YOU ARE
THE FUTURE INTERNING AT BATSON-COOK CONSTRUCTION
TABLE OF CONTENTS 3
PRESIDENT’S MESSAGE
23 TIMESHEETS
4 OUR VALUES
26 INTERNSHIP WRAP UP
5
ABOUT US
28 SOFTWARE TOOLS
7
DAY ONE
29 REGIONAL HIGHLIGHTS
9 LEADERSHIP
33 DELIVERY METHODS
12 PREPARING FOR THE
35 CORPORATE CONTACTS
INTERNSHIP
13 EQUATION 15 MENTOR/INTERN GUIDELINES
38 ABBREVIATIONS 39 GLOSSARY 41 OFFICE LOCATIONS
17 SAFETY 20 MENTORS & HUDDLES 2
PRESIDENT’S MESSAGE Congratulations for becoming a Batson-Cook Intern. You’re about to embark on a new chapter of your career, one that may lay the seeds for growth in the construction industry. I hope your internship brings you opportunities to learn more about this profession, growth as an individual, network with new people, and so much more! At Batson-Cook, you are going to be treated like every other employee. We do this so you get a better understanding of what it will be like to work here. You are going to be doing activities like everyone else in your field. This is not a “go grab a cup of coffee” kind of position - we expect you to perform like every other employee on our jobsites and in our offices. If I could share one piece of advice, it would to be forge your own path. There are numerous opportunities on our jobsites. If you see something - a task, a career path, anything that interests you - follow up with your manager and ask what you can do to follow that path. You are in control of your career. Take every opportunity we offer you. I’m very excited for you.
R. Randall Hall President & CEO
Atlanta Office
3
OUR VALUES Batson-Cook follows five core values that help us with every decision we make. It’s important to understand these, as you will not only see them in action, but be expected to live these everyday while you work at the company.
WE CARE ABOUT PEOPLE AND RESULTS. We care about people, all people; our Batson-Cook colleagues, our clients, and our trade partners. We care about their safety and the positive results from the work that we do together.
WE ARE PASSIONATE. We believe passion is the fuel that produces excellence and we encourage enthusiastic behavior.
WE ALWAYS STRIVE TO DO THE RIGHT THING. We believe that honesty and integrity are pillars of success and when faced with tough decisions we should always do the right thing.
WE DO WHAT WE SAY WE ARE GOING TO DO. We embrace accountability and take responsibility for our work. We take pride in doing what we say we are going to do.
WE BUILD STRONG, LASTING RELATIONSHIPS. We work hard to develop meaningful relationships through mutual respect. We appreciate the value of trust and the key role that it plays in successful projects.
4
ABOUT US Batson-Cook Company is a Georgia-based firm that has been in business for more than a century under the same name. The company was founded in 1915 by Mr. W. C. Batson and Mr. Edmund F. Cook in West Point, Georgia, where it began operations in textile and mill village construction. On January 10, 2008, Batson-Cook became a wholly-owned subsidiary of Kajima USA. As intended by KUSA, Batson-Cook operates as an independent entity, just as it has for the last century. Batson-Cook’s expertise as a general contractor, construction manager, and design-build contractor spans almost every major industry throughout the Southeast, including the education, healthcare, hospitality, office, retail, multi-family residential, industrial, wood frame, and religious building sectors.
2016
CHARLOTTE
1959 ATLANTA
2019
1915
DALLAS
WEST POINT
1957 JACKSONVILLE
1983 TAMPA
7 offices across four states 5
2019 ORLANDO
100+
Batson-Cook has been in business for more than 100 years under the same name.
87%
550+
Repeat clients in 2022
Batson-Cook employees
Began operations in textile and mill village construction.
1915 Founded by Mr. W.C. Batson and Mr. Edmund F. Cook in West Point, Georgia.
JANUARY 10
2008
Batson-Cook became a whollyowned subsidiary of Kajima USA. As is KUSA’s intent, Batson-Cook operates as an independent entity.
TOP
200
Consistently ranked in the top 200 contractors in the United States, according to Engineering News-Record.
6
DAY ONE WHAT TO WEAR ON SITE • Long pants • Collared shirt • Work boots • PPE (provided by Batson-Cook on first day) OFFICE ATTIRE • Business casual • Jeans or khakis or dress • Collared shirt (polo or button up shirt) • Appropriate shoes
Work Hours OFFICE 8:00 AM - 5:00 PM ON-SITE Site hours are set by your project team Late? Sick? Notify your manager and stay home if you’re sick!
ARRIVAL • To your assigned division office and ask for your respective executive assistant FREE PARKING • Park in any of the spots surrounding the office PAY DAY Paychecks are issued on a weekly basis - paid to your direct deposit Per Diems are paid on a monthly basis. BATSON-COOK LAPTOP This is a valuable asset and is to be protected as if it were your own laptop. Please take the appropriate security measures and safety precautions to protect against damage and possible theft. You are required to follow all guidelines outlined in the Policy for Electronic Communications and Internet Use, so please review and understand your responsibilities.
7
Northside Hospital Cherokee
Canton, Ga.
