Skip to main content

Barringer Construction | We Build Industrial 2026

Page 1


WE DON’T JUST

BUILD BUILDINGS.

Company Overview & Industrial Experience

We build lasting relationships.

Meet Chris, Chris, & Tim – The Founders of the Barringer Family

ABOUT BARRINGER.

We are a Carolinas-based general contractor committed to delivering an exceptional experience for our customers

We take a client-centered approach that allows us to build lasting relationships grounded in trust, honesty and shared goals. Titled ‘The Barringer Way’, we pride ourselves on going above and beyond to provide value every step of the way. Equally important, we have fun doing it.

The experience we provide and the quality of our team is what sets us apart. Our goal is to build far more than just a high quality space; we are dedicated to providing an experience rooted in excellence, professionalism and doing what is best for our clients and their projects.

Our Values

Generosity

We are generous with our time and contributions to our community, charities and to each other.

Authenticity

We are real and genuine in our dealings between each other and our customers.

Honesty

We are good stewards of company and customer resources. We tell the truth even when it’s hard.

Passion

We are passionate about our work and finding solutions for our customers.

SUBCONTRACTOR RELATIONSHIPS

REVENUE

AND GROWING!

We build

THE CAROLINAS

We’re a fun-loving group of relationship enthusiasts who genuinely love what we do.

Barringer was founded on a shared desire to revive a diminishing approach to construction services – one where handshakes still hold great value, people are put first, and the act of building something is revered as a craft, not a commodity.

Featured Project

Myers Park United Methodist Church

Building the Carolinas From NorTh to south Our Locations

WE ARE

Experience Nimble Creative Trusted

CUSTOMER

We are committed to do right by our

COMMUNITY TEAM

OUR COMMUNITY.

We build our communities in more ways than one.

We have deep roots in the communities in which we live and work, and actively advocate for their long-term success by donating our time and providing financial support. This is evidenced in many ways, including the boards on which we serve and the support of charities, churches, and other organizations that enrich the places we call home. This approach creates a ripple effect of engagement and promotes an environment in which our customers and employees thrive.

250+ 2,400+ 50+

ORGANIZATIONS & CHARITIES SUPPORTED ANNUALLY

VOLUNTEER HOURS SERVED IN 2025

COMMUNITY LEADERSHIP ROLES HELD BY OUR TEAM

EXPLORE OUR PROJECTS.

EXPERIENCE THE BARRINGER WAY.

Project approach

We build great experiences for our customers.

We treat the construction process as an inventive journey where we focus on the craft, not the process. Our approach is rooted in one goal: providing a positive, handcrafted experience for our customers, community, and team. Regardless of the project or contract type — all are built The Barringer Way.

WE GO ABOVE & BEYOND EVERY STEP OF THE WAY.

DESIGN

Early engagement matters

• Evaluation of full program requirements and enduser needs

• Direct involvement in design charrettes

• Advisement on the constructability of design elements and material and finish selections

PRECONSTRUCTION

CONSTRUCTION

• First-hand knowledge of current market trends and procurement lead items Guidance you can trust

• Timely and accurate budgets and schedules

• Cost benefit analysis and value engineering

• Detailed constructability and peer reviews

• In-depth subcontractor evaluations

• QA/QC planning

• Building Information Modeling (BIM) for trade coordination A handcrafted approach

• Safety is our top priority

• Mandatory site-specific subcontractor onboarding and training

• Pre-planning meetings and compliance reviews

• Pre-installation meetings for each scope of work

• Mock-ups, testing, and inspections

• QA/QC plan adherence, observations, and reports

PROJECT TURNOVER

The beginning of a lasting relationship

• Efficient automated punchlist process using QR codes and technology

• Prompt project closeout and owner move-in

• Complete and accurate as-built drawings

• Comprehensive Operations and Maintenance (O&M) manuals

POSTCONSTRUCTION

01 02 03 04 05

• White glove maintenance services provided by the Barringer Service Solutions team

• Technology-backed efficiency for quick and easy communication and scheduling

• Expert craftsmanship backed by Barringer Construction

• Warranty management Your partner for the lifetime of your space

We build the backbone of industry.

Whether you’re transforming an existing warehouse or envisioning a new, cutting-edge industrial marvel, we understand the unique demands of industrial environments. We engineer solutions that optimize processes, maximize efficiency, and adhere to safety standards to propel your business into the future.

