Drive-in Racking

Assembly instructions and instructions for use Edition no. 3 © BLS – Brännehylte Lagersystem AB. 260519

About these instructions

Read the entire manual before starting assembly. Follow the directions in the manual to make sure the product complies with current standards.

The purpose of these assembly instructions is to facilitate correct installation and to inform of risks and how to avoid them. Bear in mind that the instructions are for your safety and the safety of others.

Use the assembly instructions and instructions for use in conjunction with:

* assembly

* regular inspections (together with the periodic inspection template)

* taking corrective action as directed

Each installation must be fitted with a load sign located in a clearly visible place.

Perform regular checks to ensure the technical safety of the pallet racking. Information about pallet racking inspections are available on our website www.blsab.se.

Parts of the installation instructions and instructions for use refer to the Swedish Standard SS-EN 15635:2008 - Steel static storage systems – Application and maintenance of storage equipment. If necessary, the purchaser or user can obtain the above standard from SIS. See www.sis.se for further information.

If in doubt, or for further information, please contact Brännehylte Lagersystem: CONTACT US

Telephone

Email Website

Postal address

Street address

+46 370 30 50 00

info@blsab.se

www.blsab.se

P.O. Box 12, SE 335 04 Hillerstorp, Sweden

Brännehylte Lagersystem AB

High Chaparral

SE 335 96 Kulltorp, Sweden

Before you begin

Recommended tools

Underlying surface

The client/user must make sure the floor is able to bear the relevant loads.

Anchoring

Pallet racks must be anchored to the floor to prevent the uprights from moving when mechanical handling equipment is used in or near warehouse fixtures.

Safety

Correct rack assembly is essential for a safe structure. Assembly must be carried out professionally and in accordance with these instructions.

Supplied fasteners

M8x20 / M10x20 part 111308-1-20-7 part 111310-1-20-7

M8 / M10 nut with flange part 111308-7-0-7 part 111310-8-0-7

* Applies to C90

** Applies to C110

*** Applies to C120

M10x75/105

75 mm - part 111310-1-75-7*/** 105 mm - part 111310-1-105-7***

M10 nut lock part 111310-6-0-7

Art: 111308-2-30-7

Distance tube 30/43

30 mm - part 111056*/** 43 mm - part 111056-43***

Fasteners not included

* Applies to C90

** Applies to C110

*** Applies to C120

Beam safety pin part 111021

Base plate XL

C90 - part 90-002*

C110 - part 110-002** C120 - part 120-002***

Multi-Monti 10x80 part 111009-14

Art: 111308-2-110-7 M8x110

Hex socket screw M8x110 part 111308-2-110-7

* Leveling Plate

1 mm - part 111076-90-1

2 mm - part 111076-90-2

3 mm - part 111076-90-3

**/*** Leveling Plate

1 mm - part 111076-120-1 2 mm - part 111076-120-2

3 mm - part 111076-120-3

Base plate

C90 - part 90-001* C110/120 - part 120001**/***

*Leveling Plate base plate XL

1 mm - part 90-002-1

2 mm - part 90-002-2

3 mm - part 90-002-3

**/*** Leveling Plate base plate XL

1 mm - part 110-002-1

2 mm - part 110-002-2

3 mm - part 110-002-3

Floor attachment specification

Securing in concrete - Concrete

Multi-Monti M10×60

Drilled hole Ø8

Drill depth 65 mm, cleaned hole

Max. Mounting thickness 10 mm

Multi-Monti M10×80

Drilled hole Ø8

Drill depth 85 mm, cleaned hole

Max. Mounting thickness 30 mm

Multi-Monti M10×100

Drilled hole Ø8

Drill depth 105 mm, cleaned hole

Max. Mounting thickness 50 mm

Max torque impact wrench

Multi-Monti M10, 600 Nm

Securing in asphalt - Concrete

Multi-Monti M10×100

Drilled hole Ø8

Drill depth 115 mm

Max. Mounting thickness 50 mm

Multi-Monti M10×140

Drilled hole Ø8

Drill depth 155 mm

Max. Mounting thickness 90 mm

Always use concrete screws and anchoring compound when installing on asphalt.