Completed 2022
CORPORATE LEADERSHIP
9
R. RANDALL HALL
KEVIN APPLETON
PRESIDENT & CEO
CHIEF OPERATING OFFICER
JEFFREY KRALL
NANCY BLACK
ALLEN WESTMORELAND
CHIEF FINANCIAL OFFICER
CHIEF PEOPLE AND ADMINISTRATIVE OFFICER
SENIOR VICE PRESIDENT OF RISK MANAGEMENT
OPERATIONAL LEADERSHIP
CURT RIGNEY
DARIN APPLETON
DENISON GODWIN
SENIOR VICE PRESIDENT
SENIOR VICE PRESIDENT
SENIOR VICE PRESIDENT
& GENERAL MANAGER,
& GENERAL MANAGER,
& GENERAL MANAGER,
CHARLOTTE DIVISION
WEST POINT DIVISION
HEALTHCARE DIVISION - ATLANTA
EVENDER SPRADLIN
KEVIN APPLETON
PAT RAY
SENIOR VICE PRESIDENT
COO & ACTING GENERAL MANAGER,
SENIOR VICE PRESIDENT
& GENERAL MANAGER,
DALLAS DIVISION
& GENERAL MANAGER, PRIVATE COMMERCIAL DIVISION -
FLORIDA DIVISION
ATLANTA
SPENCER HOUSTON
SHAWN BAXTER VICE PRESIDENT
VICE PRESIDENT
OF FIELD OPERATIONS,
OF FIELD OPERATIONS,
ATLANTA
ATLANTA
DAVID GLASSCOCK
CHRISTOPHER SHEPHERD
VICE PRESIDENT
VICE PRESIDENT
ROBERT TRICE VICE PRESIDENT
& BUSINESS UNIT LEADER
& BUSINESS UNIT LEADER
& BUSINESS UNIT LEADER
10
Previous Intern Events
11
PREPARING FOR THE INTERNSHIP Our Code of Conduct Upon accepting the position, you became an employee of Batson-Cook Construction. As such, we have high standards and take our reputation seriously. Our people are expected to behave as adults and positive role models at all times. Your behavior on and off the job is a reflection of Batson-Cook. Negative behavior on the job, in Batson-Cook supplied housing or at a Batson-Cook event can result in the termination of your employment. Respect Confidential Information Any information concerning the business of our firm, its customers, suppliers, subcontractors, dealers, employees or personnel associated with the firm is confidential and restricted. You may not discuss any such information unless directed or approved by your supervisor. If you are unsure what information is subject to our confidentiality policy, ask your supervisor. Practice the following to develop your skills! • • • • • • • • • • •
Start building your network – now! Do not be shy – always ask questions and speak up. Learn to read drawings. Understand the big picture on your project. Attend as many meetings as possible. Prepare before making phone calls. Do not be afraid to tell subcontractors and vendors that you are an intern. Show initiative and ask to take on more responsibility if you want to. Practice public speaking and writing. Get exposed to as much as possible. Don’t be afraid to get your hands dirty.
Remember Courtesy Maintaining our customer relationships and business family is our most important responsibility. You are expected to help us carry out this policy by extending every courtesy and all assistance necessary, not only to customers and your fellow employees, but to our subcontractors, suppliers, and any callers or business visitors to Batson-Cook. If someone asks you for assistance that you are unable to give, refer them to your supervisor.
12
EQUATION Batson-Cook is launching a program called “EQUATION.” The term equation is derived from three words: Equity, Awareness and Action. Here is why those specific words were chosen: EQUITY • We care about people and results • We strive to do the right thing • We pledge that at Batson-Cook, Inclusion is the STANDARD. We pledge to make sure that everyone at is afforded equal access to resources and opportunities, and that we will put in place measures to ensure that everyone who desires to grow in the company will be able to do so. AWARENESS • We are passionate • We strive to educate our employees (and trade partners) to make sure that everyone feels seen and heard, and we all can grow from learning about each other’s differences and appreciating them. ACTION • We do what we say we are going to do • We build strong, lasting relationships • We want to create a culture of inclusion and align ourselves with organizations that share our mission to promote diversity and inclusion. • We want to be an example of a company that does not just talk about issues; we take ACTION. We show we care about people by nurturing a safe and supportive environment that respects and celebrates each other’s individuality and culture. We acknowledge the critical importance of the results that an inclusive environment produces. We realize this vision by implementing policies and programs that focus on internal awareness, recruiting, and community outreach. We want Batson-Cook to be an organization where you love to come to work as your authentic self.
13
Adventist Care Center
Celebration, Fla.
Completed 2019
14
MENTOR / INTERN GUIDELINES ALL DISCIPLINES:
All internships should start with an introduction to our Core Values. Please take some time to learn them and understand that we expect you to represent them every day on the job. Think of them as part of your responsibilities while at work. After you’ve become accustomed to those, you can review the opportunities to learn while on the job. These are the things you should focus on. Some of these are contingent on the stage of construction and the needs of the project. For example, if a project is just starting, you will probably not have the opportunity to perform a punch list.
Operation Based Internships All operation-based internships should start with a complete overview of our B-C Basics. Preconstruction • Exposure to preconstruction ◦ Hard bid, GMP, Cost + • Exposure to project buyout and scope coverage ◦ Buyout meetings and scope reviews • Introduction Site logistics, pre-planning, scheduling • Tools of the trade – On screen take off, Building Connected, BlueBeam, etc. Field Engineer • Safety requirements ◦ Exposure to BC Safety Basics ◦ Participate in weekly safety meetings ◦ Participate in daily inspections as needed ◦ Shared responsibility of overall safety for the project • Gain Layout Experience ◦ Learn the builder’s level and how to use a level loop ◦ Learn about and how to use common engineering equipment ◦ Learn how to effectively layout and set-up grade for various building components per contract documents ◦ Document review – contract drawings and shop drawings ◦ As-builts – How to properly draw and record ◦ Shop drawings – How to read and apply shops to ongoing work ◦ Specifications – How to understand specifications and apply them to work being performed ◦ Assist with overall documentation control including maintaining the Field Set of drawings, updating any new sheets, and adding RFI’s • Exposure to BIM 360 ◦ Quality checklist ◦ Drawing management as needed, may coincide with Project Engineer roles ◦ Punch list documentation and Quality Control/Work Completion • Build relationships with Trade Partners, including participating in weekly trade partner meetings • Build relationships with and work alongside B-C Carpenters to gain hands-on experience • Receive proper certifications and training for heavy equipment as needed.
