delivery program and operational plan 2021 - 2025 ADOPTED 24 JUNE 2021
our community our future
Our design rationale for this document is based on a conceptual interpretation of its contents. To symbolise the strategic community approach, we have used segmented shapes to represent the elements of the community that fit into the geographic focus – Ballina. Together, the shapes form the Ballina River map. Every element impacts on the challenges, direction and ultimately the future of its entire form – our community. We hope you enjoy the journey and the view.
Ballina Shire Council - Delivery Program / Operational Plan 2021 - 2025
table of contents INTRODUCTION FROM OUR MAYOR VISION + VALUES OUR COUNCIL REPRESENTATIVES
A
DELIVERY PROGRAM 1
INTEGRATED PLANNING + REPORTING FRAMEWORK ...... 9
2
WHAT OUR COMMUNITY WANTS.................................... 13
3
STATE AND REGIONAL PLANS ........................................ 16
4
SENIOR STAFF AND ORGANISATION STRUCTURE ........... 18
5
HEADING IN THE RIGHT DIRECTION ............................... 20 DIRECTION 1: CONNECTED COMMUNITY DIRECTION 2: PROSPEROUS ECONOMY DIRECTION 3: HEALTHY ENVIRONMENT DIRECTION 4: ENGAGED LEADERSHIP
B
6
CAPITAL EXPENDITURE ................................................. 40
7
STAFF RESOURCES ....................................................... 50
OPERATIONAL PLAN 8
INCOME STATEMENT 2021/2022 .................................. 54
9
LONG TERM FINANCIAL PLAN ........................................ 56
10
OPERATING RESULTS 2021/2022 .................................. 58
11
DISTRIBUTION OF GENERAL PURPOSE RATE INCOME..... 60
12
REVENUE POLICY .......................................................... 62
13
RELATED POLICIES AND INFORMATION ......................... 72
15
APPENDIX A : ROAD RECONSTRUCTION PROGRAM ........ 75
3
Ballina Shire Council - Delivery Program / Operational Plan 2021 - 2025
introduction from our mayor On behalf of Councillors and staff I am pleased to present our Delivery Program and Operational Plan for the period 2021/22 to 2024/25. The Program and Plan outline our vision and priorities for the future in four main areas: a Connected Community, a Prosperous Economy, a Healthy Environment and Engaged Leadership. As a Council we aim to be responsive and creative to ensure that what we deliver to our community aligns with the four priorities mentioned in the opening paragraph. The COVID-19 pandemic has impacted us in so many ways socially and economically, and we have worked with all levels of government to protect the health of our community. We will continue to be guided by the relevant agencies on all matters of public health. Many of the services we provide such as water, waste collection, parks, roads, footpaths and drainage are all critical components of our day to day life. This means it is essential that we provide the services that our community needs. We will also stay on track with the delivery of major projects, which will bring economic and social benefits to our community. Major projects planned for the next 12 months include the completion of the Wollongbar District Park, the continued refurbishment of Pop Denison Park in East Ballina, the new statement road, Airport Boulevard and the redevelopment of Kingsford Smith Park, Ballina. We will continue delivering the duplication of River Street throughout the four year program to ease traffic congestion in Ballina.
The Ballina Byron Gateway Airport will deliver economic benefits to this entire region, with further capital works planned in the four year period. Upgraded security measures and the car park expansion will be complete with runway improvements scheduled to commence in 2021/22. Many of these projects will be achieved by Council partnering with the Federal and State Government. We will continue to work cooperatively with all levels of government, local businesses and our community, as so much more can be accomplished when we work together. This is the last Delivery Program and Operational Plan for this term of Council with the Local Government Elections scheduled for September 2021. It has been our pleasure to serve the community during this extended term. Our team of Councillors and staff have so much more do, and this document provides a good overview of our preferred priorities for the next four years and the difference we hope to make. The Program and Plan is the product of teamwork by Councillors, staff and community input. We hope you find this document informative and we look forward to any feedback you may wish to provide on the outcomes we seek for the residents of the Ballina Shire.
The beautification of Lennox Head village will commence in earnest during 2021/22 with expected completion in 2022/23.
4
Cr David Wright, Mayor Acknowledgement of Country Ballina Shire Council acknowledges that we are here on the land of the Bundjalung people. The Bundjalung are the traditional owners of this land and are part of the oldest surviving continuous culture in the world.
our vision The Ballina Shire is safe, with a connected community, a healthy environment and a thriving economy.
our values C R E AT I V E – we want to encourage ideas and be innovative. A C C E S S I B L E – we need to be accessible and responsive to our community and our fellow employees. R E S P E C T F U L – we take responsibility for our actions and appreciate everyone’s opinions. E N E R G E T I C – we want to be enthusiastic in our approach to work. S A F E – safety takes priority over all actions and we want everyone to arrive at work and go home from work safe.
5
Ballina Shire Council - Delivery Program / Operational Plan 2021 - 2025 Ballina Shire Council - Delivery Program / Operational Plan 2018 - 2022
our council representatives Councillors are elected in Wards, however each Councillor represents the entire community and can be contacted on any matter. You can contact Councillors in person, by phone or email.
Cr David Wright
phone 0415 965 403 david.wright@ballina.nsw.gov.au Cr Phillip Meehan
MAYOR
phone 0415 965 403 david.wright@ballina.nsw.gov.au
MAYOR
Cr David Wright
what ward are you in?
phone 0408 349 833 phil.meehan@ballina.nsw.gov.au
Cr Phillip Meehan
WARD A
Cr Stephen phone 0408 349 833 McCarthy phone 0407 841 149 phil.meehan@ballina.nsw.gov.au
stephen.mccarthy@ballina.nsw. gov.au
WARD A
Cr Stephen McCarthy
Cr Nathan phone 0435 759 987Willis phone 0434 154 782 stephen.mccarthy@ballina.nsw. nathan.willis@ballina.nsw.gov.au gov.au
WARD B
LENNOX HEAD
WOLLONGBAR
CUMBALUM SKENNARS HEAD
Cr Sharon Cadwallader
ALSTONVILLE
phone 0413 091 440
Cr Nathan Willis sharon.cadwallader@ballina.
BALLINA
nsw.gov.au nathan.willis@ballina.nsw.gov.au
WARD C
phone 0413 091 440 sharon.cadwallader@ballina. nsw.gov.au Cr Jeff Johnson
WARD B
Cr Keith Williams phone 0418 504 644 Cr Sharon Cadwallader keith.williams@ballina.nsw.gov.au
WARD A
DEPUTY MAYOR
Cr Keith Williams
phone 0418 504 644 keith.williams@ballina.nsw.gov.au Cr Sharon Parry
WARD B
phone 0407 651 948 jeff.johnson@ballina.nsw.gov.au
WARDELL
phone 0408 683 052 sharon.parry@ballina.nsw.gov.au
phone 0438 677 202 Smith Cr Benjamin phone 0415 482 412 jeff.johnson@ballina.nsw.gov.au
ben.smith@ballina.nsw.gov.au
Cr Sharon Parry Cr Eoin Johnston phone 0407 416 149 phone 0408 683 052 eoin.johnston@ballina.nsw.gov.au sharon.parry@ballina.nsw.gov.au
WARD C
Cr Jeff Johnson
The Ballina Shire Local Government Area is divided into three Wards, Councillors are hererepresented to represent yourby views. ten elected Councillors, Councillors are elected in Wards, however each being three from each Ward plus a Councillor represents the entire community popularly elected and can be contacted on any matter. You can Mayor. contact Councillors in person, by phone or email.
6
phone 0415 482 412 ben.smith@ballina.nsw.gov.au
Cr Eoin Johnston phone 0407 416 149 eoin.johnston@ballina.nsw.gov.au
Like us on Facebook
WARD C
Cr Benjamin Smith
The elected Council is responsible for the direction and control of Council’s affairs in accordance with the NSW Local Government Act and associated legislation. Councillors represent the interests of our residents and ratepayers. They serve the community by listening to people and then representing those views on Council. They work together to make decisions about what the Council will do to meet community needs and how money should be spent in the best interests of the community as a whole. They provide leadership and guidance to the community; and facilitate communication between the community while maintaining the broader vision, needs and aspirations of the whole Ballina Shire community. Councillors do not get involved in the day to day running of the Council. This is the role of the General Manager. Some of the many things a Councillor does include:
• • •
Taking part in Council and committee meetings Reading Council business papers and preparing for meetings Reviewing Council’s progress on the Delivery Program and Operational Plan and budget on a regular basis to check if progress is on track
• • •
Speaking to members of the community about their needs and concerns Taking part in civic events Keeping an eye out for problems with Council assets that may need to be reported or inspected.
getting involved There are an number of ways you can get involved and help shape decisions for our community by:
• • • • • •
Attending Council meetings Making an appointment to speak with the Mayor or Councillors Making an appointment to speak with the General Manager or relevant Director Writing or telephoning Council about the issues important to you Attending a public meeting or forum to discuss specific issues Joining a Council Ward Committee as a representative of a community group.
7
PART A delivery program
01
integrated planning + reporting framework
Ballina Shire Council - Delivery Program / Operational Plan 2021 - 2025
1. integrated planning + reporting framework The Delivery Program and Operational Plan form part of the NSW Office of Local Government’s Integrated Planning and Reporting (IPR) Framework. There are a number of key elements in the framework that focus on planning and reporting requirements. The diagram below illustrates where the Delivery Program and Operational Plan fit in the overall framework and how our plans interrelate.
Other State Plans and Strategies
NSW Government Premier’s Priorities
Relevant Regional Plans
COMMUNITY STRATEGIC PLAN
10+ YEAR FOCUS
OTHER STRATEGIC PLANS (EXAMPLES)
COMMUNITY ENGAGEMENT
Ballina2035
Destination Management Plan
Cultural Plan
BBGA Masterplan
Local Environmental Plan
• Strategic Asset Management Plan
4 YEAR FOCUS
OPERATIONAL PLAN 1 YEAR FOCUS
Perpetual monitoring and review
10
• Long Term Financial Plan • Workforce Management Plan
DELIVERY PROGRAM
ANNUAL REPORT
RESOURCING STRATEGY
integrated planning and reporting framework @ ballina shire council “The Ballina Shire is safe, with a connected community, a healthy environment and a thriving economy.”
our community our future COMMUNITY STRATEGIC PLAN 2017–2027 ADOPTED 28 APRIL 2016
Strategic Plan and then translated into actions and activities in our four-year Delivery Program and annual Operational Plan.
The Community Strategic Plan identifies the community’s future goals, and strategies to achieve those goals by posing four key questions:
• •
Where are we now? Where do we want to be in 10 years
time?
This vision, together with our priorities and aspirations for the future are encompassed in the Ballina Shire Community
C O M M U N I T Y S T R AT E G I C P L A N
•
•
How will we get there?
How will we know when we’ve arrived?
Our Community Our Future is supported by other plans in the planning framework which reflect the priorities and
Our Community Strategic Plan is built around four key
aspirations identified in the Community Strategic Plan.
themes: The Community Strategic Plan (CSP) is the visionary long term document within the Integrated Planning and Reporting Framework. It provides the broader strategic direction for a
1 1
Connected Community (CC)
2
Prosperous Economy (PE)
council and outlines the key outcomes that the council, other
4
3
Healthy Environment (HE)
Engaged Leadership (EL)
agencies and the community will be working to achieve, such as improved services for health, education, and transport, modern community infrastructure and viable businesses.
The NSW Government’s Integrated Planning and Reporting
It translates the community’s key priorities and aspirations
framework (illustrated on page 10) outlines how local
into long-term strategic goals that guide the future direction
government’s capture the community’s main priorities and
of Ballina Shire. Safe, healthy and happy communities and
aspirations for the future and outlines how these will be
protection of the environment were key concerns identified
achieved. These documents are linked through a series of
during the community engagement undertaken to develop
cascading actions that detail how the community’s long term
this plan.
aspirations and outcomes will be achieved. All councils have a:
Whilst the CSP is Ballina Shire Council’s work, its success
1.
