Sun The
Blenheim Marlborough
May 31, 2013
Sun Weather
Today 6-17
Saturday 10-18
Sunday 7-18
Monday 6-17
Outlook for Today Fine, morning frosts. Light winds.
CONSULTANTS 2007 LIMITED Tax/GST Returns Payroll services
03 5780330
call us on: 5777 868
Revamped marina
Work on the inner basin of the Picton marina, inland of the Coathanger Bridge, has begun, with work due for completion in October. The work will extend the basin approximately 30 metres to the north and will provide 20 additional marina berths. Remaining old boatsheds at the northern end of the marina are scheduled to be removed within the next fortnight. The Picton trailer boat launching ramp is closed and launching traffic is being redirected to the Waikawa Marina. A three-bay washdown area is being built and a new car parking area will extend out over the old tennis courts and to the road near the Emergency Centre. This is the last major stage of works to replace facilities in the basin originally built in the mid 1960’s. Road and pedestrian access through the marina will be improved. Continued page 2
From left, Port Marlborough engineer Matt Preece, Gavin Beattie, manager of Infrastructure and Engineering with Port Marlborough, Brendon Dodd, Higgins Construction Project Manager and Leigh McGlynn, consultant engineer with Davidson Group. Photo by Glenise Dreaver.
“It’s all about choices” Springlands Lifestyle Village offers retirement living at its finest. Not only is this a small, boutique-style facility in a great, central location in Springlands with the latest in modern design and facilities, but the level of care offered to the residents is one of the reasons Springlands Lifestyle Village offers the ultimate in retirement living.
Phone 03 577 5208 Email: info@slv.net.nz 5 Battys Road, Blenheim www.springlandsLifestyleVillage.co.nz