INDUSTRIAL

Featured Project

Indulor Production & Administrative Building

• Factories & Manufacturing Facilities

• Storage Warehouses

• Distribution Centers

• Operations Centers

• Warehouse/Manufacturing/ Office Flex Spaces

• Heavy Machinery & Equipment Storage Facilities

• Chemical & HazMat Storage Buildings

• Vehicle Storage Buildings

• Wastewater Treatment Plants

• Testing Labs

• Maintenance Shops

• Pre-Engineered Metal Buildings

• Machine/Equipment

Our specialTies

85+ $304M

INDUSTRIAL PROJECTS COMPLETED IN TOTAL CONSTRUCTION VALUE

CHARLOTTE PIPE & FOUNDRY OAKBORO FOUNDRY

Repeat Design-build OSHA

2,000,000+

Founding the next century: a one-of-a-kind industrial manufacturing campus for the nation’s largest cast iron and pipe fittings producer

A locally owned and operated company with a global product footprint, Charlotte Pipe & Foundry was founded in Charlotte in 1901 and has a storied history as one of the city’s most well-known businesses. In early 2020, Charlotte Pipe announced plans to relocate its cast iron foundry from its 55-acre plot of land on the outskirts of uptown Charlotte to a 480-acre property in Oakboro, NC. This massive three-year project included out-of-ground construction for multiple buildings across 129 acres to create a state-of-the-art manufacturing campus that would not only better support the company’s operations but also provide flexibility to expand and meet future needs.

At the center of the new campus is the modern 505,000-square-foot foundry building that houses the company’s latest manufacturing facility and supports major operations, including melting iron and casting molds. The thoughtful layout of the new foundry features a straightline production design to allow for increased production efficiency. It is helping the company move towards more technologically advanced, sustainable production. In keeping true to the company’s values, all construction materials and supplies are 100% Made in America.

REFERENCES

CHARLIE PONSCHECK

Charlotte Pipe & Foundry Co.

704.589.1375

cponscheck@charlottepipe.com

TERRY MARESKI WGM Design

704.248.3268

terrym@wgmdesign.com

I believe Barringer Construction is a unique and special company who takes safety and health seriously. We achieved success with the safety and health of the employees at this jobsite.

Creating a sustainable polymer manufacturing facility and chemical storage warehouse

Barringer served as the general contractor for this state-of-the-art Polymer Manufacturing Facility in Graham, NC. Indulor’s first American facility, this project included renovating the existing 27,547 square foot chemical warehouse to accommodate the company’s laboratory needs as well as adding an additional 2,318 square foot, two-story structural steel building to house a tank farm and multiple chemical process tanks.

Creating a functional laboratory

Our team transformed this warehouse to meet the company’s extensive technical laboratory needs. This included building a Quality Assurance Lab, maintenance shop, low voltage room and new main electrical control room. High-tech safety features including explosionproof lighting and smoke detectors, an intricate fire alarm system and a 500-kilowatt emergency backup generator were also installed throughout the space.

Project scope also included creating a functional space for Indulor’s employees. Additional storage rooms, a training room, employee locker rooms, restrooms, employee offices and a break room were added to the space.

REFERENCES

SEBASTIAN

Indulor America LP

336.578.9660

s.fengler@indulor.net

GAS-FIRED PRODUCTS RELOCATION

157,000 Phased Design-build TOTAL

Consolidating manufacturing, warehouse, and office locations into one fully-functional factory center for improved operations

Gas-Fired Products has been designing and manufacturing gas fired heating equipment since 1949. In 2020, the company decided to consolidate and relocate their manufacturing, warehousing, and office facilities into one fully-functional factory operations center. A complete renovation of an existing 157,000 square foot concrete tilt-up panel warehouse and adjacent metal framed building in Charlotte, NC was preformed to create their new homebase. The project included the buildout of a two-story office, manufacturing, warehouse, and lab engineering/testing space, building facade improvements, parking and site improvements, and new electrical service and HVAC systems to accommodate the company’s heavy equipment and machinery.

Time savings through our project approach

This project was broken into five phases to allow for move-in in sequence with the lease end dates of their existing facilities and to minimize downtime of manufacturing processes. In addition, the designbuild delivery method allowed for a condensed design schedule with the release of early permit packages while other areas were still being designed and submitted for permit.