Community Strategic Plan
2.
Delivery Program and Operational Plan
3.
Resourcing Strategy
Council reports to its community how it has progressed in
inevitably depends upon collaboration and partnership with the community and State and Federal Governments. This document is available on Council’s website ballina.nsw. gov.au/planning-and-delivery.
achieving these plans through: 1.
Quarterly Reports
2.
Annual Report
3.
End of Term Report.
11
D E L I V E R Y P R O G R A M A N D O P E R AT I O N A L P L A N (COMBINED DOCUMENT) This is the point where the directions outlined in the CSP
ANNUAL REPORT The Annual Report focuses on our implementation of the Delivery
annual report
Program and Operational Plan. The
2019 - 2020
are systematically translated into
report also includes some information
actions. The Delivery Program
that is prescribed by the Local
and Operational Plan (combined
Government (General) Regulation
document) is designed as a single
2005. This information has been
point of reference for all key
included in the Regulation to help
activities to be undertaken by the
community members understand how
Council during their elected term.
council has been performing both as a business entity and
This document is reviewed annually with Council receiving
a community leader.
progress reports every quarter.
R E S O U R C I N G S T R AT E G Y
END OF TERM REPORTS Councils are required every
shire council
four years to produce an End of Term Report on the progress in END OF TERM REPORT 2012 - 2016
implementing the Community Strategic Plan. The Report covers the
our asset management plans explained OUR COMMUNITY OUR FUTURE
term of office for an elected council. The most recent End of Term Report 2012 - 2016 can be downloaded from Council’s website ballina.nsw.gov.au
The Community Strategic Plan (CSP) cannot be fulfilled without sufficient resources – time, money, assets and people – to actually carry them out. The Resourcing Strategy has three components:
• • •
PROGRESS REPORTS In accordance with the Integrated Planning and Reporting requirements progress reports must be provided to
Strategic Asset Management Plan
Council at least every six months. At Ballina Shire Council
Workforce Management Plan
we present quarterly reviews to Council. This monitoring
Long Term Financial Plan
mechanism provides a snapshot of accomplishments and
The Resourcing Strategy assists Council to translate the outcomes identified in the CSP, for which it is responsible, into actions. Some issues will be the responsibility of Council, some will be the responsibility of other levels of government and some will rely on input from community groups or individuals.
any shortfalls in achieving Council’s goals and priorities.
02 what our community wants
Ballina Shire Council - Delivery Program / Operational Plan 2021 - 2025
what our community wants Our community aspirations have been grouped under four themes, referred to as Directions. The Directions apply the Quadruple Bottom Line (social, economic, environment and governance) to provide a holistic approach to achieving our vision. The Directions and Outcomes identified in our Community Strategic Plan are as follows, with every Delivery Program and Operational Plan Strategy and Action then linked to these Directions and Outcomes. CONNECTED COMMUNITY (CC)
PROSPEROUS ECONOMY (PE)
People told us they want to
During our community
feel connected to a community
engagement people told us
which is respectful, inclusive and
they want a vibrant and diverse
tolerant of all ages and cultures.
local economy that provides
We want to feel safe and supported. We want to
a range of jobs and opportunities for people of all
live in an area that is relaxed, where we know our
ages. Importantly, we want to ensure there are job
neighbours, where people are happy and friendly and
opportunities for our young people so they do not
where the needs of all residents, from the young to the
have to leave the area to find work. We want to attract
old, and those with disabilities are treated equally and
innovative and progressive businesses that will ensure
fairly. The outcomes we are after are:
our villages and towns continue to thrive and prosper. The outcomes we are after are:
CC1 We feel safe CC2 We feel connected to the community CC3 There are services and facilities that suit our needs
14
PE1 We attract new business and visitors PE2 My business can grow and diversify PE3 Improved liveability in the Ballina Shire
HEALTHY ENVIRONMENT (HE)
ENGAGED LEADERSHIP (EL)
The health and preservation of
During our community
our natural environment was
engagement people told us
a strong recurring theme from
they want to have confidence
our community engagement.
and trust in their elected
We want to continue to find a balance between
representatives and want a genuine partnership
development and the environment to ensure we
with Council where their voices are heard and
preserve what people love so much about living
their opinions respected. Our community wants
in the Ballina Shire. We want to restore and repair
resources to be used efficiently and responsibly.
our waterways and areas that have been degraded
People want Council to act locally but to also work
to maintain aquatic and bird life. We understand
effectively and collaboratively with other levels
the importance of peace, serenity and harmony
of government, private sector organisations and
with nature. We want our built environment to meet
community groups to drive economic and social
our needs but not at the expense of our natural
prosperity. The outcomes we are after are:
environment or the people who live and work here. The outcomes we are after are: HE1 We understand the environment HE2 We use our resources wisely HE3 Our built environment blends with the natural environment
EL1 Our Council works with the community EL2 Council’s finances and assets are well managed EL3 We are all valued citizens
03
state and regional plans
3. consideration of state and regional plans Local Government is legislated by the NSW State Government and it is important that our plans align with the State Government’s priorities. To achieve this we have linked the Strategies and Actions in our Delivery Program to the Goals and Directions in the NSW State Government’s North Coast Regional Plan (March 2017).
A summary of those Goals and Directions is as follows, with further information available at planning.nsw. gov.au/Plans-for-your-area/Regional-Plans/North-Coast/North-Coast-Regional-Plan
GOAL 1 The most stunning environment in NSW
Direction 1 Deliver environmentally sustainable growth Direction 2 Enhance biodiversity, coastal and aquatic habitats, and water catchments Direction 3 Manage natural hazards and climate change Direction 4 Promote renewable energy opportunities
GOAL 2 A thriving, interconnected economy
Direction 5 Strengthen communities of interest and cross-regional relationships Direction 6 Develop successful centres of employment Direction 7 Coordinate the growth of regional cities Direction 8 Promote the growth of tourism Direction 9 Strengthen regionally significant transport corridors Direction 10 Facilitate air, rail and public transport infrastructure Direction 11 Protect and enhance productive agricultural lands Direction 12 Grow agribusiness across the region Direction 13 Sustainably manage natural resources
GOAL 3 Vibrant and engaged communities
Direction 14 Provide great places to live and work Direction 15 Develop healthy, safe, socially engaged and well-connected communities Direction 16 Collaborate and partner with Aboriginal communities Direction 17 Increase the economic self-determination of Aboriginal communities Direction 18 Respect and protect the North Coast’s Aboriginal heritage Direction 19 Protect historic heritage Direction 20 Maintain the region’s distinctive built character Direction 21 Coordinate local infrastructure delivery
GOAL 4 Great housing choice and lifestyle options
Direction 22 Deliver greater housing supply Direction 23 Increase housing diversity and choice Direction 24 Deliver well-planned rural residential housing areas Direction 25 Deliver more opportunities for affordable housing
17
04
senior staff and organisation structure
4. our executive team + organisation structure Councillors adopt an organisation structure that supports the position of General Manager in implementing the Strategies and Actions identified in the Delivery Program and Operational Plan. The adopted structure is as follows:
General Manager Paul Hickey
Director Kelly Brown
Director John Truman
Director Matthew Wood
Corporate and Community Division
Civil Services Division
Planning and Environmental Health Division
Infrastructure Planning
Strategic Planning
Information Services
Engineering Works
Development Services
Communications and Customer Service
Project Management
Public and
Facilities Management People and Culture
Commercial Services Financial Services Contracts and Procurement Risk Management
Resource Recovery Water and Wastewater Asset Management
Environmental Health Open Spaces
19
05
heading in the right direction
05
heading in the right direction Council has developed the Delivery Program and Operational Plan to achieve the Directions and Outcomes identified in our Community Strategic Plan.
1. CONNECTED COMMUNITY
2. PROSPEROUS ECONOMY
3. HEALTHY ENVIRONMENT
4. ENGAGED LEADERSHIP
This section provides details of the major Delivery Program Strategies, including the Operational Plan Actions, scheduled for the next four years. Our success in achieving the Actions identified for 2021/2022 will be reported to Council on a quarterly basis - in October, January, April and July.
Ballina Shire Council - Delivery Program / Operational Plan 2021 - 2025
direction one : connected community (CC) Delivery Program Strategy
The benefits will be...
Operational Plan Activity
Measures/Targets
21/22
22/23
23/24
24/25
Responsibility
Links to North Coast Regional Plan
X
X
X
Infrastructure Planning
D15
Infrastructure Planning
D15
CSP OUTCOME CC1 - WE FEEL SAFE CC1.1 Actively promote safety and wellbeing strategies
CC1.2 Ensure relevant public health and safety standards are being met
CC1.1.a
Implement Council’s Road Safety Plan to maximise road safety awareness
Actions implemented
X
CC1.1b
Ensure the Road Safety Strategy remains contemporary
Review completed
X
CC1.1c
Implement NSW State Government Pool Barrier Inspection Program
Actions implemented
X
X
X
X
Development Services
D15
CC1.1d
Provide timely responses to barking dog complaints
100% of barking dog complaints responded to within seven days
X
X
X
X
Public and Environmental Health
D14
CC1.1e
Provide rapid responses to reported dog attacks
100% of reported attacks responded to within 48 hours
X
X
X
X
Public and Environmental Health
D14
CC1.1f
Implement Parking Enforcement Program
Number of high risk school zones patrolled (Target > 36 p.a.)
X
X
X
X
Public and Environmental Health
D14
CC1.1g
Implement Parking Enforcement Program
Actions implemented
X
X
X
X
Public and Environmental Health
D14
CC1.1h
Investigate smart parking technology to improve parking efficiency
Analysis complete
X
Public and Environmental Health
D14
Higher levels of compliance
CC1.2a
Minimise number of unplanned water supply interruptions greater than four hours in duration (#)
Number of interruptions (Target = Nil)
X
X
X
X
Water and Wastewater
D15
Improved public health
CC1.2b
Ensure fire hydrants are functional
Fire hydrants inspected (Target > 50% p.a.)
X
X
X
X
Water and Wastewater
D15
CC1.2c
Minimise notifiable Drinking Water Health Incidents at Marom Creek Water Treatment Plant
Notifiable incidents (Target = Nil)
X
X
X
X
Water and Wastewater
D15
CC1.2d
Maximise Drinking Water Reticulation Monitoring Compliance (Microbial)
Level of compliance (100% with ADWG)
X
X
X
X
Water and Wastewater
D15
Lower crime rates
Increased compliance through proactive programs
Increased public safety
22
Proactive risk management
Ballina Shire Council - Delivery Program / Operational Plan 2021 - 2025
direction one : connected community (CC) Delivery Program Strategy
The benefits will be...
CC1.2 Ensure relevant public health and safety standards are being met
Higher levels of compliance Improved public health
Measures/Targets
21/22
22/23
23/24
24/25
Responsibility
Links to North Coast Regional Plan
CC1.2e
Maximise Drinking Water Reticulation Monitoring Compliance (Chemical and Physical)
Level of compliance (100% with ADWG)
X
X
X
X
Water and Wastewater
D15
CC1.2f
Provide a proactive compliance program
Dual occupancy noncompliance audits (Target > 20 p.a.)
X
X
X
X
Public and Environmental Health
D15
CC1.2g
Implement a responsive compliance program
Level of non-compliance reported and actions taken
X
X
X
X
Public and Environmental Health
D15
CC1.2h
Implement fire safety certificate compliance program
Actions implemented
X
X
X
X
Development Services
D15
CC1.2i
Ensure all drinking water sites are monitored weekly
Drinking water sites monitored (Target 100% per week)
X
X
X
X
Public and Environmental Health
D15
CC1.2j
Ensure compliance with the National Health and Medical Research Council drinking water standards
Non-compliance issues (Target = nil)
X
X
X
X
Public and Environmental Health
D15
CC1.2k
Ensure all food premises are regularly inspected
Food premises audited (Target 100% p.a.)
X
X
X
X
Public and Environmental Health
D15
CC1.2l
Audit all commercial premises as required under the inspection program
Premises audited (Target High risk premises audited twice p.a.)
X
X
X
X
Public and Environmental Health
D15
CC1.2m
Ensure public pools are regularly monitored and inspected for water quality
Public pools monitored (Target 100% public pools audited p.a.)
X
X
X
X
Public and Environmental Health
D15
CC1.2n
Ensure public pools are regularly monitored and inspected for water quality
Public pools monitored (Target 1/3 of semi-public pool audited p.a.)
X
X
X
X
Public and Environmental Health
D15
Operational Plan Activity
Increased public safety Proactive risk management
23
23
Ballina Shire Council - Delivery Program / Operational Plan 2021 - 2025
direction one : connected community (CC) Delivery Program Strategy
CC1.3 Ensure adequate plans are in place for natural disasters and environmental changes
The benefits will be...
The community is well prepared
Operational Plan Activity
Measures/Targets
21/22
22/23
23/24
24/25
Responsibility
Links to North Coast Regional Plan
Actions implemented and currency of Policy
X
X
X
X
Strategic Planning
D3
X
X
Project Management Office
D15
Project Management Office
D15
CC1.3a
Implement the Climate Change Action Policy
CC1.3b
Deliver the Ballina SES Headquarters premises
Project completed
X
CC1.3c
Deliver the Lennox Head Rural Fire Shed at Byron Bay Road
Project completed
X
CC1.3d
Ensure Business Continuity Plans (BCPs) remain contemporary
BCP’s monitored
X
X
X
X
Communications and Customer Service
D15
CSP OUTCOME CC2 - WE FEEL CONNECTED TO THE COMMUNITY CC2.1 Create events and activities that promote interaction and education, as well as a sense of place
CC2.2 Encourage community interaction, volunteering and wellbeing
24
Increase in events, community participation and a sense of place
There are more people volunteering in our community Improved sense of wellbeing
CC2.1a
Implement Cultural Plan
Actions implemented
X
X
X
X
Strategic Planning
D19
CC2.1b
Promote the Northern Rivers Community Gallery and Ignite Studio
Actions implemented
X
X
X
X
Strategic Planning
D19
CC2.1c
Deliver a well patronised Northern Rivers Community Gallery
Gallery visitors (Target > 25,000 p.a.)
X
X
X
X
Strategic Planning
D19
CC2.1d
Deliver a well patronised Northern Rivers Community Gallery
Gallery website visits (Target > 26,000 p.a.)
X
X
X
X
Strategic Planning
D19
CC2.1e
Expand number of Council approved events
Event numbers (Target > 25 p.a.)
X
X
X
X
Open Spaces
D8
CC2.1f
Administer filming approvals in accordance with Local Government Filming Protocol
Approval numbers (Target > 25 p.a.)
X
X
X
X
Open Spaces
D8
CC2.2a
Support Council initiated volunteer programs (Airport, Gallery etc)
Program effectiveness
X
X
X
X
Strategic Planning / Communications and Customer Service
D14
CC2.2b
Implement Companion Animals Management Plan
Actions implemented
X
X
X
X
Public and Environmental Health
D15
Ballina Shire Council - Delivery Program / Operational Plan 2021 - 2025
direction one : connected community (CC) Delivery Program Strategy
The benefits will be...
CC2.3 Assist disadvantaged groups within our community
Disadvantaged groups are supported
Operational Plan Activity
Measures/Targets
21/22
22/23
23/24
24/25
Responsibility
Links to North Coast Regional Plan
CC2.3a
Implement Equal Employment Opportunity Management Plan
Actions implemented
X
X
X
X
People and Culture
D14
CC2.3b
Implement Disability Inclusion Action Plan
Plan adopted and actions implemented
X
X
X
X
Strategic Planning
D15
CC2.3c
Develop and implement Memorandum of Understanding (MoU) with Jali Aboriginal Land Council
MoU signed
X
X
X
X
Strategic Planning
D16
CSP OUTCOME CC3 - THERE ARE SERVICES AND FACILITIES THAT SUIT OUR NEEDS CC3.1 Provide strategies for older residents to be part of our community
Older residents are more engaged and active
CC3.2 Provide young people with a range of leisure activities
Expanded range of youth facilities
CC3.3 Support improved health outcomes by providing equitable access to community facilities
CC3.1a
Implement Ageing Strategy
Actions implemented
X
X
X
X
Strategic Planning
D15
CC3.2a
Implement the Sport and Recreation Facilities Plan
Actions implemented
X
X
X
X
Open Spaces
D15
CC3.2b
Implement Playground Upgrade and Renewal Plan (PURP)
Actions implemented
X
X
X
X
Open Spaces
D15
Increased satisfaction and participation rates
CC3.3a
Ensure library services reflect contemporary needs
Membership (Target > 20,,000 p.a.)
X
X
X
X
Communications and Customer Service
D15
A healthier community
CC3.3b
Ensure library services reflect contemporary needs
Loans (Target > 330,000 p.a.)
X
X
X
X
Communications and Customer Service
D15
CC3.3c
Ensure library services reflect contemporary needs
PC (Target > 20,000 p.a.)
X
X
X
X
Communications and Customer Service
D15
CC3.3d
Ensure library services reflect contemporary needs
Wireless usage (Target > 20,000 p.a.)
X
X
X
X
Communications and Customer Service
D15
25
25
Ballina Shire Council - Delivery Program / Operational Plan 2021 - 2025
direction one : connected community (CC) Delivery Program Strategy
CC3.3 Support improved health outcomes by providing equitable access to community facilities
26
The benefits will be...
Operational Plan Activity
Measures/Targets
21/22
22/23
23/24
24/25
Responsibility
Links to North Coast Regional Plan
Increased satisfaction and participation rates
CC3.3e
Increase use of our community facilities
Kentwell Centre (Target > 30% = 4,200hrs p.a.)
X
X
X
X
Communications and Customer Service
D15
A healthier community
CC3.3f
Increase use of our community facilities
Lennox Head Centre – Meeting Rooms (Target 50%. = 7,000hrs p.a.)
X
X
X
X
Communications and Customer Service
D15
CC3.3g
Increase use of our community facilities
Lennox Head Centre – Auditorium (Target 30%. = 1,050hrs p.a.)
X
X
X
X
Communications and Customer Service
D15
CC3.3h
Increase use of our community facilities
Ballina Surf Club (Target 50% = 5,250hrs p.a.)
X
X
X
X
Communications and Customer Service
D15
CC3.3i
Increase use of our community facilities
Richmond Room (Target 30% = 1,050hrs p.a.)
X
X
X
X
Communications and Customer Service
D15
CC3.3j
Increase use of our community facilities
BISC – Meeting Rooms (Target 30% = 3,150hrs p.a.)
X
X
X
X
Communications and Customer Service
D15
CC3.3k
Increase use of our community facilities
BISC – Courts (Target 50% = 3,500hrs p.a.)
X
X
X
X
Communications and Customer Service
D15
CC3.3l
Ensure public pool facilities are well patronised
Swimming pool patrons (Target >260,000 p.a.)
X
X
X
X
Facilities Management
D15
CC3.3m
Implement Captain Cook Master Plan
Actions completed
X
Open Spaces
D15
CC3.3n
Implement Pedestrian Access and Mobility Plan (PAMP)
Works completed
X
X
X
Engineering Works
D15
CC3.3o
Implement Pop Denison Park Master Plan
Actions completed
X
X
Open Spaces
D15
CC3.3p
Review of the Ballina Shire Open Spaces and Community Facilities Strategy 2008
Review completed
X
Strategic Planning
D15
X
Ballina Shire Council - Delivery Program / Operational Plan 2021 - 2025
direction two : prosperous economy (PE) Delivery Program Strategy
The benefits will be...
Operational Plan Activity
Measures/Targets
21/22
22/23
23/24
24/25
Responsibility
Links to North Coast Regional Plan
Promotions conducted and effectiveness
X
X
X
X
Communications and Customer Service
D8
Actions implemented
X
X
X
X
Communications and Customer Service
D8
CSP OUTCOME PE1 - WE ATTRACT NEW BUSINESS AND VISITORS PE1.1 Promote our area as an attractive place to visit
Enhanced experience for residents and visitors Increased visitor numbers
PE1.2 Provide opportunities for new business
PE1.3 Enhance the image of the local economy
Our economy expands over time
Increased resilience for our economy
PE1.1a
Participate in and leverage opportunities to market the Ballina Coast and Hinterland
PE1.1b
Implement Destination Management Plan
PE1.1c
Provide accessible and efficient visitor information services
Visitor Centre Enquiries (Target > 40,000 p.a.)
X
X
X
X
Communications and Customer Service
D8
PE1.1d
Provide accessible and efficient visitor information services
Tourism website visits (Target >110,000 p.a.)
X
X
X
X
Communications and Customer Service
D8
PE1.1e
Provide accessible and efficient visitor information services
Proportion of satisfied visitors to Visitor Centre (Target > 98%)
X
X
X
X
Communications and Customer Service
D8
PE1.1f
Improve Promotional and Interpretative Signage
Actions implemented
X
X
X
X
Communications and Customer Service
D8
PE1.2a
Deliver Lennox Head Town Centre Village Renewal
Works completed
X
X
Project Management Office
D21
PE1.2b
Examine planning options to expedite the delivery of commercial and retail shops in the Ballina Heights Estate
Actions implemented
X
X
Strategic Planning
D24
PE1.3a
Implement economic development strategy
Actions implemented
X
X
X
X
Strategic Planning
D6
PE1.3b
Promote Ballina Marina (Trawler Harbour) Master Plan
Actions implemented
X
X
X
X
Strategic Planning
D7
PE1.3c
Promote and implement Martin Street Boat Harbour Master Plan
Actions implemented
X
X
X
X
Engineering Works
D7
27
27
Ballina Shire Council - Delivery Program / Operational Plan 2021 - 2025
direction two : prosperous economy (PE) Delivery Program Strategy
The benefits will be...
Operational Plan Activity
Measures/Targets
21/22
22/23
23/24
24/25
Responsibility
Links to North Coast Regional Plan
CSP OUTCOME PE2 - MY BUSINESS CAN GROW AND DIVERSIFY PE2.1 Provide an efficient and cost effective regulatory environment for doing business
PE2.2 Enhance connectivity to capital cities
28
Easier to do business
PE2.1a
Efficiently process and assess development related applications
% of Section 10.7 certificates issued within four days (Target > 90%)
X
X
X
X
Development Services
D22
PE2.1b
Efficiently process and assess development related applications
Time to determine development application (Target mean time < 60 days)
X
X
X
X
Development Services
D22
PE2.1c
Efficiently process building and construction applications
Complying development certificates issued within 10 working days (Target > 80%)
X
X
X
X
Development Services
D22
PE2.1d
Efficiently process building and construction applications
% of construction certificates issued by Council (Target > 50% of market)
X
X
X
X
Development Services
D22
PE2.1e
Efficiently process building and construction applications
% of building information certificates determined within 20 days (Target > 90%)
X
X
X
X
Development Services
D22
PE2.1f
Efficiently process building and construction applications
Number of Section 68 Approvals issued for plumbing and drainage work (Target > 450 p.a.)
X
X
X
X
Development Services
D22
PE2.2a
Implement Ballina Byron Gateway Airport upgrades
Works progressed
X
X
X
X
Commercial Services
D10
PE2.2b
Ensure the on-going viability of the Ballina Byron Gateway Airport
Operating revenue (Target > $6.0 million)
X
X
X
X
Commercial Services
D10
PE2.2c
Ensure the on-going viability of the Ballina Byron Gateway Airport
Operating surplus (Target > 20% of revenue)
X
X
X
X
Commercial Services
D10
PE2.2d
Ensure the on-going viability of the Ballina Byron Gateway Airport
Passengers (Target > 500,000 p.a.)
X
X
X
X
Commercial Services
D10
Enhanced business relationships
Increased business opportunities
Ballina Shire Council - Delivery Program / Operational Plan 2021 - 2025
direction two : prosperous economy (PE) Delivery Program Strategy
PE2.3 Operate Council business activities that support economic development
The benefits will be...
Council contributes and understands the local economy
Operational Plan Activity
Measures/Targets
21/22
22/23
23/24
24/25
Responsibility
Links to North Coast Regional Plan
PE2.3a
Determine future of Stokers Quarry
Future strategy confirmed
X
Open Spaces
D13
PE2.3b
Determine future of Tuckombil Quarry
Future strategy confirmed
X
Strategic Plan
D13
PE2.3c
Determine future of Airport Sandpit
Future strategy confirmed
X
Infrastructure Planning
D13
PE2.3d
Pursue sand dredging of North Creek
Actions implemented
PE2.3e
Proactively manage our commercial properties
Minimise vacancy rates (Target < 10%)
X
PE2.3f
Ensure on-going profitability of the Flat Rock Tent Park
Operating revenue (Target > $400,000)
X
X
X
Infrastructure Planning
D13
X
X
X
Commercial Services
D14
X
X
X
Commercial Services
D8
X
X
Commercial Services
D7
CSP OUTCOME PE3 – IMPROVE LIVEABILITY IN THE SHIRE PE3.1 Facilitate commercially viable industrial precincts
PE3.2 Facilitate residential land
Increased business activity and local employment
Readily available land and housing stock More affordable housing
PE3.1a
Progress availability of land at the Russellton Industrial Estate
Lots available for sale
PE3.1b
Progress availability of land at the Southern Cross Industrial Estate
Land zoned and lots available for sale
X
X
X
X
Commercial Services
D7
PE3.2a
Prepare residential land and housing report
Report published
X
X
X
X
Strategic Planning
D23
PE3.2b
Develop and sell Wollongbar Residential Land Holding
Lots available for sale, actual sales and net profit
X
X
Commercial Services
D23
PE3.2c
Monitor infrastructure to support growth areas
Actions implemented
X
X
Strategic Planning
D24
PE3.2d
Review local affordable housing planning and policy framework
Review complete
X
X
Strategic Planning
D25
X
X
29 29
Ballina Shire Council - Delivery Program / Operational Plan 2021 - 2025
direction two : prosperous economy (PE) Delivery Program Strategy
The benefits will be...
PE3.3 Deliver infrastructure that supports residential living
An attractive place to live
30
Operational Plan Activity
Measures/Targets
21/22
22/23
23/24
24/25
Responsibility
Links to North Coast Regional Plan
X
X
Project Management Office
D21
Project Management Office
D21
PE3.3a
Progress delivery of Hutley Drive – southern section
Consent enacted
X
X
PE3.3b
Progress Angels Beach Drive / Bangalow Road roundabout lane extensions
Designs and approvals in place and works undertaken
X
X
PE3.3c
Progress River Street Dual Laning
Designs and approvals in place and works undertaken
X
X
X
X
Project Management Office
D21
PE3.3d
Progress Tamarind Drive Dual Laning
Designs and approvals in place and works undertaken
X
X
X
X
Project Management Office
D21
PE3.3e
Progress Barlows Road as a connection between Tamarind Drive and River Street
Designs and approvals in place and works undertaken
X
X
X
Project Management Office
D21
PE3.3f
Progress design and approvals for North Creek Road Bridge reinstatement
Level of progress on design and approvals
X
X
X
Project Management Office
D21
PE3.3g
Ensure Pedestrian Access and Mobility Plan remains contemporary
Reviews completed in a timely manner
X
X
Infrastructure Planning
D21
PE3.3h
Ensure Ballina Shire Bike Plan remains contemporary
Reviews completed in a timely manner
Infrastructure Planning
D21
X
X
X
Ballina Shire Council - Delivery Program / Operational Plan 2021 - 2025
direction three : healthy environment (HE) Delivery Program Strategy
The benefits will be...
Operational Plan Activity
Measures/Targets
21/22
22/23
23/24
24/25
Responsibility
Links to North Coast Regional Plan
CSP OUTCOME HE1 - WE UNDERSTAND THE ENVIRONMENT HE1.1 Our planning considers past and predicted changes to the environment
Reduced risk from natural disasters or changes in climate
HE1.2 Undertake and promote initiatives that improve our waterways
Health of our waterways is improving
HE1.3 Increased flora and Beautify and vegetation cover protect our streetscapes and open spaces
HE1.1a
Implement Ballina Coastline Management Plan
Actions implemented and currency of Plan
X
X
X
X
Engineering Works
D1
HE1.1b
Implement Floodplain Management Plans
Actions implemented and currency of Plan
X
X
X
X
Engineering Works
D1
HE1.2a
Implement Healthy Waterways Strategy
Actions implemented
X
X
X
X
Public and Environmental Health
D2
HE1.2b
Implement Shaws Bay Coastal Management Plan
Actions implemented and currency of Plan
X
X
X
X
Public and Environmental Health
D2
HE1.2c
Implement Lake Ainsworth Coastal Management Plan
Actions implemented and currency of Plan
X
X
X
X
Public and Environmental Health
D2
HE1.2d
Develop North Creek Coastal Management Plan
Actions implemented and currency of Plan
X
X
X
X
Public and Environmental Health
D2
HE1.2e
Implement Urban Stormwater Management Plan
Actions implemented and currency of Plan
X
X
X
X
Engineering Works
D2
HE1.3a
Implement proactive street tree planting program
Actions implemented
X
X
X
X
Open Spaces
D2
HE1.3b
Implement a proactive fig tree management program
Actions implemented
X
X
X
X
Open Spaces
D2
CSP OUTCOME HE2 - WE USE OUR RESOURCES WISELY HE2.1 Implement total water cycle management practices
Reduced water consumption per capita
HE2.1a
Improve quality of water and wastewater data
Actions implemented
X
X
X
X
Water and Wastewater
D2
Maximise recycled water use
HE2.1b
Increase recycled water to dual Reticulated Properties
Properties using service and kilolitres used
X
X
X
X
Water and Wastewater
D2
HE2.1c
Minimise notifiable Recycled Water Health Incidents at the Ballina and Lennox Head Wastewater Treatment Plants
Number of incidents (Target = Nil)
X
X
X
X
Water and Wastewater
D15
31
Ballina Shire Council - Delivery Program / Operational Plan 2021 - 2025
direction three : healthy environment (HE) Delivery Program Strategy
HE2.1 Implement total water cycle management practices
The benefits will be...
Reduced water consumption per capita Maximise recycled water use
HE2.2 Reduced costs and Use our scarce extended life for resources wisely existing resources
32
Operational Plan Activity
Measures/Targets
21/22
22/23
23/24
24/25
Responsibility
Links to North Coast Regional Plan
HE2.1d
Maximise Recycled Water Reticulation Compliance in Ballina and Lennox Head (Microbial)
Level of compliance (Target = 100% with AGWR)
X
X
X
X
Water and Wastewater
D1
HE2.1e
Maximise Recycled Water Reticulation Compliance in Ballina and Lennox Head (Chemical and Physical)
Level of compliance (Target = 100% with AGWR)
X
X
X
X
Water and Wastewater
D1
HE2.1f
Monitor average water consumption per residential connection
Per residential connection (Target <170 kl/pa)
X
X
X
X
Water and Wastewater
D1
HE2.1g
Review the Recycled Water Master Plan
Review complete
X
X
Water and Wastewater
D1
HE2.1h
Recycled water during dry weather (% ADWF)
Level of compliance (Target > 20%)
X
X
Water and Wastewater
D1
HE2.1i
Develop an Integrated Water Cycle Management Plan
Plan developed
X
X
Water and Wastewater
D1
HE2.2a
Increase kerbside recycling diversion rates
(Target > 59%)
X
X
X
X
Resource Recovery
D21
HE2.2b
Reduce missed kerbside bin services
(Target < 27 per month)
X
X
X
X
Resource Recovery
D21
HE2.2c
Implement water loss reduction program
Actions implemented
X
X
X
X
Water and Wastewater
D1
HE2.2d
Reduce the volume of unaccounted water
Ensure there is a trend in the reduction of unaccounted water
X
X
X
X
Water and Wastewater
D1
HE2.2e
Minimise light fleet greenhouse gas emissions
Average CO2 emissions of light fleet (Target < 200g/km)
X
X
X
X
Facilities Management
D4
HE2.2f
Reduce water main breaks
Minimise main breaks (Target < one break per 30km of main)
X
X
X
X
Water and Wastewater
D21
X
X
Ballina Shire Council - Delivery Program / Operational Plan 2021 - 2025
direction three : healthy environment (HE) Delivery Program Strategy
The benefits will be...
HE2.3 Cost and resource Reduce resource use efficiencies use through innovation
Operational Plan Activity
HE2.3a
Reduce CO2 emissions from our built assets
HE2.3b
Increase renewable energy generated on council sites
HE2.3c
Reduce the energy consumption from our built assets
Measures/Targets
21/22
22/23
23/24
24/25
Responsibility
Links to North Coast Regional Plan
Reduce CO2 emissions (Target < 9,800 tonnes)
X
X
X
X
Facilities Management
D3
Increase kilowatts generated (Target > 800 kW)
X
X
X
X
Facilities Management
D4
Minimise megawatts consumed (Target < 9,000 MWh)
X
X
X
X
Facilities Management
D3
CSP OUTCOME HE3 - OUR BUILT ENVIRONMENT BLENDS WITH THE NATURAL ENVIRONMENT HE3.1 Implement plans that balance the built environment with the natural environment
More people are satisfied with our management of development Reduced impacts of development on the environment
HE3.1a
Implement Ballina Major Regional Centre Strategy
Actions implemented
X
X
X
X
Strategic Planning
D14
HE3.1c
Implement Wardell Strategic Plan
Actions Implemented
X
X
X
X
Strategic Planning
D24
HE3.1d
Implement Alstonville Strategic Plan
Actions Implemented
X
X
X
X
Strategic Planning
D24
HE3.1b
Implement Wollongbar Strategic Plan
Actions Implemented
X
X
X
X
Strategic Planning
D24
HE3.1e
Review Planning Framework for Lennox Head
Updated planning framework adopted
X
X
Strategic Planning
D24
HE3.1f
Review Wardell Strategic Plan
Review complete
Strategic Planning
D24
HE3.1h
Review Alstonville Strategic Plan
Review complete
X
Strategic Planning
D24
HE3.1c
Review Wollongbar Strategic Plan
Review complete
X
Strategic Planning
D24
HE3.1i
Review environmental protection zone framework
Updated planning framework adopted
X
Strategic Planning
D1
HE3.1j
Review Local Environmental Plan (LEP)
Review complete
X
Strategic Planning
D20
HE3.1i
Maintain Development Control Plan (DCP)
Timely reviews
X
X
X
X
X
Strategic Planning
D20
33
Ballina Shire Council - Delivery Program / Operational Plan 2021 - 2025
direction three : healthy environment (HE) Delivery Program Strategy
The benefits will be...
HE3.1 Implement plans that balance the built environment with the natural environment
More people are satisfied with our management of development
HE3.2 Minimise negative impacts on the natural environment
34
Reduced impacts of development on the environment
Protection and retention of our natural environment
Operational Plan Activity
Measures/Targets
21/22
22/23
23/24
Review complete
X
Amendments assessed and processed
X
X
X
X
Responsibility
Links to North Coast Regional Plan
Strategic Planning
D20
X
Strategic Planning
D20
X
Strategic Planning
D14
Strategic Planning
D3
24/25
HE3.1j
Review Local Growth Management Strategy
HE3.1k
Manage LEP amendment requests
HE3.1l
Maintain a contemporary management framework for public land
Timely reviews
X
X
HE3.1m
Review Plan of Management for Ballina Coastal Reserve
Review complete
X
X
HE3.1n
Implement management plans for Killen and Tosha Falls
Actions implemented
X
X
X
X
Open Spaces
D13
HE3.1o
Implement management plan for Ocean Breeze Reserve
Actions implemented
X
X
X
X
Open Spaces
D13
HE3.1p
Develop and implement an illegal dumping strategy
Strategy complete and actions implemented
X
X
X
X
Public and Environmental Health
D15
HE3.1q
Develop and implement Extractive Industry Strategy
Strategy complete and actions implemented
X
X
X
X
Public and Environmental Health
D13
HE3.2a
Minimise notifiable Pollution Incidents triggering a formal regulatory response
Number of incidents (Target = Nil)
X
X
X
X
Water and Wastewater
D3
HE3.2b
Monitor on-site sewage management (OSSM) systems to ensure systems are compliant
Number inspected (Target > 100 p.a.)
X
X
X
X
Public and Environmental Health
D3
HE3.2c
Monitor on-site sewage management (OSSM) systems to ensure systems are compliant
Approvals to Install issued (Target > 30 p.a.)
X
X
X
X
Public and Environmental Health
D3
HE3.2d
Monitor on-site sewage Approvals to Operate issued management (OSSM) systems (Target > 100 p.a.) to ensure systems are compliant
X
X
X
X
Public and Environmental Health
D3
Ballina Shire Council - Delivery Program / Operational Plan 2021 - 2025
direction three : healthy environment (HE) Delivery Program Strategy
HE3.2 Minimise negative impacts on the natural environment
HE3.3 Match infrastructure with development to mitigate any impacts on the environment
The benefits will be...
Protection and retention of our natural environment
The impacts of development on the environment will be minimised
Operational Plan Activity
Measures/Targets
21/22
22/23
23/24
24/25
Responsibility
Links to North Coast Regional Plan
HE3.2c
Ensure compliance with Environmental Protection License Concentration Limits
Level of compliance (Target = 100% with license)
X
X
X
X
Water and Wastewater
D2
HE3.2d
Implement trade waste management program
Actions implemented
X
X
X
X
Water and Wastewater
D3
HE3.2e
Timely licence reports for waste, water and wastewater
100% of reports are completed within 30 days of quarter
X
X
X
X
Water and Wastewater
D2
HE3.2f
Implement Ballina Shire Koala Management Strategy
Actions implemented
X
X
X
X
Strategic Planning
D2
HE3.2g
Prepare a biodiversity strategy
Strategy completed
X
X
Strategic Planning
D2
HE3.2h
Implement Alstonville and East Ballina Cemetery Master Plans
Plan updated and implemented
X
X
Open Spaces
D21
HE3.3a
Maintain Water and Wastewater Developer Contribution Plans
Timely reviews
X
Infrastructure Planning
D21
HE3.3b
Maintain Car Parking Developer Contribution Plan
Timely reviews
Infrastructure Planning
D21
HE3.3c
Maintain Roads Developer Contribution Plan
Timely reviews
Infrastructure Planning
D21
HE3.3d
Maintain Open Spaces and Community Facilities Developer Contribution Plan
Timely reviews
Strategic Planning
D21
HE3.3e
Maintain Heavy Haulage Developer Contribution Plan
Timely reviews
Infrastructure Planning
D21
X
X
X
X
X
X
35
Ballina Shire Council - Delivery Program / Operational Plan 2021 - 2025
direction four : engaged leadership (EL) Delivery Program Strategy
The benefits will be...
Operational Plan Activity
Measures/Targets
21/22
22/23
23/24
24/25
Responsibility
Links to North Coast Regional Plan
X
Communications and Customer Service
D5
X
Communications and Customer Service
D5
Strategic Planning
D21
Strategic Planning
D21
CSP OUTCOME EL1 - OUR COUNCIL WORKS WITH THE COMMUNITY EL1.1 Ensure corporate publications reflect community sentiment
More engaged community
EL1.2 Involve our community in our planning and decision making processes
Improved satisfaction levels with Council’s consultation
EL1.3 Actively advocate community issues to other levels of government
Increased levels of State and Federal Government support
EL1.1a
Complete the review of Community Strategic Plan
Review completed
X
EL1.1b
Prepare Council’s Annual Report
Review completed
X
EL1.2a
Prepare management plan for Kingsford Smith Reserve
Management plan completed
X
EL1.2b
Prepare management plan for Cawarra Park
Management plan completed
X
EL1.2c
Prepare management plan for Hampton Park
Management plan completed
X
Strategic Planning
D21
EL1.2d
Prepare management plan for Bicentennial Park
Management plan completed
X
Strategic Planning
D21
EL1.2e
Prepare management plan for Serpentine/Pioneer Park/Shaws Bay
Management plan completed
Strategic Planning
D21
EL1.2f
Prepare management plan for Spoonbill Reserve
Management plan completed
Strategic Planning
D21
EL1.3a
Approach State and Federal Governments on local issues
Issues identified and pursued
X
X
X
X
Communications and Customer Service
D21
EL1.3b
Actively seek grant funding from State and Federal Governments
Grant applications (Target > 25 p.a.)
X
X
X
X
Communications and Customer Service
D21
X
X
X
X
X
CSP OUTCOME EL2 - COUNCIL’S FINANCES AND ASSETS ARE WELL MANAGED EL2.1 Proactively pursue revenue opportunities, cost savings and/or efficiencies
3636
More financially viable Council resulting in improved asset management
EL2.1a
Maximise the fleet operating surplus (excluding depreciation)
Operating surplus (Target > $1.8m p.a.)
X
X
X
X
Facilities Management
D21
EL2.1b
Minimise the value of store stock control bin errors
Minimise variances (Target < $500)
X
X
X
X
Financial Services
D21
EL2.1c
Achieve investment returns greater than 90 day bank bill Rate
Investment returns (Target 75 basis points)
X
X
X
X
Financial Services
D21
Ballina Shire Council - Delivery Program / Operational Plan 2021 - 2025
direction four : engaged leadership (EL) Delivery Program Strategy
The benefits will be...
EL2.1 Proactively pursue revenue opportunities, cost savings and/or efficiencies
More financially viable Council resulting in improved asset management
EL2.2 Use modern systems and equipment
EL2.3 Provide effective risk and safety practices
Increased efficiencies and higher staff satisfaction
Reduced incidents and lower insurance premiums and related costs
Operational Plan Activity
Measures/Targets
21/22
22/23
23/24
24/25
Responsibility
Links to North Coast Regional Plan
EL2.1d
Pursue compliance with the Fit for the Future Program
Improve our overall financial sustainability
X
X
X
X
Financial Services
D21
EL2.1e
Minimise the net operating deficit for the Burns Point Ferry (excluding depreciation)
Minimise deficit (Target < $200,000 p.a.)
X
X
X
X
Engineering Works
D21
EL2.1f
Minimise the net operating deficit for swimming pools (excluding depreciation and loan interest)
Deficit (Target < $200,000 p.a.)
X
X
X
X
Facilities Management
D21
EL2.1g
Minimise net operating deficit for Community Centres and Halls (excluding depreciation)
Deficit (Target < $500,000 p.a.)
X
X
X
X
Communications and Customer Service
D21
EL2.1i
Minimise net operating deficit for the Community Gallery (excluding depreciation)
Deficit (Target < $320,000 p.a.)
X
X
X
X
Strategic Planning
D21
EL2.1j
Maximise revenue generated from our commercial properties
Revenues (Target > $2.5m)
X
X
X
X
Commercial Services
D21
EL2.1k
Implement business excellence framework or similar to generate efficiencies
Improvements implemented
X
X
X
X
Communications and Customer Service
D21
EL2.1l
Ensure Asset Management Policy, Strategy and Plans remain contemporary
Ensure documents remain contemporary
X
X
X
Infrastructure Planning
D21
EL2.2a
Implement technology solutions that generate productivity gains
Improvements implemented
X
X
X
X
Information Services
D21
EL2.2b
Continuous improvement of Council's cyber security
Improvements implemented
X
X
X
X
Information Services
D21
EL2.3a
Provide a pro-active internal risk claims management service
Workers compensation claims (Target < 20 p.a.)
X
X
X
X
People and Culture
D21
EL2.3b
Provide a pro-active internal risk claims management service
Hours of workers compensation lost time (Target < 1,000 hrs p.a.)
X
X
X
X
People and Culture
D21
37
37
Ballina Shire Council - Delivery Program / Operational Plan 2021 - 2025
direction four : engaged leadership (EL) Delivery Program Strategy
The benefits will be...
Operational Plan Activity
Measures/Targets
21/22
22/23
23/24
24/25
Responsibility
Links to North Coast Regional Plan
EL2.3c
Provide a pro-active internal risk claims management service
Number of Insurance claims (Target < 30 p.a.)
X
X
X
X
Financial Services
D21
EL2.3d
Risk management practices align with insurer and legislative requirements
Audit completed and level of compliance
X
X
X
X
Financial Services
D21
EL2.3e
Implementation organise wide Risk Management Framework
Actions undertaken
X
X
X
X
Financial Services
D21
X
Communications and Customer Service
D5
CSP OUTCOME EL3 - WE ARE ALL VALUED CITIZENS EL3.1 Provide prompt, knowledgeable, friendly and helpful advice
There are more people in the community who consider Council staff friendly and helpful
EL3.2 Encourage a motivated and adaptive workforce
High staff retention with a proactive and well skilled workforce
EL3.3 Deliver responsive and efficient services
3838
Increased community and employee satisfaction levels with Council’s customer service Increased efficiencies and cost savings
EL3.1a
Undertake a community survey to measure perception of Council service delivery
Satisfaction ratings
EL3.1b
Ensure customer requests are dealt with effectively and promptly
% completed within allocated timeframe (Target > 90%)
X
X
X
X
Communications and Customer Service
D21
EL3.2a
Implement strategies to expand staff skills and plan for future need
Actions taken
X
X
X
X
People and Culture
D21
EL3.2b
Develop organisational development programs designed to retain staff
Staff turnover (Target <10%)
X
X
X
X
People and Culture
D21
EL3.2c
Develop organisational development programs designed to motivate staff
Staff training (Target > 80% of staff)
X
X
X
X
People and Culture
D21
EL3.2d
Develop organisational development programs designed to retain and motivate staff
Number of sick days (Target < 8 days per employee)
X
X
X
X
People and Culture
D21
EL3.3a
Development applications determined under delegated authority
% of applications determined under delegated authority (Target > 95%)
X
X
X
X
Development Services
D22
EL3.3b
Development application referrals completed within 21 days
% of internal referral applications assessed within 21 days (Target > 70%)
X
X
X
X
Infrastructure Planning
D22
X
Ballina Shire Council - Delivery Program / Operational Plan 2021 - 2025
direction four : engaged leadership (EL) Delivery Program Strategy
The benefits will be...
Operational Plan Activity
Measures/Targets
21/22
22/23
23/24
24/25
Responsibility
Links to North Coast Regional Plan
EL3.3c
Ensure complaints are dealt with effectively and promptly
% receiving response within 15 working days (Target > 80%)
X
X
X
X
Communications and Customer Service
D21
EL3.3d
Enhance web accessibility to improve availability of information
Increase website visits (Target > 360,000)
X
X
X
X
Communications and Customer Service
D21
EL3.3e
Efficiently attend to employee requests for assistance with technology systems
% addressed within one working day (Target > 85%)
X
X
X
X
Information Services
D21
EL3.3f
Provide road maintenance intervention actions in accordance with response targets
Compliance with inspection program and response times for hazards
X
X
X
X
Engineering Works
D21
EL3.3g
Deliver annual unsealed rural road maintenance program
Works completed according to program
X
X
X
X
Engineering Works
D21
EL3.3h
Monitor operating budgets to comply with approved funding
Within 5% of budget
X
X
X
X
Engineering Works Open Spaces Water and Wastewater Facilities Management
D21
EL3.3i
Monitor capital works to ensure they are completed on time and within budget
Within 20% of budget
X
X
X
Engineering Works Open Spaces Water and Wastewater Commercial Services
D21
39
39
06 capital expenditure
0
6. capital expenditure
6. capital expenditure
This section outlines the capital expenditure planned for the four year period from 2021/22 to 2024/25. This section outlines the capital expenditure planned for the four year period from 2021/22 to 2024/25. Description
2021/22 ($)
2022/23 ($)
2023/24 ($)
2024/25 ($)
Ballina Byron Gateway Airport
8,768,000
27,350,000
3,200,000
2,650,000
Apron Overlay and Concrete Pads
1,600,000
Terminal – Baggage Area Expansion
500,000
1,600,000
Terminal – Checked Baggage Screening
650,000
Terminal - Arrivals Hall Expansion
2,500,000
Terminal - Passenger Screening
2,503,000
Car Park, Solar, Boulevard Connection
2,000,000
2,700,000
Crown Land and Revetment Wall Pilot Activated Light Controls / Lighting Equipment Room Runway - Lengthening / Strengthening
100,000 165,000 2,000,000
Miscellaneous Infrastructure Commercial Property Management Henderson Farm Infrastructure
2,500,000
3,795,000
23,000,000 50,000
50,000
50,000
3,150,000
20,000
20,000
275,000
Wollongbar Urban Expansion Area – Stage Three
2,400,000
Southern Cross Estate – Lots Two and Three
1,000,000
3,130,000
Flat Rock Tent Park
120,000
20,000
20,000
20,000
Community Facilities
200,000
813,000
0
0
Alstonville Cultural Centre Modifications
100,000
813,000
Alstonville Swimming Pool Shade Structure
100,000
Facilities Management
157,000
510,000
520,000
280,000
Public Halls
Improvements
Ballina Surf Club
Dividing Wall
157,000
Ballina Surf Club
Floors / A/C / Hot Water
Ballina Surf Club
Building B Roller Doors
16,000
Kentwell Centre
Refurbishment
220,000
40,000 78,000
Library / VIC / Richmond Room Roof
220,000
Lennox Head Library
Carpet / Painting / Roof
60,000
150,000
Lennox Head CWA
Kitchen / Sheeting / Roof
42,000
150,000
Wardell Hall
Roof
42,000
Wollongbar Hall
Roof
50,000
Ballina Library
Amenities and Foyer
120,000
Richmond Room
Amenities and Foyer
82,000
32 Swift Street
Repairs
40,000
Public and Environmental Health
395,000
645,000
Lake Ainsworth Coastal Management Plan
395,000
645,000
0
0
41 41
Ballina Shire Council - Delivery Program / Operational Plan 2021 - 2025
Description
2021/22 ($)
2022/23 ($)
2023/24 ($)
2024/25 ($)
Public Amenities
170,000
300,000
160,000
160,000
Lennox Head Surf Club Precinct, Lennox Head
20,000
140,000
Moon Street, Ballina / Commemoration Park, East Ballina 100,000 Regatta Avenue, Ballina
50,000
Lennox Head Park, Lennox Head
160,000
Bulwinkel Park, Alstonville
80,000
Cawarra Park, Ballina
80,000
Compton Drive, East Ballina
160,000
Depot Facilities and Administration Centre
944,000
Administration Centre - Foyer / Lifts / Toilets
75,000
Works Depot - Solar
120,000
Works Depot – Workshop and Roof Refurbishment
400,000
Works Depot - Open Spaces Storage Area
149,000
Works Depot - Hardstand / Security / Electrical
200,000
Works Depot - Trades and Open Spaces Roof Replacement
200,000
208,000
204,000
208,000
200,000
Works Depot - Store Roof Replacement and Security Open Spaces
204,000
2,565,000
822,000
744,000
759,000
Crown Reserve Improvements
28,000
29,000
30,000
31,000
Wollongbar District Park – Embellishment
530,000
Pop Denison, Ballina - Master Plan
750,000
Ross Park, Lennox head
550,000
BBQs and Park Shelters - Various
100,000
Bolwarra Park, Wollongbar
10,000
Cummings Park, Cumbalum
100,000
Elevations Park, Lennox Head
99,000
Fitzroy Park, Wardell
179,000
Meldrum Park, Ballina
119,000
Ocean Breeze Reserve, Lennox Head
100,000
93,000
Lakefield Park, Lennox Head
39,000
Campbell Park, Wollongbar
95,000
Madden Park, Cumbalum
80,000
Missingham Park, East Ballina
391,000
Montwood Park, Lennox Head
95,000
Edgewater Park, Ballina
65,000
Lilli Pilli Park, Lennox Head
85,000
Prospect Park, East Ballina
90,000
Swift Street, Ballina
85,000
Faulks Reserve, Ballina
199,000
Saunders Oval, Ballina
190,000
Ballina Heights Sports Field, Cumbalum
150,000
John Kearney Park, Ballina
100,000
42 42
Description
2021/22 ($)
2022/23 ($)
2023/24 ($)
2024/25 ($)
Open Spaces (continued) Westland Park, West Ballina
100,000
EA Brown Park, Alstonville
100,000
Condon Park, East Ballina
65,000
Chickiba, East Ballina
150,000
Cawarra Park, Ballina
63,000
Open Space – Sports Fields
661,000
Saunders Oval - Irrigation
30,000
Lyle Park - Lighting
170,000
Kingsford Smith - Major Upgrades
200,000
Sporting Facilities – Various Improvements
261,000
Williams Reserve - Irrigation
3,500,000
204,000
3,300,000 200,000
Geoff Watt Oval - Lighting
204,000
Wollongbar Sports Field - Surface Improvements Stormwater
208,000 825,000
Urban Lanes
842,000
859,000
876,000
75,000
75,000
75,000
Kerr Street (Tamar Street to Richmond River), Ballina Urban Stormwater Management Plan
208,000
60,000 25,000
25,000
25,000
25,000
Asset Data Collection
45,000
50,000
50,000
50,000
Tide Gates to Urban Streets
55,000
55,000
55,000
55,000
Urban Stormwater Reticulation Renewal
152,000
307,000
211,000
371,000
Alison Avenue, Lennox Head (re-lining)
150,000
Moon Street (Tamar Street to Holden Lane), Ballina
90,000
Henry Philp Avenue, Ballina Martin Street (River Street to Richmond River), Ballina
90,000
50,000
40,000
70,000
90,000
Williams Reserve, Lennox Head
15,000
Ballina Fair, Ballina
60,000
Owen Street, Ballina
80,000
Grant Street, Ballina
84,000
Temple Street, Ballina
100,000 120,000
Oakland Avenue, Ballina
120,000
River Street, Ballina
50,000
Norton Street, Ballina
80,000
Cherry Street, Ballina Lems Lane and Cliff Murray Lane, Lennox Head
120,000
40,000
28,000
84,000
43 43
Ballina Shire Council - Delivery Program / Operational Plan 2021 - 2025
Description
Roads and Bridges
2021/22 ($)
2022/23 ($)
2023/24 ($)
2024/25 ($)
21,992,500
29,332,900
17,255,500
10,285,000
a) Road Reconstruction Program Urban Roads Northumberland Avenue Segment 10
540,000
Gibbon Street Segment 20
147,000
Gibbon Street Segment 10
215,000
Stewart Street shoulders Segment 150
90,000
Fawcett Street Segment 10
89,000
Brunswick Street Segment 20
135,000
Broadwater Place Segment 10
185,000
Crane Street Segment 30
120,000
Simmons Street Segment 20
150,000
Broadwater Place Segment 10
156,000
Bangalow Road Segment 20
97,000
Wilson Street Segment 10 & 20
140,000
Smith Drive Segment 20 Burnet Street Segment 50
274,000 393,000
192,000
Henry Phillip Avenue Segments 10-20-30
390,000
Moon Street Segment 130
230,000
Raglan Street Segment 10
120,000
Cawley Close Segment 10
107,000
Temple Street Segment 10
400,000
Holden Lane Segment 30
38,000
350,000
Hickey Place Segment 30
125,000
Bolding Street Segment 10
210,000
Russell Street Segment 10
340,000
Waverley Place Segment 10
139,000
Burnet Street Segment 40
180,000
Kalinga Street Segment 30
240,000
278,000
Helen Court Segment 10
90,000
Hickey Place Segment 20
230,000
Mary Street Segment 10
140,000
Skinner Street Segment 20
200,000
Burnet Street Segment 60
210,000
Cawarra Street Segment 20
150,000
Moon Street Segment 20
315,000
Cherry Street Segment 30
315,000
Rural Roads Teven Road Segments 70 and 58-60
330,000
South Ballina Beach Road Segment 60
304,000
Fernleigh Road Segment 80
499,000
River Drive Segment 10-30
280,000
Teven Road Segment 10
460,000
44 44
Description Roads Reconstruction Program (continued)
2021/22 ($)
Wardell Road Segment 110
303,500
Teven Road Segment 52
450,000
2022/23 ($)
2023/24 ($)
Moylans Lane Segment 10
360,000
Old Pacific Highway Segment 20
385,000
Houghlahans Creek Road Segment 160
130,000
River Drive Segment 70
330,000
362,000
Teven Road Segment 60
447,000
560,000
Fernleigh Road Segment 10
242,000
2024/25 ($)
560,000
Beacon Road Segment 10
292,000
Pimlico Road Segment 100
199,000
River Drive Segment 120
480,000
321,000
Dalwood Road Segment 110
390,000
Marom Creek Road Segment 140
350,000
Hermans Lane Segment 30
300,000
Dust Seal Program Rishworths Lane Dust Seal
120,000
O'Keefes Lane Dust Seal
120,000
Gap Road Dust Seal
43,000
Houghlahans Creek Road Dust Seal
35,000
Cooks Lane Dust Seal
42,000
102,000
Bartletts Lane Dust Seal Sub Total
18,000 4,516,500
4,062,000
3,987,000
3,969,000
b) Resealing Program and Heavy Patching Urban Roads - Bitumen Reseals
503,000
523,000
533,000
544,000
Urban Roads - Heavy Patching
478,000
498,000
508,000
518,000
Rural Roads - Bitumen Reseals
491,000
511,000
521,000
531,000
Rural Roads - Heavy Patching
289,000
305,000
311,000
317,000
c) Bypass Reserves (Funded from handover monies held in reserve) Alstonville Bypass 102,000
104,000
106,000
108,000
Ballina Bypass
160,000
163,000
166,000
169,000
Tintenbar to Ewingsdale Bypass
108,000
110,000
112,000
114,000
d) Bridges Bridges - Other
108,000
120,000
122,000
124,000
Pearces Creek Road Bridge
300,000
3,948,000
e) Section 7.11 Roads Plan Hutley Drive - Middle Connection Bangalow Road / Angels Beach Drive Lanes
50,000 1,000,000
1,600,000
River Street 4 Lanes - Smith Drive to Burns Point Ferry Road River Street 4 Lanes - Burns Point to Barlows Road
3,671,000
2,300,000
River Street 4 Lanes - Fishery Creek Bridge
200,000
7,446,000
River Street 4 Lanes - Brunswick to Tweed Streets
510,000
1,400,000
Tamarind Drive – Four Laning (Kerr to North Creek Road) 200,000
45
7,669,500
45
Ballina Shire Council - Delivery Program / Operational Plan 2021 - 2025
Description Roads Section 7.11 Roads Plan (continued)
2021/22 ($)
2022/23 ($)
2023/24 ($)
2024/25 ($)
50,000
Angels Bch Dve/Sheath St (Land)
135,000
North Creek Road and Bridge
200,000
50,000
50,000
Barlows Road Connection (feasibility commenced)
200,000
3,000,000
3,000,000
Heavy Vehicles
170,000
170,000
170,000
170,000
510,000
520,000
530,000
Bike Plan Projects
100,000
100,000
100,000
Bike Plan – Eyles, John Sharpe, Links Avenue
100,000
f) Loan, Grant Funds and Miscellaneous Airport Boulevard
3,740,000
Lennox Head - Village Renewal
3,500,000
2,995,900
Safer Roads - Byron Bay Road / Ross Lane
1,050,000
2,327,000
Safer Roads - Kerr Street / Bentinck Street
757,000
Lanes Upgrade – Local Roads and Comm Infra Grant
226,000
Southern Cross Drive – Fixing Local Roads Grant
250,000
Friday Hut Road Segment 90
141,000
Brooklet Road Segment 30
152,000
Houghlahans Creek Road Segment 130
156,000
Footpaths and Shared Paths
826,000
Shared Path (Skennars Head, Angels Beach)
50,000
Coastal Walk Structure 5
120,000
Grandview Street, East Ballina
70,000
Owen Street, Ballina
15,000
Tamarind Drive, Ballina North
10,000
Old Pacific Highway, Newrybar
65,000
Grandview Street, East Ballina
110,000
Manly Street, East Ballina
22,000
Moon Street, Ballina
13,000
Williams Street, Lennox Head
50,000
Kerr Street, Ballina
20,000
North Creek Road, Ballina
15,000
Quays Drive, West Ballina
80,000
Greenwood Place, Sunrise Crescent, Lennox Head
54,000
Camoola Avenue, Ballina
35,000
River Street, Ballina
45,000
Fox Street, Ballina
90,000
Tamar Street, Ballina
35,000
Coral Street, Alstonville
5,000
Cedar Street, Wardell
50,000
Rifle Range Road, Wollongbar
100,000
45,000
Burnet Street, Ballina
46
Owen Street, Ballina
35,000 5,000
Skennars Head Road, Skennars Head
20,000
Westland Drive, West Ballina
5,000
Green Street, Alstonville
15,000
Canal Road, Ballina
40,000
46
Description
2021/22 ($)
2022/23 ($)
2023/24 ($)
2024/25 ($)
Footpaths and Shared Paths (continued) Chickiba Drive, East Ballina
70,000
Martin Street, Ballina
80,000
Banksia Avenue, Lennox Head
32,000
Montwood Drive, Lennox Head
155,000
35,000
Jameson Avenue, East Ballina
100,000
Anderson Street, East Ballina
5,000
Cawarra Street, Ballina
70,000
Martin Street/Fox Street, Ballina
10,000
Horizon Drive, West Ballina
90,000
Mellis Court, Alstonville
120,000
Fleet and Plant
1,927,000
1,880,000
2,177,000
1,740,000
Plant Replacement Program (net cost)
1,927,000
1,880,000
2,177,000
1,740,000
Street Lighting
33,000
91,000
56,100
57,300
Riverside Drive, West Ballina
12,000
Daydream Avenue / Sunnybank Drive, West Ballina
7,000
Hackett Lane, Ballina
91,000
Hill Street / Pine Avenue, East Ballina Daly Street, Alstonville
42,100 14,000
North Creek Road, North Ballina
57,300
Burnet Street, Ballina
7,000
Amber Drive, Lennox Head (part)
7,000
Emergency Services
1,070,000
Lennox Head – Rural Fire Shed Relocation
1,070,000
Ballina – SES Building Water Infrastructure
3,282,000
800,000
1,700,000
800,000
1,700,000
9,665,000
7,081,000
9,628,000
500,000
3,200,000
Water Reservoirs Reservoirs - Ross Lane Reservoirs - Pacific Pines
200,000
Reservoir - East Ballina Reservoir
50,000
Reservoir - Lennox Reservoir
50,000
Reservoir - Pine Avenue
200,000
1,027,000
Reservoirs - Exterior Painting
50,000
Reservoir - Ladder (Basalt, Lennox) Main Renewals Main renewal recurrent
0
150,000
700,000
540,000
551,000
562,000
47 47
Ballina Shire Council - Delivery Program / Operational Plan 2021 - 2025
Description Water Infrastructure (continued)
2021/22 ($) 3,282,000
2022/23 ($) 9,665,000
2023/24 ($) 7,081,000
Trunk Mains Wardell Mains
2024/25 ($) 9,628,000
282,000
North Ballina Reticulation Mains
712,000
North Ballina Distribution Mains
400,000
Pine Avenue Distribution Mains
1,678,000
2,343,000
2,600,000
Ballina Island Distribution Mains
590,000
Lennox Head Mains
640,000
CURA B Distribution Main
330,000
Russellton Reticulation Mains
160,000
West Ballina Bypass Distribution Main
1,214,000
Pacific Pine Distribution Main
240,000
Tamar Street (Bagot to Canal Road)
290,000
Bagot Street (River Crossing to Tamar)
150,000
Bentinck Street (Owen Street / Kingsford Smith) Fox Street (Fox / Martin Steet)
220,000 270,000
Temple Street (Tarmar Street / Tamarind Drive)
720,000
North Creek Road / Angels Beach Drive
780,000
Angels Beach Drive to Missingham
100,000
800,000
North Creek Flowmeter Installation
20,000
Water Treatment Plant Marom Creek WTP - Upgrade
500,000
4,000,000
Marom Creek WTP - Renewals
30,000
31,000
32,000
33,000
Miscellaneous Telemetry
10,000
10,000
10,000
10,000
Reticulation Valve Replacement
50,000
50,000
50,000
50,000
Water Loss Reduction Program
100,000
Plant and Equipment Vehicle and Plant Replacement
22,000
42,000
180,000
Water Pump and Bore Stations Pump Stations - Russellton Booster
450,000
Water Capital - Service Connection Water Meter - New <20mm
240,000
245,000
250,000
255,000
Water Meter - Replacement
300,000
250,000
68,000
69,000
Wastewater Infrastructure
4,646,000
11,750,000
9,174,000
11,976,000
500,000
5,400,000 2,500,000
2,500,000
Ballina Treatment Plant Upgrade Ballina - Defect Rectification Ballina – Reverse Osmosis Plant Ballina – Gantry Crane
100,000
Ballina - Septage Receiver
150,000
Ballina - Floating Solar
20,000
Ballina - DAF Shed Re-Fit
150,000
48 48
580,000 280,000
Description
2021/22 ($)
2022/23 ($)
2023/24 ($)
2024/25 ($)
Wastewater Infrastructure (continued) Wardell Treatment Plant Upgrade Treatment Plant Master Plan Alstonville Treatment Plant Upgrade Alstonville - Inlet Works
100,000
1,000,000
190,000
20,000
280,000
Alstonville – Biosolids Alstonville - Solar Farm
150,000
3,290,000
Lennox Head Treatment Plant Upgrade Lennox – Treatment Master Plan
200,000
Lennox - High Lift Switchboard
245,000
Lennox - Aeration Optimisation
75,000
Lennox - Catch Pond Floor lining
150,000
Lennox - Solar Installation
20,000
Lennox - Pond Wall Renewal
150,000
280,000
Lennox - Chlorination Renewal
35,000
Treatment Facilities - Minor Capital Wastewater Treatment Plant Ballina
24,000
24,000
24,000
24,000
Wastewater Treatment Plant Lennox
23,000
23,000
23,000
23,000
Wastewater Treatment Plant Alstonville
11,000
11,000
11,000
11,000
Wastewater Treatment Plant Wardell
11,000
11,000
11,000
11,000
Main Renewals Main Renewals
85,000
87,000
89,000
91,000
339,000
346,000
Seamist Rising Main Renewal
100,000
620,000
Sewer Relining Works – Various
325,000
332,000
Trunk Mains Rising Main Rehabilitation - Swift Street
60,000
SP4006 - Gravity Sewer Alstonville
80,000
GM4104 - Transfer Mains Alstonville / Wollongbar
10,000
GMWUEA - Gravity Mains
200,000
GM2101 - Gravity Main, West Ballina
205,000
GM2104 - Gravity Main, West Ballina
438,000
RM-PS6 - CURA B Rising Main Pumping Stations SP2001 - Wet Well Relining
4,011,000
100,000
150,000
North Ballina - New Pumping Station
153,000
156,000
1,364,000
SP5006 - Richmond Street Storage
182,000
SP2402 - Lindsay Avenue
106,000
Pumping Stations - Renewal Program
354,000
EC Meter Installation (Ballina Island)
50,000
Tamar Street SPS Valve Pit Renewal
25,000
361,000
368,000
375,000
49 49
07
staff resources
7. staff resources The elected Council approves the allocation of staff resources to support the implementation of the Delivery Program and Operational Plan. The following table provides the staffing resources available for recent years and predicted figures for future years. The numbers are based on equivalent full-time employment (EFTs) and include permanent full-time and part-time staff. The total estimated salaries and wages, including associated overheads such as superannuation, workers compensation and leave entitlements, for 2021/22 is approximately $29 million. SECTION / FINANCIAL YEAR
2010/11
2012/13
2014/15
2016/17
2018/19
2020/21
2022/23
2024/25
C O R P O R AT E A N D C O M M U N I T Y D I V I S I O N Communications and Customer Service
19
19
19
20
21
21
21
21
Financial Services
11
12
12
12
13
14
14
14
Information Services
11
12
12
15
17
19
19
19
People and Culture
5
7
6
7
7
7
7
7
Commercial Services
8
8
8
9
10
10
11
11
Facilities Management
20
20
21
22
23
26
27
27
SUB TOTAL
74
78
78
85
91
97
99
99
Development Services
20
22
22
23
24
25
26
26
Public and Environmental Health
14
16
16
16
18
20
21
21
Strategic Planning
8
8
8
9
9
10
11
11
Open Spaces
35
36
38
38
41
44
44
44
SUB TOTAL
77
82
84
86
92
99
102
102
Infrastructure Planning
13
13
13
13
15
17
17
17
Engineering Works
58
60
62
66
68
73
73
73
Water and Wastewater
33
33
37
39
46
48
49
49
Resource Recovery
18
18
18
18
18
19
20
21
Project Management
4
4
4
4
4
5
5
5
SUB TOTAL
126
128
134
140
151
162
164
165
TOTAL
277
288
296
311
334
358
365
366
PERCENTAGE CHANGE (%)
1.3%
2.0%
1.4%
2.5%
3.7%
3.6%
0.9%
0.1%
PLANNING AND ENVIRONMENTAL HEALTH
CIVIL SERVICES
These figures exclude trainees and apprentices and represent permanent positions only. At the time of preparing this information, Council has 13 trainees and apprentices. The positions vary from school based part-time to full time positions. Refer to our Workforce Management Plan for further detail on Council’s workforce planning for the next four years.
