’s (built up fan systems in the fan rooms with chilled water coils and supply and return/relief fans) located on Level 1, one fan room is on the north side and one is on the south side. Outside air enters the fan rooms from intake tunnels/ shafts. Exhaust/relief air is routed through tunnels to the west of the building at Level 1. These fan systems serve all floors of the building (including the renovated Levels 4 and 5) through two vertical shafts (with ducted supply risers and open shaft return). The air systems retain the original (1967) CHW coils, supply and return fans. The supply and return fans are controlled by VFD’s located in the Mechanical Equipment Room.
36 | The Center for Connected Learning - Moffitt Library, UC Berkeley
HOT WATER RISERS
2 EXISTING CONDITIONS
Terminal Equipment The primary terminal systems on Levels 1-3 are VAV induction units. Perimeter HW radiation is located on these levels at glazed wall areas. HW reheat coils are provided at selected zone locations on Levels 1-3. Levels 4 & 5 terminal equipment has been replaced with a mixture of single duct and parallel fan powered VAV boxes with HW reheat coils. Perimeter radiation systems have been eliminated on Levels 4 and 5. Split system heat pumps were added for the corner spaces created during the seismic infills in 1992. Controls There are major control issues with Levels 1-3 as most terminal equipment and the AHU system controls are original pneumatics, tied into the Barrington system. New central plant equipment installed in 2016 and the terminal equipment on Levels 4 &5 have been installed with new DDC controls tied to the campus Automated Logic system.
SCHEMATIC DESIGN REPORT | 37
2 EXISTING CONDITIONS
PLUMBING ANALYSIS Plumbing The plumbing systems consist of the following components: » » » » »
Sanitary waste and vent system Incoming domestic cold-water service to building Domestic hot water service Storm water drainage system Natural gas system
Feasibility Our analysis defines a scope of work and corresponding cost estimate for the project that demonstrated the renovation is feasible within the existing $35 million construction budget.
UTILITY SITE PLAN
Sanitary Sewer There is an exiting 6” sanitary sewer line connection below grade at Level 2 (Invert 244.34’) near the northeast corner (between column lines 6 and 7) of the building. There is also an existing sewage ejector pump located in the Mechanical Equipment Room that takes floor drain flow from level 1 and pumps it out of the building in a 4” sanitary (forced main) line (between Column lines 3 &4) that connects to the 6” site sanitary line on the north of the building. (This 4” line is not shown on the site utility plan.) Water The building is served by a 6” water line entering the northeast corner of the mechanical room at Level 2 near column Line 5. This 6” connection serves both domestic cold water as well as fire suppression systems, which splits inside the building into one 4” domestic cold water service and 6” fire service . See site utility plan below. Domestic Hot Water The domestic hot water is generated by a central system located in the mechanical room at basement level, using steam as the energy source through a heat exchanger.
38 | The Center for Connected Learning - Moffitt Library, UC Berkeley
HOT WATER RISERS
2 EXISTING CONDITIONS
Storm The site utility plan below shows the majors storm sewer lines around Moffitt Library. Below is a list of the lateral connections to the building (Note – B reference building floor levels are Level 1 – 234’, Level 2 – 248’, level 3 – 262’ and Level 4 – 276’) : »
Northwest – 10’ – Invert 241.88’; West – 12” – Invert 242.5
»
South – 6” – Invert 258.75’; 8” – Invert 258.75’; 4” – Invert 258.34’; 4” – Invert 258.42
»
East – 4” – Invert 269’; 4” – Invert 269’
STORM DRAINAGE
There is a storm water sump located on the West side of the building that receives drainage from the Level 1 terrace space drains. There are submersible pumps located in this catch basin that are elevated and operate only when the water level reaches the pump elevation. The pumps discharge into the 12” West site storm line connection. Natural Gas The building is served by a 2” natural gas lines that enter the northeast corner of the Mechanical Equipment Room. Internal Distribution The plumbing distribution systems serving Levels 1-3 can be demolished and replaced as required to serve the new plan layout for restrooms and the café. However, plumbing distribution piping serving fixtures on levels 4 and 5 will be required to remain in service. See part plan snapshot below of the riser piping at Level 3 near the elevators that must remain to serve the Level 4 and 5 core toilets.
NATURAL GAS CONNECTION
Fixtures Due to plan revisions, all new food service and core toilet fixtures will be replaced.
INTERNAL DISTRIBUTION
SCHEMATIC DESIGN REPORT | 39
2 EXISTING CONDITIONS
ELECTRICAL ANALYSIS Incoming Service Conductors The incoming electrical service cables for “A” and “B” circuits from the 12.47 kV campus distribution system are routed through three, 3-1/2’ conduits (one spare) to the main switch located in the Mechanical Equipment Room. The incoming telecom service enters Moffitt at the northeast corner and includes nine, 4” conduits. Incoming 15 kV Medium Voltage Selector Switch This switch, located in the basement mechanical room dates from approximately 1989 and will have to be replaced. The switch cannot accommodate a larger transformer than the one that is currently installed. Service cables from the manhole are #4/0 AWG copper shielded 15KV, EPR type. The cables should be in good condition and have adequate capacity to serve the anticipated building load. Main 480-volt Circuit Breaker This breaker, located in the basement mechanical room dates from approximately 1989 and will have to be replaced if the load at Moffitt is increased enough to warrant a larger main transformer. Main Transformer This transformer, located in the basement mechanical room dates from approximately 1989 and will have to be replaced since the load at Moffitt is increasing enough to warrant a larger main transformer. 480/277 Volt, 1600 Amp Bus Duct This bus duct runs from the existing main breaker to the new distribution switchboard located in basement mechanical room and is original equipment (1969 vintage). It has had been subjected to water leakage from the ceiling of the basement mechanical room at some time in the past. Although it was inspected and tested in 2016, and was earmarked for replacement, that work was not accomplished as part of the 2016 MEP renewal project due to value engineering. Motor Control Center The MCC located in the basement was manufactured by Federal Pacific. The equipment manufactured by Federal
40 | The Center for Connected Learning - Moffitt Library, UC Berkeley
POWER AND TELECOMMUNICATIONS
2 EXISTING CONDITIONS
Pacific has been known to be deficient for many years. This particular MCC is original (manufactured around 1969), which makes it almost 50 years old. Generator During the 2016 renovation project, the 45 KW Moffitt generator was supposed to have been removed. The 45 KW generator is still in place in the mechanical/electrical room and appears to be serving emergency loads in Moffitt. The Gardner Stacks generator has a capacity of 230 KW and was installed in 1992. The Gardner Stacks generator is located in a weatherproof enclosure outside near the northwest corner of the building. Lighting The existing lighting is primarily original construction recessed fluorescent fixtures. T8 lamps have been retrofitted into most fixtures and with lamp quantities in most fixtures reduced by half. In general, the lighting is of poor quality.
ELECTRICAL
Lighting Controls A Barrington system (no longer in business) provides lighting control. Fire Alarm The existing fire alarm devices are connected to a Siemens MXL fire alarm control panel. A Siemens XLS voice control panel was installed during the 4th and 5th floor renovation in 2016.
SCHEMATIC DESIGN REPORT | 41
3 PROGRAMMING
Blank Page
42 | The Center for Connected Learning - Moffitt Library, UC Berkeley
3 PROGRAMMING
3 PROGRAMMING
SCHEMATIC DESIGN REPORT | 43
3 PROGRAMMING
PROJECT PURPOSE + DEFINITION The space is for students, by students. They are empowered to influence service and space design, structure, and policies. It is a place students want to be because they can collaborate with novices and experts to make things happen. Students are creators of information, not just consumers. To build on the 2018 project vision created by campus leaders, thinkers, and creators and to reintroduce Moffitt Library as The Center for Connected Learning (CCL); an undergraduate collider space supporting the behaviors of learning, collaborating, making, and reflecting.
Learn The Center for Connected Learning supports the full range of learning activities and behaviors. Learning can be individual or collective, formal or informal, and can take many forms. Spaces can include active and serendipitous learning spaces, classrooms, labs, and areas for focused learning and study. Collaborate The space brings together people, information, and technology to inspire new, unexpected collaborations. Spaces can include peer-to-peer and expert mentoring stations, group study spaces, and collider spaces for spontaneous idea sharing and generation. Make The environment supports experimentation and tinkering and invites curiosity and creativity. Spaces are flexible so students can switch modalities. Technology will evolve over time. The processes, products, and even failures of scholarship are shared and celebrated. Reflect Students seek connections with nature in both the structure and aesthetic of the building. Places for introspection and reflection support students throughout their day. The culture should emphasize well-being and mindfulness. Spaces could include welcome and wellness zones and outdoor learning spaces.
44 | The Center for Connected Learning - Moffitt Library, UC Berkeley
3 PROGRAMMING
Retired Dean Lee Van Orsdel
SCHEMATIC DESIGN REPORT | 45
3 PROGRAMMING
BENCHMARKING Benchmarking involves identifying peer institutions or similar project types to use for comparison and inspiration. Metrics used in benchmarking may vary based on a project’s specific goals, input from stakeholders, and availability of comparable data. In addition to quantitative metrics, qualitative and experiential comparisons can also be drawn, typically identifying similar spaces and amenities, services, potential user experiences, and overall building organization to relate program areas with architectural solutions. Benchmarking for Moffitt focused more on qualitative aspects. In early December, the CCL project team and two designers from BNIM traveled to Grand Rapids to visit The Mary Idema Pew Library at Grand Valley State University and tour the Steelcase Headquarters. The GVSU’s website states that: “The Mary Idema Pew Library Learning and Information Commons is designed to be the intellectual heart of the Allendale Campus. It will exceed the expectations of anyone who thinks of a library solely as a home for printed books and whispered words. In this new library, students will find a range of environments, from noisy to quiet, in which they can work on an assignment alone or in a group; receive coaching from a peer consultant in research, writing, or presenting; practice a new skill or play with a new idea; learn something unexpectedly; engage easily with each other in spaces engineered to accommodate the sounds of natural conversation; or curl up by the fireplace in a contemplative space with the best views on campus. Students will do all of these things in a building that was crafted with their needs in mind—the right lighting, the right furniture, the right resources, the right services, the right spaces, and the right amount of flexibility. ‘Going to the library’ will take on a whole new meaning as the Mary Idema Pew Library Learning and Information Commons becomes an integral part of every student’s experience at Grand Valley.”
46 | The Center for Connected Learning - Moffitt Library, UC Berkeley
Following the tour, the group was fortunate enough to spend time with retired Dean Lee Van Orsdel, the visionary behind the GVSU library project. During breakfast Dean Van Orsdel stated, “The library will become what the library needs to be,” referencing that the students at Grand Valley State take ownership in how the library functions throughout the day. The CCL at Moffitt will focus on Students at the Center in much the same way. The benchmarking trip to Grand Rapids allowed the combined team to build a strong relationship and develop a project language based common experiences. Campus In addition to the trip to Grand Rapids the team also participated in several on campus tours: The Jacobs Institute for Design Innovation, Berkeley Engineering, Academic Innovation Studio, Student Learning Center, Open Computing Facility, Active Learning Classrooms, Berkeley Center for New Media, and Think and Zeb Cafes. These tours helped the design team understand the opportunities for programmatic connections on Berkeley’s campus. A focus of the Center for Connected Learning is to provide barrier-free entry for students to experiment in areas they are unfamiliar with, build confidence in those areas, and move from a “novice” user within the CCL to an “experienced” user in another building on campus – i.e. from the Moffitt makerspace to The Jacobs Institute for Design Innovation.
3 PROGRAMMING
Idema Pew Library
Steelcase Headquarters
Jacob’s Institute for Design and Innovation
SCHEMATIC DESIGN REPORT | 47
3 PROGRAMMING
ENGAGEMENT PROCESS The starting point for our process was understanding the 2018 project vision created by campus leaders, thinkers, and creators to reintroduce Moffitt Library as The Center for Connected Learning (CCL); an undergraduate collider space supporting the behaviors of learning, collaborating, making, and reflecting. We also analyzed the series of “design sprints”, or future service strategies, that had been developed as part of the visioning process to create the initial Space Program List. In addition to understanding the visioning process for levels 1-3 we also researched/investigated/explored the recent renovation of levels 4 and 5 to understand potential influences for our project. Our 7-month engagement included 10 trips to campus where during the span of 200 hours we conducted 94 meetings or workshops with over 150 people and toured 9 related benchmark sites across campus as well as visited The Idema Pew Library at Grand Valley State University and the Steelcase Headquarters in Grand Rapids, Michigan. Engagement The design team was typically on-site every three weeks for three to four days each time. The focus of our visits was on project and design team workshops, broad engagement with students, faculty, staff, and the campus, and program and design opportunities. In addition to gathering information while on-site, the design team also regularly reported back to the students, faculty, staff, and campus on the project’s progress. During our first on-site visit the team created a list of project “problems” and desired outcomes – these are the Measures of Success which can be found later in this document.
48 | The Center for Connected Learning - Moffitt Library, UC Berkeley
In addition to engaging with the students face-to-face, a series of questions were posed on level 4 across from the elevators related to the programmatic elements planned for levels 1-3. These questions served to validate some of what we had heard from the students or observed while in Moffitt. We learned that the most common group size was made up of 2-3 people so we right-sized the enclosed collaboration spaces to support that size. The team also learned that no matter the question, the request for additional seats was always voiced.
3 PROGRAMMING
SCHEMATIC DESIGN REPORT | 49
3 PROGRAMMING
MEASURES OF SUCCESS Our work identified a series of problems and related measure of success that shaped and guided the spaces, services, and design character for Moffitt Library. Problem: Building is introverted. Measure: Improved connection to campus. Take advantage of ground level visibility on all sides of the building. Make activity visible — the building tells you what it is.
Problem: Three different vocabularies on the exterior of the building. Measure: Building is perceived a single architectural statement.
Problem: Bland character and lack of flexibility. Measure: Variety of distinctive spaces that can be easily adapted to meet changing needs through the day and semester and over time (durability, flexibility, diversity, address users’ various needs).
Problem: Campus ID access does not allow access for public access events. Measure: Design supports public programs that are manageable (with available staff) and includes a secure perimeter.
Problem: Lack of organization, wayfinding, and general circulation. Measure: Visual cues to easily identify programs and vertical integration of bottom 3 floors.
Problem: Invisible connection to Gardner Stacks. Measure: Strong, visible connection to Gardner Stacks.
Problem: Egress. Measure: Intuitive and code compliant widths and paths of egress.
50 | The Center for Connected Learning - Moffitt Library, UC Berkeley
Problem: Lack of daylighting. Measure: Maximize appropriate daylighting connected to program needs.
Problem: Floors 4+5 to remain open during construction. Measure: Floors 4+5 remain open during construction. Use this as a criteria to inform the design and construction with low impact on those services.
Problem: No or limited connection to outdoors (includes balconies). Measure: Maximize appropriate connection to outdoors, and inclusion of natural elements, aligned to program needs. Quality of outdoor space is considered as part of the design and campus sustainability standards and guidelines.
Problem: Size of level 4+5 HVAC systems. Measure: Address efficient, responsive, and sustainable systems across whole building.
Problem: Campus has higher level efficiency goals that current system does not meet. Measure: Choose systems that meet or exceed campus goals without increasing current energy use.
Problem: Seismic upgrades needed. Measure: Building meets or exceeds seismic performance of Level 3. Interventions are integrated well into the architecture.
Problem: Completion of Fire Protection System. Measure: Sprinklers added on Floor 3 and end result is a unified fire notification system across the building that is easy to monitor for library staff and understandable to patrons.
3 PROGRAMMING
SCHEMATIC DESIGN REPORT | 51
3 PROGRAMMING
EXISTING BUILDING USE The following plans illustrate the current existing programming and layout of Levels 1-3. Program Levels 1-3 currently house a wide variety of programs serving an mix of user types. Levels 1 and 3 primarily house student focused programs, while Level 2 is exclusively dedicated to back-of-house library functions that serve the larger library network. A large portion of the current Level 2 floorplate is dedicated to Technical Services, which has been slated for relocation to an offsite facility. This existing configuration splits the student activities apart from one another. Access The central circulation core bifurcates the building into two wings, each served by its own staircase and elevator. Stair 1 and the central elevators are only accessible to students with valid identification, and are the main point of connection between secure student spaces Levels 1, 3, 4 and 5. Stair 2 exclusively serves the existing General Assignment classrooms in the eastern wing of Level 1. The building currently functions within as two separated buildings with completely different access. The corridor to Gardner stacks is a maze of a corridor that twists and bends around several different internal spaces as a very narrow passage. The building’s counterintuitive organization was identified early on in the design process as key issue to solve in the forthcoming renovation.
52 | The Center for Connected Learning - Moffitt Library, UC Berkeley
3 PROGRAMMING
Level Existing Use Mechanical 2015 SF
Instruction Lab 1256 SF
Makerspace 1280 SF
Makerspace Fan SF Room 1280 2014 SF
Mechanical Mechanical 979 SF 2015 SF
Media Instruction Resources Lab 1486 SF 1256 SF
Media Resources Fan Room 1520 SF 2014 SF
Mechanical 979 SF
Media Resources 1486 SF
Room 204 SF
MR 210 SF
Stair 4 312 SF
EXT ERIOR SPA C E
Classroom Enclosed Laboratory
EXT ERIOR SPA C E
Open Space Stair 4 7182 SF 312 SF
Stair 2 216 SF Stair 1 293 SF
Library Classroom 3055 SF Fan Room 1637 SF
Fan Room Library 1637 SF Classroom 968 SF
Library Classroom 968 SF
Storage 445 SF
MR SF Open29 Space 7182 SF
Cust. 185 SF
Media Resources 1520 SF
Classroom 716 SF
Room 238 SF
MR 210 SF
Stair 2 216 SFClassroom 530 SF Stair 1 293 SF
Room 246 SF
Room 204 SF
Classroom 720 SF Library Classroom 3055 SF
Classroom 979 SF Cust. 185 SF
Classroom 716 SF
Room 238 SF
MR 29 SF
Classroom 979 SF
Classroom Stair 3 530 SF 295 SF
Classroom 974 SF Room 246 SF
Classroom 720 SF
Storage 445 SF
Open Laboratory Special Use - Private Special Use - Public Office Open Collaboration Enclosed Collaboration Non Assignable SCHEMATIC DESIGN REPORT | 53
Stair 3 295 SF
Classroom 974 SF
1
Leve
Existing U
2
Leve
Level Existing Use
LO A D ING D OC K
LO A D ING D OC K
Office 227 SF
Office 227 SF Mail Room Storage 1981 SF611 SF
Storage 611 SF
Office 100 SF RR 51 SF
RR 51 SF
Office 100 SF Mail Room 1981 SF
RR 51 SF
W 391 SF
RR 51 SF
Storage 453 SF W 391 SF
EXT ERIOR SPA C E
Storage 453 SF Stair 2 216 SF
Information Services 15781 SF
EXT ERIOR SPA C E
Information Services 15781 SF
Stair 2 216 SF
Stair 1 293 SF
MR 28 SF
M 365 SF
Classroom Enclosed Laboratory
Disabled Student Programs 772 SF
Special Use - Public Office Open Collaboration Enclosed Collaboration Non Assignable
Disabled Student Programs 772 SF
Staff Conf. 574 SF
Meeting 392 SF M 151 SF W 220 SF
Stair 3 295 SF Digital Lab 769 SF Stair 3 295 SF
M Digital365 LabSF 769 SF
Digital Lab 1290 SF
Digital Lab 1290 SF Staff Conf. 574 SF
Open Laboratory Special Use - Private
Meeting 392 SF
M 151 SF W 220 SF
Stair 1 293 SF
Bindery MR 561 SF 28 SF
Facilities Workshop 441 SF
Bindery 561 SF
Facilities Workshop 441 SF
TO GARDNER STACKS
TO GARDNER STACKS
Existing U
SECTION TITLE
Level Existing Use
3
TO MEMORIAL GLADE
NORTH TERRACE
Library Classroom 698 SF
EXISTING CANOPY ABOVE
Enclosed Laboratory Open Laboratory
EAST COURTYARD
Open Office / Circulation 1549 SF
Kitchen 143 SF Cafe 1715 SF
Entry Desk 67 SF
Berkeley Center for New Media 558 SF
FSM CAFE ENTRY
Copy Center 531 SF
Office 216Stair SF 3 295 SF
Stair 1 418 SF
Office Cafe Stor. 216 SF Entry Desk 188 SF 67 SF Lobby 2832 SF W 41 SF
FSM CAFE ENTRY
CLASSROOM ENTRY
Stair 3 295 SF
Stair 2 EAST 115 SFCOURTYARD
M 33 SF
Copy Center 531 SF
Staff Break 601 SF
Mother's W Stor. W 106 SF 47 SF 70 SF 211 SF LIBRARY ENTRY
Staff Break 601 SF
TO GARDNER STACKS
TO GARDNER STACKS
Mother's W Stor. W 106 SF 47 SF 70 SF 211 SF
Nap 72 SF
CLASSROOM ENTRY Nap 72 SF
LIBRARY ENTRY
Special Use - Private
AD AP A TH
Special Use - Public Office
Lockers / ER 186 SF
Lobby 2832 SF M 33 SF
Google Project 2229 SF Google Project 2229 SF
Stair 1 418 SF
Cafe Stor.
Telecom 90 SF
Telecom 90 SF
Stair 2 115 SF
WEST188 CAFE SF TERRACE
W 41 SF Berkeley Center for New Media 558 SF
Student Study Space 4316 SF
Open Office / Circulation 1549 SF
Machine Rm. 28 SF
Student Study Space 4316 SF
Open Office 720 SF
Cafe 1715 SF
Classroom
Cafe Storage 658 SF Machine Rm. 28 SF
SOUTH ENTRY PLAZA
AD AP A TH
Lockers / ER 186 SF
Kitchen 143 SF
WEST CAFE TERRACE
TO MEMORIAL GLADE
Cafe Storage 658 SF
EXISTING CANOPY ABOVE
Open Office 720 SF
NORTH TERRACE
Library Classroom 698 SF
SOUTH ENTRY PLAZA
Open Collaboration Enclosed Collaboration Non Assignable PROGRAMMING + FEASIBILITY STUDY | 55
L
Ex
3 PROGRAMMING
AVAILABLE AREA ANALYSIS Through the programming and redesign process, the project team identified opportunities to reorganize the existing program, eliminate unnecessary circulation + utility spaces, and relocate specific programs off site in order to dedicate more area to spaces for students and supporting staff.
HVAC The proposed mechanical strategy eliminates the need for approximately 2,610 square feet of fan room and shaft space. In addition to generating more space for program, the elimination of the existing shafts on Levels 1-3 permanently removes two large obstructions to the floorplate, creating more flexibility for future program arrangement and higher use of the existing adjacent space. Vertical Circulation Through our analysis of potential egress strategies, our team found that the existing stairs and elevator currently serving the General Assignment classrooms on Level 1 are redundant and functionally unnecessary. As part of the effort to improve wayfinding and egress clarity throughout the building, the project proposes to remove existing Stair 2, Stair 3 and Elevator 3, which gains back this area as usable square footage and eliminates additional obstructions within the floor plates. Outdoor Space Conversion The most significant opportunity for converting exterior space to interior program space is the Level 3 east courtyard. The current demand for student study spaces and library services has led the team to consider the conversion of this space to a toplit interior space covered by a walkable glass skylight. This space conversion adds a central focal space adjacent to the connection to Gardner stacks to house a hub of student services provided by the library. The addition of this enclosed square footage changes the manner in which the adjacent areas can function by creating a larger space that can be interconnected internally with circulation and functional spaces.
56 | The Center for Connected Learning - Moffitt Library, UC Berkeley
Additionally, the elimination of redundant circulation for the General Assignment classrooms allows for the recapture of the existing exterior entry foyer inside of the southeast tower created during the 1992 seismic renovation. Recaptured Exterior Areas Reorganization of program, upgraded egress features, and enhanced fire protection allow for the existing balconies and outdoor terraces to be reopened for student access, increasing the amount of space and seats for students to occupy within and around the building.
3 PROGRAMMING
2,610 SF - HVAC 1,707 SF - Vertical Circulation 3,426 SF - Outdoor Space 7,743 SF Subtotal -2,767 SF - New Floor Openings & Stairs 4,976 SF - Net Total Recaptured Area 9,892 SF - Restored Use of Balconies 14, 868 SF - NET ADDITIONAL AREA GIVEN TO PROGRAM
SCHEMATIC DESIGN REPORT | 57
3 PROGRAMMING
PROPOSED SPACE PROGRAM We developed a list of program spaces and services that will fit within the building with the ability to develop and change over time. This approach is based on a ‘long life, loose fit’ strategy for the organization of the building. The Space Program is a direct reflection of the 2018 Vision and Design Sprint Process led by the CCL project team. Each of the spaces falls into one of three categories: Public, Student (ID required for access), or Staff Secure. Public Space that are classified as “Public” are open to the campus and the broader Berkeley community. In addition to an improved entry sequence and an expanded Free Speech Movement Café, there is also a proposed Event Space that can be used not only by the library and the campus, but also the broader Berkeley community. Student Spaces that are classified as “Student” require a valid UC Berkeley ID to access. A major goal of the CCL is to improve the undergraduate experience on campus so having dedicated student space is very important. This category encompasses all of the classrooms and learning studios in addition to specialized programs like a makerspace, AR/VR lab, Data Peers, along with much need student study and collaboration space. Staff The final category of “Staff” is dedicated to staff workspace for those groups supporting the programs occurring with the CCL. The following is a summary of the Levels 1-3 Space Program for the Center for Connected Learning in Moffitt Library. Expanded programmatic information can be found in the appendix of this document.
58 | The Center for Connected Learning - Moffitt Library, UC Berkeley
3 PROGRAMMING
-23%
+5%
+18%
SCHEMATIC DESIGN REPORT | 59
3 PROGRAMMING
ADJACENCY DIAGRAM The purpose of an adjacency diagram is to document critical adjacencies or physical proximity needs of major program space components and support functions, or proximities of organizational groups to each other. The CCL project team and the BNIM design team worked together to determine appropriate adjacencies based on the programmatic themes of Public, Student (ID required), and Staff Secure. The following is an overall adjacency diagram for the approved space program. The design team used the Entry Point exercise from the work in early 2018 as a springboard for the adjacency diagrams shared here.
