Basim Shamsuddin Architecture Portfolio

Page 1


Basim Shamsuddin, AIA, RIBA, NCARB

1.0 John Ronan Architects, Chicago, IL, USA

1.1 Frank Lloyd Wright Museum & Learning Center, Oak Park, IL

1.2 Globeville Affordable Housing & Library

2.0 HDR, Chicago, IL, USA

2.1 Joan & Paul Rubschlager Building, Rush University Medical Center, Chicago, IL

2.2 Advocate Aurora Outpatient Clinic, Lakeview, Chicago, IL

2.3 Shirley Ryan Ability Lab, Burr Ridge, Chicago, IL

2.4 Asante Rogue Regional Medical Center, Medford, OR

3.0 Howells, Birmingham, UK

3.1 Stihl Treetop Walkway, Westonbirt, UK

3.2 National Arboretum Welcome Building, Westonbirt, UK

3.3 University College Birmingham Phase 2 Campus, Birmingham, UK

3.4 Bramall Music Building, Birmingham, UK

3.5 Horizons, Poole, UK

3.6 Student Housing, London, UK

3.7 Edgbaston Priory Club, Birmingham, UK

3.8 Newman University College, Birmingham, UK

3.9 Parkside Place, Cambridge, UK

2022-current

2016-2022

2007-2016

4.0 Munkenbeck & Marshall, London, UK 2004/2007

4.1 Strancally Castle Swimming Poolc, County Waterford, Ireland

4.2 The Jerwood Space, London, UK

5.0 Holford Associates, Dubai, UAE 2003-2004

6.0 Academic Work, University of Sheffield, UK

6.1 M.Arch 2005-2007

6.1.1 Softspace

6.1.2 Interdependence

6.1.3 Nymark

6.2 BA (Hons) 2000-2003

Frank Lloyd Wright, Museum & Learning Center

Joan & Paul Rubschlager Building, Rush University Medical Center

Rush University Medical Center, Chicago, IL, USA

Completion January 2023

$450M

Building: 500,000 sf, B+10 Levels

• Senior Project Architect from competition entry through to CA

• Led concept design, integration with site design, medical planning, and coordination with interior design

• Prepared & coordinated BIM execution plan, initiated model set-up ( BIM 360/ C4R ), developed project digital protocols, established LOD matrix with team

• Led Core & Shell design (SD, DD, CD, CA). Developed details & directed other architectural staff via redlining. Provided input to specifications, mock-ups

• Client presentations and sign-off, materials for PD, preliminary code analysis & liaison with external code consultant on select issues.

• Led coordination with consultants: Envelope, SE, MEP, Parking AOR, Vertical Transportation, Facade Access

• Led on all exterior submittal / shop drawing reviews, mock up reviews and refinement

• Detail reviews related to air/weather tightness, thermal continuity, condensation risk and long term durability & weathering.

Advocate Aurora Outpatient Clinic

Asante Rogue Regional Medical Center

Asante Rogue Regional Mediucal Center Medford, Oregon

Completing September 2023

420,000sf inpatient hospital Five Story New Build + Fit Out

• Senior Project Architect responsible for all aspects of Shell & Core Design

• DD, CD, CA stages

• Specifications writing / editing for all aspects related to Shell & Core

• Detail Coordination between Consultant Team

• Responsible for team demonstration of code compliance

• Coordinated responses and completion of COMCheck submission

• Successfully resolved an Alternate Code Approval Request with the AHJ permitting use of

Stihl Treetop Walkway

Westonbirt National Arboretum, Gloucestershire, UK Forestry Commission

Completed February 2016

£1.7M / $2.6M

300m / 1000ft long, up to 13m / 45ft in height

• RIBA Stages D - L / Outline Design - Schematic Design - Construction & Contract Administration

• Developing all aspects of design - concept to completion

• Client presentations and sign-off

• Coordination with Structural Engineer, and other specialists

• Development of parametric model to form basis of construction documents & written material specification

Preview of grasshopper definition prior to baking
Interpretation bay 1 with tapered decking treads & structure
Visualisation from parametric model
Contractor model developed from architectural IFC model
Walkway plan

Westonbirt Welcome Building

University College Birmingham, Phase 2 Campus

Jewellery Quarter, Birmingham, UK

University College Birmingham

Completing Spring 2019

£60M / $92M

170,000 ft2 / 15,800m2

• RIBA Stages 1 -2 / Schematic to Design Development

• Competition / successful bid

• Concept design & briefing

• Project & design coordination, detail design studies

• Planning authority presentations & approvals

• Client & public forum presentations

Horizons, Poole

Poole, Dorset, UK

McCarthy and Stone

78 Assisted/ Later living apartments and communal facilities

£18M / $28M

96,000ft2 / 8,800m2

BREEAM Excellent

Housebuilder Award Shortlisted 2013 •

• Successful competition entry

• Site and historical appraisal

• Feasibility studies, option appraisals

• Technical report writing

Student Housing

Newman University College

Strancally Castle Swimming Pool

Completed:

Strancally Castle

The full renovation of a Victorian building on the Blackwater in Ireland included a new spa and pool.

The Architect responsible for this portion of the work recognised the importance of keeping the new facility adjacent to the existing castle and therefore directly accessible, without obscuring the castle. The solution was to bury the spa below ground. EOC were retained as structural engineers for the project, designied a concrete box below ground to house the pool and spa. Limitations on levels and the additional challenge of running the landscape over demanded a creative roof solution. Long span precast units were used to maximise span while minimising structural depth.

Within the green roof is a large skylight which EOC designed with glass beams to support it.

The full renovation of a Victorian building on the Blackwater in Ireland included a new spa and pool.

The Architect responsible for this portion of the work recognised the importance of keeping the new facility adjacent to the existing castle and therefore directly accessible, without obscuring the castle. The solution was to bury the spa below ground. EOC were retained as structural engineers for the project, designied a concrete box below ground to house the pool and spa. Limitations on levels and the additional challenge of running the landscape over demanded a creative roof solution. Long span precast units were used to maximise span while minimising structural depth.

One end of the pool is separated from the outside by a fully automatic frameless glazed door that slices through the pool water surface and is designed to withstand wind loads as a membrane in the closed position.

Within the green roof is a large skylight which EOC designed with glass beams to support it.

One end of the pool is separated from the outside by a fully automatic frameless glazed door that slices through the pool water surface and is designed to withstand wind loads as a membrane in the closed position.

The Jerwood Space

Space & Science World, Dubailand, Dubai, UAE
Burj Dubai Mall Hotel,
Dubai Marina Yacht Club
Dubai International Financial Centre Arabian Radio Network

M.Arch, University of Sheffield, 2005 - 2007

Softspace 1

M.Arch, University of Sheffield, 2005 - 2007

Softspace 2

M.Arch, University of Sheffield, 2005 - 2007 Softspace 2

M.Arch, University of Sheffield, 2005 - 2007

Interdependence

M.Arch, University of Sheffield, 2005 - 2007

Interdependence

6.1.2

M.Arch, University of Sheffield, 2005 - 2007

Interdependence

M.Arch, University of Sheffield, 2005 - 2007

Interdependence

M.Arch, University of Sheffield, 2005 - 2007

Interdependence

M.Arch, University of Sheffield, 2005 - 2007

Nymark with Alex Hartley

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Basim Shamsuddin Architecture Portfolio by Basim Shamsuddin - Issuu