Skip to main content

B+H Brochure Laboratories

Page 1

ii

Cover + This Page: MaRS Centre Phase 2, Toronto, Canada


iii

1

WHO WE ARE

8 BUILDING REGENERATIVE FUTURES 10

ADVANCED STRATEGY

12 CAPABILITIES 13

OUR WORK

60

GET IN TOUCH


iv


1

WHO WE ARE

FOR OVER 70 YEARS, we’ve worked with clients across the globe to design buildings and environments that are inspiring, functional, and contextual.

At B+H we believe in the power

Our bold design solutions are

of design to transform spaces,

inspired by the confidence that’s

communities, and economies. We

derived from honed insight, active

enable our clients’ visions through

listening, fearless entrepreneurialism,

customized designs that exceed their

and a collaborative fusion of

business goals and inspire the people

perspectives. Design performance

that live, work, heal, play, and learn

achieved through constant

within them. We view every challenge

innovation, accountability, hands-on

as an opportunity for learning and

service, cultivating talent, and being

never lose sight of the people we’re

a champion for diversity in all its

designing for – regardless of the

forms – these are the things we value.

type of development, scale, scope, or geography involved.


2

QUICK FACTS

WE THINK GLOBALLY AND ACT LOCALLY WITH PROJECTS IN 30+ COUNTRIES

VANCOUVER SEATTLE

Satellite Office

TORONTO SHANGHAI HONG KONG

SINGAPORE

150+ 30 STAFF

PARTNERS

200+

Across 6 integrated and satellite offices

Across our global practice

Won in the last 20 years alone

AWARDS


3

| INTERIOR DESIGN | ADVANCED STRATEGY | SERVICES ARCHITECTURE BIOMIMICRY | RENEWAL | EXPERIENTIAL GRAPHIC DESIGN |

SECTORS

COMPLIANCE

COMMERCIAL/ MIXED USE

INSTITUTIONAL/ EDUCATION

RESIDENTIAL

RETAIL

HEALTHCARE

SPORTS & RECREATION

HOSPITALITY

TRANSPORTATION

CORPORATE WORKPLACE

60+

PROJECTS WELL, Green Mark, China 3-Star, Net Zero, Passive House and LEED® Certified

Award-winning design that is always

CLIENTFOCUSED


4

We do things

bold + We’ll ask the right questions. We believe in fearless exploration. A conventional design process is a risky strategy in a world that’s changing by the minute.


5

WHO WE ARE

differently.

+ Human People must come first. We design for multi-dimensional experiences. Blended environments offer visitors and residents enhanced and amplified lifestyle options.


6

BUILDING REGENERATIVE FUTURES Designing places that give more than they take For decades, sustainable design has focused on reducing

infrastructure, and people. The goal is not simply to

harm by using less energy, producing less waste, and

minimize a project’s footprint, but to strengthen the

limiting environmental impact. These efforts remain

ecological and social systems that support it.

essential, but regenerative design asks us to go further. This approach helps our clients identify risk earlier, What if buildings and infrastructure could actively

respond to changing climate conditions, and create

contribute to the places they inhabit?

projects that are more resilient, adaptable, and connected to place.

Regenerative design treats every project as part of a larger living system. Instead of viewing a site as an

Regenerative design moves beyond doing less harm

empty parcel, it considers the relationships already

to strengthen the living systems that sustain us.

at work between land, water, climate, plants, wildlife,

BIOMIMICRY: OUR DESIGN LENS Biomimicry is the lens B+H uses to engage regenerative design. Rather than copying how nature looks, biomimicry learns from how living systems function, adapt, and thrive. It helps us understand what nature is already doing in a place and how design can work with those systems. This way of thinking is not new. Indigenous Peoples around the world have long understood humans as part of nature and have developed distinct, place-based knowledge grounded in relationship, reciprocity, and responsibility to the land. We recognize these longstanding ways of knowing and seek to work with Indigenous communities where appropriate, respecting that knowledge is specific to each Nation, community, and place. Nature becomes a model, mentor, and measure for creating projects that are more resilient and better connected to their environment.


7

THE LIVING STORY Understanding Place Before Design Begins Every place has a story shaped by its ecology, climate,

The approach draws from biomimicry and longstanding

culture, and community. B+H’s Living Story is a predesign

Indigenous understandings of the relationships between

strategy that helps project teams understand these

people, land, and living systems.

conditions before major decisions are made, reducing risk and setting the foundation for a more resilient, regenerative project.

What does this place want to do?

What will it support?

What will it permit?

What might it inspire?

+ What ecological processes and relationships are already at work?

+ We look at existing ecological services the free engineering that nature provides to see how it can support our resilience.

+ Nature has a trajectory, and with climate change that trajectory is becoming much more difficult to predict

+ Through biomimicry, we learn from the timetested genius of the site how to solve our design problems

+ Pre-design risk assessments allow us to understand the trajectory of a place and how we will best fit in

+ Learn from local organisms how to self-cool, create circular economies, leverage solar energy, dissipate storms, or build with benign materials

+ Understand existing ecological assets, services, and opportunities to integrate as Naturebased Solutions

By building this understanding early, the Living Story helps teams:

+ Helps reduce risk and costs associated with climate change

+ It is expensive fighting nature, which is why the pre-design Living Story helps us avoid unnecessary costs

+ Identify climate risks and resilience opportunities early

+ Inform planning, infrastructure, and site decisions

+ Reduce uncertainty before significant design investment

+ Embed regenerative principles from the outset

+ Expand innovation by exploring the billionyear old ideas in nature

+ Establish measurable regenerative goals

FROM INTENTION TO MEASURABLE IMPACT The Living Story establishes a baseline for understanding

The ambition is not to make buildings look like nature. It

how a place performs before development and helps

is to create places that participate in living systems and

teams define relevant regenerative goals.

contribute to their long-term health.