TEGORY ADJACENCIES
UBLIC
DENT ID
DOCK
TAFF RCURE
SECURE CORRIDOR TO DOE
GOOGLE BOOKS
DIGITIZATION LAB
DIGI STAFF
GENERAL ASSIGNMENT CLASSROOM
LIBRARIAN | STAFF SPACE
PUBLIC COMPUTING
DISABLED STUDENT PROGRAM
RESIDENCY PROGRAMS
GENERAL ASSIGNMENT CLASSROOM
LEARNING STUDIO
LEARNING STUDIO 3D PRINTING FSM EVENT
EVENT SPACE
LIBRARY INSTRUCTION
MAKESPACE | RAPID PROTOTYPING
VR | AR
MEDIA AUTHORING & PRODUCTION
WEST TERRACE
DIGITAL SCHOLARSHIP
LEARNING STUDIO
GARDNER PORTAL STUDY | GALLERY FSM CAFE
LOBBY COPY CENTER
BCNM
ACCESS SERVICES | CHECKOUT
DATA CONSULTING
CATEGORY ADJACENCIES PUBLIC STUDENT ID STAFF SERCURE
60 | The Center for Connected Learning - Moffitt Library, UC Berkeley
3 PROGRAMMING
ENTRY SEQUENCE
SCHEMATIC DESIGN REPORT | 61
3 PROGRAMMING
ACCESS AND 24-HOUR USE The Center for Connected Learning at Moffitt Library is dedicated to improving the undergraduate experience on Berkeley’s campus. Levels 1 - 3 The renovation of Levels 1 through 3 will deliver Level 3 as additional space available twenty-four hours a day, 5 days a week. Levels 1 and 2 are planned to only be available during normal building hours. The current Level 4 entry will remain accessible after normal building hours and the renovated entry on Level 3 will become the “main” entry to Moffitt both during normal business hours as well as after hours. The existing security office will remain on
Level 4 with additional touch down space for security staff to be located on Level 3 adjacent to the entry. Students will still be required to show their valid Berkeley student ID when entering on Level 4 and when accessing the designated Student areas on Level 3 and beyond. Levels 4 - 5 The renovation of Levels 4 and 5 provided much needed access to space available twenty-four hours a day, five days a week. The current Level 4 entry will remain accessible after normal building hours and the renovated entry on Level 3 will become the “main” entry to Moffitt Library.
ENTRY SEQUENCE
62 | The Center for Connected Learning - Moffitt Library, UC Berkeley
3 PROGRAMMING
Level 3 - Access Diagram
Level 2 - Access Diagram
Public Public - Exterior Student ID Student ID - Exterior Staff Secure Level 1 - Access Diagram
SCHEMATIC DESIGN REPORT | 63
4 DESIGN
Blank Page
64 | The Center for Connected Learning - Moffitt Library, UC Berkeley
4 DESIGN
4 DESIGN
SCHEMATIC DESIGN REPORT | 65
4 DESIGN
DESIGN PROCESS The design completed on the project to date has included programming, existing building analysis, and a schematic design phase. Throughout the design process BNIM conducted several on-site programming and design workshops with the library leadership team and key stakeholder groups. This process included the use of three dimensional Building Information Modeling software coupled with an immersive virtual reality engine to communicate the design intent. This workflow streamlined the design process and allowed the design team to make both create and visualize within a central model, reducing a significant amount of typical redundant work seen in design revisions. In conjunction with this effort, BNIM coordinated the design intent with the consultant teams through sharing building information models on a regular basis, conducting coordination calls, and hosting in person coordination meetings. Through these coordination efforts substantial information relating to existing conditions and systems was uncovered and documented, resulting in a rich building information model that is developed to a level of detail beyond what is typically found in a schematic design phase. For an illustration of the visualization technology used on for the design and presentation of this project, refer to the Stereoscopic Panorama section found on Page 110.
66 | The Center for Connected Learning - Moffitt Library, UC Berkeley
4 DESIGN
SCHEMATIC DESIGN REPORT | 67
4 DESIGN
LAYERS OF DESIGN When looking at building design and design opportunities, BNIM uses a methodology of layers of design to consider and assess how a prospective project can transform. The following diagrams and descriptions represent only a portion of the layers that were considered for this project. • The existing courtyard has an opportunity to become the heart of the library community, serving as a central hub for student services to support a vertical campus of activities. • Clear, high-performing exterior glazing system will increase visual transparency between interior library activities and the exterior environment, as well as providing improved daylighting opportunities.
POROUS CAMPUS CONNECTION
• A focused staff office area allows for efficient operations and strengthens collaborative work among staff. Adding degrees of transparency to the staff area provides for increased visual connectivity between staff and students. • The organization of internal program spaces will be intuitively organized for improved way-finding and connectivity between program spaces and vertical circulation systems. • The structure of the existing building will support the transformation to a library of the 21st century, enabling the library to provide ubiquitous power and technology to support student needs.
HEALTH + WELLBEING
• Natural quiet zones located at the perimeter and active zones at the center support the courtyard as the hub of activity and spine for vertical circulation. • Expanded glazing areas will allow the library to become more visible and extroverted, while increasing building envelope performance to meet thermal comfort goals and strengthening the visible connection to nature. • Activating the thermal mass of the existing structure, improving the building envelope performance, will allow the integrated building systems design to achieve enhanced thermal comfort. • De-coupling ventilation from thermal comfort provides efficiencies in mechanical system design.
68 | The Center for Connected Learning - Moffitt Library, UC Berkeley
CONNECTED PROGRAM
4 DESIGN
POWER/TECH
THERMAL MASS / RADIANT COMFORT
SAFETY, TRANSPARENCY MULTIPLE ENTRIES
ACCESS TO DAYLIGHT
CELEBRATE STRUCTURE & DESIGN INTEGRITY
THERMAL COMFORT
VISUAL TRANSPARENCY
INTUITIVE ORGANIZATION
COLLIDER SPACE
SCHEMATIC DESIGN REPORT | 69
4 DESIGN
CONCEPTUAL DEMOLITION The follow schematic floor plans illustrate the proposed design intent for the renovation scope. Refer to the Schematic Design drawing set for more detailed information.
Demolition Approach The project’s approach to the demolition of selective components of the existing building and site is driven by our layers of design analysis, towards the larger goal of transforming the library into the Center for Connected Learning. As a general goal, the project seeks to maximize value by targeting demolition towards creating spaces that enhance the student experience while maintaining existing conditions that may continue to function in their current state. Refer to the Available Area Analysis summary for further description. Levels 4 + 5 Scope In order to unify the egress system throughout the building and create code-compliant exit routes from all levels, the project proposes to demolish and replace the existing Stair 1 from Level 1-5 with a new stair that meets current code requirements. Additional demolition for building systems and site work relating to the proposed skylight over the East Courtyard will also effect Levels 4 and 5. Levels 1 - 3 Renovation The project proposes significant demolition of building components and systems throughout Levels 1-3, as indicated on the following floor plans. Of significant note are the demolition of all areas precast concrete panels at the building exterior, removal of redundant vertical circulation elements, and removal of selective portions of floor structure to create vertical connections spanning all three floors. Site Improvements The project includes demolition of existing exterior stairs and site components on to create space for new code compliant exit stairs and a revitalized exterior spaces. Refer to Landscape drawings in the schematic design drawing set for additional site demolition information.
70 | The Center for Connected Learning - Moffitt Library, UC Berkeley
4 DESIGN
FOLD OUT PAGE
Level
1
Demolition Plan
ADDITIONAL HVAC AND SHAFT SPACE 459 gsf
EXTERIOR SPACE
RENOVATION AREA (BLUE) 29,431 asf
CENTRAL STAIR 360 gsf
RENOVATION AREA LIGHT RENOVATION AREA UTILITY / VERTICAL CIRCULATION NOT IN PROJECT AREA ELEVATED SLAB REMOVAL
SCHEMATIC DESIGN REPORT | 71
UC BERKELEY MOFFITT LIBRARY | SCHEMATIC DESIGN REPORT
FOLD OUT PAGE
Level
2
Demolition Plan LOADING DOCK
NEW SHAFT 92 gsf
LIGHT RENOVATION 6,216 gsf
SLAB REMOVAL 272 gsf SLAB REMOVAL 370 gsf
EXTERIOR SPACE
SLAB REMOVAL 370 gsf
SLAB REMOVAL 344 gsf
CENTRAL STAIR 360 gsf
RENOVATION AREA (BLUE) 24,352 asf
RENOVATION AREA LIGHT RENOVATION AREA UTILITY / VERTICAL CIRCULATION NOT IN PROJECT AREA ELEVATED SLAB REMOVAL
UC BERKELEY MOFFITT LIBRARY | SCHEMATIC DESIGN REPORT
DESIGN
Level
3
Demolition Plan
EXTERIOR SPACE
EXTERIOR SPACE SLAB REMOVAL 370 gsf
SLAB REMOVAL 344 gsf
CENTRAL STAIR 360 gsf
SLAB REMOVAL 276 gsf
NEW SHAFT 130 gsf
RENOVATION AREA (BLUE) 22,558 asf
EXTERIOR SPACE
RENOVATION AREA LIGHT RENOVATION AREA UTILITY / VERTICAL CIRCULATION NOT IN PROJECT AREA ELEVATED SLAB REMOVAL
SCHEMATIC DESIGN REPORT | 73
UC BERKELEY MOFFITT LIBRARY | SCHEMATIC DESIGN REPORT
Level
4
Demolition Plan
MECHANICAL DEMOLITION
ST FA TS 2
GFI
GFI
GFIGFI GFI GFI GFI GFI GFI GFI GFI PRESS CAFE GFI GFI GFI GFIGFI GFI GFI G FIGFI PAVING AND MEMBRANE REMOVAL
COURTYARD STAIR REMOVAL CENTRAL STAIR REMOVAL + STANDPIPE REROUTE
MECHANICAL DEMOLITION
RENOVATION AREA LIGHT RENOVATION AREA UTILITY / VERTICAL CIRCULATION NOT IN PROJECT AREA ELEVATED SLAB REMOVAL
UC BERKELEY MOFFITT LIBRARY | SCHEMATIC DESIGN REPORT
DESIGN
Level
5
Demolition Plan
MECHANICAL DEMOLITION
CENTRAL STAIR REMOVAL + STANDPIPE REROUTE
MECHANICAL DEMOLITION
RENOVATION AREA LIGHT RENOVATION AREA UTILITY / VERTICAL CIRCULATION NOT IN PROJECT AREA ELEVATED SLAB REMOVAL
SCHEMATIC DESIGN REPORT | 75
UC BERKELEY MOFFITT LIBRARY | SCHEMATIC DESIGN REPORT
4 DESIGN
SCHEMATIC STACKING & BLOCKING DIAGRAMS The current existing layout of floors 1-3 lacks clear organization, has limited exposure to daylight, is disconnected by staff and classroom spaces, and is very difficult to navigate. These organizational issues, as well as the focus on improving the undergraduate experience on Berkeley’s campus influenced the approach to the stacking and blocking of levels 1-3. In order to create intuitive pathways through the building, the design team dispersed open collaboration throughout each level and layered enclosed collaboration spaces in a vertical manner whenever possible. Likewise, the classroom spaces, whether General Assignment or CCL Learning Studios are stacked on the south side of levels 1 and 2. The staff work space was consolidated to the north side of level 2 while the staff supporting critical services offered on level 3 are located adjacent to the service areas. Specialized programs and services are located along main paths of circulation in order to highlight their presence and put learning and doing on display. The event areas that are open to the broader campus community and the public are located on level 3 outside of the Student ID area and adjacent the Free Speech Movement Cafe.
OPEN COLLABORATION
76 | The Center for Connected Learning - Moffitt Library, UC Berkeley
4 DESIGN
ENCLOSED COLLABORATION
STAFF SPACE
SCHEMATIC DESIGN REPORT | 77
4 DESIGN
CLASSROOM SPACES
78 | The Center for Connected Learning - Moffitt Library, UC Berkeley
LIBRARY SERVICES / SPECIAL PROGRAMS
4 DESIGN
PUBLIC + EVENT
NON ASSIGNABLE
SCHEMATIC DESIGN REPORT | 79
4 DESIGN
SCHEMATIC FLOOR PLANS OVERVIEW The follow schematic floor plans illustrate the proposed design intent for Levels 1-3. Refer to the Schematic Design drawing set for more detailed information.
L eve
Blocking
LEVEL 1 The ground floor embodies the idea of learning within the Center for Connected Learning. This plan focuses on providing multiple learning environment types and opportunities for undergraduate students creating and accessing information within Moffitt library. Programmatically, all general assignment classrooms are located on the south side of this floor. Small communal learning spaces flank the larger classrooms creating a backdrop for the open learning spaces on the floor. To the east side of the plan, a single large active learning classroom creates an environment in which students can participate in active classroom learning classes. This space would be larger than any existing active learning classroom on campus.
UC BERKELEY MOFFITT LIBRARY | SCHEM
The existing mechanical equipment rooms on the north side of the plan are directly adjacent to the maker spaces, which include both enclosed and open maker studio environments. Lastly, the west side of the plan has a direct relationship with the newly revitalized exterior courtyard. This open collaboration and study space flows seamleslly with the new exterior design, creating an indoor/outdoor connection.
80 | The Center for Connected Learning - Moffitt Library, UC Berkeley
1
DESIGN
Level Floor Plan
Utility 4221 SF
EGRESS ONLY STAIR TO LIGHTED EGRESS PATH
SECURITY GATE Maker Workshop 777 SF LA SER
3 D P RIN T
SPRAY B OOT H
VI N Y L C UTT ER
Mechanical 1575 SF
Disabled Student Services 1114 SF
GA Computer Lab 1157 SF Stor. 67 SF
Maker Studio 1967 SF
Specialized Computing 915 SF
AR / VR Suite 880 SF
Machine Room 231 SF
Stor. 110 SF IS & T 113 SF
REFLECTION GARDEN
Open Collaboration 781 SF
General Use
OP E N T O A B OV E
O P EN TO A BO VE
Open Study 318 SF
O PEN TO AB OV E
Open Collaboration 358 SF
Open Collaboration 358 SF
Open Collaboration 502 SF
Consult. 111 SF
Consult. Consult. 120 SF 120 SF
Consult. 85 SF
Laboratory - Open Classrooms - Library
Classroom Classrooms - General Assignment Special Use
SECURITY GATE EGRESS ONLY STAIR TO LIGHTED EGRESS PATH
Open Collaboration 1610 SF
GA Storage / AV Equipment 295 SF
Print 128 SF
Mens 374 SF
Open Study / Breakout 162 SF
Womens 390 SF
General Use - Open Laboratory
GA Active Learning Classroom 4125 SF
JC 67 SF
Learning Studio (Maker) 1308 SF
GA Classroom 1209 SF
GA Classroom 1209 SF Stor. 104 SF
Stor. 104 SF
Enclosed Laboratory Study Facilities
Open Laboratory Open Collaboration Office
Special Use - Private Non Assignable
Special Use - Public Office Open Collaboration
Level 1
Enclosed Collaboration
UC BERKELEY MOFFITT LIBRARY | SCHEMATIC DESIGN REPORT
Assignable FloorNon Pla n SCHEMATIC DESIGN REPORT | 81
UC BERKELEY MOFFITT LIBRARY | SCHEMATIC DESIGN REPORT
4 DESIGN
L eve
Blocking
LEVEL 2 The second floor is a continuation of the Center for Connected Learning. Programmatically, classrooms are again located on the south side of this floor. Small communal learning spaces flank the larger classrooms creating a backdrop for the open learning spaces on the floor. The north and east side of the floor plan encompass much of the back of house operations of the library, including the loading dock, book storage, digitization lab among other activities. Many of the spaces are fronted by digital scholarship spaces. The Northwest portion of level 2 holds the library staff office suite including open office spaces, break room and conference rooms.
UC BERKELEY MOFFITT LIBRARY | SCHEM
To the Southwest, Open study space adjacent to the existing exterior terrace will provides a connection to the surrounding nature for students sitting on both the inside and outside of this area. A feature communicating stair connects levels 1 through 3, providing a visual connection between each floor and facilitating intuitive wayfinding and access to program spaces throughout each level.
82 | The Center for Connected Learning - Moffitt Library, UC Berkeley
DESIGN
Level Egress to University Drive
Floor Plan
2
Loading dock
Mail Suite 2232 SF
C OPY
K ITC H EN
Google Books 626 SF
REC O RDIN G BO OT H
STO R. PRO DUC T IO N S T U DI O
O PEN OF F ICE
Office Suite 3283 SF
B REA K
H OT D ESK
WO RK
C ON F EREN C E
Open Study 329 SF
General Use - Open
Open Collboration 989 SF
Open Collaboration 981 SF
Scholar in Scholar in Residence Residence 215 SF 196 SF Course in Residence 743 SF
Classrooms - Library
Classroom Classrooms - General Assignment
Copy Center Production 679 SF
Cust. 290 SF
Cust. Conf. 359 SF
Facilities Workshop 498 SF
IS & T 113 SF
Open O P EN TO Collaboration BELOW 329 SF
OP EN TO B EL OW
D OW N TO L1
Open Collboration 281 SF
Laboratory - Open
WO RK
OP EN TO B EL OW
General Use
Laboratory
WO RK
Digital Scholarship 1982 SF
OP EN TO B EL OW
Outdoor Balcony
WO RK
Media Collaboration 408 SF
Media Collaboration 375 SF
Consult. 85 SF
Consult. 85 SF
Learning Studio (Multi) 1222 SF
Learning Studio (Media) 1222 SF
Course in Residence 586 SF
Storage 295 SF
Print 136 SF
Digitization Lab 2490 SF
Connection to Gardner
Special Use
Enclosed Laboratory
Gender Inclusive Restroom 1057 SF
Study Facilities
Open Laboratory Open Collaboration
Non Assignable
Special Use - Public Office Open Collaboration
Level 2
Enclosed Collaboration
FlooNon r PlAssignable an
Egress to Free Speech Bikeway
Office
Special Use - Private
UC BERKELEY MOFFITT LIBRARY | SCHEMATIC DESIGN REPORT SCHEMATIC DESIGN REPORT | 83
UC BERKELEY MOFFITT LIBRARY | SCHEMATIC DESIGN REPORT
4 DESIGN
L eve
Blocking
LEVEL 3 The third floor plan becomes an active and lively space for students and visitors experiencing Moffitt Library. A newly renovated south entry plaza provides a new user experience when approaching the library. Once inside, users will be greeted by library staff. The west side of the plan holds a newly expanded and designed Free Speech Movement Cafe with both public and private dining spaces. Connected to the interior cafe is the existing exterior dining terrace, which provides outdoor dining opportunities to visitors. The Center for Connected Learning becomes apparent upon entry into the library, as both the Events space and Learning Studio front new floor openings with a communicating connecting stair down to level 2. One of the most important aspects of Moffitt Library and the renovation as a whole is the connection to the Gardner Stacks. This connection is now a highlighted feature on the east side of the plan, with clearly visible circulation access from the main entry. Adjacent to the Gardner Stacks connection is the existing east courtyard, which has been enclosed with a glass skylight to create a hub of student services provided by the library staff.
84 | The Center for Connected Learning - Moffitt Library, UC Berkeley
UC BERKELEY MOFFITT LIBRARY | SCHEM
DESIGN
Level Floor Plan
3
Classroom Enclosed Laboratory Open Laboratory Special Use - Private Special Use - Public Office Open Collaboration Enclosed Collaboration Non Assignable
UC BERKELEY MOFFITT LIBRARY | SCHEMATIC DESIGN REPORT SCHEMATIC DESIGN REPORT | 85
4 DESIGN DRAWINGS
EXTERIOR ELEVATIONS OVERVIEW The following exterior elevations illustrate the extents of renovation scope on the building exterior. The project proposes to replace all the existing pre-cast concrete panel system on Levels 1-3 with a butt glazed aluminum storefront system with high performance vision glass to achieve the following design goals: •
Transform the interior quality of space and student experience in promoting daylight access to a higher percentage of student spaces.
•
Enhance building performance and thermal comfort- the original precast concrete panels offer poor insulation, leading to heightened energy use and discomfort for users sitting near the perimeter.
•
Bring more daylight into spaces that need it. Daylighting studies completed by Integral Group show significant improvement to daylighting throughout the building.
•
Provide views to the exterior throughout the building to re-establish users’ connection to nature: the current precast panel system alternates between fully solid panels and panels with vision glass embedded. Fully solid panels currently interrupt views to the exterior from many key locations throughout the proposed project.
The new glazing system will seek to achieve visual harmony with the recently added glazing on the east side of Levels 4-5, while achieving cost savings through standardization of units and elimination of complex details.
86 | The Center for Connected Learning - Moffitt Library, UC Berkeley
DESIGN
NEW ROOFTOP MECHANICAL EQUIPMENT + SCREENING FOR LEVELS 4+5
OCCUPIABLE BALCONY PER FIRE SPRINKLER UPGRADE
OPTIONAL PV CANOPY
OPTIONAL GLAZING REPLACEMENT ON LEVELS 4+5 IMPROVED EXTERIOR COURTYARD FOR CCL USE NEW SITE STAIRS, SECURITY GATES, AND LIGHTED EGRESS PATH
NEW GLAZING TO REPLACE EXISTING PRECAST PANELS
NEW SITE STAIRS, SECURITY GATES, AND LIGHTED EGRESS PATH
WEST ELEVATION
SCHEMATIC DESIGN REPORT | 87
NEW ROOFTOP MECHANICAL EQUIPMENT AND SCREENING FOR LEVELS 4-5 NEW ROOFTOP MECHANICAL EQUIPMENT FOR LEVELS 1-3 OCCUPIABLE BALCONY PER FIRE SPRINKLER UPGRADE
NEW SKYLIGHT AND PAVING AT LEVEL 4 EAST PLAZA
OPTIONAL PV CANOPY AT WEST TERRACE
OPTIONAL GLAZING REPLACEMENT ON LEVELS 4+5 NEW GLAZING TO REPLACE EXISTING PRECAST PANELS
NEW LIGHTED EGRESS PATH
NORTH ELEVATION
1
E x te r io r E l e v a tio n - N o r th - Fo r R e p o r t 1" = 20'-0"
RE:
1 006G
DESIGN
NEW ROOFTOP MECHANICAL EQUIPMENT AND SCREENING FOR LEVELS 4-5 NEW ROOFTOP MECHANICAL EQUIPMENT FOR LEVELS 1-3
OCCUPIABLE BALCONY PER FIRE SPRINKLER UPDATE
NEW ENTRY DOORS AND PAVING AT SOUTH PLAZA
NEW SKYLIGHT AND PAVING AT LEVEL 4 TERRACE OPTIONAL PV CANOPY AT WEST TERRACE
OPTIONAL GLAZING REPLACEMENT ON LEVELS 4+5 NEW GLAZING TO REPLACE EXISTING PRECAST PANELS
NEW LIGHTED EGRESS PATH TO FREE SPEECH BIKEWAY
SOUTH ELEVATION
SCHEMATIC DESIGN REPORT | 89
4 DESIGN
BUILDING SECTIONS Overview The following building cross sections illustrate the vertical relationships between spaces within the CCL renovation. North-South Section The North-South section illustrates the spatial quality of the “Collider” space at the center of the building from Levels 1 through 3. On the left hand side of the image one can see the Central Spine, which houses the high-visibility showcase program within the building including the Digital Scholarship labs, Maker Studios, and VR Spaces. To the right (south) of the Collider space collaboration rooms and booths front a variety of learning environments. Open collaboration areas fill the interstitial space between the enclosed programs. East-West Section The East-West section is taken through the Collider space, and illustrates the vertical connection between floors and communicating stair that connects Levels 1-3. On the right hand side of the image one sees the new skylight enclosed East Courtyard, which allows natural light to penetrate all the way to Level 1 through a series of openings in the floor. At the center of the image one sees the Central Spine, with spaces interconnected along a single path via a continuous communicating stair. This stair provides a directed path for students through the Collider space, presenting them with a variety of educational experiences before culminating in the revitalized West Courtyard at the far western end of Level 1.
90 | The Center for Connected Learning - Moffitt Library, UC Berkeley
DESIGN
NORTH / SOUTH SECTION
SCHEMATIC DESIGN REPORT | 91
EAST / WEST SECTION
DESIGN
SCHEMATIC DESIGN REPORT | 93
4 DESIGN
FREE SPEECH MOVEMENT CAFE This perspective view shows a view from the point of sale counter of the expanded Free Speech Movement Cafe looking west towards the dining terrace, with a view of the Free Speech Movement Cafe event space on the right and open seating in the middle.
Level 3
LEVEL 3 KEY PLAN
Floor Plan
Moffitt Library Renovation Floors 1-3 | PROGRAMMING + SCHEMATIC DESIGN REPORT Copyright © 2019 BNIM Architects
94 | The Center for Connected Learning - Moffitt Library, UC Berkeley
4 DESIGN
SCHEMATIC DESIGN REPORT | 95
4 DESIGN
GARDNER CONNECTION This view shows the revamped connection to Gardner Stacks, the terminus of a long pedestrian boulevard that connects the east and west ends of Level 3. On the right hand side alternating open and enclosed spaces provide a variety of venues for consultation and collaboration. To the left the new enclosed skylit space offers additional seating for students and a the hub for library services.
Level 3
LEVEL 3 KEY PLAN
Floor Plan
Moffitt Library Renovation Floors 1-3 | PROGRAMMING + SCHEMATIC DESIGN REPORT Copyright © 2019 BNIM Architects
96 | The Center for Connected Learning - Moffitt Library, UC Berkeley
4 DESIGN
SCHEMATIC DESIGN REPORT | 97
4 DESIGN
LIBRARY SERVICES This view illustrates the experience within the newly enclosed East Courtyard library service hub. This space is created by enclosing the existing East Courtyard with a walkable glass skylight. At the eastern edge of the space is a service bar providing material and device lending, course reserves, and other programs to students. Ample space is provided for queuing at the service bar while still allowing for additional study and collaboration space for students. Visitors to Moffitt will be able to see the Campanile and other library buildings in the distance, providing context for their experience within the building and aiding overall wayfinding.
Level 3
LEVEL 3 KEY PLAN
Floor Plan
Moffitt Library Renovation Floors 1-3 | PROGRAMMING + SCHEMATIC DESIGN REPORT Copyright © 2019 BNIM Architects
98 | The Center for Connected Learning - Moffitt Library, UC Berkeley
4 DESIGN
LEVEL 3 - STAIRCASE VOID
SCHEMATIC DESIGN REPORT | 99
4 DESIGN
COLLIDER ENTRY The perspective view from the top of the communicating stair illustrates what students will see as they embark on their voyage of discovery within the collider space of the CCL, with a view of the Free Speech Movement Cafe beyond. The first piece of program on the route is a library Learning Studio, which can combined with the Event Space in the bay beyond to create a single continuous high-ceiling event space.