15
Note - Field Engineer Classes in Halogen/Saba – when an intern reaches a high level of competency in the field engineer discipline, we can request that the Field Engineer Classes are opened and available to them. Please see HR for additional information regarding this process. Health, Safety and Environment (HSE) • Attend Safety Training ◦ Hazcom/Silica ◦ Site Specific – Fall Prot., Scaffolding, Excavation, Confined Space • Receive overview of HSE Manual, policies, and culture • Learn Predictive Solutions ◦ Enter observations ◦ Close out items ◦ Enter incident information • Gain hands on experience ◦ Assemble different types of guardrail systems ◦ Hole covers ◦ Fire extinguisher inspection ◦ Simple scaffold inspection • Attend Safety Meetings – Safe Start, Toolbox, Stand Up, Pro-Active • Participate in Blue Vest Walks – take notes • Learn to conduct Safety Orientation • Issue and Log in Safety Permits • Conduct Safety Data Sheet spot checks • Learn to use air monitoring equipment • Learn JHA procedure and develop for specific operation Field Management • Safety – engaged in jobsite specifics, leading toolbox talks • Trade Partner relations • Site logistics, pre-planning, scheduling • Quality control Project Management • Owner relations ◦ Exposure to OAC meetings and minutes • A/E relations • Billings and cost control • Change management • Contracts, bonds and insurance • Documentation – letters, emails, etc. • Project Engineer Classes in – when an intern reaches a high level of competency in the project engineer discipline, we can request that the Project Engineer Classes are opened an available to them. Please see HR for additional information regarding this process.
MENTOR / INTERN GUIDELINES Project Engineer • Document control ◦ QC the contract documents (missing sheets, complete specs, etc.) ◦ Familiarity with ASI’s, Field orders, etc. ◦ Posting (and understanding) of RFI’s ◦ Updating record set (hardcopy & electronic) • Safety requirements ◦ Exposure to BC Safety Basics ◦ Participate in weekly safety meetings ◦ Participate in daily inspections as needed ◦ Shared responsibility of overall safety for the project ◦ Exposure to ‘Safe-Start’ meetings • Exposure to constructability details how to coordinate with responsible parties involved and document the resolution. • Document review – contract drawings and shop drawings ◦ As-builts ◦ Shop drawings ◦ Specifications ◦ Assist with overall documentation control for the project. • Exposure to ACC ◦ Quality checklist ◦ Drawing management ◦ Punch list documentation • Meet different Trade Partners and how-to coordination with them. Mechanical, Engineering, Plumbing (MEP) • Building Codes • Building Systems ◦ Refrigeration Cycle ◦ Mechanical Equipment ◦ Chillers, Cooling Towers, AHUs, VFV, Booster Pump, Duct, Diffusers, Heat Exchange, Water Side Economizer ◦ Test and Balance ◦ Electrical Equipment ◦ UPS, ATS, Switch Gear, MDS, Transformer, Lightning Protection, Grounding, Generators, VFD ◦ Fire Alarm ◦ Substation ◦ High/Low Voltage ◦ Sprinkler Systems ◦ Domestic Water (Chilled & Heated) ◦ Waste Water ◦ Gas ◦ Drawings • Building Relationships • Safety on Site ◦ Exposure to OSHA Regulations and safety Guidelines • QA / QC
Non-Operation Based Internships Marketing • Learning the process of pursing new business • Maintaining company information through CRM system • Plan, execute and publicize company events • Utilize and Enhance Design Software Skillset, such as Adobe Suite Virtual Design & Construction (VDC) • Coordination ◦ Process Trades models ◦ Coordination meetings • RFP ◦ Models and Renderings ◦ Site Logistics • Laser Scanning ◦ Data Collection in the field ◦ Process data in the office ◦ Analyze the data Information Technology • Overview of the department personnel and functions • Internet usage and IT security policies Century Building Materials • Overview of the department personnel and functions • Build relationships with B-C employees, community customers, etc. Corporate Office • Overview of the Company and the specific department they are serving • Build relationships with B-C employees ACTION STEPS: • Evaluate specific project or department needs as they relate to this guide • Evaluate capability and individual intern’s level of experience • Determine how much exposure to the disciplines can be achieved during the internship • Help Intern set goals and remain on track • Provide continuous feedback to the intern • If Intern falls off-track, contact HR rep to have a goal setting review.
16
SAFETY A strong culture of safety is at the foundation of how we protect our Batson-Cook colleagues, our clients, our trade partners, and communities in which we work. We know a concerted effort to protect safety, health, and the environment has a direct effect on the engagement of our workforce and the quality of work we perform. Batson-Cook’s Health, Safety and Environmental (HSE) management system follows the following guiding principles: Visible Leadership Commitment Safety leadership starts at the top. Our leadership has established the expectation that all Batson-Cook employees, as well as our trade partners will perform safe work, and will continuously look for opportunities to improve and apply best practices. They recognize and reinforce employees’ positive behaviors and those individuals that support our safety efforts and expectations.
Continual Improvement Our operations teams and HSE professionals analyze all unintended or unplanned events whether they result in injury or not. The information learned from these events allows us to identify root causes, as well as opportunities for implementing new technologies, systems or processes. Lessons are shared within the company and trade partners to continually refine our safety measures. Batson-Cook believes the more we talk about safety, the more we cultivate a strong, proactive safety culture where our people embrace ownership for the health and safety of themselves and others.
Pre-planning Our Preconstruction department makes every effort to identify and budget for health and safety resources, as well as identifying proactive systems and technologies. In partnership with our project teams, safety risks are identified, assessed, and planned for in advance. Our employees are trained and empowered to engage in health and safety planning; to identify and speak up about hazards in the workplace; and report and learn from unintended events. Safe Start Our Safe Start Program is Batson-Cook’s system for onboarding each trade partner prior to starting work and continues throughout the project. The preparation and various proactive safety meetings allow us to discuss work methods, assess risk, and agree to controls and procedures.