By comparing performance before and after development, teams can assess whether the project is simply reducing harm or actively improving the systems around it.

+ Carbon sequestration + Stormwater retention + Air purification + Temperature regulation + Biodiversity and habitat + Community connection and resilience


8

ADVANCED STRATEGY At B+H, Advanced Strategy helps clients connect organizational objectives with future ready spatial and portfolio decisions across sectors, using research, stakeholder engagement, and scenario testing to translate complexity into actionable direction.

HEALTHCARE Canadian healthcare environments sit within complex systems of clinical practice, policy, funding, and community health outcomes. Our Advanced Strategy practice works with health authorities, clinical leaders, staff, and patients to clarify priorities, map care model futures, and understand operational realities before design decisions are locked in. Through research, systems mapping, and scenarios, we explore how changing demographics, technology, and care models will reshape facilities throughout their lifecycles.

Core Challenge: Designing mission‑ready, patient‑centred and staff‑supportive healthcare environments that can adapt to demographic, technological, and funding shifts. Stakeholders: •

Health Authorities

•

Clinical Leadership

•

Nursing & Allied Health Staff

•

Facilities/Biomed Teams

•

Patients/Families

•

Unions

•

Indigenous &

Offer: Care‑model futures scenarios (virtual care, distributed hubs), patient/ staff experience research, operational resilience, roadmaps

4.

Strategic Brief

1.

Discovery & Research

& Roadmap

2.

Analysis & Systems Mapping -

- Operational

Patient/Staff Experience

Resilience

3.

Scenarios - Care‑Models (Virtual Care, Distributed Hubs)

Community Partners •

Regulators

KICK-OFF + DATA EXCHANGE

DISCOVERY & RESEARCH

ANALYSIS & SYSTEMS MAPPING

SCENARIOS CARE‑MODELS

STRATEGIC BRIEF & ROADMAP

WHERE WE WANT TO BE

MAXIMIZE OPPORTUNITY, MINIMIZE RISK


9

CORE CAPABILITIES: DISCOVERY & RESEARCH We start by defining the right problem by clarifying project parameters, identifying key stakeholders, and establishing an organizational vision. Stakeholder engagements explore user experience and reveal underlying challenges, opportunities, and aspirations for the future. Quantitative (about the people) and qualitative (from the people) data are collected alongside benchmarking, environmental and horizon scanning to surface emerging trends and disruptions.

•

Visioning

•

Stakeholder/user engagements

•

Benchmarking

•

Environmental & Horizon scan

ANALYSIS Our analysis, built on a strong research foundation, aims to frame the problem before pursuing solutions. In evaluating the collected data sets, we are seeking to identify patterns that suggest key themes, generate insights and highlight critical success factors. In our analysis, we synthesize the information by considering how those items affect space in the future state.

•

Key Insights

•

Key Recommendations

•

Success Measures

SCENARIOS We extend our analysis by translating spatial implications into evidence-based scenarios. Scenarios test the design strategy’s alignment with anticipated future conditions and desired physical environments, policies, and experiences, ensuring long-term adaptability and success. The objective of this phase is to, through iteration, fully define a way forward.

•

Concept Plans, Block Plans, Building Stacks

•

Evaluation / Scorecard

STRATEGIC BRIEF & ROADMAP In this phase, the agreed strategy is captured in an executive level brief and translated into a detailed implementation plan across the project lifecycle. The Strategic Brief communicates the validated problem statement, chosen solution, key decisions, and success measures, while the roadmap sequences workstreams and milestones, anticipates future requirements, and embeds change management activities to support adoption. Together, they ensure recommendations move from concept into the physical environment in a coordinated, adaptable way.

•

Strategic Brief – Executive Summary

•

Roadmap – Implementation Plan


10

CAPABILITIES

P3 HEALTHCARE We are renowned for our expertise in delivering healthcare facilities in public-private partnerships [PPP/ P3/AFP]. We understand the key challenges that impact facility design under various P3 models and are skilled

• Kelowna General Hospital – Expansions (2008), Kelowna, Canada • Vernon Jubilee Hospital – Expansion (2008), Vernon, Canada

at assembling winning teams, building consensus among

• Milton District Hospital – (2008), Milton, Canada

stakeholders and maintaining the momentum to move

• New Western Memorial Regional Health Centre,

these projects to successful completion.

Corner Brook, Canada • Newfoundland Adult Mental Health and Addictions

B+H works in a variety of project roles across the various project phases including Planning, Design and Compliance [PDC]; as project architect in Design, Build, Finance and Maintain [DBFM] projects; and as part of fast-track teams. We are known for our ability

Facility (NAMHAF), Newfoundland, Canada • Burnaby Hospital - Redevelopment Phase 1, Burnaby, Canada • Halifax Infirmary Expansion Project (HIEP), Halifax, Canada

to coordinate large design and construction teams and

• Grandview Children’s Treatment Centre, Ajax, Canada

it is not unusual for us to manage between 20 to 40

• Children’s Hospital of Eastern Ontario, Ottawa, Canada

consulting firms on a single project. We recognize the

• West Lincoln Memorial Hospital, Grimsby, Canada

strengths that each consultant brings to the team and we value regional expertise. B+H team members are

We provide the following services for P3 projects:

increasingly invited to share their P3 project expertise to

Develop a functional program in consultation with the

governments and at leading industry gatherings.

end users • Develop block diagrams to support the functional

Our relevant experience includes the following projects: • Michael Garron Hospital Patient Care Tower (Completed, 2022), Toronto, Canada • Milton District Hospital Redevelopment (Completed 2017), Milton, Canada • St. Catharines Hospital + Walker Family Cancer Centre (Completed, 2012), St. Catharines, Canada (B+H + STH) • New Oakville Hospital (Bid), Oakville, Canada (B+H + STH) • Centre for Mental Health and Addiction - DBFM Services (Bid), Toronto, Canada (B+H + STH) • Markham Stouffville Hospital – Redevelopment (Completed, 2013), Markham, Canada (B+H/ Perkins+Will) • Surrey Outpatient Facility (P3 Design Proposal, 2008), Surrey, Canada

program • Prepare design documents, block schematics, and the Programme • Specific Design Specifications (PSDS) as components of the Programme Specific Output Specifications (PSOS) • Produce preliminary sustainable Design reports • Assist in expediting municipal planning approvals • Assist in the preparation, evaluation and selection of RFP proponents • Review and recommend acceptance of schematic design • Review design development, construction documents and commissioning, completion and occupancy submissions by the project consortium


11

S C H E M AT I C D E S I G N

Design development

Construction documents

Project management

Programming & Briefing

Public Private Partnerships

Master Planning

Community Hospitals

Sustainability

Remodelling & Renovation

Laboratories

Interior Design

Way Finding & Signage

Acute & Tertiary Care

Paediatrics

Equipment Planning

DESIGN SCAPE


12

MaRS Centre Phase 2, Toronto, Canada


13

OUR WORK


14

TRANSPORTATION SAFETY AND TECHNOLOGY SCIENCE

INNOVATIVE AND SUSTAINABLE FACILITIES TO SUPPORT A STRONG FUTURE Architecture49 and B+H Architects are collaborating in a joint-venture to deliver the development of the Transportation Safety & Technology Science (TSTS) Hub, a pioneering federal project set to redefine collaborative, accessible, and sustainable laboratory facilities in Canada. This dedicated team brings together a wealth of expertise and a track record of success in designing and delivering internationally acclaimed interdisciplinary science facilities for both public and private sectors. The TSTS Hub aims to evaluate and mitigate transportation safety risks for Canadians, pioneer new technologies to enhance safety certification procedures, improve investigative methods with responsiveness and precision, and overall elevate transportation safety standards. B+H combines strategic thinking with bold and inspiring design to transform spaces, communities, and economies. We believe in the power of design to transform spaces, communities, and economies. We enable our clients’ visions through customized designs that exceed their business goals and inspire the people who live, work, heal, play, and learn within them. We view every challenge as an opportunity for learning and never lose sight of the people we’re designing for – regardless of the type of development, scale, scope, or geography involved. Our bold design solutions are inspired by the confidence that’s derived from honed insight, active listening, fearless entrepreneurialism, and a collaborative fusion of perspectives. Design performance is achieved through constant innovation, accountability, handson service, cultivating talent, and being a champion for diversity in all its forms – these are the things we value.

Location Ottawa, Canada Size 228,195 ft2 | 21,200 m2 Status In Progress Client Laboratories Canada


15


16

MARS CENTRE PHASE 2

CONNECTING HERITAGE AND NEW CONSTRUCTION MaRS West Tower is an iconic, 780,000 sf, 20-storey Class A lab/office building that anchors the Discovery District of Toronto and represents the final piece of the MaRS Centre. The West Tower (formerly known as Phase II) is designed to enhance this campus of converging ideas, and innovation between science, business and government by providing a concentrated volume of research laboratories. Situated on a prominent street corner in Toronto at University Avenue and College Street, the building sits adjacent to the seat of the provincial government, cultural and financial districts and world-class academic and medical institutions. The building is home to office and laboratory and incubator space offers 780,000 square feet of advanced laboratory and office space. The tower floors boast advanced communications and information technology capabilities and expansive conference, meeting and collaboration facilities, including advanced mechanical and electrical systems, wet lab capability and floors with advanced load-bearing capabilities and 15-foot clearances. The West Tower design features include the podium level ‘jewel box’ which house exhibition space at the ground level and front a new urban plaza. The ‘jewel box’ serves as integral volumetric piece to the overall massing of Phase II that acknowledges the Heritage building through a modern sensitivity and prominently recognizes its adjacency to Queen’s Park. Along the West elevation (University Ave.) terracotta screens and panels are employed as an aesthetic response to the terracotta cornices of the Heritage Building. Continuity of the terracotta extends through a ceremonial 4-storey entrance into the public, 60ft high sky-lit interior atrium providing a subtle contrast to the ‘jewel box’ and a complementary materiality to the brick faced Heritage façade. The building is designed as several articulated masses in a process to break down the monolithic building surfaces resulting from such a large floor plate. Analogous to a protective skin being peeled away to reveal the inner tissue, a portion of the building is clad in a blue-sliver tinted glazing. This glazing includes protruding aluminum fins that further break down the mass by creating a finely textured surface. Recessed from the blue-silver glazing, is ultra-clear low-iron glass, which exhibits to the city the inner workings of the building. As a result, the exterior skin of the building focuses on balancing inward views and outward views with selectively revealing the inner activity of the atrium and the strategic application of transparent materials that address private and public spaces. Awards PUG Awards - People’s Choice for Toronto Architecture, Positive score Location Toronto, Canada Status Completed 2014 Client MaRS Discovery District Certification LEED® Canada-CS Gold Certified


17


18

BLUEROCK LABS

COHESIVE SPATIAL EXPERIENCE BlueRock Therapeutics is an engineered cell therapy company with a mission to develop regenerative medicines for intractable diseases. The company initiated its first clinical trial to treat Parkinson’s Disease patients in 2018, and is developing a cell therapy designed to remuscularize damaged cardiac tissue in heart failure patients. This laboratory and research space within the MaRS II complex is designed to support BlueRock’s emerging role within Toronto’s Discovery District network of biotechnology development and commercialization. A cohesive spatial experience and project identity was achieved via a palette of spaces fostering culture, curiosity, collaboration and discovery, which could be applied to both renovated and new workspaces. Open, studiolike, tech-enabled, lighting-enhanced, reconfigurable co-lab zones with kitchenette and presentation capabilities are at the heart of both spaces, with open workstations and meeting spaces adjacent to them. Highly controlled laboratory environs with their own service flows are physically separated but visually engaged with these central hives through glazed screens enlivened with custom felt cutouts based on cell morphology. At the MaRS II space, conference spaces can open onto the central co-lab zone to host events, and with the goal to showcase science-in-action, include framed views into the GMP-pilot lab. Design details balance modular arrangements and the crisp lines and cleanable finishes of a high-tech laboratory environment with the organic, colour-saturated forms of a energetic, brandresponsive biotech start-up. This new environment establishes BlueRock as a magnet for product development and commercialization within the biotech ecosystem of MaRS II.

Location Toronto, Canada Size 16,000 ft2 | 1486 m2 Status Completed 2019 Client BlueRock Therapeutics LLC


19


20

LCBO, 100 QUEENS QUAY EAST QUALITY CONTROL LAB DEVELOPMENT

ADVANCING BEVERAGE QUALITY ASSURANCE B+H was responsible for the fit-out and installation of the new Quality Control and Assurance Laboratory for the LCBO. The project involved relocating the existing facility to a new office building in downtown Toronto and modernizing the laboratory to meet current operational and technical requirements. As the principal Quality Assurance Lab for the LCBO, this facility reviews every controlled beverage sold within the Province of Ontario. The project presented significant cost challenges in integrating a high-profile laboratory within a standard office tower environment. Through innovative design and careful coordination, B+H successfully delivered a state-of-the-art laboratory that supports one of the central functions of one of the world’s largest retailers and distributors of alcohol. This project forms part of the broader LCBO head office relocation and development, for which B+H is also a key contributor.

Location Toronto, Canada Size 9000 ft2 | 836 m2 Status Completed 2022 Client LCBO


21


22

QUEEN’S UNIVERSITY - BOTTERELL HALL

ADVANCING BIOMEDICAL DISCOVERY Botterell Hall is the primary health sciences and biomedical research building at Queen’s University. It houses wet labs, a small library, faculty offices and one of the university’s vivaria. The building was designed and built in the 1970s and is in-need of programmatic and infrastructure renewal. In 2010, B+H won an RFP to provide a strategic study for the renewal of the vivarium. The objective was twofold – to update the rodent facility to exceed current regulatory requirements and to position the overall animal facility resource to support future-focused recruitment and growth in Queen’s biomedical research program. Following the study, two more rounds of work to develop, engineer and cost this design were undertaken – culminating in a successful SIF grant in 2016. The project scope grew to include a major infrastructure renewal for the whole of Botterell Hall (HVAC, Emergency Power Systems) as well as an expanded upgrade to other portions of the multi-species facility (including fish, dogs, pigs, rabbits, sheep and guinea-pigs). Even before it was completed, the project helped the University recruit a significant new Principal Investigator. B+H led and developed the project from concept, through programming, design and into phased construction. The team worked closely with the Queen’s project management team and Dr. Winterborn, Queen’s head Vet. The team worked closely with the facility’s major technology vendors: Tecniplast, Getinge and Dust Control. In spite of a complex renovation scope and the addition of major infrastructure elements to the project, the process was delivered on-time and on-budget.

Location Kingston, Canada Size 35,000 ft² | 3252 m² Status Completed 2016 Services Architecture Client Queen’s University


23


24

MAX BELL RESEARCH CENTRE

MODERNIZING RESEARCH INFRASTRUCTURE The Max Bell Research Centre is one of UHN’s older facilities. It now forms a part of the MaRS Complex. The building houses two of UHN’s many animal facilities – one for transgenic mice and one that is used flexibly for multiple species. This project was principally focused on updating an aging facility to address regulatory inspection citations and to provide some additional functionality to house research models of varying health status by giving the facility the ability to switch rooms from biocontainment to bioexclusion. The facility was designed to a BSL 2+ standard. The scope of the project included re-work of major portions of the HVAC system, the creation of a new cage washing and sterilization area and consolidated staff support areas located outside of the controlled areas. B+H led and developed the project from programming, through design and to the completion of construction. B+H’s team worked closely with UHN’s project management team and Dr. Moloo, UHN’s head Vet. The project faced significant challenges due to tight space and budget constraints, unforeseen and undetected sub-grade utilities and issues with the aging building infrastructure upon which parts of the project depend. Due to these mitigating site conditions that were beyond the control of the design team or the client, the project was completed approximately 4 months after its original target date and was 10% over budget.

Location Toronto, Canada Size 8,000 ft2 | 743 m2 Completion Completed 2016 Client University Health Network


25


26

UNIVERSITY OF TORONTO LASH MILLER BUILDING RENOVATIONS

THE FUTURE OF CHEMISTRY, REIMAGINED B+H was responsible for a series of renovations to the Lash Miller Building, home to the University’s Department of Chemistry, including 9,000 square feet of research offices for the Chemical Physics Theory Group and a new 10,000-square foot “super” laboratory teaching environment for undergraduate students. This laboratory can accommodate 130 students and features breakout lab areas, advanced networking capabilities and interactive teaching amenities. B+H also designed lobby furniture for the common areas. A second phase of work created approximately 10,000 square feet of lab facilities on two half-floors of the building. Additional Alterations to the Lash Miller Building, Department of Chemistry, Research Wing: conversion of the existing Constant Air Volume HVAC system (CAV) to a Variable Air Volume system (VAV) including the integration of existing fume hoods to a VAV system. Secondary measures such as exhaust heat recovery and process cooling will be considered. This lab can accommodate 130 students and features breakout lab areas, advanced networking capabilities and interactive teaching amenities.

Location Toronto, Canada Size 29,000 ft2 | 2,69060 m2 Status Phase 1 Completed 2003 Phase 2 Completed 2006 Phase 2 Completed 2018 Client University of Toronto


27


28

AFFINIUM PHARMACEUTICALS LABORATORIES

DESIGNED FOR SCIENTIFIC INNOVATION B+H were the architects and planners for this private sector biotechnology laboratory and production facility. Involved in the high-throughput production of proteins, research, and the development of an integrated proteomics database, this facility includes a wide range of technical requirements and specialized laboratory needs. It is located within an existing downtown Toronto commercial office building, as part of a trend of bringing leading edge research and commercial biotech activities out of the suburban business park model and back into the urban core.

Location Toronto, Canada Size 20,000 ft2 | 1,860 m2 Status Completed 2001 Client Affinium Pharmaceuticals


29


30

UNIVERSITY HEALTH NETWORK UNIVERSITY AND COLLEGE CAMPUS STUDIES

PLANNING THE FUTURE OF BIOTECHNOLOGY This 1,000,000-square foot project involved a Master Plan Study for the long-term growth of the overall campus, an Architectural Study for the integration and adaptive reuse of existing research and heritage buildings, and a Design Study for the development of the site into a leading-edge biotech research facility.

Location Toronto, Canada Size 1,000,000 ft2 | 92,900 m2 Status Completed 2001 Client University Health Network


31


32

NATIONAL RESEARCH COUNCIL INSTITUTE FOR FUEL CELL INNOVATION

POWERING THE FUTURE OF CLEAN ENERGY The NRC Institute for Fuel Cell Research contains 21 laboratories, including 7 laboratories allocated for industry incubation. Many of the energy-saving technologies used in the building were developed by the occupant. The Institute for Fuel Cell Innovation (NRC-IFCI) at the University of British Columbia is the centrepiece of BC’s Fuel Cell industry cluster. The facility is one of the first of seven nodes to be built in the Hydrogen Highway and is the demonstration site for many innovative fuel cell systems and technologies that were developed for the 2010 Vancouver-Whistler Winter Olympics. A unique aspect of the centre is that the technology used to partially power the building was developed by the resident user and can be incorporated by the sustainable building industry. The full suite of technologies featured in this progressive facility includes a ground source heat pump to provide natural-source heating and cooling, a 5KW solid oxide fuel cell system powered by natural gas and a photovoltaic array to capture energy from sunlight. The Institute for Fuel Cell Innovation is LEED Gold certified. This project was completed by Bunting Coady Architects, Bunting Coady merged with B+H in December 2010.

Location Vancouver, Canada Status Completed 2010 Client National Research Council Institute for Fuel Cell Innovation Certification LEED® Canada-CS Gold Certified


33


34

UNIVERSITY OF BRITISH COLUMBIA LIFE SCIENCES CENTRE

A LANDMARK FOR LIFE SCIENCES An international hub for medical research and education, the LSC opened in six phases only 29 months after breaking ground. The building is composed of three large five storey blocks, connected by atria, with two basement levels. A highly sophisticated building with interstitial floors and a complex program, the facility includes a range of different spaces including laboratories with Biosafety ratings of 2 and 3, a vivarium, wet and dry labs, two lecture theatres each seating up to 350 students, a 128 seat lecture theatre and 42 classrooms of varying sizes. The LSC is one of the largest buildings in Canada to achieve LEED® Gold certification, which is regarded as particularly impressive due to the building’s significant laboratory component; only a handful of laboratories in North America have achieved LEED® Gold rating. This project was completed by Bunting Coady Architects in joint venture with Diamond Schmitt Architects Inc.. Bunting Coady Architects merged with B+H in December 2010.