Level 3
LEVEL 3 KEY PLAN
Floor Plan
Moffitt Library Renovation Floors 1-3 | PROGRAMMING + SCHEMATIC DESIGN REPORT Copyright © 2019 BNIM Architects
100 | The Center for Connected Learning - Moffitt Library, UC Berkeley
4 DESIGN
LEVEL 3 - STAIRCASE VOID
SCHEMATIC DESIGN REPORT | 101
vel 2
4 DESIGN
CENTRAL SPINE Standing in the central collaboration space on Level 2, this view demonstrates the concept of the “Collider” space at the center of the plan, with students watching a student made movie screening within the Digital Scholarship lab at the center of view while students in the collaboration area look on.
LEVEL 2 KEY PLAN
Plan
Moffitt Library Renovation Floors 1-3 | PROGRAMMING + SCHEMATIC DESIGN REPORT Copyright © 2019 BNIM Architects
102 | The Center for Connected Learning - Moffitt Library, UC Berkeley
4 DESIGN
SCHEMATIC DESIGN REPORT | 103
vel 2
4 DESIGN
COURSE IN RESIDENCE This image captures a view of the Course in Residence space and adjacent collaboration area. New openings between the existing structural members supporting Level 3 bring natural light into what is currently a dark and neglected corridor serving the classroom wing of the building. By opening up the floorplate on all three levels, light is able to penetrate to the depths of the building, creating beautiful daylit study environments adjacent to new learning spaces on Levels 1 and 2.
LEVEL 2 KEY PLAN
Plan
Moffitt Library Renovation Floors 1-3 | PROGRAMMING + SCHEMATIC DESIGN REPORT Copyright © 2019 BNIM Architects
104 | The Center for Connected Learning - Moffitt Library, UC Berkeley
4 DESIGN
SCHEMATIC DESIGN REPORT | 105
vel 2
4 DESIGN
COLLABORATION AREAS This view is taken from the center of Level 2 looking to the west, with enclosed collaboration spaces fronting the entrances to the Learning Studios on the left hand side of the image. On the right hand side is the central spine. This vantage point illustrates the organizational principle that drives the plans of the lower two levels, with classroom program (Learn) on the south side, laboratory program on the north side (Create), and collaboration spaces in between.
LEVEL 2 KEY PLAN
Plan
Moffitt Library Renovation Floors 1-3 | PROGRAMMING + SCHEMATIC DESIGN REPORT Copyright © 2019 BNIM Architects
106 | The Center for Connected Learning - Moffitt Library, UC Berkeley
4 DESIGN
SCHEMATIC DESIGN REPORT | 107
4 DESIGN
MAKER AREA This view taken from the landing of the communicating stair on Level 1. In the upper right hand corner the staff conference room is suspended above the Maker Studio. On the left hand side is an open collaboration area adjacent to the revamped west courtyard in the which is visible in the distance. New vision glazing affords clear views to the exterior in a space which is currently deprived of daylight. Students will be able to access this exterior courtyard for study, relaxation, meditation, and other activities.
Level 1
LEVEL 1 KEY PLAN
Floor Plan
Moffitt Library Renovation Floors 1-3 | PROGRAMMING + SCHEMATIC DESIGN REPORT Copyright © 2019 BNIM Architects
108 | The Center for Connected Learning - Moffitt Library, UC Berkeley
4 DESIGN
SCHEMATIC DESIGN REPORT | 109
4 DESIGN
STEREOSCOPIC PANORAMA QR CODES
ENTRY
Throughout the design process, BNIM utilized immersive technologies to communicate the schematic design intent of the Moffitt Library Renovation project. These technologies incude the use of stereoscopic panorama “Pivot” views, that allow users to see a 3-dimensional designed environment.
How to scan a QR code 1.
Open the Camera app from your device’s Home screen, Control Center, or Lock screen.
2.
Hold your device so that the QR code appears in the Camera app’s viewfinder. Your device recognizes the QR code and shows a notification.
3.
Tap the notification to open the link associated with the QR code.
FREE SPEECH MOVEMENT CAFE
GARDNER PORTAL
Created by Oleksandr Panasovskyi from the Noun Project
LEVEL 1 LANDING
110 | The Center for Connected Learning - Moffitt Library, UC Berkeley
4 DESIGN
LEVEL 2 BRIDGE
LEVEL 2 COURSE IN RESIDENCE
LEVEL 3 EAST COURTYARD
LEVEL 3 EVENT SPACE
SCHEMATIC DESIGN REPORT | 111
5 DESIGN NARRATIVES AND ANALYSIS
Blank Page
112 | The Center for Connected Learning - Moffitt Library, UC Berkeley
5 DESIGN NARRATIVES AND ANALYSIS
5 DESIGN NARRATIVES AND ANALYSIS
SCHEMATIC DESIGN REPORT | 113
5 DESIGN NARRATIVES AND ANALYSIS
SECTION OVERVIEW The following section includes specific recommendations in relationship to design and analysis for the University of California Berkeley Moffitt Library. These recommendations cover the following areas •
Site Improvements & Recommendations
•
Code Analysis & Narrative
•
Structural Narrative
•
Mechanical Narrative
•
Telecommunications Narrative
•
Electronic Security Narrative
•
Audiovisual Narrative
•
Acoustics Narrative
•
Daylighting Analysis
•
Fire Protection Narrative
•
Food Service Narrative
These analysis and recommendations have are embodied within the schematic design drawings and throughout this report.
114 | The Center for Connected Learning - Moffitt Library, UC Berkeley
5 DESIGN NARRATIVES AND ANALYSIS
SCHEMATIC DESIGN REPORT | 115
5 DESIGN NARRATIVES AND ANALYSIS
SITE IMPROVEMENTS & RECOMMENDATIONS OVERVIEW The goals of the project site improvements aim to preserve existing mature vegetation, promote a sustainable environment and provide various outdoor space that integrates the renovated building into the Berkeley Campus fabric. Additional goals serve to strengthen pedestrian connections, introduce new building egress paths, and revisit the design of the West terrace and East courtyards. The outdoor space adjacent to the Moffitt Library embodies the spirit of successful campus design, where students go to research, study, congregate, rest, pass through, and attend events. By creating flexible spaces to accommodate a variety of outdoor uses and activities, Moffitt Library is better able to serve the students and staff that inhabit it. The integration of permeable surfaces, drought tolerant planting, and rainwater infiltration strategies as part of Berkeley’s sustainability master plan ensures that Moffitt Library remains a stable, sustainable, and vibrant node within the greater UC Berkeley campus. The locally cohesive plant palette and restrained material choices complement the architecture, helping to visually connect the sequence of spaces and create a harmonious flow through the site.
LANDSCAPE DESIGN West Courtyard The new library sits gracefully embedded in the existing environment. The West Courtyard, located on level one, is adjacent to the interior study
116 | The Center for Connected Learning - Moffitt Library, UC Berkeley
area. The design for the courtyard proposes a low maintenance, healthy and sustainable landscape; providing clear and safe access through the courtyard space while maintaining the flexibility of the area to allow for various uses. This makes the courtyard a place for people, a place that promotes social, educational, and intellectual interaction. This design introduces new egress paths to the north and south, connecting into existing pedestrian walks. Path surfacing is proposed to be a stabilized decomposed granite path with heavy-duty steel edging. New bollard path lighting fixtures will be placed adjacent to the path, while the existing stair and walls will be demolished to accommodate proposed concrete stairs and metal egress gates. A vibrant, native, and adaptable planting palette is proposed within the courtyard area to provided year-round and seasonal interest, at a variety of visual scales that are based upon the proportions of the courtyard space. Bioretention planting are proposed at lower pavement level. Drainage improvements from this bioretention zone will connect into the existing storm water infrastructure in the area. The existing pavement in the lower courtyard is proposed to be removed. The new pavement design in the courtyard helps to mitigate the scale of the space, while visually connecting the interior and exterior spaces. This proposed concrete pavement is a durable and easily maintained surface that allows for universal access across the courtyard
5 DESIGN NARRATIVES AND ANALYSIS
and accommodates many activities that occur throughout the year, such as a future meditation area or group yoga space. South Entry Plaza The South Plaza marks the starting point of the library experience. We have developed both a basic and enhanced design scope to consider based upon budget.
and inviting atmosphere that encourages students to sit, rest, and socialize. Additionally, a new outdoor picnic area will be placed upon stabilized decomposed granite paving. Future landscape improvements are included in the bike rack storage and outdoor picnic areas. These upgrades to existing facilities provide added value for the benefit of all campus users. East Entry Plaza
The basic scope will celebrate the existing plaza’s significant heritage and its relationship to the Moffitt Library. Existing site elements to remain in place include: concrete bollards, bike racks, monumental signage, and newspaper stands. Existing concrete furnishings will be demolished. A new concrete topping slab is proposed to match the building slab.
The approach for developing and designing the Level 4 East Courtyard proposes a new exterior topping slab to match the proposed glass atrium stem wall. This establishes view connections between the large atrium inside and public spaces outside.
The improved scope enhances the building entrance by providing safe pedestrian access and a series of attractive open spaces in which students and staff can gather, sit, and relax. Existing bike racks will remain in place. The new bollards align with the proposed exterior paving, drawing people into space. A new exterior concrete topping slab will match proposed exterior paving. This design strengthens the plaza by improving seating amenities, embracing the newspaper display, and providing planting along the edges.
North Plaza
This conceptual design preserves and protects the mature trees and integrates these trees as essential elements in the new layout of the plaza. This design creates a versatile urban space with a welcoming
The Press Café will remain. Existing site furnishings and existing light pole bases will remain.
A new concrete egress path is proposed from the north terrace to the existing service drive. Pedestrian-scale lighting fixtures are planned along the path. Sustainability Initiatives •
Native and Adapted Plant Species
•
Create Habitat
•
Storm Water Bioretention, Runoff Collection, and Filtration
SCHEMATIC DESIGN REPORT | 117
5 DESIGN NARRATIVES AND ANALYSIS
CODE ANALYSIS & NARRATIVE OVERVIEW The University of California (UC) system requires campuses to construct and maintain facilities in compliance with the 2016 California Building Code (CBC). This applies to new buildings and renovations. It is the A/E (architect/engineer) team’s responsibility to design the project in compliance with federal and state laws, codes, rules, regulations, ordinances, and standards. It should also be noted that on January 1, 2020, before the scheduled completion of this project, the 2019 CBC will be adopted.
APPLICABLE CODES
Applicable codes are as follows: •
The California Building Code -- Title 24 as adopted by the California Building Standards Commission.
•
Part 1, Building Standards Administrative Code
•
Part 2, California Building Code
•
Part 3, California Electrical Code
AUTHORITY HAVING JURISDICTION
•
Part 4, California Mechanical Code
The university is not subject to local jurisdictions’ planning and building codes, nor is it required to obtain building permits from local jurisdictions for construction on real estate owned or controlled by the University. However, the design and construction of utility connections and fire-protection systems may require liaison with local jurisdictions. This liaison shall be coordinated through the university project administrator.
•
Part 5, California Plumbing Code
•
Part 6, California Energy Code
•
Part 7, California Elevator Safety Construction Code
•
Part 8, California Historical Building Code
•
Part 9, California Fire Code
•
Part 10, California Existing Building Code
The UC system acts as its own Building Official. The UC system coordinates its building official authority with both the State Fire Marshal (SFM) and The UC system is required to construct and maintain its facilities in compliance with the California Building Code (CBC).
•
Part 12, California Reference Standards Code
•
The California Administrative Code, Title 19 (Industrial Relations, Public Safety)
•
The California Occupational Safety and Health Act
•
The California Environmental Quality Act, latest edition
•
Requirements or the Regional Water Quality Board
•
Public Contract Code, Sections 10700 et seq.
Building code review for all UC system projects may be performed directly by the Campus Deputy Building Official (CDBO) or, on their behalf, by any of the authorized plan check firms under systemwide agreements. 118 | The Center for Connected Learning - Moffitt Library, UC Berkeley
5 DESIGN NARRATIVES AND ANALYSIS
(California State Contract Law)
the comments or lack of comments from any plan review
•
State/Local health departments (regarding food service)
•
Air Quality Management District regulations
agency. Early consultation with all plan check groups is strongly encouraged.
•
Americans with Disabilities Act (ADA), Title II, ADAAG (ADA Accessibility Guidelines)
CODE APPROACH
•
ASHRAE indoor air quality standard 62-1989
The existing building is a five-story structure consisting of cast-in-place concrete columns, floor slabs, and shear walls. There are occupiable outdoor roof decks on Levels 2-5.
UNIVERSITY DESIGN STANDARDS Compliance with all university standards, including but not limited to: •
UC Berkeley Real Estate Campus Design Standards
•
University of California – Seismic Safety Policy
•
University of California Berkeley – Policy on Energy Use
REGULATORY APPROVALS The architect/engineer shall be responsible for obtaining review and approval by applicable regulatory agencies. Specific plan review and approvals are required by statute and Trustee policy. Submittals must be coordinated with the university project administrator. The project administrator will furnish a project specific listing of agency contact information to the architect/engineer. The architect/engineer’s sole responsibility for code compliance is not diminished in any manner by
The project design will follow the non-separated mixed-use design approach described in CBC Section 508.3. The building will be fully protected with an automatic sprinkler system in accordance with CBC Section 903.3.1.1 and an emergency voice/ alarm communication system in accordance with CBC Section 907.5.2.2. The project will utilize Exception 4 to CBC Section 1019.3 for interconnected stories by open stairways. Enclosed stairways discharging through the building will comply with the Exceptions to CBC Section 1028.
BUILDING TYPE AND OCCUPANCY CALCULATION The existing building seems to be constructed as a Type 1-B with a non-separated mixed-use occupancy per CBC Table 601 and CBC Section 303.4. In recent years, and as is the trend with most libraries, the stack space for collections has been replaced with student study space and classrooms. The proposed
SCHEMATIC DESIGN REPORT | 119
5 DESIGN NARRATIVES AND ANALYSIS
Schematic Design amplifies that aspect even more, increasing the overall occupancy compared to the original design. A mixed occupancy with the majority of the spaces as A-3 Assembly occupancy will be more appropriate for the future library. The occupancy types are as follows: •
A-3 (Library)
•
A-2 (Food Service)
•
B (Classrooms)
•
S-1 and S-2 (Storage) rooms greater than 100sf
OCCUPANCY SEPARATION The project design intends to follow the nonseparated mixed use design approach as described in CBC Section 508.3. Therefore, the most restrictive fire protection features of CBC Chapter 9 applicable to Group A-3 occupancy regarding the occupancy types above will be applicable to the building. The building will be fully protected with an automatic fire sprinkler system. Therefore, the proposed Schematic Design does not include any Occupancy Separations.
BUILDING SEPARATION A building separation will be maintained between existing Gardner Stack building which adjoins Moffitt Library on the east end of the second and third floors.
ALLOWABLE HEIGHT AND AREA 120 | The Center for Connected Learning - Moffitt Library, UC Berkeley
The total allowable area is “unlimited” for this building and the area per floor is also “unlimited” according to table CBC Section 506.2. The total allowable height is 11 stories with additional 1 story possible with a fire sprinkler system according to CBC Table 504.4. The existing building is not considered a high rise. The proposed renovation contained in the concept design will not alter the original building and does not exceed these limitations. The lowest floor, Level 1, has a finished floor more than 6 feet below grade plane, in the proposed Schematic Design will be considered a basement by definition per CBC Chapter 2.
ELEVATOR LOBBIES AND TWO-WAY COMMUNICATION FEATURES It is required to either pressurize the hoist-way or add elevator lobbies because the building is beyond three stories tall. In the previous 2016 renovation, smoke curtains complying with the requirements of CBC Section 3006.3, Item 5 were added outside each elevator door which satisfies the requirement in lieu of pressurization or elevator lobbies. The lobbies immediately outside the elevators will be an open lobby. An existing interior stair tower immediately adjacent to the elevator shaft serves to satisfy the requirement of having a stair connecting these lobbies if required. EAs required by CBC Section 1009.8 each elevator landing should be supplied will be provided with a two-way communications system which affords communication between the landing and the fire command room or other approved location.
ELEVATOR SUMMARY
5 DESIGN NARRATIVES AND ANALYSIS
Where elevators are provided in buildings more than four stories, at least one elevator cab shall be sized to accommodate an ambulance stretcher 24” x 84”. However, for the maneuvering the stretcher into the cab, the minimum dimensions of 64” x 80” are needed which allows clear space for a gurney. The size most manufacturers have available that meets this minimum is a 3500lb cab with interior dimensions of 80” x 92”. The current elevators were renovated in 2016 and meet the current standards for size and accessibility
PASSIVE FIRE RESISTIVE REQUIREMENTS The fire resistive requirements per CBC Table 601 & 602 are as follows: •
• Primary structural frame – 2 hours
•
Exterior bearing walls – 2 hours
•
Interior bearing walls – 2 hours
•
Nonbearing walls/partitions with Fire Separation of more than 30 feet (exterior) – 0 hrs.
•
Nonbearing walls/partitions (interior) – 0 hrs.
•
Structural frame/floors – 2 hours
•
Ceiling/roof – 1 hour
•
Roof covering – Class B
•
Shafts – 2 hours with fire /smoke dampers
•
Stair enclosures – 2 hours
•
Elevator hoist-way – 2 hours
•
Elevator machine rooms – 2 hours with 90 min doors and fire dampers
ACTIVE FIRE RESISTIVE REQUIREMENTS •
Automatic sprinkler system – required
•
Fire alarm system – required
•
Smoke detection system – required
•
Emergency voice communication system – required
FIRE EXTINGUISHERS AND SPACING REQUIREMENTS Fire extinguishers are required in every mechanical, electrical, shop, kitchen, trash, telecom and storage room. In addition to those requirements, fire extinguishers are to be provided with a minimum spacing maximum travel distance of 75 feet and the maximum coverage area as determined by CBC Table 906.3.
OCCUPANT LOAD FACTORS Traditional library occupant load factors are: •
Reading Room - 50 nsf per person
•
Stacks – 100 gsf per person
The modern academic library is not quite as simply defined, and a more diverse definition of loading is required. These assumptions will be used to determine occupancy for the Schematic Design program and test fit: •
Reading Rooms (General Study) – 50 nsf per person
SCHEMATIC DESIGN REPORT | 121
5 DESIGN NARRATIVES AND ANALYSIS
•
Service Points/Offices – 100 gsf per person
•
Stair – 80 inches
•
Classrooms – 20 nsf per person
•
Doors – 80 inches clear
•
Workshops – 50 nsf per person
•
Meeting Rooms – 15 nsf per person
•
Lobbies – 5 nsf per person
•
Assembly/Seating (outdoor balconies) – 15 nsf per person
•
Gallery – 30 nsf per person
•
Retail – 60 gsf per person
•
Kitchen – 200 gsf per person
•
Storage – 300 gsf per person
WIDTH AND HEIGHT FACTORS Egress width for the following components considering a building that is equipped throughout with an automatic sprinkler system and an emergency voice communication system: •
Stairs - .20 inches per person
•
Doors - .15 inches per person
Minimum widths of components are as follows: •
Corridor – 44 inches
•
Stair – 44 inches
•
Doors – 32 inches clear
Minimum heights of components are as follows: •
Corridor – 90 inches
122 | The Center for Connected Learning - Moffitt Library, UC Berkeley
TRAVEL DISTANCE For an A (assembly) occupancy the travel distance for a fully sprinkled building is as follows: •
Common path of travel – 75 feet
•
Maximum travel distance – 250 feet
•
Dead-end corridors – 20 feet (50 feet for B (business) occupancy
STAIR DIMENSIONS AND RAILS Although the following are the required dimension for stair design, our design team generally tries to use a maximum rise of 6 inches with a tread depth of 12 inches for all stairs. Code required dimensions are as follows: •
Stair treads – 11 inches max.
•
Stair risers – 7 inches max. 4 inches min.
•
Handrail height shall not be less than 34” and not more than 38” above the stair nosing or ramp surface.
•
Guardrails shall be a minimum of 42” high.
5 DESIGN NARRATIVES AND ANALYSIS
PLUMBING FIXTURE COUNTS The existing building fixture counts are as follows:
SCHEMATIC DESIGN REPORT | 123
5 DESIGN NARRATIVES AND ANALYSIS
124 | The Center for Connected Learning - Moffitt Library, UC Berkeley
5 DESIGN NARRATIVES AND ANALYSIS
page left intentionally blank SCHEMATIC DESIGN REPORT | 125
5 DESIGN NARRATIVES AND ANALYSIS
STRUCTURAL NARRATIVE OVERVIEW
SCOPE OF RENOVATIONS
Two large openings will be cut in the center of the existing floor to provide stair access from the second floor. A new light well will be cut in the existing floor. An existing central stair will be removed and the opening filled with a two-way concrete floor matching the existing structural system. An egress stair at the east will also be removed and the opening filled with a concrete slab over metal deck. An exterior courtyard will be converted into an interior study space with planters. The as-built condition of existing joists in this area will need to be verified and may require local strengthening.
First Floor
Fourth Floor
Existing slab depressions at the tiered classrooms will be infilled with a concrete slab level with the existing floor elevation.
An existing opening at the east balcony will be filled with an accessible skylight framed with steel beams. The skylight framing is designed for strength and serviceability, including vibration comfort caused by “dancing” loads applied to a portion of the skylight. An existing canopy at the west balcony will be expanded to accommodate solar photovoltaic panels, utilizing the existing steel columns and replacing steel framing with HSS beams.
The project consists of a renovation to the existing Moffitt Library. The structure was designed and constructed under the 1964 Uniform Building Code. The existing floors and roof consist of concrete slabs with post-tensioned girders and joists spanning in two directions. The structure was designed to accommodate library areas, reading rooms, and classrooms. This renovation will re-program some areas to include offices, study spaces, and a café.
Second Floor Three large openings will be cut in the center of the existing floor to accommodate new central stairs deigned with steel plate stringers. A new light well will be cut in the existing floor. An existing central stair will be removed and the opening filled with a two-way concrete floor matching the existing structural system. An egress stair at the east will also be removed and the opening filled with a concrete slab over metal deck. New cast in place concrete stairs placed on grade will be added at the west side to access the floor below. Various ducts will be filled with flat concrete slabs. Third Floor
126 | The Center for Connected Learning - Moffitt Library, UC Berkeley
Roof New mechanical units will be added to the roof encompassed by a mechanical screen matching the eixisting screen. New shaft openings will be added.
5 DESIGN NARRATIVES AND ANALYSIS
SLAB OPENINGS
DESIGN LOADS
Stairs
Original Design Live Loads: Library Areas Office Areas Balconies Roof
175 psf 100 psf 100 psf 20 psf
Current Design Live Loads Office & Study Areas Café & Dining Areas Balconies Roof
50 psf 100 psf 100 psf 20 psf
Stair openings approximately 13 ft by 27 ft in plan will be added to Levels 2 and 3 for the new central stairs. These openings will require the demolition of the existing slabs and joists. The existing tendons in the joists will be de-stressed, cut, re-anchored, re-stressed, and then patched. At some locations, tendons spanning between new openings will not be re-stressed. The south side of the new slab openings will be overcut and rebuilt with concrete slabs and joists to allow the existing tendons to be adequately anchored.
EVALUATION AND RECOMMENDATIONS
Shafts Shaft openings at various locations will be cut in the existing slab at Levels 2, 3, and Roof. These openings will be located between existing joists to avoid existing tendons. Lightwell Lightwell openings will be added near the courtyard at Levels 2 and 3. These openings will be long and narrow in plan. We recommend keeping the existing joists within these openings to avoid reanchoring existing tendons.
The existing floor systems were evaluated for the proposed structural modifications and reprogrammed space using RAM Concept analysis program. The design live loads used in the analysis are listed below. Structural demands on the existing joist and girders were then compared to their capacities. Retrofit recommendations for the joists and girders are shown in the drawings.
SCHEMATIC DESIGN REPORT | 127
5 DESIGN NARRATIVES AND ANALYSIS
MECHANICAL SYSTEMS ANALYSIS OVERVIEW
GENERAL
Three HVAC options were analyzed to select the system that best met the goals of the project. Factors considered in the analysis included energy savings and first cost as well as other criteria such as maintenance, floor and roof area, comfort, flexibility acoustics and carbon emissions reductions. As a result of the analysis the project team selected Option 1, dedicated outside air system with air cooled Variable Refrigerant Flow (VRF) as the basis of design for developing the enhanced schematic submission.
During the development of the building program a parallel effort was undertaken to study options for the HVAC system to serve Levels 1-3 of Moffitt Library. The University goals for the renovation of Moffitt were reviewed with the stakeholders to develop the options to be compared. The initial results of the conversations were reviewed based on the matrix below with selected criteria and rankings.
128 | The Center for Connected Learning - Moffitt Library, UC Berkeley
A brief description of the three HVAC options are as follows:
5 DESIGN NARRATIVES AND ANALYSIS
HVAC BASELINE – VARIABLE AIR VOLUME (VAV) 1.
Hot water heating source to remain from central plant steam
2. Existing air-cooled chiller acts as cooling source 3. New VAV AHU to serve floors 1-3 (as well as floors 4&5) – CHW cooling coils, energy recovery wheel, 100% OA economizer capability (assume no heating coil required in AHU with energy recovery coil) 4. Install new VAV boxes for floors 1-3 with electric reheat
HVAC OPTION 1 – DEDICATED OUTSIDE AIR SYSTEM (DOAS) WITH AIR-COOLED VRF 1.
New chilled water DOAS unit with energy recovery wheel to temper and supply ventilation air to Levels 1-3
2. Existing air-cooled chillers (installed in 2016) to serve new DOAS unit (no heating coil required due to climate and energy recovery wheel) 3. New air-cooled heat recovery VRF systems for Levels 1-3
A brief description of the three HVAC options are as follows:
Bar Chart Showing Initial Ranking
HVAC Baseline – Variable Air Volume (VAV)
4. New rooftop VAV air handling units to serve Levels 4 and 5 (to replace existing original VAV units located on Level 1 that currently serve the entire building through large vertical chases)
1. Hot water heating source to remain from central plant steam 2. Existing air-cooled chiller acts as cooling source 3. New VAV AHU to serve floors 1-3 (as well as floors 4&5) – CHW cooling coils, energy recovery wheel, 100% OA economizer capability (assume no heating coil required in AHU with energy recovery coil) 4. Install new VAV boxes for floors 1-3 with electric reheat
SCHEMATIC DESIGN REPORT | 129
5 DESIGN NARRATIVES AND ANALYSIS
HVAC OPTION 2 – DOAS WITH SENSIBLE COOLING 1.
