Drive-in Racking
Assembly instructions and instructions for use Edition no. 3 © BLS – Brännehylte Lagersystem AB. 260519
![]()
Assembly instructions and instructions for use Edition no. 3 © BLS – Brännehylte Lagersystem AB. 260519
Read the entire manual before starting assembly. Follow the directions in the manual to make sure the product complies with current standards.
The purpose of these assembly instructions is to facilitate correct installation and to inform of risks and how to avoid them. Bear in mind that the instructions are for your safety and the safety of others.
Use the assembly instructions and instructions for use in conjunction with:
* assembly
* regular inspections (together with the periodic inspection template)
* taking corrective action as directed
Each installation must be fitted with a load sign located in a clearly visible place.
Perform regular checks to ensure the technical safety of the pallet racking. Information about pallet racking inspections are available on our website www.blsab.se.
Parts of the installation instructions and instructions for use refer to the Swedish Standard SS-EN 15635:2008 - Steel static storage systems – Application and maintenance of storage equipment. If necessary, the purchaser or user can obtain the above standard from SIS. See www.sis.se for further information.
If in doubt, or for further information, please contact Brännehylte Lagersystem: CONTACT US
Telephone
Email Website
Postal address
Street address
+46 370 30 50 00
info@blsab.se
www.blsab.se
P.O. Box 12, SE 335 04 Hillerstorp, Sweden
Brännehylte Lagersystem AB
High Chaparral
SE 335 96 Kulltorp, Sweden
Recommended tools
The client/user must make sure the floor is able to bear the relevant loads.
Pallet racks must be anchored to the floor to prevent the uprights from moving when mechanical handling equipment is used in or near warehouse fixtures.
Correct rack assembly is essential for a safe structure. Assembly must be carried out professionally and in accordance with these instructions.
M8x20 / M10x20 part 111308-1-20-7 part 111310-1-20-7
M8 / M10 nut with flange part 111308-7-0-7 part 111310-8-0-7
* Applies to C90
** Applies to C110
*** Applies to C120
M10x75/105
75 mm - part 111310-1-75-7*/** 105 mm - part 111310-1-105-7***
M10 nut lock part 111310-6-0-7
Art: 111308-2-30-7
Distance tube 30/43
30 mm - part 111056*/** 43 mm - part 111056-43***
Fasteners not included
* Applies to C90
** Applies to C110
*** Applies to C120
Beam safety pin part 111021
Base plate XL
C90 - part 90-002*
C110 - part 110-002** C120 - part 120-002***
Multi-Monti 10x80 part 111009-14
Art: 111308-2-110-7 M8x110
Hex socket screw M8x110 part 111308-2-110-7
* Leveling Plate
1 mm - part 111076-90-1
2 mm - part 111076-90-2
3 mm - part 111076-90-3
**/*** Leveling Plate
1 mm - part 111076-120-1 2 mm - part 111076-120-2
3 mm - part 111076-120-3
Base plate
C90 - part 90-001* C110/120 - part 120001**/***
*Leveling Plate base plate XL
1 mm - part 90-002-1
2 mm - part 90-002-2
3 mm - part 90-002-3
**/*** Leveling Plate base plate XL
1 mm - part 110-002-1
2 mm - part 110-002-2
3 mm - part 110-002-3
Multi-Monti M10×60
Drilled hole Ø8
Drill depth 65 mm, cleaned hole
Max. Mounting thickness 10 mm
Multi-Monti M10×80
Drilled hole Ø8
Drill depth 85 mm, cleaned hole
Max. Mounting thickness 30 mm
Multi-Monti M10×100
Drilled hole Ø8
Drill depth 105 mm, cleaned hole
Max. Mounting thickness 50 mm
Max torque impact wrench
Multi-Monti M10, 600 Nm
Multi-Monti M10×100
Drilled hole Ø8
Drill depth 115 mm
Max. Mounting thickness 50 mm
Multi-Monti M10×140
Drilled hole Ø8
Drill depth 155 mm
Max. Mounting thickness 90 mm
Always use concrete screws and anchoring compound when installing on asphalt.








1. Frame
2. Support rail
3. Bracket
4. Entry guide rail
5. Rear beam
6. Rear cross bracing
7. Top profile
8. Top brace
9. Floor guide rail
10. Frame barrier
1. Installing upright base plates (A)
2. Locate the braces according to the bracing diagram on pages 6. (B) The braces shall be mounted back-to-back, with the openings facing outwards.
3. Place distance tubes at single braces at the ends of the frame. (C)
4. Tighten the braces.
Assembled together with frames
Top profile / splice
Bracket
2pcs
Entry guide
Support rail splice
1. Erect two frames and temporarily install back beams to brace the racking during the continued installation.It is important that, at this stage, the structure is levelled and aligned vertically (plumb). (G)
2. Top braces are installed according to the project drawing. Then remove the temporary back beams and use them in the next section. (H)
Inclination
The deviation from the vertical plumb line must not exceed 3 mm per metre in both the depth and side directions.
1. Beams are installed at the bottom and directly above each load level.
2. Rear back bracing is installed according to the project drawing.
Eye
least
be
Secure the nut against the coupling sleeve.
Back beam is installed above the entry guide.
Installation of rail guide bracket
Installation of rails, entry guide front
Back beam is installed above the entry guide.
Installation of rail guide bracket
Installation of rails, entry guide front
Frame barriers, double rack
Floor bracket Profile End caps
2 pcs M8×110
4 pcs Multi-Monti 10×80 /Expander bolt M10×90 2 pcs M8×110
2 pcs M8×30
At least one load sign per rack must be clearly visible.