REFERENCES

TIM GARRISON

Garrison Consulting

704.361.0304

tgarrisoniop@gmail.com NICKY NANJI Merriman Schmitt

980.286.7600 nnanij@msacharlotte.com

CHARLOTTE PIPE & FOUNDRY MONROE WAREHOUSE EXPANSION

NC

COMPLETION DATE January 2023

MARKET SECTORS

SUB-SECTORS

PARTNERS WGM Design

Geoscience Group WGPM, Inc.

Repeat Design-build Tilt-up Accelerated

CLIENT DELIVERY

CONCRETE CONSTRUCTION SCHEDULE

Expanding shipping and warehousing facilities to support Charlotte Pipe’s growing Plastics Division

Through a design-build partnership, Barringer and WGM Design completed this 123,200 square foot expansion to Charlotte Pipe & Foundry’s existing 160,000 square foot warehouse for their growing Plastics Division. The new building addition is constructed with tilt-up concrete walls and a steel structure to match the existing building and houses new dock areas, truck court, and a unisex restroom. New fire lines, resurfacing of the loading dock parking lot, and replacement of the existing roof were also executed within the scope of work.

Early design and construction coordination

Due to the extensive, multi-step process that accompanies tilt-up concrete construction, our team developed a strategy early on to ensure the project’s success. By establishing a collaborative and communicative partnership early on, our team was able to release the steel, roofing, and loading dock equipment contractors early in the design process to combat increasing material lead times and accommodate the accelerated schedule.

REFERENCES

DAVID LADD retired

Charlotte Pipe & Foundry Co.

704.289.2531

dladd@charlottepipe.com

SEAN DELAPP

WGM Design

704.342.9876

seand@wgmdesign.com

MOMENTIVE SILANES LAB

LOCATION

Charlotte, NC

SIZE

20,000 SF

MARKET SECTORS

Industrial

SUB-SECTORS

Headquarters

Infrastructure - Power/Energy

Laboratory - Bio/Pharma

CLIENT Momentive

CBRE

PARTNERS

Flad Architecture & Engineering

Accelerated 14 Tilt-up Zeiss

SCHEDULE ROOFTOP HVAC UNITS CONCRETE BUILDING EXPANSION

CONSTRUCTABILITY

Transforming a dated office space into a large, state-of-the-art global headquarters and lab

This project became two projects simultaneously, an origin site and destination site. Parallel to construction progress, the origin facility was meticulously examined and dismantled by each trade to determine all rough-in requirements necessary for the transplant of 165 pieces of equipment at the destination site. Major milestones of this project included replacement of 14 rooftop HVAC units, a rework of 90% of all ductwork, installation of a new 1200A switch gear and separate large sub electrical panels for relocated equipment, installation of a new transformer with main power transfer from Duke Energy and the moving of office, sensitive lab equipment, and large heavy manufacturing equipment to the destination site.

Zeiss constructability

The team meticulously categorized, measured, and logged each piece of equipment to ensure a seamless transition between locations. Utilizing detailed preplanning drawings, all equipment within the new facility was mapped out with precise placements. This thorough planning process guaranteed that every piece was accounted for and incorporated into the renovation, enabling a smooth and efficient relocation.

REFERENCES

BRIAN BRADLEY

CBRE (formerly)

704.995.5887

brianb0518@yahoo.com

608.232.1219

plarue@flad.com

Ground-up PEMB

BUILD STRUCTURE

LINEAR FEET OF TRENCH SYSTEMS SAVED IN VALUE ENGINEERING LOCATION

1,200

PARTNERS

Sportsmed Properties

WGM Design

$200K+

Cutting-edge

PEMB manufacturing facility for national producer of steel wire products

This 80,000-square-foot manufacturing facility, a ground-up project featuring a pre-engineered metal building (PEMB), is designed to support the production of welded wire mesh. Set on a newly developed site, the project includes complete site demolition, site stabilization, underground utilities, and concrete paving, laying the groundwork for a modern industrial footprint. The single-story building houses both manufacturing space and a dedicated office area for Keysteel’s operational needs.

One of the most complex components of this build involved precision blasting in a highly sensitive area—directly adjacent to an occupied property line and active power infrastructure. Through careful planning and coordination, our team safely navigated these challenges and minimized disruption.

REFERENCES CHAD HAGERMAN

Sportsmed Properties

704.965.1978

chad@sportsmedproperties.com

Turn static files into dynamic content formats.

Create a flipbook
Barringer Construction | We Build Industrial 2026 by Barringer Construction - Issuu