New CHW DOAS unit with energy recovery wheel for floors 1-3. Existing chillers serve new DOAS unit (DOAS unit does not require any heating due to climate and energy recovery wheel)
2. Existing air-cooled chillers acts as primary cooling source. Provide new cooling tower for free cooling (based on climate conditions) to sensible cooling terminal equipment as well as heat sink for water-to-water heat pumps to provide heating hot water to perimeter HW radiation 3. Provide hot water radiant system to offset perimeter skin loads 4. Fan Powered Terminal Cooling Units (FPTCU) for perimeter selected high zone cooling load spaces (approximately 50% of total usable floor area) 5. Cooling only (2-pipe) Active Chilled Beams (ACB) for higher load perimeter and interior zone cooling (approximately 26% of total usable floor area) 6. Radiant ceiling panels for low load interior zones (approximately 16% of total usable floor area)
130 | The Center for Connected Learning - Moffitt Library, UC Berkeley
7.
New rooftop VAV air handling units to serve Levels 4 and 5 (to replace existing original VAV units located on Level 1 that currently serve the entire building through large vertical chases)
Systems diagrams and equipment images for the above options are provided on the following pages.
5 DESIGN NARRATIVES AND ANALYSIS
VAV TERMINAL EQUIPMENT
SCHEMATIC DESIGN REPORT | 131
5 DESIGN NARRATIVES AND ANALYSIS
OPTION 1 - AIR-COOLED VRF SYSTEM
AIR-COOLED VRF SYSTEM EQUIPMENT 132 | The Center for Connected Learning - Moffitt Library, UC Berkeley
5 DESIGN NARRATIVES AND ANALYSIS
OPTION 2 – SENSIBLE COOLING SYSTEM
FAN POWERED TERMINAL COOLING UNIT SCHEMATIC DESIGN REPORT | 133
5 DESIGN NARRATIVES AND ANALYSIS
ACTIVE CHILLED BEAMS
RADIANT PANELS ENERGY MODELING Energy ModelingANALYSIS Analysis:
3. No overall building skin changes other than changing existing Levels 1-3 glazing to insulating compare the three identified options detail, models were developed using IEStype with energy Glass U-value winter = 0.29; Summer To compareTo the three identified options above in above in more VE. Due to the early stage of the overall design process, assumptions were developed and agreed upon = 0.26; Glass Shading Coefficient = 0.46 (Similar more detail, energy models were developed using with team of to the allow comparable, energy performance of the three options. The Viracon VE24-2M) IES-VE. Due to the the project early stage overall design relative to
assumptionswere weredeveloped as follows:and agreed process, assumptions 4. Wall U-Value = 0.25 (no added insulation) upon with the project team toLevels allow1-3 comparable, 1. Model only relative energy 2. performance the for three options. Total usableofarea Levels 1-3 of 77,481 SF (based on program data) 5. changing Occupancy of Levels ofglazing 1,180 people at peak 3. No overall building skin changes other than existing Levels1-3 1-3 to insulating (based on Glass program data and code=required The assumptions were follows: type as with Glass U-value winter = 0.29; Summer = 0.26; Shading Coefficient 0.46 (Similar occupant loads by space type) to Viracon VE24-2M) 1.
Model only 4. Levels Wall1-3 U-Value = 0.25 (no added insulation) DOAS peakon outside airdata flowand of 18,500 CFM for 5. Occupancy of Levels 1-3 of 1,180 people6.at peak (based program code required Levels in Option 1 and Option 2 2. Total usable area for Levels 77,481 SF occupant loads1-3 byof space type) (based on program data) 6. DOAS peak outside air flow of 18,500 CFM for Levels in Option 1 and Option 2 7. Lighting power density of 0.5 W/sf
134 | The Center for Connected Learning - Moffitt Library, UC Berkeley
5 DESIGN NARRATIVES AND ANALYSIS
8. Internal equipment power density of 1.0 W/Sf (computers and equipment) 9.
Winter indoor setpoint of 70F and summer setpoint of 76F
10. Occupancy and lighting schedules per the following table (developed based on UCB entrance/exit data as well as more detailed 7. Lighting power density of 0.5 W/sf occupant data for a similar library renovation 8. Internal equipment power density of 1.0 W/Sf (computers and equipment) project at Georgia Tech):
9. Winter indoor setpoint of 70F and summer setpoint of 76F 10. Occupancy and lighting schedules per the following table (developed based on UCB entrance/exit data as well as more detailed occupant data for a similar library renovation project at Georgia Tech):
Time 0100 0200 0300 0400 0500 0600 0700 0800 0900 1000 1100 1200 1300 1400 1500 1600 1700 1800 1900 2000 2100 2200 2300 2400
Typical Day of Max % Weekday % Weekend 50% 0% 50% 0% 40% 0% 20% 0% 10% 0% 10% 0% 10% 0% 20% 10% 40% 10% 40% 30% 40% 30% 50% 40% 60% 40% 60% 40% 70% 50% 80% 60% 90% 70% 90% 70% 100% 70% 100% 70% 90% 70% 90% 60% 80% 60% 70% 50%
Jun-Aug 20% 20% 20% 20% 20% 20% 20% 20% 20% 20% 20% 20% 20% 20% 20% 20% 20% 20% 20% 20% 20% 20% 20% 20%
Monthly Multipliers for Typical Days Sep-Nov 15 Nov 15-Dec 15 Dec 15-Jan 15 Jan 15-Apr 80% 100% 20% 80% 80% 100% 20% 80% 80% 100% 20% 80% 80% 100% 20% 80% 80% 100% 20% 80% 80% 100% 20% 80% 80% 100% 20% 80% 80% 100% 20% 80% 80% 100% 20% 80% 80% 100% 20% 80% 80% 100% 20% 80% 80% 100% 20% 80% 80% 100% 20% 80% 80% 100% 20% 80% 80% 100% 20% 80% 80% 100% 20% 80% 80% 100% 20% 80% 80% 100% 20% 80% 80% 100% 20% 80% 80% 100% 20% 80% 80% 100% 20% 80% 80% 100% 20% 80% 80% 100% 20% 80% 80% 100% 20% 80%
May 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Assumptions on space program and Option 2 sensible equipment and areas used in the modeling are as depicted below: SCHEMATIC DESIGN REPORT | 135
5 DESIGN NARRATIVES AND ANALYSIS
SPACE LAYOUT FOR MODELING
OPTION 2 SENSIBLE SYSTEM LAYOUT FOR MODELING
136 | The Center for Connected Learning - Moffitt Library, UC Berkeley
5 DESIGN NARRATIVES AND ANALYSIS
SPACE PROGRAM FOR MODELING
OPTION 2 SENSIBLE SYSTEM TYPE AREAS FOR MODELING The energy modeling performance results of the three HVAC system options are presented below:
SCHEMATIC DESIGN REPORT | 137
5 DESIGN NARRATIVES AND ANALYSIS
ANNUAL ENERGY USE RESULTS FOR OPTIONS
138 | The Center for Connected Learning - Moffitt Library, UC Berkeley
5 DESIGN NARRATIVES AND ANALYSIS
HVAC SYSTEM ENERGY USE FOR OPTIONS
A cost analysis to compare the options was prepared by the cost consultant, Cumming Corporation. The results of that cost analysis are presented in the table below: HVAC Option Cost Analysis MEP/FP MEP/FP HVAC Only HVAC Only Cost System Cost Cost/SF Cost/SF Baseline - VAV $5,352,160 $69.11 $3,435,520 $44.36 Option 1 - Air Cooled VRF $4,837,840 $62.47 $2,708,240 $34.97 Option 2 - Sensible Cooling $5,410,570 $43.87 $3,242,250 $41.87 Based on all factors, energy savings, ranking criteria and first cost the project team selected Option 1, air cooled VRF as the basis of design for developing the enhanced schematic design submission.
SCHEMATIC DESIGN REPORT | 139
5 DESIGN NARRATIVES AND ANALYSIS
LOW-VOLTAGE TECHNOLOGY NARRATIVE OVERVIEW This document is a Basis-of-Design Narrative for the Low-Voltage Technology (LVT) systems for Levels F1 to F3 at Moffitt Library. The Library will be renovating their existing facility to accommodate new classrooms, maker spaces, and media spaces, as well as updating program and building amenities for students and staff. Our LVT recommendations are based on industry standards and best practices, UC Berkeley design standards documents, responses to Salter discovery questions, and owner input. Each section of this Narrative provides a breakdown of the project goals and a description of each discipline’s subsystems, as well as product examples to establish desired aesthetics and minimum levels of performance. The project will have the following spaces: • Lobbies • Café/Kitchen areas • Public/Student circulation areas • Library Classrooms • GA Classrooms • Staff Conference Rooms • Open and closed office spaces • Staff consulting spaces • Maker Area and adjacent Collaboration areas • Media Suite and adjacent Collaboration areas • Event Spaces • Exhibit spaces
140 | The Center for Connected Learning - Moffitt Library, UC Berkeley
5 DESIGN NARRATIVES AND ANALYSIS
page left intentionally blank SCHEMATIC DESIGN REPORT | 141
5 DESIGN NARRATIVES AND ANALYSIS
TELECOMMUNICATIONS NARRATIVE DEFINITIONS: AP: Wireless Access Point BDF: Building Distribution Frame ER: Equipment Room IDF: Intermediate Distribution Frame IST: Information Services PBX: Private Branch Exchange (or voice system server) TBB: Telecommunications Bonding Backbone TR: Telecommunications Room UPS: Uninterrupted Power Supply
OVERVIEW The telecommunications systems infrastructure will support the following systems: •
Backbone cabling from BDF to each IDF for voice and data connectivity
•
Voice and data device locations for telecom, AV, and security networking
•
Wireless (Wi-Fi) infrastructure, including for outdoor areas
To support the above systems, the design will include the following infrastructure: •
Telecommunications spaces, including the following: •
BDF (also known as Equipment Room): the location for the servers, routers, audiovisual, and other centralized technology equipment; for this building, the BDF is on Level 3
142 | The Center for Connected Learning - Moffitt Library, UC Berkeley
•
IDF (otherwise known as Telecommunications Room): the location on each floor for network, security, and other equipment and cabling
•
Intra-building network cabling (copper voice and data cables, and potentially coaxial cabling)
•
Telecommunications pathways to support the telecommunications cabling within the building
•
Horizontal cabling distribution to support voice and data at device locations
•
Grounding and bonding of the telecommunications system
•
Wireless access point (AP) infrastructure
INCOMING SERVICE PATHWAYS Outside Plant (OSP) Conduit Systems The building is served from the nearest manhole terminating in D84 of the Gardner Stacks, and therefore OSP infrastructure will not be a part of this project. Backbone Pathways A cable riser pathway exists, and is comprised of cable tray out of D84 in the Gardner Stacks’ MPOE down the hall towards the library. About 8’ of no cable support occurs after the cable tray prior to the backbone cables entering 4-4” conduits. The conduits are continuous to the closet on level 2 library IDF.
5 DESIGN NARRATIVES AND ANALYSIS
The plan is to reroute the conduits prior to entering the library as they are currently installed across what will be an open-to-above space in the library. This rerouted pathway will house the backbone cabling to level 3 MDF, as well as a new MDF on level 2. Provide UL system rated 4-inch EZ Path or Hilti Speed Sleeves for riser connections between rooms, and through other rated partitions. A 100% growth factor should be used when calculating the quantity of any UL sleeve system. Populate all 4-inch conduits with innerduct: a 4-inch conduit will have four 1-inch innerducts of different colors, and at minimum one of the conduits must be fully populated with innerduct. IST-Telecom standard colors are blue, black, white, and orange. Horizontal Pathways
the trays and a clear space 1 foot above the trays. When circumstances require, provide a minimum of 2 feet of access every 20 feet to the tray run. Support tray every 4 feet with threaded rod and utilize radius shields on field installed bends and cable drop outs where cables transition between two different heights of tray. Bond all raceways to telecommunications grounding system. Install cable bend radius drop-outs and bushings on all conduits. Similar to Levels 4 and 5, beam penetrations may need to occur for the routing of the horizontal cabling. This will be determined in future design phases. Partition Penetrations Transition the main pathway to large diameter conduits when traversing partitions and utilize firerated UL Listed systems for rated partitions, and non-fire rated EZ Path sleeves where allowed.
The horizontal cable pathway system will be cable basket trays in corridors to within 30 feet of any communications outlet where possible. Finish the cable path with J-Hooks (40 cables or less) spaced at a maximum of 5 feet, routed to 1-1/4-inch conduits stubbed up to devices above (from 5 sq. in. box 3 inches deep, with a single-gang mud ring) conduits routed to cable trays when over hard lids.
Provide Hilti Speed 4-inch firestop sleeves in fire-rated partition penetrations, and 4-inch STI acoustical sleeves for non-fire rated penetrations. Calculate maximum cables and fill for each BDF/ IDF and provide 50% spare capacity in sleeves once all cables are installed.
J-hooks must be rated for Category 6A cables. The basket trays will be solid bottom to hide the cabling. Place pull boxes every 180 degrees of bend of conduit (minimum bend radius: 12 inches), and design such that there are no changes of direction within a pull box.
Interbuilding backbone cabling exists as high-pair count copper and 18 strands of single-mode cable, and multi-mode fiber cable from D84 to the level 3 library MDF. New backbone cable from D84 to the new BDF on level 2 will be comprised of 24 singlemode fiber and 200 pair copper
In general, provide continuous access to one side of
If the possibility of installing 2 small network
Backbone Cabling
SCHEMATIC DESIGN REPORT | 143
5 DESIGN NARRATIVES AND ANALYSIS
cabinets on levels 1 & 2 due to horizontal cable distances (discussed below) is found to be necessary, 12 strands of single-mode plenum-rated armored Corning from the new level 2 MDF would be installed to each cabinet.
installations other than those that directly support those functions. Equipment not related to the support of these rooms (e.g., piping, ductwork, conduit) should not be installed in, pass through, or enter the rooms.
Provide a minimum of 25-pair Category 3 plenum Systimax rated copper cable from BDF to IDF’s (verify with IST)
Communication rooms for Levels 1 to 3 exist. A site survey will be conducted to determine if their current size will be adequate for this project.
Horizontal Cabling
Equipment Rooms
Cabling to data (computer, Wi-Fi) locations will be Category 6A, and 5E for voice.
As described above, these rooms will contain infrastructure for AV, security, voice, and data services. The rooms are to be located so that the overall standards’ requirement for cable length will not exceed 295 feet in total length. Practically speaking, this means that they should be located such that no horizontal distance be greater than about 240 feet from the farthest data or voice connections, as measured along corridors from the back of the serving telecom room. This accounts for cable slack at racks and work area outlets, vertical changes in cable direction, etc.
TELECOMMUNICATIONS SPACES General Requirements As mentioned above, the BDF on Level 3 is the source and common space for backbone cabling, horizontal cabling (for Level 3), grounding systems, and building pathways. The rooms will contain the following: •
Telecommunications, network equipment, audiovisual, possibly CATV, voice and data cabling, and equipment
•
Security-related network cabling and equipment
•
Cable terminations; building entrance protection for incoming copper cables
•
Associated cross connect and/or patch cable wiring
The BDF and IDF’s will not be shared with electrical
144 | The Center for Connected Learning - Moffitt Library, UC Berkeley
Existing cabling and hardware in all telecom rooms will need to be identified and tagged for “To Remain” or “To Be Removed”. A determination of who will provide this hardware and cable ID’s and demolition must be made by campus. As alluded to above, the level 3 MDF will be downgraded to an IDF serving levels 4 and 5 (as it now does). The new MDF on level 2 will serve floors 1-3. Due to the size of the floor plates on levels 1 and 2 and the distance the horizontal cables would need to travel, it seems likely that remote wall cabinets will
5 DESIGN NARRATIVES AND ANALYSIS
need to be installed in the N-W and S-W corners of the building to serve those areas. If a more centralized location can be found for telecom rooms on 1 & 2, the need to install auxiliary wall cabinets would be removed. However, this will need to be studied by the architect as the move would cause a disruption to the approved room layouts on the 2 floors. Specific Requirements
•
The following are additional requirements for the telecommunications systems: •
Electromagnetic interference: Locate telecommunications spaces away from sources of electromagnetic interference, such as electrical power supply transformers, motors, and generators
•
The height between the finished floor and the lowest point of the ceiling in the telecom spaces should be 11 feet (floor to structure) with no ceilings, such as lay-in (ACT) ceilings
•
Walls should be painted a flat white and be full height to the deck above
Plywood backboards: For all communications rooms, provide 3/4-inch thick AC-grade painted (flat white) fire-retardant plywood over the gypsum board with the sheets of 4-foot by 8-foot plywood wrapping all walls. Recommended, but optional: fire-retardant paint.
ELECTRICAL Equipment Service
•
Waterproofing to prevent water ingress
•
Telecommunications spaces will not be located below groundwater level
•
Water or drain pipes that are not directly required in support of the equipment should not be located within the spaces
•
A floor drain should be provided within spaces where there is risk of water infiltration (either from overhead or adjacent spaces)
•
Doors to be a minimum of 36-inches wide by 80-inches high with electronic access control door locks
•
Ceilings
•
Locate two 20A 120v power circuits terminated in an L5-20R above each equipment rack. Mount the circuit boxes to side of overhead floor 1 cable runway; face circuits toward rear circulation aisle. Wire the power circuits with 30A-rated wire for future upgrade of the receptacle and breaker without the need to rewire the circuits. Ensure that the electrical circuit boxes do not impede free operation of the vertical wire manager doors.
•
Provide two vertical PDU’s per rack (Eaton ePDU P/N Epabz74) with L5-20P plug-in rack vertical cable management and in the back of cabinets.
•
If a PBX UPS is required, IST will specify a 5-20R or a 5-30R at the bottom of the vertical wire SCHEMATIC DESIGN REPORT | 145
5 DESIGN NARRATIVES AND ANALYSIS
managers. •
•
If security equipment is housed in the IDF, install a 20A quad receptacle at the wall area servicing the security equipment.
lighting, motor, or other devices – shall be served from these panels.
HVAC •
Provide cooling on a 24/7/365 basis that can be called independent of surrounding space cooling calls. The heat load in communication rooms will be at least one-half of the total wattage capacity supplied to each room.
•
Install a split system (e.g., Mitsubishi Mr. Slim), based on an output of 6,500 BTUs per equipment rack. To be confirmed with mechanical engineer.
•
Cooling system shall operate 24/7 365 days per year, be controlled from within each room, and maintain a temperature between 64°F to 75°F.
Electrical distribution panels serving an IDF are to be located in the IDF.
Convenience Outlets •
Place convenience outlets every 6 feet along the walls, with a minimum of one outlet per wall. Locate these outlets at 12 inches above finished floor so as not to impact wall-mounted equipment.
LIGHTING •
•
•
•
Provide 50 foot-candles of illumination on the vertical surfaces of the wall and rack-mounted equipment. Install shine-down type fixtures with cage-over bulbs. Align fixtures with circulation aisles and locate above and to the side of overhead cable management. Maintain a minimum 12-inch clearance from the top of the upper most cable tray. Install one fixture within room with a batteryoperated ballast (or connection to the building’s emergency generator, if feasible), locate emergency fixture closest to the door. Provide electrical panels in the rooms that are dedicated to communications equipment only. No other loads – such as utility electrical,
146 | The Center for Connected Learning - Moffitt Library, UC Berkeley
Racks and Cabinets •
BDF and IDF’s: 7-foot x 19-inch CPI racks (with seismic gussets) with 6-inch and 10-inch vertical cable managers
•
Chatsworth Products (CPI): 28-inch wide x 36inch deep x 7-foot high lockable cabinets may be utilized for security installation if a “rackmounted” UPS is required
Seismic Bracing Provide seismic bracing for all racks and cabinets as required to maintain the seismic rating of the rack or cabinet: Affix to floors, walls, and install bracing to walls as required.
5 DESIGN NARRATIVES AND ANALYSIS
Cable Runway
•
Install #2/0 row bonding conductors between Technology telecommunications buss bar (TGB) andLow-Voltage each 6 May 2019 Install Universal CPI 18-inch and 24-inch cable row of racks extending to the last rack with #6 runway in all telecom/AV rooms over racks and AWG copper conductors bonded to(TMGB) located in the BDF in the formrack of a bonded telecommunications main ground buss bar cabinets with 6-inch vertical retaining Provideplan on one • posts. Provisionally, stranded/insulated row#4/0 bonding conductor copper bonding conductor (BC) from in the ER to building’s electrical service entrance grounding electrode system runway from walls to runway over racksbar when wall• Install one continuous #3/0 stranded/insulated copper bonding conductor between BDF mounted hardware is present or to be installed. • Ground bars in the rooms will be bonded to the the communications bonding riser BCconductors with exothermic • Install #2/0 row bonding between welds telecommunications buss bar (TGB) and e Telecom Hardware racks extending to the last rack with #6 AWG rack bonded copper conductors bonded to • Bond all metallic conduits other than sleeves to conductor • Ground bars in the rooms will be bonded to thegrounding BC with exothermic • OSP fiber cable is currently terminated on walltelecommunications system.welds Refer • Bond all metallic conduits other than sleeves to telecommunications grounding mount fiber enclosures to the chart below for grounding and bonding system. R chart below for grounding and bonding conductor sizing: conductor sizing: • Terminate incoming and plenum rated riser voice cables on the wall of each room on 300 or 900 Table 1: Sizing of the TBB Cables pair Panduit wall-mount 110 block systems Moffitt Library, Floors 1 to 3 Renovations
TBB Length (in Linear Feet)
•
•
Terminate plenum rated horizontal data cables on rack mounted 2 RU Panduit patch panels Place two RU Panduit horizontal cable management between patch panels
Grounding and Bonding •
•
•
Bonding for the building’s telecommunications system (data/voice) will be to a single-ground referent located in the BDF in the form of a telecommunications main ground buss bar (TMGB) Provisionally, plan on one #4/0 stranded/ insulated copper bonding conductor (BC) from main ground bar in the ER to building’s Systemelectrical Requirements service entrance grounding electrode system
TBB Size AWG
Less than 13
6
14 to 20
4
21 to 26
3
27 to 33
2
34 to 41
1
42 to 52
1/0
53 to 66
2/0
67 to 84
3/0
85 to 105
4/0
106 to 125
250 kcmil
126 to 150
300 kcmil
151 to 175
350 kcmil
176 to 250
500 kcmil
251 to 300
600 kcmil
Greater than 301
750 kcmil
Backbone Cabling Install one continuous #3/0 stranded/insulated • Install 12 strands of single-mode plenum-rated armored Corning cable from BDF to IDF’s copper bonding conductor between BDF and IST) IDF’s for the communications bonding riser •
Provide a minimum of 25-pair Category 3 plenum Systimax rated copper cable from BDF (verify with IST)
Testing Cabling
SCHEMATIC DESIGN REPORT | 147
5 DESIGN NARRATIVES AND ANALYSIS
SYSTEM REQUIREMENTS
outlined above.
Backbone Cabling
Wireless Access Points (AP)
•
Install 12 strands of single-mode plenum-rated armored Corning cable from BDF to IDF’s (verify with IST)
•
Provide a minimum of 25-pair Category 3 plenum Systimax rated copper cable from BDF to IDF’s (verify with IST)
The intent for wireless is to supply high-speed internet/cloud connectivity throughout the building. Coordination will be needed on wireless with IST wireless engineer and construction team. In addition to full coverage on the interior. Wi-Fi will be provided via one CAT6A cable for 802.11ac Wave II devices, with space for a second cable if required in the future.
Testing Cabling All cables will be tested with current Fluke fiber/ copper tester and provide PDF print outs of all test results (summary pages and individual cable tests).
The preferred location of AP will be above ceiling. However, depending on space usage and other factors, they may be installed on walls or surfacemounted to ceilings if required by ceiling constraints.
Cable Colors
Security Systems
•
The planned security system for the new building will rely heavily on IP-networked cameras. Wall -field infrastructure for access control will also require data drops for LAN communication. Data for security will be indicated as, for example, 1D SY (where 1D is one data cable and SY is the nomenclature to indicate a security requirement), and to refer to security details and devices for other information such as mounting heights.
Data cabling for the project will be terminated in rack-mounted patch panels, and voice on 110 wall blocks with the ports colored to match cabling (refer to cabling color designations below). CAT6 for data, security, and audiovisual cabling will use the following colors: •
Data = blue; voice (CAT5e) = white; surveillance cameras = black; access control (card readers) = yellow; audiovisual = green
•
CAT6A wireless cabling = yellow
Audiovisual Systems
Supported Telecommunications Systems There will be a variety of networking and buildingwide systems supported by the infrastructure
148 | The Center for Connected Learning - Moffitt Library, UC Berkeley
AV equipment racks, LCD displays, floor boxes, and video projectors will require LAN connectivity. Data for AV will be indicated as 1D AV, 2D AV, 4D AV, etc.
5 DESIGN NARRATIVES AND ANALYSIS
page left intentionally blank SCHEMATIC DESIGN REPORT | 149
5 DESIGN NARRATIVES AND ANALYSIS
ELECTRONIC SECURITY NARRATIVE OVERVIEW The goal of the electronic security systems is control and monitoring of the building entries, lobbies, high security areas, and the exterior areas. In addition to this document, the design and construction of security systems must comply with the latest editions of: •
IST Telecommunications Standards
•
UC Lab Standards
•
UC Berkeley Real Estate Campus Design Standards
The electronic security system consists of the following subsystems:
All ACS panels must be equipped with a batteryoperated stand-by power supply capable of continuously operating the system (including any associated signal circuit to the UCPD) for a period of eight (8) continuous hours in case of the loss of commercial power. The ACS is to be designed in conjunction with the building architecture to assist the Owner in establishing layered control zones of access. Refer to the drawings for card reader locations. Access control panels communicate with the main Software House server via IP addressing on a restricted UCPD subnet.
•
Access control system
The UCPD Crime Prevention Unit shall review the ACC shop drawings for approval prior to installation.
•
Video surveillance system
Card Readers
•
Door management alarms and emergency exit monitoring
The card readers are to support both 125 KHz proximity cards, and 13.56 MHz smart card formats.
•
Elevator landing two-way communication system
ACCESS CONTROL SYSTEM (ACS) The ACS will be an extension of the campus Software House ACS. The Contractor shall be an authorized dealer for Software House hardware as well as HID card readers and be thoroughly familiar with all aspects of the access control hardware. Only prequalified University vendors may install security systems.
