1 minute read

Commercial Heat Recovery

Horizontally mounted MVHR units

Blauair CFH

• Side connection, horizontally mounting supply and extract heat recovery unit.

• Airflow rates from 800 to 6000 m3/hour (222 to 1666 l/s).

• Electric & water heater options with plug and Play controls built-in and Wi-Fi.

• Fitted with German Blauberg low energy EC motors.

• Double skinned 40mm insulation for low noise.

• Highly efficient counterflow heat exchanger for maximum heat recovery.

• Cooling Options Available.

Horizontally mounted MVHR units

Blauair RH

• Side connection, horizontally mounting supply and extract heat recovery unit.

• Airflow rates from 800 to 6000 m3/hour (222 to 1666 l/s).

• Electric and water heater options with plug and play controls built-in and Wi-Fi.

• Fitted with German Blauberg low energy EC motors.

• Double skinned 40mm insulation for low noise.

• Highly efficient rotary thermal wheel for maximum heat recovery.

• Cooling Options Available.

Scan Here > For More Information

Ceiling Mounted Heat Recovery

Ventilation Unit Decentralised School

Classroom Ventilator - Page 54

Floor Mounted Heat Recovery

Ventilation Unit Decentralised School

Classroom Ventilator - Page 55

Ventilation for classrooms and lecture halls

Whether learning to spell, experimenting with bunsen burners or completing a PHD, every learning environment requires maximum concentration and minimal disruption.

In 2021, the British government provided all state-funded schools in England with CO2 monitors with the aim of allowing pupils more freedom and less disruption, as studies show that high CO2 levels correlate with a higher transmission risk of viruses, such as COVID-19. Other research suggests that lower CO2 levels improve cognitive function, a finding which should not be overlooked in educational environments.

To combat high CO2 levels, effective ventilation is required. Blauberg’s range of Civic MVHR units offers an energy efficient solution, capable of removing CO2, VOC, humidity, viruses and combustible gases, and replacing it with fresh, filtered air. you can discuss with our engineer.

This article is from: