1.Multi Level Parking for 2000 cars (400/floor) and 250 Two-Wheelers.
2. Hypermarket on the Ground Floor whose entry/exit will be from ground floor as well as multilevel parking above it.
3. First Basement floor for MEP plants. Consider all basic services that will be required. In addition to services, the First basement floor will serve as an additional storage area for the mall/retail warehouse above it.
4. Second basement will entirely be dedicated to storage for the hypermarket.
6. Separate Entry & Exit Ramp to parking.
6. 6m wide Site Peripheral road in the setback area with appropriate greenery.
7. Entry to the site is from the South Direction