150 | The Center for Connected Learning - Moffitt Library, UC Berkeley
Manufacturer: HID R series Elevator Control Elevator cabs will have a card reader to control the elevator floor selection buttons. Duress alarms Provide a covert duress button in the main lobby reception desk. The button will be connected to the intrusion detection system panel.
5 DESIGN NARRATIVES AND ANALYSIS
ACS integration
•
Building exterior
The ACS will be integrated with both the video surveillance system and the intrusion detection system. The intrusion detection system will report alarm and supervisory conditions to the ACS, which will be recorded in the historical log.
•
Elevator cabs
•
Minimum fixed-camera resolution will be 1080p; higher resolution or multi-imager cameras are needed for cameras with wide fields of view, or long-distance views.
•
At the points of pedestrian entry, the camera resolution, positioning, and technology will be selected to recognize facial details
•
Cameras are to be rated for vandal resistance of IK10, to have day-night mechanical cut filters, and Wide Dynamic Range (WDR)
•
Exterior cameras are to be rated at IP66
•
Exterior single-imager cameras will have built in IR illuminators to improve low-light level camera performance Acceptable camera manufacturers are: Axis, Bosch, and Hanwha.
VIDEO SURVEILLANCE SYSTEM (VSS) The IP-based high definition video surveillance system will be designed to communicate on a restricted UCPD subnet. The VSS is an extension of the campus Genetec Video Management System. •
The UCPD Crime Prevention Unit shall review the VSS shop drawings for approval prior to installation
•
Video storage for the cameras will be sufficient to provide 21 days of storage at full resolution, and at continuous recording
•
UCPD will provide the video storage servers, located off site
INTRUSION DETECTION SYSTEM (IDS)
•
The PoE network switches (802.3af) will be provided by IST; cameras requiring power that exceeds 802.3af standards will be by contractorprovided power injectors
The facility will have IDS control panel to monitor the duress alarm at the reception desk. The facility tenants will have access to the building 24x7, so intrusion detection sensors are not required.
•
Drawings for camera locations will include the following spaces:
• Alarms and supervisory notifications will be sent to the UCPD digital alarm receiver
•
Building entries
• Coordinate with UCPD Lock Shop on communication technology for the IDS panel
•
Main lobby and reception desk SCHEMATIC DESIGN REPORT | 151
5 DESIGN NARRATIVES AND ANALYSIS
Acceptable manufacturer: Bosch G series alarm panel
DOOR MANAGEMENT ALARMS (DMA) AND EMERGENCY EXIT (EE) MONITORING All exterior doors will have a local audible alarm to discourage use of the door and propping it open. These alarms will be monitored by the ACS. All egress doors will have a DMA with a local door prop sounder and will be monitored by the ACS. The local sounder will activate after a field adjustable time period. The ACS will receive an alarm after a second field adjustable time-period expires. The ACS timer is independent of the local sounder timer. A key-operated switch, and an ACS output can deactivate the alarm, on a schedule, during move-ins, or construction. Coordinate with the UCPD on the key cylinder and key for the DMA and EE devices. Acceptable manufacturers include: DSI Model ES4200
AUDIO SECURITY COMMUNICATION SYSTEMS ELEVATOR Landing two-way Communications System ADA and fire codes require an elevator landing twoway communications system at all elevator landings above the level of discharge. These intercoms will call the fire command center and the UCPD. Appropriate signage will be located near each areaof-refuge calling stations. The system installation must meet the requirements laid out in NFPA 72 including Circuit Integrity with two-hour rated cabling. 152 | The Center for Connected Learning - Moffitt Library, UC Berkeley
Acceptable manufacturers include: Rath and Cornell
COMMUNICATIONS The electronic security systems will require structured cabling and static IP addresses for the following: •
IP cameras
•
Access control and intrusion detection systems panels
A dedicated security network, with Power over Ethernet (PoE) network switches, will be provided by IST. Coordinate with IST on campus cybersecurity requirements MAC addresses, and port assignments. Pathways and Cable All exposed wiring runs shall be enclosed in conduit or wire mold. The IP cabling will be installed by the Division 27 telecom contractor. Cabling for the IP cameras, access controllers, workstations, and intercoms will be the same type of category cable used in IT horizontal data cable infrastructure. This cabling must conform to IST standards for testing and labeling. Non-IP cabling, such as for card readers and locks, will run in separate pathways to avoid interference with signals on the IP cabling.
EMERGENCY POWER The building has an emergency generator to power security system equipment. The network switches, servers, and cameras will be powered by a UPS. The UPS will provide 15 minutes of power to accommodate the switchover to generator power.
5 DESIGN NARRATIVES AND ANALYSIS
Acceptable manufacturers include: APC, Eaton, and Minuteman
SECURITY WALL FIELDS Mount access control and security panels to the plywood backboard wall field in the designated telecommunication rooms. Each security wall field will require 4-foot by 8-foot section of fire treated plywood.
STANDARDS AND GUARANTEES Refer to Section 28 00 00 Electronic Safety and Security of the current UC Berkeley Real Estate Campus Design Standards.
Mechanical •
The security wall fields could produce approximately 1,000 BTU/hr. of heat.
Electrical •
The wall field security equipment to be served by dedicated emergency power (20-amp 120VAC circuit), for security use only.
•
A quad receptacle is required for plug-in transformers.
SYSTEM DOCUMENTATION Refer to Section 28 00 00 Electronic Safety and Security of the current UC Berkeley Real Estate Campus Design Standards.
SYSTEM TESTING, INSPECTION AND ACCEPTANCE Refer to Section 28 00 00 Electronic Safety and Security of the current UC Berkeley Real Estate Campus Design Standards.
SCHEMATIC DESIGN REPORT | 153
5 DESIGN NARRATIVES AND ANALYSIS
AUDIOVISUAL NARRATIVE OVERVIEW Audiovisual (AV) design for the project will support the following areas and systems: • • • • • • • •
Lobbies and/or circulation areas Free Speech Dining Spaces Learning Spaces GA Active Learning Classrooms Staff Conference Rooms Maker Area and adjacent Collaboration areas Media Suite and adjacent Collaboration areas Event Space
will be immediately and intuitively available as sources to display in the same room, while video and audio from other rooms or spaces will be segmented to “advanced” pages on the touch panel. This will allow the system to be easy to use for simple setup, while allowing flexibility for advanced routing scenarios without confusing non-technical users. AV headend equipment, such as audio processing and routing DSP, audio amplifiers, BYOD devices, video encoders, and TV headend gear, will be housed in MDF or IDF racks associated with each space, or within dedicated AV spaces such as Level 3 AV/ Storage closet.
GENERAL
Room Scheduling Displays
AV systems will be intuitive to use for firsttime users, with clear instructions on screen for connection of devices. Basic controls, such as system on/off, source selection, and volume control will be clearly labeled. Where more complex functionality is required, instructions will be given via control touch panel, display system, or laminated instruction sheet to minimize support required from staff. Devices easily accessible by students or the public will be secured to prevent theft and vandalism.
Conference rooms, classrooms, and other spaces that can be scheduled to use will feature a room scheduling display outside of the door to display room availability and event/reservation schedule. Room scheduling displays will allow users to reserve the room ad-hoc on the display itself during unreserved times. The room scheduling system could potentially allow students and staff to make reservations with their student or staff ID via nearfield communication (NFC), if the ID cards support this functionality.
Given the nature of the spaces, and the potential to share content between spaces within the building, we recommend using IP video encoders at each HDMI input, and IP video decoders at each display or projector. This will allow video and audio to be routed to anywhere in the building, or simply to the adjacent display. Video sources local in the rooms
Assistive Listening Systems (ALS)
154 | The Center for Connected Learning - Moffitt Library, UC Berkeley
Per ADA requirements, each space with audio systems shall be provided with an Assistive Listening System (ALS) for the hearing-impaired. These systems may be permanently installed within the room, or a wall plate may be provided for
5 DESIGN NARRATIVES AND ANALYSIS
portable units to be connected to when the need arises. Note that the portable option requires staff to support and connect the devices.
•
LOBBIES AND CIRCULATION AREAS Video •
•
Wall-mounted LCD displays, LCD video wall, or direct-view LED video wall for student project showcase, building information, video content, or any other content deemed suitable by the Library
HDMI inputs adjacent to each LCD display will automatically route user device content (such as laptop computers) to associated display •
FREE SPEECH DINING AREA(S) Video •
Wall-mounted 2x2 55” LCD video wall, or direct-view LED video wall for student project showcase, building information, video content, or any other content deemed suitable by the Library
LEARNING STUDIO (MULTI), LEVEL 2 Learning Studio (Multi) on Level 2 is a reconfigurable space with no fixed furniture to allow flexible environment for many types of presentations, instructor or student-led classes, and collaboration. This space will include the following functionality:
•
•
Large-format 4K UHD LCD displays on (3) walls
Touch panel display will allow non-adjacent HDMI sources, including those outside of room to route to displays via “advanced” touch panel user interface pages
Single wireless “BYOD” (Bring-Your-OwnDevice) presentation system to allow wireless connection of user devices (such as tablets or smart phones) to displays via touch panel user interface
Audio •
Wall-mounted loudspeakers flanking screen/ display for audio associated with video sources
•
Wireless microphone system for voice reinforcement during larger presentations or events
Control •
Video
Note, we recommend video projection in any room where the distance from the display surface to the further viewer is 24 feet or more due to available LCD display sizes and cost.
Control touch panel on wall adjacent to each LCD display for AV system on/off, source selection, and volume control
SCHEMATIC DESIGN REPORT | 155
5 DESIGN NARRATIVES AND ANALYSIS
LEARNING STUDIO (MULTI), LEVEL 3 Learning Studio (Multi) on Level 3 is a reconfigurable space with no fixed furniture to allow flexible environment for many types of presentations, instructor or student-led classes, and collaboration. There is a moveable partition to separate the space from the adjacent Flex Event/ Study Space. This space will include the following functionality: Video •
•
•
•
Note, we recommend video projection in any room where the distance from the display surface to the further viewer is 24 feet or more due to available LCD display sizes and cost. Current room layout will make wall-mounted LCD placement difficult; where LCD displays are difficult to wall-mount, a ceilingmounted option is recommended.
HDMI inputs adjacent to each LCD display will automatically route user device content (such as laptop computers) to associated display •
Audio •
Ceiling-mounted loudspeakers for audio associated with video sources
•
Wireless microphone system for voice reinforcement during larger presentations or events
Control
Large-format 4K UHD LCD displays on (3) walls •
smart phones) to displays via touch panel user interface
•
LEARNING STUDIO (MEDIA) Learning Studio (Media) is a reconfigurable space with no fixed furniture to allow flexible environment for many types of presentations, instructor or student-led classes, and collaboration. This space will include the following functionality: Video •
Touch panel display will allow non-adjacent HDMI sources, including those outside of room to route to displays via “advanced” touch panel user interface pages
Single wireless “BYOD” (Bring-Your-OwnDevice) presentation system to allow wireless connection of user devices (such as tablets or
156 | The Center for Connected Learning - Moffitt Library, UC Berkeley
Control touch panel on wall adjacent to each LCD display for AV system on/off, source selection, and volume control
Single large-format 4K UHD LCD display on front wall •
•
Note, we recommend video projection in any room where the distance from the display surface to the further viewer is 24 feet or more due to available LCD display sizes and cost.
HDMI inputs at (3) walls in room to allow
5 DESIGN NARRATIVES AND ANALYSIS
flexibility in presentation locations •
Display will auto-switch between HDMI wall plate inputs based on last HDMI cable connected
•
Auto-switching may be overridden via touch panel user interface
•
We recommend video projection in any room where the distance from the display surface to the further viewer is 24 feet or more due to available LCD display sizes and cost
•
Learning stations not positioned against a wall will not have any LCD displays or HDMI connection points
Audio
Audio
•
Ceiling-mounted loudspeakers for audio associated with video sources
•
•
Wireless microphone system for voice reinforcement during larger presentations or events
Control •
Control •
Control touch panel on wall for AV system on/ off, source selection, and volume control
GA ACTIVE LEARNING CLASSROOMS We assume GA Classrooms will be similar to “Basic HD Room (Analog and Digital input) Type 1D” from the University of California, Berkeley Classroom Technology Standards Version 2.1; however, given the more modular layout of the space, adjustments to these standards are recommended. The space will include the following functionality:
LCD displays at each learning station adjacent to a wall for connection of user devices via HDMI and VGA +audio wall plate or table box
Control button panel on wall adjacent to display for AV system on/off, source selection, and volume control
STAFF CONFERENCE ROOMS Video •
Single LCD display appropriately size for the room based on Avixa display sizing standards
•
HDMI input at table for connection of user devices (such as laptop computers) to display system
•
Wireless “BYOD” (Bring-Your-Own-Device) presentation system to allow wireless connection of user devices (such as tablets or smart phones) to display system
•
USB camera mounted under display for softcodec video conferencing (i.e. Skype, Zoom, etc.)
Video •
Wall-mounted loudspeakers flanking screen/ display for audio associated with video sources
SCHEMATIC DESIGN REPORT | 157
5 DESIGN NARRATIVES AND ANALYSIS
via installed computer Audio •
Ceiling loudspeakers for audio associated with video sources and far end participants of video conferencing calls
Control •
Control button panel on wall for LCD display on/ off, source selection, and volume control
MEDIA SUITE Video
•
Tabletop microphone(s) for video conferencing
•
Tabletop conference phone for audio conferencing
•
LCD display with HDMI input underneath for connection of user devices (such as laptop computers)
Control
Audio
•
•
Control touch panel on table for AV system on/ off, source selection, and volume control
Audio associated with video via internal LCD display loudspeakers
Equipment Racks/Cabinets
Control
•
•
Equipment rack within credenza or millwork, or in adjacent closet for AV headend equipment associated with room (i.e. video switching, audio processing, audio amplifiers, etc.)
Control button panel on wall for LCD display on/ off, source selection, and volume control
EVENT SPACE
MAKER AREA
Video
Video
•
Large-format video projection system with video projector on motorized lift and motorized projection screen recessed in ceiling
•
HDMI input at presentation location for connection of user devices (such as laptop computers) to display system
• LCD display with HDMI input underneath for connection of user devices (such as laptop computers) Audio •
Audio associated with video via internal LCD display loudspeakers
158 | The Center for Connected Learning - Moffitt Library, UC Berkeley
5 DESIGN NARRATIVES AND ANALYSIS
Audio
Mechanical
•
Ceiling loudspeakers for audio associated with video sources
•
Avoid vibrations from mechanical systems that could cause video images to shake
•
Bluetooth receiver for wireless connection of user devices (such as tablets or smart phones) for back-ground music during events
•
Each AV equipment rack could produce approximately 14,000 Btu of heat
•
If AV equipment is housed in millwork cabinets, the equipment will produce approximately 3,500 Btuh of heat and should be ventilated accordingly; it might be possible to passively ventilate the millwork with a cool-air intake at the bottom of the cabinet and warm-air exhaust at the top of the cabinet
Control •
Control button panel on wall for AV system on/ off, source selection, and volume control
Equipment Racks/Cabinets •
Equipment rack within credenza or millwork, or in adjacent closet for AV headend equipment associated with room (i.e. video switching, audio processing, audio amplifiers, etc.)
Electrical •
All audiovisual equipment to be served by dedicated circuits, for audiovisual use only; no inductive loads (such as motors or lighting) are to be served by these circuits
•
Typical LCD display requires double-duplex outlet and network data adjacent to junction box
•
Floor boxes and poke-thru devices centered in room under conference table (U.O.N.) and will require internal single duplex “convenience” outlet, flush-mounted with stainless steel plate
•
“AV” input/output wall plates require adjacent single duplex “convenience” outlet
•
Each audiovisual equipment rack will require two
AUDIOVISUAL COORDINATION Architectural •
General coordination of power and data for AV, as well as equipment placement
•
Structural backing, 120V AC power, and data are recommended at AV device locations including flat panel displays, video projectors, AV input/ output locations, and equipment racks
•
Black-out shades should be considered for audiovisual spaces with windows and are highly recommended for media-rich rooms
SCHEMATIC DESIGN REPORT | 159
5 DESIGN NARRATIVES AND ANALYSIS
double-duplex outlets each on dedicated 20 amp circuits (contractor to confirm final equipment load and provide adequate power to each audiovisual equipment rack) •
Ground all AV power circuits to the same building service ground via a low-impedance conductor
•
Label and provide pull strings for all conduits
160 | The Center for Connected Learning - Moffitt Library, UC Berkeley
5 DESIGN NARRATIVES AND ANALYSIS
page left intentionally blank SCHEMATIC DESIGN REPORT | 161
5 DESIGN NARRATIVES AND ANALYSIS
ACOUSTICS NARRATIVE SECTION 1: SOUND-ISOLATION ASSEMBLIES Walls
3. We have assumed that the private spaces in the disability services area are private offices or consultation rooms. We can discuss further as the design is finalized.
1. Based on our review of the room layouts, we have developed recommendations for the demising wall assemblies. Attached Figures 1 to 3 are markups of the floor plans showing the recommended wall types. A description of the various wall types is below, and in the attached Figures 4 to 8.
4. We have used Type A walls between the GA Active Learning and the adjacent open study spaces due to the entry doors and the glass wall. This is also true for the library class on Level 2.
• Wall Type A: Insulated single-stud partition with one layer of gypsum board on each side
5. We have assumed that all locations on the floor plan markup that show a single-line partition are
• Wall Type B: Insulated single-stud partition with three total layers of gypsum board
floor-to-ceiling glass partitions. We understand 1/2inch glass will be used.
• Wall Type C: Insulated single-stud partition with two layers of gypsum board on each side
It should be noted that sound isolation will be reduced with the use of the floor-to-ceiling glass partitions. If speech privacy between enclosed areas is desired, gypsum board partitions should be used.
• Wall Type D: Double-stud assembly with one layer of gypsum board on each side
Interior Glazing
Floor-Ceiling Assembly • Wall Type E: Insulated furred wall with one layer of gypsum board At locations where Wall Types B through E is used, the walls should extend full-height to the structure above. Where Wall Type A is used, the gypsum board should extend at least six inches above the acoustical ceiling tile. 2. We understand you are incorporating an operable acoustical barrier between Flex Event and Library Instructional. If a horizontal moving partition will be used, Modernfold can be considered.
162 | The Center for Connected Learning - Moffitt Library, UC Berkeley
6. Spaces where carpet and ACT will be used should provide sufficient impact noise isolation for typical use. Where there are hard-surfaced floors on Levels 2 and 3, an acoustical underlayment (e.g., 2-mm Pliteq RST02) should be used under the finish floor. We can provide updated recommendations when we receive finish and reflected ceiling plans. 7. The Flex Event space is currently located over the Recording Booth. If there is amplified music or hardsurfaced flooring in the Flex Event space, music or footfall noise might be audible in the Recording Booth. To reduce noise transfer into the Recording
5 DESIGN NARRATIVES AND ANALYSIS
Booth, we recommend a spring-isolated ceiling in the Recording Booth, as shown in Figure 9.
such.
SECTION 3: ROOM ACOUSTICS
Doors 8. Sound-gasketed doors should be used at the classrooms, consult rooms, conference rooms, maker spaces, VR edit suites, and event space. The gasketing should be as shown in Figure 10. 9. Production Studio Recording Booth should have a sound-rated door. As a placeholder, we recommend an STC 45 door. This can be discussed further based on your goals for the Recording Booth.
SECTION 2: SOUND-ISOLATING DETAILS 1. Layers of gypsum board at sound-rated partitions (e.g., Wall Types A through E) need to be held back 1/4 inch from intersecting surfaces (e.g., floor, ceiling, and walls) and caulked airtight with acoustical sealant. Acceptable acoustical sealants include USG Sheetrock Acoustical Sealant, Tremco, or Pecora BA-98. At fire-rated or exposed conditions, USG or Pecora AC-20 sealants are acoustically acceptable.
1. Sound-absorbing treatment is typically needed to reduce excessive noise “build-up” and reverberation in sound-sensitive spaces. Acoustical tile ceilings with a minimum NRC of 0.80 should adequately control reverberation in most spaces. Appendix A lists various additional acoustical treatments that can be considered. 2. In enclosed consult rooms and classrooms, we have assumed that carpet and acoustical ceiling tile be used. If possible, we recommend placing 1-inch thick absorptive wall panels on two adjacent walls. The wall panels should extend upwards at least four feet, starting at 36 inches above the finish floor. We can refine the location of this absorption as the design progresses. 3. In open areas, we recommend that acoustical tile ceilings or clouds will be used over the seating areas.
SECTION 4: BACKGROUND NOISE LEVELS Mechanical Equipment
2. Duct, pipe, and conduit penetrations through sound-rated partitions should be treated as shown in Figures 11 to 14. Recesses in sound-rated partitions should be treated as shown in Figure 15. 3.Electrical outlet boxes in plumbing walls or on opposite sides of sound-rated partitions should be separated by 16 inches and one empty stud bay (as shown in Figure 16). They should be treated with putty pads on all open sides. Low-voltage devices should be placed in outlet boxes and treated as
Noise Reduction Coefficient (NRC) – A measure of the acoustical absorption performance of a material, calculated by averaging its sound absorption coefficients at 250, 500, 1000, and 2000 Hz, expressed to the nearest multiple of 0.05. An NRC of 0.00 is completely reflective and an NRC of 1.00 is completely absorptive. American Society of Heating, Refrigerating, and AirConditioning Engineers
SCHEMATIC DESIGN REPORT | 163
n
5 DESIGN NARRATIVES AND ANALYSIS
Noise Criteria (NC) – The most widely used singlenumber rating scheme to specify acceptable background noise levels in rooms.
over corridors or non-noise sensitive spaces.
We understand that the project mechanical design is in progress but could consist of several new mechanical units. Noise generated by fans, airflow through ducts, and VAV boxes should be reduced to meet the criteria shown below in Table 1. The room criteria are in accordance with ASHRAE guidelines.
Sound masking is an electronic “white noise” system used to improve speech privacy within office spaces. Masking systems are fairly typical in openplan spaces, and have become standard in most government officespaces (those developed by the US General Services Administration).
In addition to the above background noise We understand thatyou the should project mechanical design is in recommendations, avoid locating VAV progress but enclosed could consist of several new mechanical boxes above classrooms, or the Recording units. Noise generated by fans, airflow through ducts, Booth. Instead, this equipment should be located
The masking system involves a series of speakers, located above the ceiling tiles, which are connected to a central control panel that sets both the overall level and its spectrum, i.e., how it sounds. Two recommended sound-masking system manufacturers are Logison and Lencore.
and VAV boxes should be reduced to meet the criteria shown below in Table 1. The room criteria are in accordance with ASHRAE guidelines. Table 1: Recommended Background HVAC Noise Levels 2
s
n
e
k
e
Noise Criterion (NC)
Maximum Airspeed in Register Neck, fpm
Production Studio Recording Booth
25
325
VR Suite, VR Edit Rooms
30
380
Consult, Computer Labs, Media Service, Classrooms, Library Instructional Space, Flex Event
35
450
Open Areas, Computer Areas, Corridors, Private Dining
40
Room
3
650
In addition to the above background noise recommendations, you should avoid locating VAV boxes above enclosed classrooms, or the Recording Booth. Instead, this equipment should be located over corridors or non-noise sensitive spaces. 164 | The Center for Connected Learning - Moffitt Library, UC Berkeley
Sound Masking Sound masking is an electronic “white noise” system
Sound Masking
Sound masking improves speech privacy by increasing overall background noise levels within a space, making it more difficult to understand conversations that are farther from you or on the other side of a wall or door. Masking also helps reduce the potential for activities in one area of an open-plan office to be distracting to a wide area of nearby desks. This is because nearby occupants would be less able to differentiate the masking noise from other sources (e.g., paper shuffling, keyboards, furniture movement). Masking also provides calibrated, uniform background noise that compensates for the variability of other sources of noise such as HVAC and traffic. The masking system can be “ramped” up and down during the day to provide louder background noise levels when the spaces are more occupied. The masking system provides uniform background noise in the open-plan spaces.
5 DESIGN NARRATIVES AND ANALYSIS
We recommend that sound masking be used throughout the library, including in the open-plan spaces and in the classrooms.
SECTION 5: MEP SYSTEM NOISE AND VIBRATION REDUCTION Since the MEP design is not available, we are providing the following “typical” recommendations for any new installations. We can revise these recommendations once we receive updated information on the equipment selections and duct layouts. Noise 1. To avoid “cross-talk” issues in ductwork between adjacent enclosed spaces, there should be a minimum of three duct turns or three feet of acoustical flexible duct between the spaces. 2. Avoid locating medium and high-pressure ductwork (e.g., over 1500 fpm) over enclosed spaces that have background criteria of NC 35 or below (see Section 4). Vibration 3.The MEP equipment is to be vibration isolated per the most recent edition of the ASHRAE Handbook for HVAC Applications. We will provide specific isolation recommendations for the equipment once it is selected. 4. The vibration isolators should be as follows unless stated otherwise: Unhoused springs should be equal to Mason SLFH Spring-and-neoprene hangers should be equal to Mason 30N Captive neoprene
mounts should be equal to Mason BR Neoprene waffle pads should be 40 durometer and equal to Mason Super W (with Mason HG grommets at the bolt connections)Seismic snubbers should be equal to Mason Z-1225 5. Springs should be unhoused. Where necessary, separate seismic snubbers should be used. 6. The acoustical vibration isolation should not compromise seismic code requirements and viceversa. 7. All attachments to vibration-isolated equipment should be made flexible: twin-sphere rubber connectors for pipes, bellows type canvas for ducts, and flexible hose for conduit. Metal-braided hose connectors are not considered acoustically flexible. 8. Supply water, waste, drain, condenser water, and rainwater leaders should be vibration isolated from the structure, other piping, ductwork, gypsum board, etc. This includes pipe penetrations through framing, pipes running along framing members, and hangers. This applies for all pipes attached to a partition adjacent to occupied spaces and also to pipes suspended from structure that supports the floor of occupied spaces. 9. The contractor should submit proposed plumbing isolation devices for approval. The orange-andblue Acousto-Plumb system, the blue-and-white Hubbard Holdrite Silencer system, and the Trisolator system are acceptable. 10. Hangers should incorporate minimum 1/4-inch thick sticky-back felt or ribbed neoprene between the hanger and the supported pipes. The isolation SCHEMATIC DESIGN REPORT | 165
5 DESIGN NARRATIVES AND ANALYSIS
intended should be cut so that it wraps completely around the pipe. In addition, the isolation material should extend out a minimum 1/4 inch past the hanger edges. The Hubbard Silencer 300 and 320 Series of neoprene-lined hangers are acceptable manufactured pre-isolated hangers. Alternatively, non-isolated hangers can be purchased and the isolation material added in the field. 11. At trapeze and unistrut installations, a resilient material should be required between the piping and the clamp. If a “resilient” insert is to be used, it should be submitted to verify that it is sufficiently acoustically resilient; some “cushioned” inserts are actually not resilient. Calcium silicate is not acoustically resilient. Hydro-craft Hydro-Strut and Hubbard Holdrite Silencer Systems are both acceptable. 12. 3/4-inch thick neoprene waffle pads (Mason Super W, Hubbard Holdrite Silencer 275, or approved equal) are needed between pipe riser clamps and the structure. 13. All stud and joist spaces that include piping should have a minimum of R-11 (3-1/2-inch thick) batt insulation installed.