17
Scan the QR code to learn more about our systems approach to safety.
Impact 360 Institute Heritage Student Housing Hall
Pine Mountain, Ga. Completed 2021
Beacon Parking Deck
Atlanta, Ga.
Completed 2021
HUDDLES
MENTOR & HUDDLES A few years ago, Batson-Cook realized that “performance reviews” was a term that caused a lot of anxiety in the company. Truth be told, performance reviews should be an on-going experience that happens more than twice a year - they should happen more frequent than that. Instead, we’ve developed a “huddle” program. A huddle is a quick get together with your mentor, with an agenda developed by you, to allow you to discuss whatever topic you wish to cover. If you want to talk about your performance on a project, that’s perfect. We do expect three huddles throughout your internship: 1) Beginning Huddle - this will occur within the first week of your internship to establish two goals for you to achieve throughout your period at Batson-Cook. 2) Middle Huddle - Somewhere in the middle of your internship, you should meet with your supervisor to review where you stand in these goals. 3) Closing Huddle - Before you return to school, you should have a final huddle to appraise your accomplishments during the time you worked for the company. Huddles can occur wherever you wish. They don’t need to be in an office or trailer. You can have these offsite while grabbing a cup of coffee. Speak with your supervisor and make arrangements for three huddles in your time at Batson-Cook Construction. This process will repeat every semester.
20
Cobb County Medical Examiners Building Marietta, Ga.
Completed 2020
22
COMPLETING A TIMESHEET Go to the Company Intranet and click on the Timesheets icon in the Hotlinks section.
Once the portal opens, you can add items to your My Hotlist using the Manage My Hotlist. We recommend you add Expenses and Grid Timecard for easy access to both.
To enter your time, click on the Grid Timecard. Verify you are in the correct pay period ending (if you are an hourly employee it will say Grp 2 Hourly, if you are a salaried employee it will say Grp 11 Salaried.
Click the green +Row over top of the period dates.
Once the row appears on the timesheet you will select your name from the Employee List. If you are not an approver, then you will only see your name as an option.
23
Next search for the job you are charging your time to. You can search by job number or job name. a.Note – if you can’t find your job then your manager has not given you access to the job. Ask the PM of the job to a assign you access. If you are an overhead employee (accounting, marketing, etc.) then you will leave the job and phase columns blank so that your time is charged to your department.
Once you enter the job, find your phase. This is what you are doing on the job (typically it matches your actual job title).
Finally enter the earning code. 1 is for regular work hours.
Now you are ready to enter the number of hours per day that you worked on this job.
To add another job or another earning code, click the +Row and repeat the above steps. a.Note – look at the contract for the job to determine if you can charge vacation, sick or holiday time to the job. If not, leave the job and phase blank so it charges to your department overhead.
Once your time is entered, click the save button to the right.
You can enter and save as many times as need. Once all time is entered and the pay period is done, click the actions icon and choose to submit your time.
24
Time Sheets Continued: Time for hourly employees is due by close of business on each Friday afternoon. Time for salaried employees is due by close of business on the Thursday before the pay period ends. If there are any changes to this, HR/Payroll will send an email out in advance. Salaried timesheets must be approved on Friday after time is entered (BCT timesheets by noon and BCC timesheets by close of business), and hourly timesheets must be approved by noon on Monday after the pay period ends. Once the new pay period is opened by HR/Payroll, you can use the copy feature to copy the job and hours from a previous pay period to the new one.
If you have any questions about entering your time, please reach out to IT or Kristi Whitehead/Dana Cobb in payroll.
25
INTERNSHIP WRAP UP • Conduct final huddle • Turn in equipment to divisional executive assistant if you’re not continuing to work with us into the next semester • Complete Mentor Experience Survey
Duke Energy
Charlotte, N.C.
Completed 2010
27
SOFTWARE TOOLS The following list is a brief introduction to many of the programs we use on our projects and in the office to better understand and accomplish our goals on a job.
MS Office A suite of applications designed to help with
MS Project A project management software that’s used
Oracle P6
Bluebeam
productivity and completing common tasks on a computer. You can create and edit documents containing text and images, work with data in spreadsheets and databases, and create presentations and posters.
Oracle Primavera P6 is a project, program and portfolio management tool that is used for planning, managing and executing your project work.
to create schedules, project plans, manage resources and keep track of time.
A powerful, highly customizable document management, markup and automation tool with a built-in collaboration space.
Autodesk Construction Cloud
A unified platform that connects construction projects, people, and data from the initial design phase through to project completion and operations.
28
REGIONAL HIGHLIGHTS Atlanta
Charlotte
• Georgia Aquarium
• Carowinds
• Piedmont Park
• NASCAR Hall of Fame
• Zoo Atlanta
• Discovery Place Science Museum
• World of Coke • Martin Luther King Jr. National Historical Park • Ponce City Market • Fernbank Museum • Center for Puppetry Arts • Fox Theater • Jimmy Carter Presidential Library • Six Flags Over Georgia
Dallas • The Dallas Arboretum and Botanical Garden • The Sixth Floor Museum at Dealey Plaza
• Freedom Park
• Perot Museum of Nature and Science
• Mint Museum Uptown
• Dallas Museum of Art
• Harvey B Gantt Center for African American Arts + Culture
• The Dallas World Aquarium
• UNC Charlotte Botanical Gardens
• Dallas Zoo • George W. Bush Presidential Center • Nasher Sculpture Center • John F. Kennedy Memorial Plaza • Pioneer Plaza • African American Museum of Dallas
29
Orlando
Jacksonville
Tampa
• Jacksonville Zoo and Gardens
• Universal Orlando Resort
• Busch Gardens Tampa Bay
• Jacksonville Beach
• Lake Eola Park
• The Florida Aquarium
• Cummer Museum of Art & Gardens
• Walt Disney World
• Glazer Children’s Museum
• Harry P Leu Gardens
• ZooTampa at Lowry Park
• SeaWorld Orlando
• Tampa Bay History Center
• Orlando Science Center
• Ybor City
• SEA LIFE Orlando Aquarium
• Museum of Science & Industry
• Orlando Museum of Art
• Tampa Museum of Art
• Dr. Phillips Center for the Performing Arts
• Tampa Riverwalk
• Riverside Arts Market • Kathryn Abbey Hanna Park • Little Talbot Island State Park • MOSH (Museum Of Science & History) • MOCA (Museum Of Contemporary Art)
• Blue Spring State Park
• Clearwater Marine Aquarium
• Kennedy Space Center
West Point • New Horizon Community Theatre • West Point Lake
• Hawkes Library • Long Cane Park
• Little White House Historic Site • West Point Dam
30
REVERB Hotel
Atlanta, Ga.