Location Vancouver, Canada Size 562,000 ft2 | 52,200 m2 Status Completed 2005 Client University of British Columbia Certification LEED® Canada-CS Gold Certified


35


36

UNIVERSITY OF BRITISH COLUMBIA CENTRE FOR BLOOD RESEARCH (CRYSTLALLOGRAPHY LAB)

TRANSFORMING BLOOD RESEARCH The multi-disciplinary Centre for Blood Research (CBR) at the University of British Columbia brings together basic biomedical scientists, clinical scientists, engineers and social scientists, the mission of the CBR is to perform cutting-edge research to improve transfusion science and blood products in Canada. This multi-disciplinary approach to blood research has made the UBC CBR unique in the world. The CBR has four major research themes: Analysis of blood proteins using cutting edge proteomics technology, Optimization of the value derived from blood donor platelets, Creation of artificial blood components and Increasing the involvement of Canadians in their blood system. This project was completed by Bunting Coady Architects in joint venture with Diamond Schmitt Architects Inc. Bunting Coady Architects merged with B+H in December 2010. The LSI also includes: •

Zoology (Drosophila Lab)

•

Anatomy (Histology Lab)

•

Anatomy (Morgue, Gross Anatomy Lab, Plastination Lab)

•

Human Pathology (Bovine Spongiform Encephalopathy (BSE) Containment Level - 2 Lab)

•

Lab – Vivarium Containment Level - 2

•

Lab – Vivarium Containment Level – 3

•

Magnetic Resonance Imaging (MRI)

•

Animal Pathology - Bovine Spongiform Encephalopathy (BSE) Containment Level - 2 Lab

•

Imaging Lab

Location Vancouver, Canada Status Completed 2010 Client University of British Columbia


37


38

UXBRIDGE HEALTH CENTRE

ACCESSIBLE COMMUNITY HEALTHCARE DESIGN Uxbridge Health Centre is a two-storey newly constructed building on the Uxbridge Hospital campus. The Health Centre is a unique partnership between a group of ten local physicians (Uxmed) and a major hospital system (Oak Valley Health) who own and operate the hospital on the project site. In exchange for the use of the land and with the hospital as a partial tenant, B+H designed and administered the construction of a modern ambulatory building that will form one of the future wings of the adjacent rebuilt community hospital. The new building contains a café, pharmacy, retail diagnostics lab, physiotherapy practice as well as a 30-exam-room multipurpose clinic for the physician group. In addition, Oak Valley Health has funded over 10,000sf of shelled space for its own clinics and diagnostic imaging.

Location Uxbridge, Canada Size 35,000 ft² | 3,252 m² Status Completed 2021 Client Oak Valley Health


39


40

MARKHAM STOUFFVILLE HOSPITAL REDEVELOPMENT

A FOCUS ON WELLNESS IN HEALTHCARE In 2007, B+H Architects with Perkins+Will was retained to provide full Master Plan, Design and Compliance services on the basis that the project would be awarded as a design, build, finance and maintain contract. Following the completion of a Master Plan looking out to 2024 and assistance in the process of securing rezoning and site plan approval, the project was converted to a Build-Finance model with the B+H team providing full consulting services. The work involved a new wing of 382,250 square feet, plus renovations to 146,290 square feet of the existing 322,460 square foot facility. This project is LEED® Silver certified. Awards Project of the Year - Professional Engineers of Ontario, York Chapter

Location Markham, Canada Size 505,900 ft2 | 47,000 m2 Status Completed 2013 Client Markham Stouffville Hospital / Infrastructure Ontario Certification LEED® Silver certified Collaboration B+H is Architect and Prime Consultants and Perkins + Will is Associate Architect


41


42

ST. CATHARINES HOSPITAL + WALKER FAMILY CANCER CENTRE

LOCAL CARE DESIGNED TO GLOBAL STANDARDS Plenary Health was selected as the preferred proponent by Infrastructure Ontario to design, build, finance and maintain this complex. The new 375bed hospital consolidates acute and ambulatory services on a new site for the residents of St. Catharines and the immediate area. It provides new programs and services such as cardiac catheterization, cancer treatment and longer-term mental health services, improving access to these specialized services to local residents. The state-of-the-art complex also introduces new services to the region, and is LEED Silver certified. B+H and Silver Thomas Hanley were joint venture architects on the Plenary team. Awards Toronto Construction Association: 2012 Project Achievement Award

Location St. Catharines, Canada Size 960,000 ft2 | 89,187 m2 Status Completed 2012 Client PCL Constructors Canada Inc. Certification LEED® Silver certified Collaboration Silver Thomas Hanley (Joint Venture)


43


44

XANTREX TECHNOLOGIES

POWERING INNOVATION THROUGH DESIGN Xantrex Technologies’ Simon Fraser University Office Building is a four storey 150,000 square foot single tenant building designed for a hightech communications company, located at Discovery Place Business Park, Burnaby. The building is sited up a slight hill in an existing evergreen forest as two buildings terraced around a central atrium spine. The broader context of the site features an extensive trail system through a pristine forest containing natural streams, and other preserved natural amenities. The two building scheme allows for phased development for the rapidly expanding Xantrex company. The terraced as well as fitting into the existing grade as efficiently as possible is afforded excellent views of the Lower Mainland to the south. This project was completed by Bunting Coady Architects, Bunting Coady merged with B+H in December 2010.