SECTION 6: OPERABLE PARTITION SPECIFICATION INPUT Below is the included specification input for acoustical operable partitions.
The intent of specifying operable partition acoustical characteristics is to assure adequate noise reduction between the divided spaces when the operable partitions are closed. The manufacturer is responsible for the overall sound isolation between divisible spaces. This includes not only the acoustical performance of the partition itself but also any necessary ancillary hardware and surrounding building constructions. 1.1 Codes and Standards The installed partition shall comply with the following and as specified herein: • ASTM E90: Laboratory measurement of airborne sound transmission loss of building partitions. • ASTM E336: Measurement of airborne sound insulation in buildings. • ASTM E413: Determination of Sound Transmission Class. • ASTM E557: Architectural application and installation of operable partitions. 1.2 Work Included Supply and install complete operable partition system including overhead track and acoustical seals. 1.3 Submit With Bid Submit acoustical test reports and references for at least three projects of similar size and scope that have been in operation for a minimum of five years.
1.0 General 2.0 Materials
166 | The Center for Connected Learning - Moffitt Library, UC Berkeley
5 DESIGN NARRATIVES AND ANALYSIS
Provide an operable partition system meeting the minimum laboratory rating of STC 50 and a minimum field rating of NIC 42. Acceptable Manufacturers: Advanced Equipment Co. Industrial Acoustics Co. Noise Barriers, LLC QuietLite MAARSNanawall 3.0 Installation Install the partition in accordance with ASTM E557. A partition manufacturer shall review and comment on the related permanent building construction around the operable partition to match the required acoustical performance. 4.0 Installed Acoustical Performance The field-installed performance will be verified at the Owner’s option by an independent acoustical consultant. Acoustical tests shall be performed in general accordance with ASTM E336 with special conditions as follows: 14. Due to the large size of the space and difficulty in establishing a diffuse sound field, the noise source (i.e., loudspeaker) may be directed toward the partition but not be closer than 20 feet. The source room levels shall have uniformity of ±2 dBC approximately five-feet in front of the partition under test. 15.The source and receiver room sound pressure levels will be measured across the width of the room and spatially averaged at approximately 10 feet
from the partition. 16. The minimum acceptable installed performance is Noise Isolation Class 42. In addition, the absolute minimum acceptable noise reductions achieved in any one octave band are as follows: Should the installed partition fail to meet the specified acoustical performance requirements, the installing contractor shall inspect the complete installation and make any adjustments and/or modifications as required. The cost of additional testing to determine compliance and materials/ labor required to bring the partition into compliance shall be the sole obligation of the installing contractor and/or partition manufacturer.
APPENDIX A: ACOUSTICAL PRODUCTS A minimum NRC rating of 0.80 should be used when selecting acoustical finishes. Acoustical wall finishes should be located between 3 feet to 7 feet above the finish floor. Acoustical ceilings should be located over as much of the available ceiling areas as feasible, with a concentration over seating areas. We’re available to discuss the various finishes with you further. 1. Unfaced Absorption Panels (any fabric would need to be reviewed separately) – for use at ceilings •Sound Away Cotton Panels https://www.soundaway.com/ultraquiet-cottonpanels-s/91.htm • Echo Eliminator https://www.acousticalsurfaces.com/echo_ eliminator/wall_panel.htm SCHEMATIC DESIGN REPORT | 167
5 DESIGN NARRATIVES AND ANALYSIS
2. Acoustical Plaster – for use at ceilings • K13 by International Cellulose Corporation http://www.spray-on.com/products/k13/ • StarSilent Panel System by Pyrok http://www.starsilent.com/ • Ultra Fellert by Fellert Acoustical Plaster http://www.fellert.com/products/ •BASWAphon by BASWA Acoustic https://www.baswana.com/products/baswaphon 3.Fabric-wrapped panels (minimum 1-inch thick) – for use at ceilings or walls •Quietspace by Autex http://www.autexacoustics.com/acoustics/ quietspace-panel/ • AP or HIR#1 by Decoustics http://www.decoustics.com/products/Fabric/ Acoustical-Wall-Panel • A-100 or IR-108 by Wall Technology http://conweddesignscape.com/products/wallpanels/ 4. Felt (minimum 1-inch thick) – for use at ceilings or walls • Ecoustic by Unika Vaev https://unikavaev.com/products/ecoustic-felt/ 5. ACT – for use at ceilings • Optima, Ultima, and other products by Armstrong
168 | The Center for Connected Learning - Moffitt Library, UC Berkeley
https://www.armstrongceilings.com/ commercial/en-us/commercial-ceilings-walls/ mineral-fiber-and-fiberglass-ceiling-tiles.html • Gedina and other products by Ecophon http://www.ecophon.com/uk/products/Modularceilings/Gedina/
5 DESIGN NARRATIVES AND ANALYSIS
page left intentionally blank SCHEMATIC DESIGN REPORT | 169
5 DESIGN NARRATIVES AND ANALYSIS
DAYLIGHTING ANALYSIS OVERVIEW The goals for the project included a focus on internal connectivity between floor levels as well as improving the quality of views and natural daylighting. The primary measures included in the analysis results included replacement of exterior glazing with high performance, low E glass and the addition of selected opening in the floor plates between levels. The results of the analysis presented below indicate significant improvement in the penetration of daylight to the renovated spaces. General: The analysis effort was developed using Radiance for modeling of daylighting. The results presented
170 | The Center for Connected Learning - Moffitt Library, UC Berkeley
below demonstrate the existing and proposed design daylighting in building section and plan views for March 21 at noon on a clear, sunny sky day and on December 21 at noon on an overcast sky. The plan views that follow the sections depict the proposed daylight results on September 21 at noon on a sunny day.
5 DESIGN NARRATIVES AND ANALYSIS
SCHEMATIC DESIGN REPORT | 171
5 DESIGN NARRATIVES AND ANALYSIS
172 | The Center for Connected Learning - Moffitt Library, UC Berkeley
5 DESIGN NARRATIVES AND ANALYSIS
SCHEMATIC DESIGN REPORT | 173
5 DESIGN NARRATIVES AND ANALYSIS
174 | The Center for Connected Learning - Moffitt Library, UC Berkeley
5 DESIGN NARRATIVES AND ANALYSIS
page left intentionally blank SCHEMATIC DESIGN REPORT | 175
5 DESIGN NARRATIVES AND ANALYSIS
FIRE PROTECTION NARRATIVE OVERVIEW Fire Sprinkler System
Standpipe Systems
The fire protection systems serving the building currently consist of standpipes and a partialcoverage automatic sprinkler system serving all areas but the 3rd floor and balconies. A combination sprinkler and manual wet standpipe was recently installed in Stair 1 along with the installation of the Level 4 and 5 sprinkler systems in accordance with the 2013 Editions of NFPA 13 and 14, and it is believed that the standpipe is Class I. This standpipe serves all floors of the building. Additionally, this standpipe feeds a cross-main that then serves a standpipe fire hose valve connection at the intermediate landing of between Levels 3 and 4 of Stair 6. A window sprinkler system was installed to protect both sides of existing glass adjacent to egress on Level 4. It is anticipated that a majority of the building will be classified as a Light Hazard occupancy with minor Ordinary Hazard occupancies in accordance with NFPA 13. The 3rd floor has no sprinkler protection, although the combination standpipe currently has a floor control assembly at the third floor for future use. Primary water supply is served by the City water source, and no on-site secondary water supply will exist for the building. Further on-site investigation is required to confirm the above statements.
Standpipe systems are required to be provided in new buildings and structures in accordance with CBC Section 905.1, and must be installed in
A full coverage automatic sprinkler system will be installed for the 3rd floor and remaining unprotected spaces (i.e. balconies) that require coverage in accordance with NFPA 13. Quick Response sprinklers shall be installed.
176 | The Center for Connected Learning - Moffitt Library, UC Berkeley
accordance with NFPA 14, as amended by the CBC. Combined sprinkler standpipe systems are allowed in accordance with CBC Section 905.3. When buildings have occupied floors located more than 30 feet above the lowest level of fire department access, Class III standpipes are required at each floor. However, Class I standpipes are allowed in lieu of Class III standpipes when the building is fully sprinklered in accordance with CBC Section 903.3.1.1 or 903.3.1.2. If a Class I standpipe is installed, hose connections shall be provided in the following locations: 1. In every required interior exit stairway, a hose connection shall be provided for each story above and below grade. Hose connections shall be located at an intermediate landing between stories, unless otherwise approved by the fire code official. See Section 909.20.2.3 for additional provisions in smokeproof enclosures. 2. On each side of the wall adjacent to the exit opening of a horizontal exit. a. Exception: Where floor areas adjacent to a horizontal exit are reachable from an interior exit stairway hose connections by a nozzle attached to 100 feet (30 480 mm) of hose as measured along the path of travel, a hose connection shall not be required at the
5 DESIGN NARRATIVES AND ANALYSIS
horizontal exit. 3. In every exit passageway, at the entrance from the exit passageway to other areas of a building. a. Exception: Where floor areas adjacent to an exit passageway are reachable from an interior exit stairway hose connection by a 30-foot (9144 mm) hose stream from a nozzle attached to 100 feet (30 480 mm) of hose, a hose connection shall not be required at the entrance from the exit passageway to other areas of the building.
of the standpipe systems not located within an interior exit stairway shall be protected by a degree of fire resistance equal to that required for vertical enclosures in the building in which they are located. Exception: In buildings equipped throughout with an approved automatic sprinkler system, laterals that are not located within an interior exit stairway are not required to be enclosed within fire-resistance-rated construction. In buildings where more than one standpipe is provided, the standpipes shall be interconnected in accordance with NFPA 14. Automatic Sprinkler System
4. Where the roof has a slope less than four units vertical in 12 units horizontal (33.3-percent slope), a hose connection shall be located to serve the roof or at the highest landing of an interior exit stairway with access to the roof provided in accordance with Section 1011.12. 5. Where the most remote portion of a floor or story is more than 150 feet (45 720 mm) from a hose connection, the fire code official is authorized to require that additional hose connections be provided in approved locations. The distances from a hose connection shall be measured along the path of travel. If a Class III standpipe is installed, hose connections shall be located as required for Class I standpipes and shall have Class II hose connections located and accessible such that all portions of the building are within 30 feet of a listed variable stream fog nozzle attached to 100 feet of hose. Risers and laterals
An automatic sprinkler system shall be provided throughout buildings used as Group A occupancies in accordance with CBC Section 903.2.1. The automatic sprinkler system shall be provided throughout all stories from the Group A occupancy to and including the levels of exit discharge serving the Group A occupancy. The system shall be installed throughout in accordance with NFPA 13 as amended in Chapter 35 of the CBC, except as provided in the exempt locations listed in CBC Section 903.3.1.1.2. Fire Alarm System A fire alarm system is currently provided on all levels of the existing building. However, the upgrades to Levels 4 and 5 have used a newly model system with the remaining lower three floors on an obsolete system. The proposed renovation will upgrade and combine all into one modern integrated system.
SCHEMATIC DESIGN REPORT | 177
5 DESIGN NARRATIVES AND ANALYSIS
Activation of the fire alarm system by smoke/ heat detection, manual pull station, or sprinkler water flow will initialize the occupant notification via emergency voice communication speakers and strobe visual indicators.
178 | The Center for Connected Learning - Moffitt Library, UC Berkeley
5 DESIGN NARRATIVES AND ANALYSIS
page left intentionally blank SCHEMATIC DESIGN REPORT | 179
5 DESIGN NARRATIVES AND ANALYSIS
FOOD SERVICE DESIGN AND EQUIPMENT OVERVIEW The food service schematic design and equipment list for the new Free Speech Movement Cafe was completed in coordination with the architect and the schematic design of the Moffitt Library project. The following information represents a schematic
B29 B30 B31 B32 B33 B34
DISHTABLE, CLEAN DISHTABLE, SOILED TUBULAR WALL SHELF PRE-RINSE UNIT W/ ADD-ON FAUCET 3-COMPARTMENT SINK MILK CRATE DOLLY
REMARKS
3' - 0"
SELF-CONTAINED NIKEC, BY OWNER NIKEC, BY MILLWORK
CONNECTS TO COFFEE BREWERS #F05
W/ 6" REAR & SIDE SPLASHES, & FAUCET W/ .5 GPM AERATOR
NIKEC, BY ARCHITECT
14' - 11"
DESCRIPTION DISPLAY MERCHANDISER P.O.S SYSTEM FRONT COUNTER OPEN NUMBER HOT WATER DISPENSER COFFEE BREWER, TWIN, 1.5-GAL. WATER FILTER THERMAL COFFEE DISPENSER COFFEE GRINDER DUMP SINK, DROP-IN BLENDER MICROWAVE/IMPINGEMENT OVEN ESPRESSO CAPPUCCINO MACHINE WATER FILTER FOR ESPRESSO MACHINE ESPRESSO COFFEE GRINDER ESPRESSO COFFEE GRINDER FOOD SHIELD BACK COUNTER W/ HAND SINK KNOCK CHUTE, DROP-IN TRASH CONTAINER, 23-GAL., SLIM JIM REACH-IN U/C REFRIGERATOR U/C ICE MACHINE WATER FILTER FOR U/C ICE MACHINE PASS-THRU WINDOW BACK COUNTER W/ HAND SINK SANDWICH/SALAD FOOD PREP REFRIGERATOR SANDWICH/SALAD FOOD PREP REFRIGERATOR PASS-THRU REFIRGERATOR, 2-SECTION PASS-THRU REFRIGERATOR, 3-SECTION PLASTIC SHELVING UNIT, MOBILE SHELVING, WALL MOUNTED SLICER INDUCTION RANGE, COUNTERTOP FOOD BLENDER COVEYOR TOASTER BACK COUNTER WITH PREP SINK TRASH CONTAINER, 23-GAL., SLIM JIM WALK-IN REFRIGERATOR EVAPORATOR COIL - REFRIGERATOR REMOTE CONDENSING UNIT PLASTIC SHELVING UNIT PLASTIC SHELVING UNIT, MOBILE UTILITY / BUSSING CART REACH-IN FREEZER PASS-THRU SHELF SANDWICH/SALAD FOOD PREP REFRIGERATOR PLASTIC SHELVING UNIT, MOBILE PLASTIC SHELVING UNIT, MOBILE HAND SINK, WALL-MOUNTED DESK & CHAIR ONE-WAY WINDOW PLASTIC SHELVING UNIT, MOBILE PLASTIC SHELVING UNIT, MOBILE OPEN NUMBER MOP SINK CABINET TUBULAR WALL SHELF DISHWASHER, DOOR-TYPE, VENTLESS
RECTANGULAR, 6"X6"X5"; INSTALLED IN-COUNTER TOP SELF-CONTAINED WATER FILTER FOR ICE MACHINE
SELF-CONTAINED SELF-CONTAINED SELF-CONTAINED SELF-CONTAINED
REMOTE REF SYS PART OF #B09 INCLUDES WALK-IN REFRIGERATOR
22' - 11 1/2"
QTY 2 3 1 1 1 1 1 2 2 1 4 2 2 2 1 1 1 1 1 3 2 1 2 1 1 1 1 1 2 1 1 1 1 1 1 1 4 1 1 1 2 1 1 1 1 1 1 1 2 1 1 2 2 1 1 1 1 1 1 1 2 1 1 2
SELF-CONTAINED SELF-CONTAINED
W/ SOAP & TOWEL DISPENSER NIKEC, BY ARCHITECT NIKEC BY ARCHITECT
6"
ITEM NO F01 F02 F03 F04 F05 F06 F06A F07 F08 F09 F10 F11 F12 F12A F13 F14 F15 F16 F17 F18 F19 F20 F20A F21 F22 F23 F24 F25 F26 B01 B02 B03 B04 B05 B06 B07 B08 B09 B10 B11 B12 B13 B14 B15 B16 B17 B18 B19 B20 B21 B22 B23 B24 B25 B26 B27 B28
approach to food service and an anticipated equipment list. Organization and layout was done in coordination with representative of the University of 2 California Berkeley.
VENTLESS CONDENSATE HOOD
180 | The Center for Connected Learning - Moffitt Library, UC Berkeley
5 DESIGN NARRATIVES AND ANALYSIS
2
3
3' - 2"
14' - 11"
17'-11"
3' - 0"
35' - 6 3/8"
22' - 11 1/2"
E
6"
F
34' - 8"
SCHEMATIC DESIGN REPORT | 181
5 DESIGN AND ANALYSIS Estimate - No. NARRATIVES 01 4/2/2019
#19-0176 - UC Berkeley Moffitt Library - FSM Café
Project ITEM
QTY
DESCRIPTION
FAB
F01 F02 F03 F04 F05 F06 F06A F07 F08 F09 F10 F11 F12 F12A
2 3 1 2 1 1 1 2 2 1 4 1 2 2
F13 F14 F15 F16 F17 F18
2 2 1 1 1 3
DISPLAY MERCHANDISER P.O.S SYSTEM FRONT COUNTER SHELVING, WALL MOUNTED HOT WATER DISPENSER COFFEE BREWER, TWIN, 1.5-GAL. WATER FILTER THERMAL COFFEE DISPENSER COFFEE GRINDER DUMP SINK, DROP-IN BLENDER DISPOSABLE CUP DISPENSER ESPRESSO CAPPUCCINO MACHINE WATER FILTER FOR ESPRESSO MACHINE ESPRESSO COFFEE GRINDER ESPRESSO COFFEE GRINDER OPEN NUMBER FAB BACK COUNTER W/ HAND SINK KNOCK CHUTE, DROP-IN TRASH CONTAINER, 23-GAL., SLIM JIM
F19 F20 F20A
2 1 2
REACH-IN U/C REFRIGERATOR U/C ICE MACHINE WATER FILTER FOR U/C ICE MACHINE
F21 F22 F23
1 1 1
F24
1
F25
2
F26
2
B01 B02 B03 B04 B05 B06 B07 B08
3 1 1 1 1 1 1 4
PASS-THRU WINDOW FAB BACK COUNTER W/ HAND SINK SANDWICH/SALAD FOOD PREP REFRIGERATOR SANDWICH/SALAD FOOD PREP REFRIGERATOR PASS-THRU REFIRGERATOR, 2SECTION PASS-THRU REFRIGERATOR, 3SECTION PLASTIC SHELVING UNIT, MOBILE SHELVING, WALL MOUNTED SLICER INDUCTION RANGE, COUNTERTOP FOOD BLENDER COVEYOR TOASTER FAB BACK COUNTER WITH PREP SINK TRASH CONTAINER, 23-GAL., SLIM JIM
B09 B10
1 1
WALK-IN REFRIGERATOR EVAPORATOR COIL - REFRIGERATOR
B11 B12 B13 B14 B15
1 2 1 1 1
REMOTE CONDENSING UNIT PLASTIC SHELVING UNIT PLASTIC SHELVING UNIT, MOBILE UTILITY / BUSSING CART REACH-IN FREEZER
FOODSERVICE BUDGET ESTIMATE
182 | The Center for Connected Learning - Moffitt Library, UC Berkeley
FOODSERVICE ESTIMATE
REMARKS
32,484 SELF-CONTAINED NIKEC, BY OWNER NIKEC, BY MILLWORK 412 571 1,870 1,047 506 1,690 893 5,665 75 38,280 214 4,150 2,211 13,781 44 132 7,014 SELF-CONTAINED 2,229 422 1,073 12,351 4,839 6,741 18,457 24,734 1,914 117 8,750 671 487 645 8,875 176 16,997
SELF-CONTAINED SELF-CONTAINED SELF-CONTAINED SELF-CONTAINED
Included in item B09
4,340 1,363 735 192 7,349 SELF-CONTAINED 1 of 2
Estimate - No. 01 4/2/2019
5 DESIGN NARRATIVES AND ANALYSIS
#19-0176 - UC Berkeley Moffitt Library - FSM Café
Project ITEM
QTY
DESCRIPTION
FAB
F01 F02 F03 F04 F05 F06 F06A F07 F08 F09 F10 F11 F12 F12A
2 3 1 2 1 1 1 2 2 1 4 1 2 2
F13 F14 F15 F16 F17 F18
2 2 1 1 1 3
DISPLAY MERCHANDISER P.O.S SYSTEM FRONT COUNTER SHELVING, WALL MOUNTED HOT WATER DISPENSER COFFEE BREWER, TWIN, 1.5-GAL. WATER FILTER THERMAL COFFEE DISPENSER COFFEE GRINDER DUMP SINK, DROP-IN BLENDER DISPOSABLE CUP DISPENSER ESPRESSO CAPPUCCINO MACHINE WATER FILTER FOR ESPRESSO MACHINE ESPRESSO COFFEE GRINDER ESPRESSO COFFEE GRINDER OPEN NUMBER FAB BACK COUNTER W/ HAND SINK KNOCK CHUTE, DROP-IN TRASH CONTAINER, 23-GAL., SLIM JIM
F19 F20 F20A
2 1 2
REACH-IN U/C REFRIGERATOR U/C ICE MACHINE WATER FILTER FOR U/C ICE MACHINE
F21 F22 F23
1 1 1
F24
1
F25
2
F26
2
B01 B02 B03 B04 B05 B06 B07 B08
3 1 1 1 1 1 1 4
PASS-THRU WINDOW FAB BACK COUNTER W/ HAND SINK SANDWICH/SALAD FOOD PREP REFRIGERATOR SANDWICH/SALAD FOOD PREP REFRIGERATOR PASS-THRU REFIRGERATOR, 2SECTION PASS-THRU REFRIGERATOR, 3SECTION PLASTIC SHELVING UNIT, MOBILE SHELVING, WALL MOUNTED SLICER INDUCTION RANGE, COUNTERTOP FOOD BLENDER COVEYOR TOASTER FAB BACK COUNTER WITH PREP SINK TRASH CONTAINER, 23-GAL., SLIM JIM
B09 B10
1 1
WALK-IN REFRIGERATOR EVAPORATOR COIL - REFRIGERATOR
B11 B12 B13 B14 B15
1 2 1 1 1
REMOTE CONDENSING UNIT PLASTIC SHELVING UNIT PLASTIC SHELVING UNIT, MOBILE UTILITY / BUSSING CART REACH-IN FREEZER
FOODSERVICE BUDGET ESTIMATE
FOODSERVICE ESTIMATE
REMARKS
32,484 SELF-CONTAINED NIKEC, BY OWNER NIKEC, BY MILLWORK 412 571 1,870 1,047 506 1,690 893 5,665 75 38,280 214 4,150 2,211 13,781 44 132 7,014 SELF-CONTAINED 2,229 422 1,073 12,351 4,839 6,741 18,457 24,734 1,914 117 8,750 671 487 645 8,875 176 16,997
SELF-CONTAINED SELF-CONTAINED SELF-CONTAINED SELF-CONTAINED
Included in item B09
4,340 1,363 735 192 7,349 SELF-CONTAINED 1 of 2
SCHEMATIC DESIGN REPORT | 183
6 STATEMENT OF PROBABLE COST SUMMARY
Blank Page
184 | The Center for Connected Learning - Moffitt Library, UC Berkeley
6 STATEMENT OF PROBABLE COST SUMMARY
6 STATEMENT OF PROBABLE COST
SCHEMATIC DESIGN REPORT | 185
6 STATEMENT OF PROBABLE COST SUMMARY
UC Berkeley Moffitt Library Renovation Berkeley, CA Schematic Design Statement of Probable Cost May 28, 2019 Cumming Project No. 19-00112.00
Revision 2
Prepared for bnim
15015 AVENUE OF SCIENCE, SUITE 160 • SAN DIEGO • CALIFORNIA • 92128 PHONE: 858-485-6765 • FAX: 858-673-9263
186 | The Center for Connected Learning - Moffitt Library, UC Berkeley
6 STATEMENT OF PROBABLE COST SUMMARY
UC Berkeley Moffitt Library Renovation
Berkeley, CA Schematic Design SOPC
Project # 19-00112.00 05/28/19
TABLE OF CONTENTS Page 1. Project Introduction Executive Summary
3
2. Cost Summaries Summary
4
3. Construction Cost Back Up Moffit Library Renovation
5
4. Appendix Appendix 1 - Approach & Methodology
22
Prepared by
Page 2 of 24
SCHEMATIC DESIGN REPORT | 187
6 STATEMENT OF PROBABLE COST SUMMARY
UC Berkeley Moffitt Library Renovation
Berkeley, CA Schematic Design SOPC
Project # 19-00112.00 05/28/19
EXECUTIVE SUMMARY 1.1 Introduction This estimate has been prepared, pursuant to an agreement between bnim and Cumming, for the purpose of establishing a probable cost of construction at the Schematic Design stage. The project scope encompasses renovation of approximately 91,025 interior square feet on Levels 1, 2, 3, 4 and 5 of the existing Moffitt Library. Also included is approximately 10,700 square feet of site improvements. 1.2 Cost Estimation Breakdown The total estimated construction cost within our cost report is summarized below: Moffit Library Renovation
Description A. Direct Costs
$25,254,205
Subtotal Direct Costs
$25,254,205
B. Indirect Costs B1 - GCs B2 - GRs B3 - Bonds & Insurance B4 - GC Fee B5 - Design Contingency B6 - CM Contingency
8.00% 4.00% 2.70% 5.00% 10.00% 5.00%
$2,020,336 $1,090,982 $765,869 $1,456,570 $3,058,796 $1,682,338
Subtotal Indirect Costs
$10,074,891
Subtotal Estimated Construction Costs
$35,329,097
B7 - Escalation to MOC
16.59%
$5,861,452
Total Estimated Construction Costs w/Escalation 1.3 Project Schedule Design & Engineering Construction
$41,190,548
Start Jan-21 Jun-22
Finish Jun-22 Nov-23
1.4 Key Assumptions & Exclusions This document should be read in association with Appendix 1 which outline assumptions, project understanding, approach, and cost management methodology. Key assumptions built into the above cost breakdown include: Key Assumptions - CM@Risk - Phased Construction - Normal Working Hours - Selective Demolition Included
Key Exclusions - Project Soft Costs - Department Relocation - Seismic Upgrades - FF&E, AV Equipment etc.