Bracing diagram

Detailed overview

1. Frame

2. Support rail

3. Bracket

4. Entry guide rail

5. Rear beam

6. Rear cross bracing

7. Top profile

8. Top brace

9. Floor guide rail

10. Frame barrier

Installing frames

1. Installing upright base plates (A)

2. Locate the braces according to the bracing diagram on pages 6. (B) The braces shall be mounted back-to-back, with the openings facing outwards.

3. Place distance tubes at single braces at the ends of the frame. (C)

4. Tighten the braces.

(A: Base Plate XL)
2 pcs M8×20
2 pcs M8 with flange
M10×75/105
M10 with lock
M10 with lock
Distance tube
M10×75/105
Distance tube

Installation of top profiles and support rails

Assembled together with frames

Top profile / splice

Bracket

2pcs

Entry guide

Support rail splice

4pcs M10 with flange
4pcs M10x20
4pcs M10x20
4pcs M10 with flange
4pcs M10 with flange
2pcs M8 with flange
M8x20
3pcs M10x20
3pcs M10 with flange
2pcs Washer 8,4x23x4
8pcs M8x20
8pcs M8 with flange
2pcs M8 with flange
2pcs M8x20
4pcs M10x20

Installation of first section

1. Erect two frames and temporarily install back beams to brace the racking during the continued installation.It is important that, at this stage, the structure is levelled and aligned vertically (plumb). (G)

2. Top braces are installed according to the project drawing. Then remove the temporary back beams and use them in the next section. (H)

Inclination

The deviation from the vertical plumb line must not exceed 3 mm per metre in both the depth and side directions.

2st Beam Safety pin
2pcs M10x20
2pcs M10x20
2pcs M10 with flange
2pcs M10 with flange
Top Brace

Installation of back beams and rear back bracing

1. Beams are installed at the bottom and directly above each load level.

2. Rear back bracing is installed according to the project drawing.

Eye

least

be

Secure the nut against the coupling sleeve.

c/c165-225mm
c/c165-225mm
2pcs M10x20
2pcs M10 with flange
M10x20
M10 with flange
2pcs M10x20
2pcs M10 with flange
Lock with nut
Turnbuckle
Installation of turnbuckle
bolts must
screwed at
15 mm into the coupling sleeve.
3pcs M10 with flange
2pcs M10x25 countersunk
Eye bolt M10x95 right‑hand threaded
Eye bolt M10x95 left-hand threaded
Coupling sleeve

Installation of entry guide 200 mm

Back beam is installed above the entry guide.

Installation of rail guide bracket

Installation of rails, entry guide front

8pcs M10 with flange
8pcs M10x20
4pcs M10x20
4pcs M10 with flange
2pcs M8 with flange
2pcs Multi-Monti 10x80
2pcs Multi-Monti 10x80
4pcs M8 with flange
2pcs Hex socket screw M8x110
4pcs Hex socket screw M8x110

Installation of entry guide 400 mm

Back beam is installed above the entry guide.

Installation of rail guide bracket

Installation of rails, entry guide front

4pcs M8 with flange
2pcs Multi-Monti 10x80
2pcs Multi-Monti 10x80
8pcs M8 with flange
16pcs M10 with flange
16pcs M10x20
8pcs M10x20
8pcs M10 with flange
4pcs Hex socket screw M8x110
8pcs Hex socket screw M8x110

Installation of splice for entry guide rail

8pcs M10x20
8pcs M10 with lock

Installing upright protectors

Installing frame barriers

Frame barriers, double rack

Floor bracket Profile End caps

2 pcs M8×110

4 pcs Multi-Monti 10×80 /Expander bolt M10×90 2 pcs M8×110

2 pcs M8×30

2 pcs M8 with flange

Installing load signs

At least one load sign per rack must be clearly visible.

BLS AB - Box 12 - SE 335 04 Hillerstorp, Sweden

+46 370-30 50 00 - blsab.se

Turn static files into dynamic content formats.

Create a flipbook
ENG assembly instructions drive-in racking by blsab.se - Issuu