Completed 2021
Winship Cancer Institue
Atlanta, Ga.
Completed 2023
DELIVERY METHODS Batson-Cook has been providing contracting services for more than 100 years throughout the Southeast to every sector of commercial construction from civil to industrial to high-end multi-family residential facilities. Traditional Design-Bid-Build This approach is also called “Bid,” “Hard Bid,” “Low Bid,” “Lump Sum Bid,” and “General Contracting.” The owner contracts with an architect for design, puts completed drawings and specifications out to general contractors for competitive bid, and awards the contract to the lowest bidder. The main advantage is simplicity and ease of understanding. The main disadvantages are that it is frequently an adversarial approach, does not involve the contractor during design, and frequently involves costly change orders (“lowest bid” does not necessarily mean “lowest total project cost”). These disadvantages can be minimized if the projects are small and uncomplicated. Construction Management at-Risk The owner contracts with an architect for design and with a construction manager (CM At-Risk) for valuable input during design. At or near the end of design, the CM At-Risk contractor establishes an all-inclusive guaranteed maximum price (GMP), which the owner can accept or reject. Typically, the CM At-Risk competitively bids all or most of the work to subcontractors and selects the lowest bid for each trade to ensure the lowest possible GMP or price to the owner. Advantages include construction input to design to help ensure owner goals are met in cost, schedule, and quality; a faster schedule; fewer change orders; a less adversarial and more partnering approach; full disclosure of contractor project and cost information; return to the owner of savings. The main disadvantages are the approach is not easily understood and requires more owner involvement. Design/Build The owner contracts with one firm for design, construction, and related services. The most common Design/Build entities are those with all or most design and construction services in-house, and construction firms that contract for design services. However, Design/Build entities can take several other different forms. The main advantages include only one contract for all services, better accountability, and better coordination. The main disadvantage is the potential for owner expectations in quality and scope not being met. Program Management Program management (PM) is not so much a project delivery approach as it is a partial outsourcing of owner responsibilities for managing the entire design and construction process. The owner contracts with a PM on a professional services basis to serve as the owner’s representative. The owner will also have contracts with those firms providing project delivery, such as a design firm and contractor or CM At-Risk. The PM is charged with representing the owner and with directing the design and construction teams. PM can be used in conjunction with any of the other approaches described. The main advantage is that PM allows the owner to have the equivalent of specialized staff without hiring permanent staff. It works well for a difficult project, a large group of projects, a peak in construction program workload, or where in-house staff capabilities are inadequate. Potential disadvantages are that the owner has one more contract to deal with and must still have contracts with the firm(s) providing project delivery; PM cannot guarantee or be at financial risk for the project outcome; in some situations, a PM firm may feel pressured to demonstrate value for the owner to justify their fee, sometimes at the expense of the design team and contractor or CM.
33
FNB Tower at 401 S. Graham Charlotte, N.C.
Completed 2021
CORPORATE CONTACTS AND RESPONSIBILITIES ACCOUNTING Jeff Krall, Chief Financial Officer (770) 293-1112 (Atlanta Office) jkrall@batson-cook.com Kelli Britt, Director of Accounting and Finance - (770) 293-1182 (Atlanta Office) / kbritt@batson-cook.com Financial Statements, Payroll Tax Management, GCPay administration, Keystyle Expense management, Stop payments, Owner payment posting, Company Credit Card administration Donna Ogle, Assistant Controller - (706) 643-2172 (Corporate Office) / dogle@batson-cook.com Bank Statement Reconciliation, Accounts Payable Payment Management, Stop Payments, Owner payment posting Zack Hula, Assistant Controller - (770) 293-1194 (Atlanta Office) / zhula@batson-cook.com General Ledger administration, Fixed Asset management, Monthly close out, Accounts Payable Payment Management, Journal Entry validation and posting Austin Gore, Staff Accountant - (770) 293-1195 (Corporate Office) / agore@batson-cook.com Journal Entry posting, Owner Contract management, Company Credit Card administration, Keystyle Expense management, AP Vendor setup including W-9 compliance, Journal Entry validation and posting Kerri Madden, Accounting Manager - (770) 293-1157 (Corporate Office) / kmadden@batson-cook.com Final approval and posting of subcontract invoices for assigned divisions, Subcontractor payment selection, GCPay imports, Point of Contact for AP questions, Vendor invoice posting, invoice hold management, backup to Jennifer Pendleton Jennifer Pendleton, Accounting Administrator - (770) 293-1170 (Corporate Office) / jlpendleton@batsoncook.com Final approval and posting of subcontract invoices for assigned divisions, Subcontractor payment selection, Point of Contact for AP questions, Vendor invoice posting, Office leases, invoice hold management, backup to Kerri Madden Dane Bailey, Controller
Patricia Finn, Accounts Payable Administrator
