BLUE NATION STRATEGIES IS A WOMAN-OWNED AND WOMAN-RUN FIRM WITH EXPERIENCE IN OVER 40 STATES, INCLUDING MARYLAND.
We know how to win tough races, in tough districts, in tough election cycles.
WHAT IS THE TEMPLATE MAIL PROGRAM?
The template mail program allows you to have professional mail pieces at a discounted rate because your pieces are part of a template — a layout and design that cannot change from candidate to candidate. The program is further discounted by “gang printing,” which means approving and printing two or four pieces together across multiple campaigns.
PRICING
Pricing includes targeting, design, printing, two professional proofs, data processing, and mail shop fees.
Postage and shipping are not included and are billed at cost.
Blue Nation works exclusively with union printers and mail houses.
Due to the aggressive print schedule, we WILL NOT be able to remove voters as they turn in their ballots.
If you would like to remove voters as they vote, you will need to break up your gang printing schedule.
Payment is due in full on the approval date.
To maximize cost savings, we encourage campaigns to two or four gang pieces, which requires either two or four pieces to be approved and printed at the same time.
8.5 x 11 Postcard
**Postage and shipping are not included and are billed at cost.**
WHAT IS THE TEMPLATE DIGITAL PROGRAM?
A custom digital program including a campaign spot and static display ads
Minimum spend — $7,500 ($2,500 for production + $5,000 in ad spending)
Video scripts will be approved before shooting on 4/25 or 4/26
The bulk of your spend will be IP-matched digital
KEY DATES:
4/19 AND 20 — STILL SHOOT DATES
4/25 AND 26 —
DIGITAL SHOOT DATES
SAMPLE SCHEDULE:
Early Voting - June 11 — 18 | Election Day - June 23
In 2022, one slate ran a full eight-piece plan; most candidates and slates ran two to four pieces. The schedule below lays out an eight-piece plan timeline. With the shoot timeline laid out above, we will have four weeks post-still shoot to produce and start signing off on the mail piece for the slate program.
Piece 001 — Approval Date: 5/15 — Drop Date: 5/26
Piece 002 — Approval Date: 5/15 — Drop Date: 5/28
Piece 003 — Approval Date: 5/15 — Drop Date: 6/2
Piece 004 — Approval Date: 5/15 — Drop Date: 6/4
Piece 005 — Approval Date: 5/25 — Drop Date: 6/8
Piece 006 — Approval Date: 5/25 — Drop Date: 6/10
Piece 007 — Approval Date: 5/25 — Drop Date: 6/12
Piece 008 — Approval Date: 5/25 — Drop Date: 6/15