Prepared by
188 | The Center for Connected Learning - Moffitt Library, UC Berkeley
Page 3 of 24
6 STATEMENT OF PROBABLE COST SUMMARY
UC Berkeley Moffitt Library Renovation
Berkeley, CA Schematic Design SOPC
Project # 19-00112.00 05/28/19
SUMMARY Element
Cost / SF
Total
91,025 SF
$388.13
$35,329,097
91,025 SF
$388.13
$35,329,097
91,025 SF
$64.39
$5,861,452
91,025 SF
$452.52
$41,190,548
Library Renovation Scope
81,625 SF
$418.78
$34,182,761
General Assignment Classroom Renovation Scope
9,400 SF
$350.00
$3,290,000
HVAC Controls (Division 25)
91,025 SF
$13.25
$1,206,315
IT Network Upgrades (Division 27)
91,025 SF
$21.86
$1,989,433
Electrical Enabling Scope - Medium-Voltage Switch / Tap Block
91,025 SF
$2.33
$211,704
Electrical Enabling Scope - 250 kW Generator
91,025 SF
$3.41
$310,335
Moffit Library Renovation Subtotal Estimated Construction Cost Escalation to MOC, 03/01/23 Total Estimated Construction Cost w/Escalation
Area
Scope of Work Breakouts
Alternates
Total
Alternate 1 - Levels 4 & 5 Exterior Glazing Replacement
91,025
$20.95
$1,910,000
Alternate 2 - Level 3 South Plaza Enhancements
91,025
$3.20
$300,000
Alternate 3 - Level 3 West Terrace PV Canopy
91,025
$8.52
$780,000
Alternate 4 - New Exterior Dirt Pick-Up Resistant Finish
91,025
$4.08
$380,000
Alternate 5 - New PV Panels on Roof
91,025
$24.54
$2,240,000
Alternate 6 - 500kW Generator in lieu of 250kW
91,025
$2.49
$230,000
Prepared by
Page 4 of 24
SCHEMATIC DESIGN REPORT | 189
6 STATEMENT OF PROBABLE COST SUMMARY
UC Berkeley Moffitt Library Renovation
Berkeley, CA Schematic Design SOPC
Project # 19-00112.00 05/28/19
Moffit Library Renovation
Prepared by
190 | The Center for Connected Learning - Moffitt Library, UC Berkeley
Page 5 of 24
6 STATEMENT OF PROBABLE COST SUMMARY
UC Berkeley Moffitt Library Renovation
Berkeley, CA Schematic Design SOPC
Project # 19-00112.00 05/28/19
SUMMARY - MOFFIT LIBRARY RENOVATION Element 01 02 03 04 05 06 07 08 09 10 11 12 13 14 21 22 23 25 26 27 28 31 32 33
Total
General Requirements Existing Conditions Concrete Masonry Metals Wood, Plastics, And Composites Thermal And Moisture Protection Openings Finishes Specialties Equipment Furnishings Special Construction Conveying Systems Fire Suppression Plumbing HVAC Integrated Automation Electrical Communications Electrical Safety And Security Earthwork Exterior Improvements Utilities
Cost / SF $1,397,515 $598,993
$15.35 $6.58
$643,744 $162,125 $105,343 $3,284,055 $4,520,571 $926,305
$7.07 $1.78 $1.16 $36.08 $49.66 $10.18
$17,020
$0.19
$100,000 $409,965 $1,138,881 $4,509,330 $739,600 $4,515,362 $1,219,735 $532,496 $20,000 $382,416 $30,750
$1.10 $4.50 $12.51 $49.54 $8.13 $49.61 $13.40 $5.85 $0.22 $4.20 $0.34
Subtotal General Conditions
8.00%
$25,254,205 $2,020,336
$277.44 $22.20
Subtotal General Requirements
4.00%
$27,274,542 $1,090,982
$299.64 $11.99
Subtotal Bonds, Insurance & SDI
2.70%
$28,365,524 $765,869
$311.62 $8.41
Subtotal Contractor's Fee
5.00%
$29,131,393 $1,456,570
$320.04 $16.00
Subtotal Design Contingency
10.00%
$30,587,962 $3,058,796
$336.04 $33.60
Subtotal Construction Manager Contingency
5.00%
$33,646,759 $1,682,338
$369.64 $18.48
$35,329,097
$388.13
$5,861,452
$64.39
$41,190,548
$452.52
SUBTOTAL ESTIMATED CONSTRUCTION COST Escalation to MOC, 03/01/23
16.59%
TOTAL ESTIMATED CONSTRUCTION COST w/ESCALATION Total Area:
Prepared by
91,025 SF
Page 6 of 24
SCHEMATIC DESIGN REPORT | 191
6 STATEMENT OF PROBABLE COST SUMMARY
UC Berkeley Moffitt Library Renovation
Berkeley, CA Schematic Design SOPC
Project # 19-00112.00 05/28/19
DETAIL ELEMENTS - MOFFIT LIBRARY RENOVATION Element
Quantity
Unit
Unit Cost
Total
01 General Requirements Included w/Markups, see Summary Sheet Total - General Requirements 02 Existing Conditions Selective site preparation & demolition West Terrace, 1st floor Clear / grub / remove plantings Tree protection fencing Remove existing wood fence Remove trees Sawcut & remove existing site wall Sawcut & demolish concrete paving / steps Miscellaneous demolition, allowance
4,122 513 26 4 72 3,065 1
sf lf lf ea lf sf ls
$1.00 $15.00 $10.00 $1,300.00 $100.00 $6.00 $2,200.00
$4,122 $7,695 $260 $5,200 $7,200 $18,390 $2,200
South Plaza, 3rd floor Demolish concrete furnishings Remove & salvage monument signage and newspaper stands Sawcut & demolish concrete topping slabs Miscellaneous demolition, allowance
5 1 600 1
ea ls sf ls
$1,000.00 $3,500.00 $20.00 $1,100.00
$5,000 $3,500 $12,000 $1,100
East Courtyard, 4th floor Demolish & remove concrete topping slabs Miscellaneous demolition, allowance
4,230 1
sf ls
$20.00 $4,300.00
$84,600 $4,300
Selective exterior demolition Demolish exterior precast concrete wall panels Remove exterior storefront system Remove exterior doors, single Remove exterior doors, double Remove exterior doors, glazed system, single Remove exterior doors, glazed system, double Demolish exterior soffits Remove roofing system down to structure Remove, salvage & store rooftop furniture Demolish pre-cast curbs Demolish guardrails at 4th floor roof level Demolish exterior terrace canopy Remove exterior staircase Remove planting area Demolish & remove concrete topping slabs at 3rd floor
8,156 1,278 9 3 1 7 3,000 1,330 1 419 160 1,730 1 625 3,635
sf sf ea ea ea ea sf sf ls lf lf sf flt sf sf
$10.00 $15.00 $175.00 $200.00 $200.00 $225.00 $5.00 $5.00 $2,500.00 $5.00 $6.00 $5.00 $3,500.00 $1.50 $15.00
$81,560 $19,170 $1,575 $600 $200 $1,575 $15,000 $6,650 $2,500 $2,095 $960 $8,650 $3,500 $938 $54,525
Selective interior demolition Demolish interior partitions, non structural Demolish interior partitions, CMU block wall Demolish interior partitions, concrete wall
45,132 2,420 2,750
sf sf sf
$2.50 $3.50 $4.00
$112,830 $8,470 $11,000
Prepared by
192 | The Center for Connected Learning - Moffitt Library, UC Berkeley
Page 7 of 24
6 STATEMENT OF PROBABLE COST SUMMARY
UC Berkeley Moffitt Library Renovation
Berkeley, CA Schematic Design SOPC
Project # 19-00112.00 05/28/19
DETAIL ELEMENTS - MOFFIT LIBRARY RENOVATION Element
Quantity Demolish interior precast concrete wall panels Demolish concrete curbs Remove flooring Remove existing ceiling systems Remove interior doors and frames, single Remove interior doors and frames, double Remove interior staircases Demolish casework, building specialties etc. Cut new structural openings in suspended slabs
Miscellaneous demolition Miscellaneous demolition, allowance Materials handling Off-haul and dump fees Temporary Protection Protect existing conditions
Unit
Unit Cost
Total
3,655 100 91,025 62,943 88 12 13 91,025 3,180
sf lf sf sf ea ea flt sf sf
$10.00 $8.00 $1.50 $2.25 $150.00 $175.00 $3,500.00 $0.75 $85.00
$36,550 $800 $136,500 $141,600 $13,200 $2,100 $45,500 $68,300 $270,300
91,025 1 1
sf ls ls
$0.50 $62,400.00 $62,400.00
$45,500 $62,400 $62,400
1
ls
$25,000.00
$25,000
Total - Existing Conditions
$1,397,515
03 Concrete Substructure Floor infill, slab on grade, 4" doweled into existing Infill stepped flooring in lecture rooms, average 5' deep Miscellaneous structural repairs, connections, reinforcing, allowance
3,130 541 91,025
sf cy sf
$25.00 $150.00 $0.25
$78,250 $81,148 $22,756
Floor Structure Structural floor infill at elevated slabs, 6" Elevated slab edge condition at new openings, poured & doweled into existing New concrete beams, 10" x 20", tied into existing structure Lightweight concrete topping slab / infill, 2.5" Lightweight concrete topping slab / infill, 5" Lightweight concrete topping slab / infill, 5.5" Concrete curb
1,345 385 12 485 8,225 1,414 562
sf sf cy sf sf sf lf
$60.50 $70.00 $2,500.00 $8.35 $10.60 $11.65 $25.00
$81,373 $26,950 $28,935 $4,050 $87,185 $16,473 $14,050
Roof Structure Equipment pads
1,797
sf
$20.00
$35,940
Reinforcement FRP wrap to existing concrete beams, 6" wide strips @ 24" o.c. FRP wrap to existing concrete joists, 6" wide strips @ 9" o.c. FRP wrap to existing slabs, 2 way carbon mesh Saw cut existing concrete beams and joists for FRP termination Clean and prep concrete for FRP wrap
1,975 327 689 613 2,991
sf sf sf lf sf
$27.60 $34.50 $69.00 $1.75 $2.50
$54,510 $11,282 $47,541 $1,073 $7,478
Total - Concrete
Prepared by
$598,993
Page 8 of 24
SCHEMATIC DESIGN REPORT | 193
6 STATEMENT OF PROBABLE COST SUMMARY
UC Berkeley Moffitt Library Renovation
Berkeley, CA Schematic Design SOPC
Project # 19-00112.00 05/28/19
DETAIL ELEMENTS - MOFFIT LIBRARY RENOVATION Element
Quantity
Unit
Unit Cost
Total
05 Metals Floor Structure Structural infill, incl. steel beams, 3-1/4" lightweight concrete topping over 18 GA metal decking Supplemental structure for curtainwall, headers, etc., allowance Structural steel, wide flange Miscellaneous plates, bolts, anchors and connections Roof Structure Structural steel, wide flange at skylight Miscellaneous plates, bolts, anchors and connections, at skylight
878
sf
$40.00
$35,120
16 0.8 0.1
tn tn tn
$6,200.00 $6,200.00 $7,500.00
$99,200 $4,743 $574
6.5 0.7
tn tn
$6,200.00 $7,500.00
$40,418 $4,889
Miscellaneous Structural modifications / seismic upgrades (part of separate project) Stairs, interior Glass guard rails, floor openings Stair, custom metal stair, incl. glass guardrails, and hardware, 7'W, 1flt New stairwell
Excluded 348 2 1
lf ea ea
$600.00 $75,000.00 $100,000.00
Total - Metals
$208,800 $150,000 $100,000 $643,744
06 Wood, Plastics, And Composites Interior Millwork Base cabinets & countertops Wall cabinets Information desks, wood veneer Work countertops, wall mounted, wood veneer Wood veneer drink rail Built-in wood bench Miscellaneous millwork, allowance
35 35 97 100 32 31 1
lf lf lf lf lf lf ls
$375.00 $250.00 $750.00 $225.00 $200.00 $600.00 $20,000.00
Total - Wood, Plastics, And Composites
$13,125 $8,750 $72,750 $22,500 $6,400 $18,600 $20,000 $162,125
07 Thermal And Moisture Protection Patch and repair existing roofing / waterproofing New mechanical screen, perforated metal Modifications to existing rooftop mechanical shafts & housing Mechanical curbs at rooftop Waterproofing to slab/paving Total - Thermal And Moisture Protection
Prepared by
194 | The Center for Connected Learning - Moffitt Library, UC Berkeley
1,330 108 1 118 4,497
sf lf ls lf sf
$18.00 $350.00 $10,000.00 $18.00 $7.00
$23,940 $37,800 $10,000 $2,124 $31,479 $105,343
Page 9 of 24
6 STATEMENT OF PROBABLE COST SUMMARY
UC Berkeley Moffitt Library Renovation
Berkeley, CA Schematic Design SOPC
Project # 19-00112.00 05/28/19
DETAIL ELEMENTS - MOFFIT LIBRARY RENOVATION Element
Quantity
Unit
Unit Cost
Total
08 Openings Exterior Doors Aluminum storefront door w/ dark bronze finish Single Double Retrofit existing doorway w/ new gates, metal infill panel Premiums Panic hardware, per leaf Automatic door opener Exterior Glazing Aluminum storefront walls, butt-glazed w/ double pane vision glass Glass skylight including structural steel framing, walkable Interior Doors HM door in HM frame, incl. hardware Single Double HM pivot door in HM frame, incl. hardware Single Double Wood veneer pivot door in HM frame, incl. hardware Double Coiling doors Overhead coiling security grille, 13'-0" x 10'-0" Side coiling security grille, 20'-0" x 10'-0" h Premiums Panic hardware, per leaf, allowance Interior Glazing Interior glass wall, U-channel framed Glass door, swing, single Glass door, sliding, single Glass door, sliding, pair
11 4 2
ea ea ea
$4,500.00 $7,250.00 $5,000.00
$49,500 $29,000 $10,000
13 4
ea ea
$1,096.41 $10,000.00
$14,253 $40,000
5,592 1,266
sf sf
$225.00 $550.00
$1,258,200 $696,300
77 4
ea pr
$2,750.00 $5,500.00
$211,750 $22,000
4 3
ea pr
$3,000.00 $5,800.00
$12,000 $17,400
7
pr
$6,500.00
$45,500
1 1
ea ea
$12,000.00 $15,000.00
$12,000 $15,000
13
ea
$1,123.21
$14,602
4,620 3 19 19
sf ea ea ea
$135.00 $3,500.00 $3,850.00 $6,800.00
$623,700 $10,500 $73,150 $129,200
Total - Openings
$3,284,055
09 Finishes Exterior Walls Metal stud framing, 6" 18 Ga. at 16" o.c. Exterior Wall Insulation Sheathing Rigid insulation Sound batt insulation Gypsum Board to Interior of Exterior Interior of exterior, 5/8" thick, type X, finished
Prepared by
395
sf
$20.00
$7,900
395 395 395
sf sf sf
$5.00 $4.00 $3.00
$1,975 $1,580 $1,185
395
sf
$5.50
$2,173
Page 10 of 24
SCHEMATIC DESIGN REPORT | 195
6 STATEMENT OF PROBABLE COST SUMMARY
UC Berkeley Moffitt Library Renovation
Berkeley, CA Schematic Design SOPC
Project # 19-00112.00 05/28/19
DETAIL ELEMENTS - MOFFIT LIBRARY RENOVATION Element
Quantity Exterior Plaster, Machine Finish Exterior plaster, walls Miscellaneous Exterior finish to existing, allowance
Interior Partitions Interior Metal Studs Interior metal stud furring, 2 1/2", 20 Ga., at 24" o.c. Interior metal stud framing, 4" CH, 20 ga, at 24" o.c., shaft walls Interior metal stud framing, 6", 16 Ga., at 16" o.c. Gypsum Board 5/8" thick, unfinished 5/8" thick, finished (l4), type X 1" thick coreboard at shaft walls Interior Wall Insulation Sound batt insulation, unbacked Premiums Additional blocking, support backing, stiffeners, etc. Acoustical sealant Interior finishes Flooring Patch and prepare existing floor slab for new finishes Carpet tile - Interface Super Flor Carpet tile A - $32/YD material allowance Carpet tile B - $32/YD material allowance Walk off mat Seamless black rubber flooring Quarry tile Exposed concrete flooring Floor finishes in support and ancillary spaces, allowance Base Ceramic tile, base Quarry tile, base Rubber base, 4" Wall Finishes Ceramic tile, walls FRP panels, kitchen Paint walls Wood veneer wall panels Patch and paint existing concrete columns Paint and finish existing walls in support and ancillary spaces, allowance Ceilings ACT-1 - 2' x 6', premium ACT-2 - 2' x 2', premium ACT-3 - 2' x 2', back of house ACT-4 - 2' x 2', kitchen
Prepared by
196 | The Center for Connected Learning - Moffitt Library, UC Berkeley
Unit
Unit Cost
Total
395
sf
$35.00
$13,825
1
ls
$25,000.00
$25,000
15,184 934 38,856
sf sf sf
$12.65 $14.00 $16.25
$192,078 $13,076 $631,410
25,198 88,542 934
sf sf sf
$4.25 $5.50 $7.15
$107,092 $486,981 $6,678
39,793
sf
$1.80
$71,627
54,974 17,966
sf lf
$1.50 $3.75
$82,461 $67,373
78,890 11,241 15,590 4,522 265 297 1,363 45,877 12,135
sf sf sf sf sf sf sf sf sf
$3.00 $6.31 $5.50 $5.50 $40.00 $15.50 $28.75 $2.50 $7.50
$236,670 $70,931 $85,745 $24,871 $10,600 $4,604 $39,186 $114,693 $91,013
661 116 9,200
lf lf lf
$26.50 $29.85 $6.00
$17,517 $3,463 $55,200
3,965 986 84,219 5,540
sf sf sf sf
$25.00 $17.45 $1.55 $75.00
12,135
sf
$4.00
$99,125 $17,206 $130,539 $415,500 Excluded $48,540
9,525 17,000 4,515 830
sf sf sf sf
$17.50 $17.50 $10.00 $14.00
$166,688 $297,500 $45,150 $11,620
Page 11 of 24
6 STATEMENT OF PROBABLE COST SUMMARY
UC Berkeley Moffitt Library Renovation
Berkeley, CA Schematic Design SOPC
Project # 19-00112.00 05/28/19
DETAIL ELEMENTS - MOFFIT LIBRARY RENOVATION Element
Quantity ACT-5 - 2' x 8', flush to deck Gypsum board ceilings, incl. framing, painted finish Gypsum board soffit drops, incl. framing, painted finish WDC-1 - panelized wood ceiling system Exposed ceilings, service areas, unfinished Exposed ceilings, painted (structure only) Ceiling finishes in support and ancillary spaces, allowance
Miscellaneous Allowance for enhanced finishes
Unit
Unit Cost
Total
10,035 11,685 2,025 1,000 2,005 34,430 12,135
sf sf sf sf sf sf sf
$16.00 $20.00 $25.00 $85.00
$160,560 $233,700 $50,625 $85,000
$3.50 $12.50
$120,505 $151,688
78,890
sf
$0.25
$19,723
Total - Finishes
$4,520,571
10 Specialties Toilet Room Accessories Standard, solid phenolic, w/ zero sightline Handicap, solid phenolic w/ zero sightline Urinal screen, solid phenolic Bathroom mirrors Coat hook Grab bars Hand dryer, allowance Janitor mop sink rack Paper towel dispenser combo unit, recessed Sanitary napkin disposal Seat cover dispenser Soap dispenser Toilet paper dispenser Building Specialties Code signage Interior signage, directional etc. Multiple entry tap and go (Key card reader), allowance Install Amazon Locker, allowance Fire extinguisher and cabinet Wall protection, corner guards etc. Markerboards, wallboards, etc. Miscellaneous building specialties Miscellaneous Building specialties Classroom specialties, allowance Built-in planter, incl. planter walls, landscaping Lockers, built-into wall Operable acoustic partitions, incl. supplemental framing Total - Specialties
Prepared by
28 7 2 21 35 24 8 3 8 28 35 21 35
ea ea ea ea ea ea ea ea ea ea ea ea ea
$2,250.00 $2,550.00 $850.00 $350.00 $40.00 $275.00 $700.00 $175.00 $750.00 $250.00 $180.00 $135.00 $120.00
$63,000 $17,850 $1,700 $7,350 $1,400 $6,600 $5,600 $525 $6,000 $7,000 $6,300 $2,835 $4,200
91,025 91,025 18
sf sf ea
20 91,025 91,025 91,025
ea sf sf sf
$1.25 $113,781 $2.00 $182,050 $3,500.00 $63,000 Excluded (FF&E) $465.00 $9,300 $0.30 $27,308 $1.25 $113,781 $2.00 $182,050