Tessie Schliephake, Accounts Payable Administrator
HUMAN RESOURCES Nancy Black, Corporate Secretary/VP of HR - (770) 293-1116 (Atlanta Office) / nblack@batson-cook.com
Emily Gonzalez, Human Resources Generalist - (770) 293-1113(Atlanta Office) / emilygonzalez@batson-cook.com Employee Benefits Jesse Head, Talent Acquisition Manager - (678) 903-0481 (Atlanta Office) / jhead@batson-cook.com Recruiting Kristi Whitehead, Human Resource Administrator - (770) 293-1115 (Atlanta Office) kwhitehead@batson-cook.com Payroll Assistance, 401k Processing, Personnel Files, Employee Health Insurance, Per Diem Dana Cobb, Human Resource Administrator - (706) 643-2159 (Atlanta Office) dcobb@batson-cook.com Payroll Assistance, 401k Processing, Personnel Files, Employee Health Insurance, Per Diem Karen White, Training Manager
Kristi Morris, Director of Human Resources
Donna Aplin, Human Resource Administrator
35
HEALTH, SAFETY, ENVIRONMENT (HSE) Jay Shinall, Vice President of HSE (704) 790-4024 (Atlanta Office), (770) 873-3871 (Cell) jshinall@batson-cook.com
INFORMATION TECHNOLOGY Mark Traylor, Director of IT - (770) 293-1173 (Atlanta Office) / mtraylor@batsoncook.com Designs, Executes, Evaluates and Troubleshoots Software Programs and Applications. This includes Configuring, Coding, Developing, and Documenting Software Specifications throughout the IT project Life Cycle. Jamel Shepard, PC Support (470) 681-6187 jshepard@batson-cook.com PC Support Jonathan White, PC Support (770) 771-6405 jwhite@batson-cook.com PC Support Chris Skowron, PC Support (470) 579-5108 cskowron@batson-cook.com PC Support Leissa Sulander, Help Desk (770) 679-8502 lsulander@batson-cook.com IT Help Desk Specialist Drashti Patel, IT Help Desk Coordinator (770) 771-6406 dpatel@batson-cook.com IT Help Desk Specialist Kevin Newell, Help Desk Coordinator
RISK MANAGEMENT Allen Westmoreland, Senior Vice President of Risk Management (770) 293-1185 (Atlanta Office) awestmoreland@batson-cook.com Philip Kramsky, Risk Manager - (414) 581-1388 (Atlanta Office) / pkramsky@batson-cook. com Logan Moody, Risk Analyst - (770) 293-1201 (Atlanta Office) / lmoody@batson-cook.com Commercial Insurance Program, Fleet Administration, Bonds, Banking, Licenses, Credit Applications Kelly Pippin, Contracts Administrator - (770) 293-1205 (Atlanta Office) kpippin@batson-cook.com Subcontracts, Purchase Orders, Change Orders Cathy Reed Contracts Administrator - (770) 293-1105 (Atlanta Office) creed@batson-cook.com Subcontracts, Purchase Orders, Change Orders Allison McDearmid Insurance Coordinator - (770) 293-1204 (Atlanta Office) amcdearmid@batson-cook.com Subcontractor Insurance, Insurance Certificates, Worker’s Comp Claims, GL, Auto, Builders Risk and CCIP Claims
MARKETING & COMMUNICATIONS Ashley Scarce, Senior Director of Marketing (770) 293-1162 (Atlanta Office) / ascarce@batson-cook.com Marketing Strategic Planning and Administration Jason Wasulko, Senior Communications Manager - (770) 293-1132 (Atlanta Office) jwasulko@batson-cook.com Internal & External Communications
36
COMMON ABBREVIATIONS AND THEIR MEANING A/C: Air Conditioner ACI: American Concrete Institute ADA: Americans with Disabilities Act of 1992 A.F.F.: Above Finished Floor A.F.G.: Above Finished Grade AISI: American and Steel Institute ANSI: American National Standards Insitute AWG: American Wire Gauge B.O.F.: Bottom of Footing B.O.M: Bill of Material BOT: Bottom B.O.W.: Bottom of Wall BP: Blue Print (or B/P) Brz.: Bronze BV: Butterfly Valve CAD: Cadmium or Computer-Aided Drafting CBORE: Counterbore C.C.: Center to Center C.D.: Construction Document C.F.M.: Cubic Feet per Minute CFS: Cubic Feet per Second C.I.: Cast Iron CL.: Closet CLG.: Ceiling CMU: Concrete Masonry Unit C.O.: Cleanout Cont.: Continuous CRES: Corrosion-Resistant Steel CSINK: Countersink CU. FT.: Cubic Feet CU. YD.: Cubic Yard Dia.: Diameter Dim.: Dimension DWG: Drawing ED: Edge Distance E.F.: Exhaust Fan EQ: Equal, or Equally Exc: Excavate E.W.: Each Way Ext.: Exterior FACP: Fire Alarm Control Panel FAO: Finish All Over F.C.O.: Floor cleanout F.D.: Floor Drain Fin.: Finish F.F.L.: Finished Floor Level FL: Floor Level FRPF: Fireproof FTG: Fitting Galv.: Galvanized G.C.: General Contractor G.F.C.I. or G.F.I.: Ground-Fault Circuit-Interrupter GPM: Gallons Per Minute G.T.: Glazed Tile Gyp.: Gypsum HDCP: Handicapped (better if referred to as “Accessible”) HDPE: High-Density Polyethylene HRS: Hot Rolled Steel HV: High Voltage H.V.A.C.: Heating, Ventilation, & Air Conditioning H.W.: Hot Water
IAW: In Accordance With ID: Inner Diameter IE: Invert Elevation In.: Inch Insul.: Insulation ISO: International Organization for Standards Int.: Interior Inv.: Invert J-Box: Junction Box Jct.: Junction Jst.: Joist kW: Kilowatt LDD: LImited Dimension Drawing LFT.: Linear Feet LH: Left Hand LL: Live Load LM: List of Materials Lt.: Light Ltg.: Lighting L.V.L.: Laminated Veneer Lumber MH: Manhole Mas.: Masonry MAX: Maxiumum MBW: Measurement Between Wires Mtl.: Material MFG.: Manufacturing Min.: Minimum MOW: Measurement Over Wires NEC: National Electrical Code N.I.C.: Not In Contract NOM: Nominal N.T.S.: Not to scale OAL: Overall Length O.C.: On Center O.D.: Outside Diameter OPNG.: Opening or Rough Opening PCS: Pieces PL.: Plaster P.L.: Property Line (or Parts List) Plywd.: Plywood P.S.F.: Pounds per Square Foot P.S.I.: Pounds per Square Inch Ptd.: Painted PVC: Polyvinyl Chloride QTY: Quantity R: Radius RC: Reinforced Concrete RD: Roof Drain, Round, or Receptacle Distribution Panel R.D.L.: Roof Drain Leader REBAR: Reinforcing Bar REQD: Required RH: Right Hande R.O.: Rough Opening R.O.W.: Right of Way Reinf.: Reinforced San.: Sanitary SC: Sharp Corners S.D.: Smoke Detector Sect.: Section Sht.: Sheet Sht’g.: Sheathing