Location Burnaby, BC, Canada Size 150,000 ft2 | 13,935 m2 Status Completed 2010 Client Xantrex Technologies


45


46

NATIONAL UNIVERSITY CENTRE FOR ORAL HEALTH, SINGAPORE (NUCOHS)

CREATING CENTRAL HUBS & CONNECTIONS BCA Green Mark Platinum certified, the NUCOHS can accommodate about 500 patients per day. This 34,000 sqm GFA integrated healthcare centre consolidates multi-disciplinary clinical dental services, education and research facilities under one roof. The design of the building activates a Campus Green with landscaped civic spaces linking NUCOHS to the National University Hospital, Singapore (NUHS) campus. It is connected to the public transportation network through a network of bridges and covered walkways. The treatment floors allow close cooperation between teaching and treating with a mix of tutorial rooms, open-office concept low partition dental chairs aggregated into pods, closed operatory and flexible waiting areas. Interior spaces combine high ceiling with extensive high-performance curtain walls that maximize natural light penetration and allow a better connection to the nature. The education, administration and research wings share a landscaped courtyard at the upper levels of the building with naturally-ventilated circulation, pre-function zones and student common spaces. Awards Gold (Design), BCA Universal Design Mark Award, BCA Awards 2017

Location Singapore Size 419,800 ft2 | 39,000 m2 Status Completed 2019 Client National University Hospital (S) Pte Ltd. Certification BCA Green Mark Award for Buildings | Platinum Collaboration A61 Architects


47


48

ARE TIN INTERNATIONAL LIFE SCIENCE & TECHNOLOGY CENTRE

MULTI-FACETED APPROACH FOR MULTI-USE CAMPUS The International Life Science and Technology Centre is a scientific research campus consisting of multi-usage research facilities, a series of public service facilities, and parking space. This project, located in Tianjin, China, included master planning for the bio-medical research campus, landscape design of a central park, architectural design for Phase I (including two Research and Design buildings), as well as the interior design for some of the spaces. The project obtained LEED® Silver certification.

Location Tianjin, China Size 2,449,866 ft2 | 227,600 m2 Status Completed 2017 Client Confidential


49


50

INTERNATIONAL PHARMACEUTICAL COMPANY SHANGHAI PHASE III

REIMAGINING THE SCIENCE WORKPLACE This International Pharmaceutical Company needed a new office space in Shanghai, and they were ready to financially and personally invest in their staff through a new workplace strategy concept called iWork. This office building is the influential landmark that ties together the previously constructed and standardly configured Phase I building and the unique requirements of the lab space in Phase II. For our client, Phase III wasn’t about cramming staff into cubicle farm disguised as a sound investment. It was about providing visual and interactive connection through complementary structural and landscape architecture. Reflecting on the need for a campus design, we helped our client develop a design dialogue amidst the three phases while being equally attentive to their need for an innovative activity-based workspace—a place where people wanted to come to work.

Location Shanghai, China Size 331,400 ft2 | 30,788 m2 Status Completed 2017 Client Confidential Photography Yijie Hu


51


52

NEW LAB BUILDING

DESIGNED FOR SCIENTIFIC EXCELLENCE This is a fit-out project for a confidential client located at Shanghai in Pudong District. The support services rooms are located at the ground floor and the laboratories are located at 2nd – 5th floor. B+H started this project from space planning, and all the way to detailed design development (including project specification).

Location Shanghai, China Completion 2011 Client Confidential Location Shanghai, China


53


54

INTERNATIONAL PHARMACEUTICAL AND HEALTH CARE PRODUCTS MANUFACTURER SUZHOU ADMIN BUILDING AND LABORATORY

ADVANCING PHARMACEUTICAL PRODUCTION Located in Suzhou Industrial Park, this is an international pharmaceutical and Health Care Products Manufacturer’s industrial base which includes 2-storey 7442.4 m2 Administration and Lab Building, 2-storey 6926.7 m2 CUB (Central Utility Building), 5-storey 34469.8 m2 Production building, a 9438.6 m2 warehouse, a 261 m2 Chemical Storage and other supporting facilities. B+H worked with MW Zander, Project Management.

Location Suzhou, China Size Administration and Lab Building: 80,109 ft2 | 7442.4 m2 CUB (Central Utility Building) 74,558 ft2 | 6926.7 m2 Production building 371,030 ft2 | 34,469.8 m2 Warehouse 101,596 ft2 | 9438.6 m2 Chemical Storage 2809 ft2 | 261 m2 Status Phase I completed 2009 Client International Pharmaceutical and Health Care Products Manufacturer


55


56

CHARLES RIVER LABORATORIES

ADVANCING PRECLINICAL RESEARCH B+H was commissioned by Charles River to renovate the production cells of Shanghai Pharm Valley Corp into the Vivarium. The 4-storey building occupies 10,440 square feet and the floor area is 41,760 square feet. The adjacent building is slated for offices and the necessary amenities the floor area of which is 11,840 square feet.