1 205 18 600
ls sf ea sf
$20,000.00 $75.00 $850.00 $90.00
$20,000 $15,375 $15,300 $54,000 $926,305
Page 12 of 24
SCHEMATIC DESIGN REPORT | 197
6 STATEMENT OF PROBABLE COST SUMMARY
UC Berkeley Moffitt Library Renovation
Berkeley, CA Schematic Design SOPC
Project # 19-00112.00 05/28/19
DETAIL ELEMENTS - MOFFIT LIBRARY RENOVATION Element
Quantity
Unit
Unit Cost
Total
11 Equipment Food Service Food Service Equipment, budget allowance provided by bnim.
Excluded
Total - Equipment 12 Furnishings Window Covering Motorized window shades, 3rd floor West façade
740
sf
$23.00
Total - Furnishings
$17,020 $17,020
14 Conveying Systems Elevators Upgrade existing elevators, incl. relocate call stations
2
ea
$50,000.00
Total - Conveying Systems
$100,000 $100,000
21 Fire Suppression Fire Sprinklers: Modify, extend and upgrade existing Wet-pipe sprinklers, piping distribution and sprinkler heads 78,890 sf Wet-pipe sprinklers, piping distribution and sprinkler heads, back of house 12,135 sf Fire pump and accessories, pending calculations for flow/pressure requirement Add for specialty pre-action type package for Electrical / IT spaces - allowance 4 ea Add for specialty Kitchen (ANSUL) systems within exhaust hood for Cafe spaces, not anticipated Tie in to fire alarm system 1 ea Coordinate demolition and rerouting of existing riser and standpipe in Stair 1 at all levels - allowance 1 ls
$4.00 $3.00 $7,500.00 $8,000.00 $20,000.00
Total - Fire Suppression
$315,560 $36,405 Excluded $30,000 Excluded $8,000 $20,000 $409,965
22 Plumbing Plumbing Demolition and make safe Remove fixtures and associated local pipe Remove pipe, misc. sizes, up to 4" (keep the existing 6") Miscellaneous demolition / plumbing coordination, allowance
Prepared by
198 | The Center for Connected Learning - Moffitt Library, UC Berkeley
40 400
ea lf sf
$716.60 $17.91 $0.60
$28,664 $7,164
Page 13 of 24
6 STATEMENT OF PROBABLE COST SUMMARY
UC Berkeley Moffitt Library Renovation
Berkeley, CA Schematic Design SOPC
Project # 19-00112.00 05/28/19
DETAIL ELEMENTS - MOFFIT LIBRARY RENOVATION Element
Quantity
Unit
Unit Cost
Total
General Plumbing Equipment WH, Water heater - keep existing Booster pump, domestic water - keep existing Water softener, 50 gpm to max 110 gpm flow Sewage ejector / Sump pump - keep existing Local grease interceptors for Kitchen
1
ea
$14,500.00
Excluded Excluded Excluded Excluded $14,500
Sanitary fixtures - water saving: low flow high efficiency WC-1A, Water closet, floor, hard wired / battery sensor flush valve, ada WC-1, Water closet, floor, hard wired / battery sensor flush valve UR-1A, Urinal, wall, hard wired sensor flush valve , ada L-1, Lavatory, hard wired / battery sensor, 3x faucet stations EWC-1, Water cooler / Drinking fountain, wall, ada with bottle fillers SK-1, Pantry Sink, 3/4 hp disposal SK-2, Welness Sink SK-1, Kitchen Sink, 3/4 hp disposal Eyewash station, countertop mounted - allowance FS-A, Floor Sinks - counter self rimming, single compartment, 18 gauge 302 SS MB-1, Mop Basin, floor mounted, molded stone basin Hose bibs, interior and exterior FD, Floor drains, 3" JR Smith Slotted Trench drain, galvanized, including catch basin
12 21 5 7 2 1 1 1 1 8 2 12 9 40
ea ea ea ea ea ea ea ea ea ea ea ea ea lf
$2,194.00 $2,194.00 $2,075.00 $4,417.00 $4,380.00 $1,738.00 $1,560.00 $1,738.00 $1,687.00 $2,375.00 $1,161.00 $386.00 $652.00 $215.00
$26,328 $46,074 $10,375 $30,919 $8,760 $1,738 $1,560 $1,738 $1,687 $19,000 $2,322 $4,632 $5,868 $8,600
Rough ins Local rough-in at fixture Rough-in at floor sink or floor drain Rough-in at OFCI kitchen equipment and items, per Cini-Little FSM Café details
53 24 30
ea ea ea
$1,058.00 $1,296.00 $1,500.00
$56,074 $31,104 $45,000
720 420 300 280 240 185 1,600 12,135
lf lf lf lf lf lf lf sf
$49.62 $55.70 $58.30 $59.89 $67.06 $74.80 $19.45 $2.00
$35,726 $23,394 $17,490 $16,769 $16,094 $13,838 $31,120 $24,270
Sanitary Waste / Vent piping 6" Subdrainage piping below slab - keep existing 4" pipe, ci, no-hub, below grade 60 Trench excavate, backfill, compact 30 Sand bedding in trench 16 2" and 2-1/2" pipe, ci, no-hub, in bldg 820 3" pipe, ci, no-hub, in bldg 260 4" pipe, ci, no-hub, in bldg 470 Cleanouts, wall and floor 18 Vent through roof, 4" 3 Sanitary Waste / Vent piping, back of house, allowance 12,135 Reroute Terrace Café piping to avoid HVAC issues / new vertical chase down to Level 1 ceiling1
lf cy cy lf lf lf ea ea sf ls
$59.44 $71.10 $18.40 $78.14 $93.55 $109.00 $388.20 $720.50 $2.50 $15,000.00
Excluded $3,566 $2,133 $294 $64,075 $24,323 $51,230 $6,988 $2,162 $30,338 $15,000
Domestic water piping 3/4" pipe, cu type L, in bldg 1" pipe, cu type L, in bldg 1-1/4" pipe, cu type L, in bldg 1-1/2" pipe, cu type L, in bldg 2" pipe, cu type L, in bldg 2-1/2" pipe, cu type L, in bldg Pipe insulation, misc. sizes Domestic water piping, back of house, allowance
Prepared by
Page 14 of 24
SCHEMATIC DESIGN REPORT | 199
6 STATEMENT OF PROBABLE COST SUMMARY
UC Berkeley Moffitt Library Renovation
Berkeley, CA Schematic Design SOPC
Project # 19-00112.00 05/28/19
DETAIL ELEMENTS - MOFFIT LIBRARY RENOVATION Element
Quantity
Unit
Roof / storm drainage Storm water basin structure with relief sump pump - keep existing Condensate drainage Trap and equipment connect Pipe, cu type M, in bldg Pipe insulation
101 1,610 1,610
Unit Cost
Total
sf
$1.50
ea lf lf
$564.10 $52.15 $16.67
Natural Gas - assumes café electrical appliances, no new gas scope anticipated Miscellaneous Plumbing Coordinate plumbing risers and piping chase / relocate as needed - allowance Test / clean plumbing Start-up/check-out Commissioning assist Access panels Piping identification: labels, arrows and valve tags Seismic and vibration requirements Penetrations, sleeving and firestopping
Excluded $56,974 $83,962 $26,839 Excluded
1 192 96 96 14 370 91,025 91,025
ls hr hr hr ea ea sf sf
$25,000.00 $154.53 $185.44 $162.67 $357.40 $28.54 $1.00 $0.50
Total - Plumbing
$25,000 $29,670 $17,802 $15,616 $5,004 $10,560 $91,025 $45,513 $1,138,881
23 HVAC HVAC Demolition and make safe
91,025
sf
$2.00
Wet-Side Equipment - keep existing, no new scope anticipated Hydronic Water Distribution Coordinate piping details with architectural detailing - allowance CHW coil connect, weld: DOAS and AHUs 2" pipe, cu type L, in bldg 3" pipe, blk steel, schd 40, welded 4" pipe, blk steel, schd 40, welded 6" pipe, blk steel, schd 40, welded - keep existing 8" pipe, blk steel, schd 40, welded - keep existing Pipe insulation, 2" pipe Pipe insulation, 3" pipe Pipe insulation, 4" pipe
$182,050 Excluded
1 3 180 160 580
ls ea lf lf lf
$30,000.00 $14,810.00 $74.36 $91.80 $129.30
180 160 580
lf lf lf
$21.99 $26.40 $27.86
$30,000 $44,430 $13,385 $14,688 $74,994 Excluded Excluded $3,958 $4,224 $16,159
Refrigerant piping for VRF systems, insulated
3,920
lf
$74.00
$290,080
Air-Side Equipment DOAU-101, Dedicated outdoor air unit, custom, Level 1 Mechanical room AHU-1, Air handling unit, Annex Air AHU-2, Air handling unit, Annex Air CU-601, Air cooled condensing unit, Daikin
18,000 18,000 26,000 18.00
cfm cfm cfm ton
$12.00 $10.00 $10.00 $1,820.00
$216,000 $180,000 $260,000 $32,760
Prepared by
200 | The Center for Connected Learning - Moffitt Library, UC Berkeley
Page 15 of 24
6 STATEMENT OF PROBABLE COST SUMMARY
UC Berkeley Moffitt Library Renovation
Berkeley, CA Schematic Design SOPC
Project # 19-00112.00 05/28/19
DETAIL ELEMENTS - MOFFIT LIBRARY RENOVATION Element
Quantity CU-602, Air cooled condensing unit, Daikin CU-603, Air cooled condensing unit, Daikin CU-604, Air cooled condensing unit, Daikin CU-605, Air cooled condensing unit, Daikin FCU, Fan Coil unit, VRV indoor units, Daikin BS, Brunch selector box, VRV EDC-101 to 301, Electric duct coil heater, Indeeco VAVs, Terminal boxes, with 1" lined attenuators, Price SDV EF-1, Exhaust fan, dishwasher, upblast, Greenheck EF-2, Exhaust fan, restrooms, Utility, Greenheck
Unit
20 26 24 5 93 16 3 109 800 1,950
Unit Cost
Total
ton ton ton ton ea ea ea ea cfm cfm
$1,820.00 $1,820.00 $1,820.00 $1,820.00 $3,726.00 $9,140.00 $2,800.00 $1,677.00 $3.20 $2.85
$36,400 $47,320 $43,680 $9,100 $346,518 $146,240 $8,400 $182,793 $2,560 $5,558
Air Distribution Ductwork, galvanized steel Duct insulation Dishwasher exhaust from Level 3 to roof, 12" Flexible duct, insulated, various sizes Combination fire / smoke damper Balancing damper to Level 4 Manual volume damper Ceiling diffuser Return grille, including Z-duct with two elbows open to plenum (M701 detail #4) Exhaust grille Louvers, 4 x 4 sf Sound attenuation, premium (Production Studio Recording Booth, with 25 NC)
85,972 lb 43,928 sf 1 ls 1,920 lf 100 ea 1 ea 465 ea 320 ea 185 ea 18 ea 36 sf 1 allow
$14.45 $4.69 $8,500.00 $28.67 $1,132.00 $950.00 $78.74 $242.00 $244.90 $206.70 $115.00 $50,000.00
$1,242,295 $206,022 $8,500 $55,046 $113,200 $950 $36,614 $77,440 $45,307 $3,721 $4,140 $50,000
Miscellaneous HVAC Test / balance HVAC Start-up/check-out Commissioning assist Piping identification: labels, arrows and valve tags Hoisting, rigging Seismic and vibration requirements Penetrations, sleeving and firestopping
360 180 180 500 1 91,025 91,025
$170.90 $155.36 $155.36 $28.54 $70,000.00 $2.00 $1.00
$61,524 $27,965 $27,965 $14,270 $70,000 $182,050 $91,025
hr hr hr ea ls sf sf
Total - HVAC
$4,509,330
25 Integrated Automation DDC Controls / Integrated Automation DDC controls, plumbing systems DDC controls, DOAS DDC controls, AHUs DDC controls, VRV outdoor unit DDC controls, VRF fancoil DDC controls, VAVs DDC controls, exhaust fan DDC controls, electric duct heaters DDC controls, smoke damper monitor
Prepared by
1 1 2 5 93 109 2 3 58
ea ea ea ea ea ea ea ea ea
$5,000.00 $21,400.00 $21,400.00 $8,740.00 $2,760.00 $1,680.00 $1,625.00 $1,450.00 $850.00
$5,000 $21,400 $42,800 $43,700 $256,680 $183,120 $3,250 $4,350 $49,300
Page 16 of 24
SCHEMATIC DESIGN REPORT | 201
6 STATEMENT OF PROBABLE COST SUMMARY
UC Berkeley Moffitt Library Renovation
Berkeley, CA Schematic Design SOPC
Project # 19-00112.00 05/28/19
DETAIL ELEMENTS - MOFFIT LIBRARY RENOVATION Element
Quantity Demand control ventilation, CO2 sensor system - allowance Occupancy sensor ventilation control - allowance Misc. items, training and integration
Unit 1 1 480
ea ea hr
Unit Cost
Total
$35,000.00 $23,000.00 $150.00
Total - Integrated Automation
$35,000 $23,000 $72,000 $739,600
26 Electrical Demolition Electrical Temp Electrical demolition
91,025 91,025
sf sf
$1.35 $2.35
$122,884 $213,909
Distribution equipment Tap Block 15KV Medium Voltage Switch 100Amp Fused Disc 4/0 15KV Medium Voltage Cable Primary OH Conduit 15KV Load Break Elbows 2/0 15KV Medium Voltage Cable 2500A Single End Swithgear 15KV Load Break 1500VA XFRM Main switchboard, 400 amp, 480/277v, 3ph, 4w Mini SubStation, 60 amp, 480/277v, 3ph, 4w Distribution board, 400 amp, 480/277v, 3ph, 4w Distribution board, 600 amp, 480/277v, 3ph, 4w Panelboard, 100 amp, 120/208v, 3ph, 4w Panelboard, 100 amp, 480/277v, 3ph, 4w Panelboard, 150 amp, 120/208v, 3ph, 4w Transformer, 15kVA, 480-120/208v, 3ph, 4w Transformer, 45kVA, 480-120/208v, 3ph, 4w Transformer, 75kVA, 480-120/208v, 3ph, 4w Generator, diesel, 250kW, 480v, 3ph, 4w Automatic transfer switch, 100/4 Automatic transfer switch, 600/4 400Amp Fused Disc 100Amp Fused Disc Feeder, 100 amp, emt Feeder, 400 amp, emt Feeder, 30 amp, emt Feeder, 60 amp, emt Feeder, 80 amp, emt Feeder, 100 amp, emt Feeder, 150 amp, emt Feeder, 200 amp, emt Feeder, 225 amp, emt Feeder, 250 amp, emt Feeder, 400 amp, emt Feeder, 600 amp, emt
1 1 1 1,000 40 30 200 1 2 2 3 2 1 4 6 1 1 1 1 1 1 1 1 180 150 50 345 30 460 695 30 150 20 180 180
ea ea ea lf lf ea lf ea ea ea ea ea ea ea ea ea ea ea ea ea ea ea ea lf lf lf lf lf lf lf lf lf lf lf lf
$9,986.10 $70,128.67 $1,127.08 $18.05 $142.60 $767.20 $8.94 $199,190.33 $37,305.61 $18,627.46 $23,044.32 $29,851.48 $2,362.70 $2,362.70 $2,823.05 $5,057.18 $7,565.11 $10,010.79 $127,300.00 $4,393.74 $15,581.97 $2,843.30 $1,127.08 $57.73 $190.87 $20.91 $38.19 $45.76 $57.73 $59.79 $93.06 $104.53 $123.40 $190.87 $305.99
$9,986 $70,129 $1,127 $18,048 $5,704 $23,016 $1,788 $199,190 $74,611 $37,255 $69,133 $59,703 $2,363 $9,451 $16,938 $5,057 $7,565 $10,011 $127,300 $4,394 $15,582 $2,843 $1,127 $10,392 $28,630 $1,046 $13,176 $1,373 $26,558 $41,551 $2,792 $15,680 $2,468 $34,356 $55,079
Prepared by
202 | The Center for Connected Learning - Moffitt Library, UC Berkeley
Page 17 of 24
6 STATEMENT OF PROBABLE COST SUMMARY
UC Berkeley Moffitt Library Renovation
Berkeley, CA Schematic Design SOPC
Project # 19-00112.00 05/28/19
DETAIL ELEMENTS - MOFFIT LIBRARY RENOVATION Element
Quantity Future PV Conduits
Unit
Unit Cost
Total
200
lf
$149.37
$29,874
HVAC and equipment connections Fan Coil #1 Automatic Flush DOUA Sump Pump Door Operator CU AHU-601 EF AHU-602 ATC Power EDC Coil Hand Dryers Dishwasher Dishwasher Booster Walk In Cooler Walk In Freezer Elevator Disconnect and Reconnect to New Gear Disconnect switch, motor rated Disconnect switch, 30 amp, 4-wire, fused Disconnect switch, 30 amp, 4-wire, fused N3R Disconnect switch, 60 amp, 4-wire, fused N3R Disconnect switch, 100 amp, 4-wire, fused N3R Equipment branch, 20 amp Equipment feeder, 30 amp Equipment feeder, 60 amp Equipment feeder, 100 amp Equipment feeder, 200 amp
92 32 1 2 19 5 1 2 1 2 3 6 1 1 1 1 2 19 2 6 2 2 10,270 520 130 220 40
ea ea ea ea ea ea ea ea ea ea ea ea ea ea ea ea ea ea ea ea ea ea lf lf lf lf lf
$185.52 $523.67 $185.52 $185.52 $266.64 $389.88 $240.65 $620.20 $185.52 $185.52 $185.52 $185.52 $266.64 $389.88 $211.53 $211.53 $712.11 $503.13 $775.97 $965.24 $1,214.02 $1,883.80 $18.45 $20.91 $38.19 $57.73 $93.06
$17,068 $16,757 $186 $371 $5,066 $1,949 $241 $1,240 $186 $371 $557 $1,113 $267 $390 $212 $212 $1,424 $9,559 $1,552 $5,791 $2,428 $3,768 $189,482 $10,875 $4,965 $12,702 $3,722
Convenience power Duplex receptacle, 20 amp Duplex receptacle, 20 amp GFI wp Double duplex receptacle, 20 amp Cord Reels 20Amp Eight gang duplex receptacle, flush floor Receptacle, 20 amp, appliance outlet Receptacle, 30 amp, appliance outlet Duplex USB receptacle Branch power, 20 amp Branch power, 30 amp
265 8 104 22 120 20 10 40 19,495 500
ea ea ea ea ea ea ea ea lf lf
$153.92 $205.94 $181.52 $787.12 $1,957.98 $187.79 $214.24 $199.31 $17.14 $18.37
$40,789 $1,648 $18,878 $17,317 $234,957 $3,756 $2,142 $7,972 $334,150 $9,186
Lighting and lighting control Type PL42 Pendant Linear Type RR4 4" Round Recess Downlight Type ST-T 2ckt Track Type ST-TH Track Heads Type EX1 Exit Light Type Industrial Strip
3,100 254 671 280 68 43
lf ea lf ea ea ea
$205.27 $507.22 $71.52 $596.69 $342.88 $697.19
$636,343 $128,833 $47,992 $167,073 $23,316 $29,979
Prepared by
Page 18 of 24
SCHEMATIC DESIGN REPORT | 203
6 STATEMENT OF PROBABLE COST SUMMARY
UC Berkeley Moffitt Library Renovation
Berkeley, CA Schematic Design SOPC
Project # 19-00112.00 05/28/19
DETAIL ELEMENTS - MOFFIT LIBRARY RENOVATION Element
Quantity Type RSS22 2x2 Type Wall Mnt Type P Pendant Type XP Lighting branch power, fixtures Lighting Controls
Additional electrical requirements Misc Electrical, labeling & Identifications Diesel Fuel Allownace CAD, BIM, As-builts Rigging, placement and transportation Commissioning assistance Testing (3rd party), fault study, coordination, etc. Coredrill and fire sealing
Unit
Unit Cost
Total
106 6 23 63 16,860 91,025
ea ea ea ea lf sf
$356.67 $681.97 $1,103.80 $1,021.07 $17.14 $3.85
$37,807 $4,092 $25,387 $64,327 $288,986 $350,446
91,025 1 91,025 91,025 91,025 91,025 91,025
sf ls sf sf sf sf sf
$0.55 $25,000.00 $0.75 $0.75 $0.75 $0.80 $0.25
$50,064 $25,000 $68,269 $68,269 $68,269 $72,820 $22,756
Total - Electrical
$4,515,362
27 Communications Communications Systems, inc. infrastructure, IDF Rooms, cabling, devices A/V Systems, infrastructure, incl. raceways and back boxes only Sound Masking System
91,025 91,025
sf sf
$12.00 $1.40
Total - Communications
$1,092,300 $127,435 Excluded $1,219,735
28 Electrical Safety And Security Access Controls / Security / CCTV, incl. infrastructure, cabling, devices Fire alarm system, incl. infrastructure, cabling, devices
91,025 91,025
sf sf
$1.35 $4.50
Total - Electrical Safety And Security
$122,884 $409,613 $532,496
31 Earthwork Rough grading, cut and fill, based on balanced site Total - Earthwork
Prepared by
204 | The Center for Connected Learning - Moffitt Library, UC Berkeley
1,333
cy
$15.00
$20,000 $20,000
Page 19 of 24
6 STATEMENT OF PROBABLE COST SUMMARY
UC Berkeley Moffitt Library Renovation
Berkeley, CA Schematic Design SOPC
Project # 19-00112.00 05/28/19
DETAIL ELEMENTS - MOFFIT LIBRARY RENOVATION Element
Quantity
Unit
Unit Cost
Total
32 Exterior Improvements West Terrace, 1st floor Hardscape Concrete sidewalk Concrete stairs Retaining walls, allowance Handrails, metal Guardrails, metal Fence, wood posts and slats Stabilzed decomposed granite w/steel edging Landscaping New planting area, incl. irrigation Miscellaneous Metal egress gate, includes hardware Miscellaneous site specialties, allowance Site lighting, incl. bollards, step lights, pole lights, etc., allowance Bollard lights Step lights and transfomer Site conduits and wire Site electrical excavation South Plaza, 3rd floor Hardscape New concrete topping slab / paving to match existing Miscellaneous Site lighting, allowance Miscellaneous site specialties, allowance East Courtyard, 4th floor Hardscape New concrete topping slab / paving to match existing Miscellaneous Miscellaneous site specialties, allowance Total - Exterior Improvements
Prepared by
2,460 356 1 150 95 70 998
sf sf ls lf lf lf sf
$20.00 $30.00 $30,000.00 $85.00 $135.00 $80.00 $7.00
$49,200 $10,680 $30,000 $12,750 $12,825 $5,600 $6,986
2,020
sf
$15.00
$30,300
2 1
ea ls
$1,050.00 $5,000.00
$2,100 $5,000
24 2 1,000 1
ea ea lf ls
$2,715.00 $1,005.00 $15.35 $38,500.00
$65,160 $2,010 $15,350 $38,500
600
sf
$15.00
$9,000
1 1
ls ls
$15,000.00 $1,500.00
$15,000 $1,500
4,497
sf
$15.00
$67,455
1
ls
$3,000.00
$3,000 $382,416
Page 20 of 24
SCHEMATIC DESIGN REPORT | 205
6 STATEMENT OF PROBABLE COST SUMMARY
UC Berkeley Moffitt Library Renovation
Berkeley, CA Schematic Design SOPC
Project # 19-00112.00 05/28/19
DETAIL ELEMENTS - MOFFIT LIBRARY RENOVATION Element
Quantity
Unit
Unit Cost
Total
33 Utilities Storm Drainage Overflow storm inlets Bioretention, lined with waterproof material Miscellaneous modifications and connections to existing storm system Total - Utilities
Prepared by
206 | The Center for Connected Learning - Moffitt Library, UC Berkeley
5 330 1
ea sf ls
$2,500.00 $25.00 $10,000.00
$12,500 $8,250 $10,000 $30,750
Page 21 of 24
6 STATEMENT OF PROBABLE COST SUMMARY
UC Berkeley Moffitt Library Renovation
Berkeley, CA Schematic Design SOPC
Project # 19-00112.00 05/28/19
APPENDIX 1 - APPROACH & METHODOLOGY Basis of Estimate
- 100% Schematic Design Draft drawings, dated 05/06/19, prepared by bnim - Schematic Design Outline Specifications, dated 05/03/19, prepared by bnim - Interior Acoustics Narrative, dated 03/19/19, prepared by Charles M. Salter Associates, Inc. - Schematic Design Structural Narrative, dated 05/06/19, prepared by MAR Structural Design - Audio / Visual Narrative, dated 05/07/19, prepared by Integral Group - Code Analysis, dated 05/06/19, prepared by Jensen Hughes - Fire Protection Narrative, dated 05/06/19, prepared by Jensen Hughes - Mechanical Systems Narrative, dated 05/06/19, prepared by Integral Group - Electronic Security Systems Narrative, dated 05/06/19, prepared by Integral Group - Telecommunications Systems Narrative, dated 05/07/19, prepared by Integral Group - Café layout plan, dated 03/26/19, prepared by Cini Little - Floor plan layout plan, dated 05/15/19, prepared by bnim - PV rooftop layout plan, dated 05/29/14, prepared by SunEdison
Estimate Format
CSI 48 Division Masterformat has been used for the preparation of this estimate.
Cost Mark Ups
The following % mark ups have been included in each design option: - General Conditions (8.00% on direct costs) - General Requirements (4.00% compound) - Bonds, Insurance & SDI (2.70% compound) - Contractor's Fee (5.00% compound) - Design Contingency (10.00% compound) - Construction Manager Contingency (5.00% compound) - Escalation to MOC, 03/01/23 (16.59% compound)
Escalation
All subcontract prices herein are reflective of current bid prices. Escalation has been included on the summary level to the stated mid point of construction.
Design Contingency
An allowance of 10.00% for undeveloped design details has been included in this estimate. As the design of each system is further developed, details which historically increase cost become apparent and must be incorporated into the estimate while decreasing the % burden.
Construction Contingency
It is prudent for all program budgets to include an allowance for change orders which occur during the construction phase. These change orders normally increase the cost of the project. It is recommended that a 10-15% construction contingency is carried in this respect. This cost is not included within the estimate.
Construction Schedule
Costs included herein have been based upon a construction period of 18 months. Any costs for excessive overtime to meet accelerated schedule milestone dates are not included in this estimate.
Method of Procurement
The estimate is based on a CM at Risk delivery model.
Bid Conditions
This estimate has been based upon competitive bid situations (minimum of 3 bidders) for all items of subcontracted work.
Prepared by
Page 22 of 24
SCHEMATIC DESIGN REPORT | 207
6 STATEMENT OF PROBABLE COST SUMMARY
UC Berkeley Moffitt Library Renovation
Berkeley, CA Schematic Design SOPC
Project # 19-00112.00 05/28/19
APPENDIX 1 - APPROACH & METHODOLOGY Basis For Quantities
Wherever possible, this estimate has been based upon the actual measurement of different items of work. For the remaining items, parametric measurements were used in conjunction with other projects of a similar nature.
Basis for Unit Costs
Unit costs as contained herein are based on current bid prices in Berkley, CA. Sub overheads and profit are included in each line item unit cost. Their overhead and profit covers each sub's cost for labor burden, materials, and equipment, sales taxes, field overhead, home office overhead, and profit. The general contractor's overhead is shown separately on the master summary.
Sources for Pricing
This estimate was prepared by a team of qualified cost consultants experienced in estimating construction costs at all stages of design. These consultants have used pricing data from Cumming's database, updated to reflect current conditions in Berkley, CA.
Key Exclusions
The following items have been excluded from our estimate: - Professional fees, inspections and testing - Plan check fees and building permit fees - Furnishings, furniture and equipment (FF&E), except built-in cabinets, counters and other casework - Escalation beyond mid-point of construction, March 2023 - Construction contingency - Owner furnished AV, security equipment - Hazardous material testing and abatement - Project Soft Costs - Moving / relocation Costs - Kitchen / cafeteria equipment and furniture (assumed by operator) - Seismic upgrades (part of future project)
Items Affecting Cost Estimate
Items which may change the estimated construction cost include, but are not limited to: - Modifications to the scope of work included in this estimate. - Unforeseen sub-surface conditions. - Restrictive technical specifications or excessive contract conditions. - Any specified item of material or product that cannot be obtained from 3 sources. - Any other non-competitive bid situations. - Bids delayed beyond the projected schedule.
Prepared by
208 | The Center for Connected Learning - Moffitt Library, UC Berkeley
Page 23 of 24
6 STATEMENT OF PROBABLE COST SUMMARY
UC Berkeley Moffitt Library Renovation
Berkeley, CA Schematic Design SOPC
Project # 19-00112.00 05/28/19
APPENDIX 1 - APPROACH & METHODOLOGY Statement of Probable Cost
Cumming has no control over the cost of labor and materials, the general contractor's or any subcontractor's method of determining prices, or competitive bidding and market conditions. This estimate is made on the basis of the experience, qualifications, and best judgement of a professional consultant familiar with the construction industry. Cumming, however, cannot and does not guarantee that proposals, bids, or actual construction costs will not vary from this or subsequent cost estimates. Cumming's staff of professional cost consultants has prepared this estimate in accordance with generally accepted principles and practices. This staff is available to discuss its contents with any interested party. Pricing reflects probable construction costs obtainable in the project locality on the target dates specified and is a determination of fair market value for the construction of this project. The estimate is not a prediction of low bid. Pricing assumes competitive bidding for every portion of the construction work for all sub and general contractors with a range of 3 - 4 bidders for all items of work. Experience and research indicates that a fewer number of bidders may result in higher bids. Conversely, an increased number of bidders may result in more competitive bid day responses.
Recommendations
Cumming recommends that the Owner and the Architect carefully review this entire document to ensure it reflects their design intent. Requests for modifications of any apparent errors or omissions to this document must be made to Cumming within ten days of receipt of this estimate. Otherwise, it will be assumed that its contents have been reviewed and accepted. If the project is over budget or there are unresolved budget issues, alternate systems / schemes should be evaluated before proceeding into further design phases. It is recommended that there are preparations of further cost estimates throughout design by Cumming to determine overall cost changes since the preparation of this preliminary estimate. These future estimates will have detailed breakdowns indicating materials by type, kind, and size, priced by their respective units of measure.
Prepared by
Page 24 of 24
SCHEMATIC DESIGN REPORT | 209
7 FUNDRAISING, DESIGN, AND CONSTRUCTION SCHEDULE
Blank Page
210 | The Center for Connected Learning - Moffitt Library, UC Berkeley
7 FUNDRAISING, DESIGN, AND CONSTRUCTION SCHEDULE
7 FUNDRAISING, DESIGN, AND CONSTRUCTION SCHEDULE
SCHEMATIC DESIGN REPORT | 211
7 FUNDRAISING, DESIGN, AND CONSTRUCTION SCHEDULE
CONCEPTUAL SCHEDULE
Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr Ma
2018
2019
Nov 18
2020
Feb 19 4 Months
Programming Feb 19 Dec 19 3 Months
Building Assessment Jun 19
Dec 19 6 Months
Schematic Design Jun 19
Jan 21 19 Months
Fundraising Pha Jan 21 Mar 21 2 Mo.
Schemat Mar 21
4 Mont
SUMMARY The above conceptual schedule represents the estimated project timeline as of June, 2019, as developed by BNIM in conjunction with UC Berkeley and Cumming. This rough timeline forms the basis of the projected project escalation outlined in the Schematic Design Statement of Probable Cost.
212 | The Center for Connected Learning - Moffitt Library, UC Berkeley
7 FUNDRAISING, DESIGN, AND CONSTRUCTION SCHEDULE
ay Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
2021
2022
2023
ase
tic Design Validation Phase Jul 21
ths
Design Development Jul 21
Jan 22 6 Months
Construction Documents Jan 22
Jul 22 6 Months
Bidding Nov 23
Jul 22 16 Months
Construction
SCHEMATIC DESIGN REPORT | 213