Specs.: Specifications SQ. FT.: Square Feet SQ. IN.: Square Inches SS: Stainless Steel, Setscrew, Soil Stack, Service Sink, or Slop Sink Std.: Standard Stl: Steel S.Y.: Square Yard T&B: Top and Bottom T&G: Tongue and Groove T.O.: Top of T.O.B.: Top of Beam T.O.C.: Top of Curb or Top of Concrete T.O.F.: Top of Footing T.O.J.: Top of Joist T.O.M.: Top of Masonry T.O.W.: Top of Wall TTC: Telephone Terminal Closet UON: Unless Otherwise Noted VA.: Voltage V.B.: Vapor Barrier V.I.F.: Verify in Field W.C.: Water Closet (Toilet) Wd.: Wood Wdw.: Window W.I.: Wrought Iron W.I.C.: Walk-In Closet WL: Water Level W/O: Without Wp.: Weatherproof WS: Weatherstripping or Water Stop Wt.: Weight Wtr. Htr. : Water Heater
38
GLOSSARY ADA The Americans with Disabilities Act which gives civil rights protection to individuals with disabilities similar to those provided to individuals on the basis of race, color, sex, national origin, age, and religion. It guarantees equal opportunity for individuals with disabilities in public accommodations, employment, transportation, State and local government services, and telecommunications. Aggregate A mixture of sand and stone and a major component of concrete. Alterations 1. A term used to describe partial construction work performed within an existing structure; 2. Remodeling without a building addition. As-Built Drawings (also known as Record Drawings) Contract drawings marked up to reflect changes made during the construction process. It is good practice to make As-Built drawings by marking the changes on reproducible drawings such a sepias for the duplication purposes later. Backfill The replacement of excavated earth into a trench around or against a basement /crawl space foundationwall. Backing Frame lumber installed between the wall studs to give additional support for drywall or an interior trim related item, such as handrail brackets, cabinets, and towel bars. In this way, items are screwed and mounted into solid wood rather than weak drywall that may allow the item to break loose from the wall. Balustrade The rail, posts and vertical balusters along the edge of a stairway or elevated walkway. Bearing Wall A wall that supports any vertical load in addition to its own weight. Bedrock A subsurface layer of earth that is suitable to support a structure. Blue Print(s) A type of copying method often used for architectural drawings. Usually used to describe the drawing of a structure which is prepared by an architect or designer for the purpose of design and planning, estimating, securing permits and actual construction. Blue Stake Another phrase for Utility Notification. This is when a utility company (telephone, gas, electric, sewer and water, etc) comes to the job site and locates and spray paints the ground and/or installs little flags to show where their service is located underground. Breaker Panel The electrical box that distributes electric power to each branch circuit (each plug and switch) and composed of circuit breakers. Breezeway A roofed walkway with open sides. Bridging Small wood or metal members that are inserted in a
39
diagonal position between the floor joists or rafters at mid-span for the purpose of bracing the joists/rafters & spreading the load. Building Envelope (Sometimes referred to as Building Shell) 1. The waterproof elements of a building which enclose conditioned spaces through which thermal energy may be transferred to or from the exterior. 2. The outer structure of the building. Building Inspector/Official A qualified government representative authorized to inspect construction for compliance with applicable building codes, regulations and ordinances. Courts have ruled that building inspections are exempt from errors and omissions liabilities. Cantilever An overhang. Where one floor extends beyond and over a foundation wall. Cavity Wall Double masonry wall having an air space between the wyths. Ceiling Joist One of a series of parallel framing members used to support ceiling loads and supported in turn by larger beams, girders or bearing walls. Also called roof joists. Change Order A written document between the owner and the contractor signed by the owner and the contractor authorizing a change in the work or an adjustment in the contract sum or the contract time. A change order may be signed by the architect or engineer, provided they have written authority from the owner for such procedure and that a copy of such written authority is furnished to the contractor upon request. The contract sum and the contract time may be changed only by change order. A change order may be in the form of additional compensation or time; or less compensation or time known as a Deduction (from the contract) the amount deducted from the contract sum by change order. Circuit The path of electrical flow from a power source through an outlet and back to ground. Circuit Breaker A device which looks like a switch and is usually located inside the electrical breaker panel or circuit breaker box. It is designed to (1) shut of the power and (2) to limit the amount of power flowing through a circuit (measured in amperes). 110 volt household circuits require a fuse or circuit breaker with a rating of 15 or a maximum of 20 amps. 220 volt circuits may be designed for higher amperage loads. CO An abbreviation for “Certificate of Occupancy”. This certificate is issued by the local municipality and is required before anyone can occupy a space. It is issued only after the local municipality has made all inspections and all monies and fees have been paid.