Location Shanghai, China Size 41,760 ft2 | 3880 m2 Completion 2008 Client Charles River Laboratories


57


58

GLOBAL PHARMACEUTICAL + LABORATORY EXPERIENCE PHARMACEUTICAL LABS, MANUFACTURING AND SUPPORTING FACILITIES

BIOMEDICAL RESEARCH LABORATORIES

UNIVERSITY | COLLEGE LABORATORIES

Charles River Laboratories, Shanghai, China Size: Confidential Budget: Confidential

MaRS Centre Phase II, Toronto, Canada Size: 1,026,370 ft2 Budget: $280 Million

University of British Columbia – Life Sciences Centre Laboratories, Vancouver, Canada Size: 562,000 ft2 Budget: $200 Million

Afinium Pharmaceuticals (formerly known as Integrative Proteomics), Toronto Size: 20,000 ft2 Budget” $2 Million

University Health Network – GMP Cell Processing Plant, Toronto, Canada Size: 3,000 ft2 Budget: $1.4 Million

International Pharmaceutical and Healthcare Products Manufacturing, Suzhou, China Size: Confidential Budget: Confidential

University Health Network – Gene Profiling Lab at Princess Margaret Hospital, Toronto, Canada Size: 3,820 ft2 Budget: $1 Million

Confidential R&D Campus Size: Confidential Budget: Confidential

University Health Network – Max Bell Research Centre Multi-Species Vivarium Renewal, Toronto, Canada Size: 20,000 ft2 Budget: $4 Million

ARE Tin (International Life Science and Technology Centre) – Phase 1 Size: Confidential Budget: Confidential Novartis New Lad Building in Zhangjiang Hi-Tech Zone, Shanghai, China Size: Confidential Budget: Confidential

Queen’s University Faculty of Health Sciences – Botterell Hall Animal Facility Renewal, Kingston, Canada Size: 60,000 ft2 Budget: $24 Million High-Tech Laboratories Design Proposal for Discovery Parks, Vancouver, Canada Size: 60,000 ft2 Budget: $30 Million University Health Network Research Institute – Max Bell Research Centre Lab Renewal, Toronto, Canada Size: 40,000 ft2 Budget: $7 Million

University of British Columbia – Chemical & Biological Engineering Building and Clean Energy Research Centre, Vancouver, Canada Size: 126,190 ft2 Budget $30 Million University of British Columbia – Centre for Blood Research (Crystallography Lab, Vancouver, Canada University of Toronto – Lash Miller Building (Department of Chemistry) Renovations, Toronto, Canada Size: 29,000 ft2 Budget: $5 Million Simon Fraser University ASSC 1&2 Life Sciences Building, Burnaby, BC Size: 120,000 ft2 Budget: $40 Million


59

CLINICAL LABORATORIES

New Niagara Health System Healthcare Complex and Walker Family Cancer Centre – including Clinical, Pathology and Blood Labs, St. Catherines, Canada Size: 960,000 ft2 (20,000 cgsf Lab Component) Budget: $430 Million Markham Stouffville Hospital Redevelopment, Including Clinical, Pathology and Blood Labs, Markham, Canada Size: 538,000 ft2 Budget: $250 Million Gleneagles Medini Hospital, Cancer Care Including Clinical, Pathology and Blood Labs, Iskandar, Johor Bahru, Malaysia Size: 1,400,000 ft2 Budget: $200 Million National University Centre for Oral Health (NUCOHS) – Dental Labs, Singapore Size: 39,000 ft2 Budget: Confidential Juravinski Centre for Integrated Care Including Clinical, Pathology and Blood Labs, Hamilton, Canada Size: 800,000 ft2 (Facility) | 12,000 ft2 (Labs) Budget: $240 Million Beijing International Medical Centre, (study included shared and dedicated labs), Beijing, China Size: 22,000,000 ft2 Budget: Confidential

GOVERNMENT | REGULATORY TESTING LABORATORIES | REFERENCE LABS Cleveland Clinic Abu Dhabi Hospital (including Pathology, Clinical & Blood Lab), Abu Dhabi, UAE (Peer Review) Budget: $1000 ($1B)

National Research Council – Biology Laboratory M-54 Addition, Ottawa, Canada Size: 41,000 ft2 Budget: $5.5 Million


60

150+ STAFF ACROSS 6 INTEGRATED AND SATELLITE OFFICES

VANCOUVER SEATTLE Satellite Office

TORONTO SHANGHAI HONG KONG

SINGAPORE

AMERICAS Toronto 320 Bay Street Suite 200 Toronto, ON M5H 4A6 Canada T +1 416 596 2299

Vancouver 400 - 1706 West 1st Avenue Vancouver, BC V6J 0E4 Canada T +1 604 685 9913

Seattle Seattle, WA United States T +1 604 685 9913

Hong Kong 41/F, AIA Tower, 183 Electric Road North Point, Hong Kong China T +852 3158 2123

Singapore 38 Cleantech Loop, #01-31 636741 Singapore T +65 6911 8675

ASIA Shanghai 19F, Crystal Tower No.68, Yuyuan Road Shanghai 200040 China T +86 21 3360 7861


A GLOBAL COMMUNITY DESIGNING & DELIVERING THE BEST SOLUTIONS


62

B+H Americas | Asia bharchitects.com


Turn static files into dynamic content formats.

Create a flipbook
B+H Brochure Laboratories by B+H Architects - Issuu