Column A vertical structural compression member which supports loads Concrete The mixture of Portland cement, sand, gravel, and water. Used to make garage and basement floors, sidewalks, patios, foundation walls, etc. It is commonly reinforced with steel rods (rebar) or wire screening (mesh). Conduit, electrical A pipe, usually metal, in which wire is installed. Construction Management Organizing and directing men, materials, and equipment to accomplish the purpose of the designer. Contract 1. An agreement between two or more parties, especially one that is written and enforceable by law; 2. The writing or document containing such an agreement. Cornice Overhang of a pitched roof , usually consisting of a fascia board, a soffit and appropriate trim moldings. Cure To allow concrete to dry slowly by keeping it moist to allow maximum strength. Dead Load All the weight in a structure made up of unmovable materials. Design-Build Construction When a Prime or Main contractor bids or negotiates to provide Design and Construction services for the entire construction project. Drywall (or Gypsum Wallboard (GWB), Sheet rock or Plasterboard) Wall board or gypsum- A manufactured panel made out of gypsum plaster and encased in a thin cardboard. Usually 1/2” thick and 4’ x 8’ or 4’ x 12’ in size. The panels are nailed or screwed onto the framing and the joints are taped and covered with a ‘joint compound’. ‘Green board’ type drywall has a greater resistance to moisture than regular (white) plasterboard and is used in bathrooms and other “wet areas”. Estimate 1. To calculate approximately the amount, extent or value of something; 2. To form an opinion of estimated costs. Estimate of Construction Cost, Detailed Fabrication Work done on parts of a structure at the factory before delivery to the building site. Facade Face or front elevation of a building. Finish Date The date that an activity or project is completed. Floating Wall A non-bearing wall built on a concrete floor. It is constructed so that the bottom two horizontal plates can compress or pull apart if the concrete floor moves up or down. Normally built on basements and garage slabs. General Contractor Properly licensed individual or company having primary (prime) responsibility for the work. Grade Ground level, or the elevation at any given point. Also the work of leveling dirt. Also the designated quality of a manufactured piece of wood. Inspection 1. The act of inspecting.; 2. An official examination or review of the work completed or in progress to determine its compliance with contract requirements. Joist Structural member which directly supports floors or ceilings adn is supported by bearing walls, beam, or girders. Live Load The total of all moving and variable loads that may be placed upon a building. Masonry Stone, brick, concrete, hollow-tile, concrete block, or other similar building units or materials. Normally bonded together with mortar to form a wall. Milestone An activity with a duration of zero (0) and by which progress of the project is measured. A milestone is an informational marker only; it does not affect scheduling.
Millwork Generally all building materials made of finished wood and manufactured in millwork plants. Includes all doors, window and door frames, blinds, mantels, panelwork, stairway components (ballusters, rail, etc.), moldings, and interior trim. Does not include flooring, ceiling, or siding. Nonbearing Wall A wall supporting no load other than its own weight. Orientation The positioning of a building on a lot in relation to the sun, wind, view, and noise. Owner An individual or corporation that owns a real property. Parapet A wall placed at the edge of a roof to prevent people from falling off. Partition A wall that subdivides spaces within any story of a building or room. Pitch The incline slope of a roof or the ratio of the total rise to the total width, i.e., a 6-foot rise and 24-foot width is a onefourth pitch roof. Roof slope is expressed in the inches of rise, per foot of horizontal run. Plan 1. A line drawing (by floor) representing the horizontal geometrical section of the walls of a building. The section (a horizontal plane) is taken at an elevation to include the relative positions of the walls, partitions, windows, doors, chimneys, columns, pilasters, etc. 2. A plan can be thought of as cutting a horizontal section through a building at an eye level elevation. Plan View Drawing of a structure with the view from overhead, looking down. Plans A term used to represent all drawings including sections and details; and any supplemental drawings for complete execution of a specific project. Plumbing Rough Work performed by the plumbing contractor after the Rough Heat is installed. This work includes installing all plastic ABS drain and waste lines, copper water lines, bath tubs, shower pans, and gas piping to furnaces and fireplaces. Plumbing Trim Work performed by the plumbing contractor to get ready for a final plumbing inspection. Includes installing all toilets (water closets), hot water heaters, sinks, connecting all gas pipe to appliances, disposal, dishwasher, and all plumbing items. Post-and-Beam A basic building method that uses just a few hefty posts and beams to support an entire structure. Contrasts with stud framing. Precast Concrete shapes made separately before being used in a structure. Preliminary Drawings 1. The drawings that precede the final approved drawings. 2. Usually these drawings are stamped or titled “PRELIMINARY”; and the “PRELIMINARY” is removed from the drawings upon being reviewed and approved by the owner.
40
OFFICE LOCATIONS ATLANTA & CORPORATE HEADQUARTERS 2859 Paces Ferry Rd SE, Suite 200 Atlanta, GA 30339 770.955.1951 Batson-Cook Texas LLC, 1431 Greenway Drive, Suite 740 Irving, TX 75038 972.550.3417
CHARLOTTE 2001 W. Morehead St., Suite F Charlotte, NC 28208 704.790.4040
JACKSONVILLE 8860 Philips Highway Jacksonville, FL 32241 904.268.0094
TAMPA 8800 Grand Oak Circle, Suite 690 Tampa, FL 33637 813.221.7575
ORLANDO 1560 N. Orange Avenue, Suite 550 Winter Park, FL 32789 407.550.8924
WEST POINT 817 Fourth Avenue West Point, GA 31833 706.643.2500
Batson-Cook Flounoy Construction 1100 Brookstone Centre Parkway Columbus, GA 31904 706.243.9242
Batson-Cook.com
@BatsonCookConstruction
41
@Batson-Cook Construction
@batsoncook
NOTES
42
The first thing we build is the relationship.