51
PART B operational plan
PART B operational plan Whereas the Delivery Program element of this document has a focus on a four year period, the Operational Plan outlines the activities to be undertaken for one year, which in the case of this document is 2021/2022. In respect to the key activities and the measures that we will be using to assess our performance, the 2021/22 column in the “Heading in the Right Direction” of the Delivery Program lists all the agreed activities and measures. Similarly the Capital Expenditure section of the Delivery Program also identifies the major capital expenditure projects planned for 2021/22. The balance of the Operational Plan component of this document, as follows, includes the mandatory elements as specified in the NSW Local Government Act, along with other items of interest. Briefly the remaining elements of this document are as follows:
•
Estimated Income Statements – The Income Statement is the primary indicator of how Council is performing financially, on an annual basis, and this section provides the estimated income statement for 2021/22.
•
Long Term Financial Plan – Even though the Operational Plan focuses on one year, it is important to have an understanding of how Council’s finances are trending in the longer term. This section provides a summary of Council’s ten-year financial plan.
•
Program Operating Results – Council delivers a wide range of services and to understand the net cost, or surplus, generated of each service, this section provides an operating result for each program.
•
Distribution of General Purpose Rate Income – Many Council delivered programs operate at a net cost to the community and this page provides a useful overview of how the ordinary rates raised from an average residential property are distributed across the various loss making programs.
•
Statement of Revenue Policy – This statement provides a summary of the various rates and charges that Council will levy during 2021/22. It provides details of the rating structure along with information on the major charges such as water, waste and wastewater.
Other mandatory items included are the pricing methodology Council has adopted in preparing its fees and charges for 2021/22, along with details of the proposed loan borrowings.
•
Related Policies and Information – This final section of the Operational Plan provides details on a number of miscellaneous items such as Council’s Donation Programs and our Commercial Activities.
•
Appendices – The appendices to the Operational Plan provide a map outlining the Road Reconstruction Program.
53
08 income statement
8.income incomestatement statement 8. for2021/22 2021/22 for Council’s Annual Annual Financial areare prepared in accordance with Australian Accounting StandardsStandards and the Council’s FinancialStatements Statements prepared in accordance with Australian Accounting NSW Government Act. and theLocal NSW Local Government Act. Thekey keyfinancial financial statement that measures the performance of Council on an annual is the Income Statement. The statement that measures the performance of Council on anbasis annual basis is the Income To ensure long term financial sustainability needs toCouncil be aimingneeds for a net operating Statement. To ensure long term financialCouncil sustainability to be aiming for a net operating surpluswithin withinthe theIncome Income Statement, Statement, once once Capital Capital Grants and surplus and Contributions Contributions provided providedfor forCapital CapitalPurposes Purposes are eliminated. are eliminated. Revenuesfrom fromWater Waterand and Wastewater Wastewater Operations Operations must be expended Revenues expended on on those thoseactivities. activities.This Thismeans means ititisis necessary to record those areas of Council’s operations as separate funds and the remaining operations of Council are necessary to record those areas of Council’s operations as separate funds and the remaining operations of referredare to as the General Council referred to asFund. the General Fund. Thefollowing following figures thethe forecast Income Statements for thefor three by Councilby in Council accordance The figuresprovide provide forecast Income Statements thefunds threeoperated funds operated in with Note 27with of the Annual Statements, as well as on a consolidated accordance Note 27 Financial of the Annual Financial Statements, as well asbasis. on a consolidated basis. Description
General
Water
Wastewater
Consolidated
Income from Continuing Operations Rates and Annual Charges
34,367
4,126
18,755
57,248
User Charges and Fees
20,347
9,164
1,861
31,372
628
176
72
876
Other Revenues
11,516
252
471
12,239
Operating Grants and Contributions
8,468
238
149
8,855
Capital Grants and Contributions
23,190
1,870
2,560
27,620
Total Income from Continuing Operations
98,516
15,826
23,868
138,210
Employee Benefits and On-Costs
21,565
2,560
4,725
28,850
Materials and Contracts
31,357
8,624
4,220
44,201
Borrowing Costs
1,026
0
2,996
4,022
Depreciation and Amortisation
16,765
1,700
4,200
22,665
Other Expenses
6,020
655
1,492
8,167
Sub Total
76,733
13,539
17,633
107,905
Net Loss from Disposal of Assets
1,800
120
500
2,420
Total Expense from Continuing Operations
78,533
13,659
18,133
110,325
Operating Result from Continuing Operations
19,983
2,167
5,735
27,885
(3,207)
297
3,175
265
Interest and Investment Revenues
Expenses from Continuing Operations
Net Operating Result before Capital Grants and Contributions Provided for Capital Purposes
Council is forecasting operating surpluses for Water and Wastewater and a deficit for the General Fund. Councilis is also forecasting operating surpluses Water and Wastewater Council forecasting a surplus onfor a consolidated basis. and a deficit for the General Fund. Council is
also forecasting a surplus on a consolidated basis. Council’s ten year Long Term Financial Plan is outlined on the following page. Council’s ten year Long Term Financial Plan is outlined on the following page.
56
55
09
long term financial plan
9. long term financial plan 9. long term financial plan Council’s long term financial plan (LTFP), based on a ten year time frame, has a preferred target of achieving Council’s long term financial plan (LTFP), based on a ten year time frame, has a preferred preferred target target of of achieving achieving an operating surplus on a consolidated basis and for the General Fund. Council achieves this result on a an operating surplus on a consolidated basis and for the General Fund. Council achieves achieves this this result result on on aa consolidated basis, whereas the General Fund achieved this result in 2030/31. This means that Council consolidated basis, whereas the General Fund achieved this result in 2030/31. This This means means that that Council Council needs needs needs to look at expense savings or extra revenue, or both, to ensure sustainability for the General Fund. to look at expense savings or extra revenue, or both, to ensure sustainability for the the General General Fund. Fund. The The LTFP LTFP is is The LTFP is based on the IPART approved rate peg of 2% in 2021/22. A summary of our LTFP is as per the based on the IPART approved rate peg of 2% in 2021/22. A summary of our LTFP is is as as per per the the following following tables. tables. following tables. Consolidated Result Year Plan Financial Sustainability – Consolidated Result OurOur TenTen Year Plan totoFinancial Sustainability – Consolidated Result 2021/22 (‘000)
2022/23 (‘000)
2023/24 (‘000)
2024/25 (‘000)
2025/26 (‘000)
2026/27 2026/27 (‘000) (‘000)
2027/28 2027/28 (‘000) (‘000)
2028/29 2028/29 (‘000) (‘000)
2029/30 2029/30 (‘000) (‘000)
2030/31 2030/31 (‘000) (‘000)
Operating Revenues Rates / Annual Charges User Charges and Fees Investment Revenues Operating Grants Other Revenues Sub Total
57,248 31,372 876 8,855 12,239 110,590
58,533 31,660 849 8,783 12,164 111,989
59,848 32,418 976 8,923 12,281 114,446
61,211 33,199 987 9,003 12,524 116,924
62,587 34,001 977 9,100 12,780 119,445
64,141 64,141 34,739 34,739 994 994 9,272 9,272 13,038 13,038 122,184 122,184
65,731 65,731 35,494 35,494 1,221 1,221 9,456 9,456 13,423 13,423 125,325 125,325
67,359 67,359 36,263 36,263 1,440 1,440 9,545 9,545 13,571 13,571 128,178 128,178
69,042 69,042 37,051 37,051 1,709 1,709 9,773 9,773 13,848 13,848 131,423 131,423
70,762 70,762 37,854 37,854 1,989 1,989 9,960 9,960 14,129 14,129 134,694 134,694
Operating Expenses Employee Costs Materials and Contracts Borrowing Costs Depreciation Other Expenses Loss on Disposal Sub Total
28,850 44,201 4,022 22,665 8,167 2,420 110,325
29,427 44,192 3,835 23,005 7,300 2,433 110,192
30,016 45,130 3,942 23,469 8,027 2,456 113,040
30,616 45,999 3,558 23,943 8,537 2,479 115,132
31,228 47,473 3,230 24,425 8,378 2,502 117,236
31,853 31,853 48,085 48,085 2,968 2,968 24,917 24,917 8,601 8,601 2,525 2,525 118,949 118,949
32,490 32,490 49,323 49,323 2,702 2,702 25,421 25,421 8,756 8,756 2,548 2,548 121,240 121,240
33,140 33,140 50,217 50,217 2,436 2,436 25,934 25,934 9,276 9,276 2,571 2,571 123,574 123,574
33,803 33,803 51,308 51,308 2,169 2,169 26,456 26,456 9,106 9,106 2,594 2,594 125,436 125,436
34,479 34,479 52,827 52,827 1,902 1,902 26,989 26,989 9,295 9,295 2,617 2,617 128,109 128,109
265
1,797
1,406
1,792
2,209
3,235 3,235
4,085 4,085
4,604 4,604
5,987 5,987
6,585 6,585
Item
Surplus/(Deficit)
Fund The following table is the LTFP for the General Fund The following table is the LTFP for the General Fund 2021/22 (‘000)
2022/23 (‘000)
2023/24 (‘000)
2024/25 (‘000)
2025/26 (‘000)
2026/27 2026/27 (‘000) (‘000)
2027/28 2027/28 (‘000) (‘000)
2028/29 2028/29 (‘000) (‘000)
2029/30 2029/30 (‘000) (‘000)
2030/31 2030/31 (‘000) (‘000)
Operating Revenues Rates / Annual Charges User Charges and Fees Investment Revenues Operating Grants Other Revenues Sub Total
34,367 20,347 628 8,468 11,516 75,326
35,293 20,306 595 8,393 11,425 76,012
36,241 20,718 756 8,530 11,527 77,772
37,229 21,142 789 8,607 11,754 79,521
38,241 21,575 879 8,701 11,995 81,391
39,278 39,278 22,016 22,016 867 867 8,870 8,870 12,237 12,237 83,268 83,268
40,339 40,339 22,465 22,465 983 983 9,051 9,051 12,605 12,605 85,443 85,443
41,424 41,424 22,924 22,924 1,064 1,064 9,227 9,227 12,736 12,736 87,375 87,375
42,554 42,554 23,392 23,392 1,165 1,165 9,451 9,451 12,996 12,996 89,558 89,558
43,711 43,711 23,869 23,869 1,236 1,236 9,636 9,636 13,261 13,261 91,713 91,713
Operating Expenses Employee Costs Materials and Contracts Borrowing Costs Depreciation Other Expenses Loss on Disposal Sub Total
21,565 31,357 1,026 16,765 6,020 1,800 78,533
21,996 30,556 1,034 16,987 5,808 1,800 78,181
22,437 31,462 1,336 17,330 5,941 1,800 80,306
22,886 31,853 1,153 17,682 6,402 1,800 81,776
23,344 32,780 1,026 18,039 6,200 1,800 83,189
23,812 23,812 33,093 33,093 964 964 18,403 18,403 6,332 6,332 1,800 1,800 84,404 84,404
24,288 24,288 34,101 34,101 898 898 18,776 18,776 6,467 6,467 1,800 1,800 86,330 86,330
24,774 24,774 34,669 34,669 832 832 19,156 19,156 6,960 6,960 1,800 1,800 88,191 88,191
25,269 25,269 35,449 35,449 766 766 19,542 19,542 6,741 6,741 1,800 1,800 89,567 89,567
25,774 25,774 36,475 36,475 699 699 19,937 19,937 6,882 6,882 1,800 1,800 91,567 91,567
Surplus/(Deficit)
(3,207)
(2,169)
(2,534)
(2,255)
(1,798)
(1,136) (1,136)
(887) (887)
(816) (816)
Item
58
57 (9) (9)
146 146
10
operating results 2021/2022
results2021/2022 10. operating results Income Statement, which is formatted in accordance with Australian Accounting In addition additiontotoour our Income Statement, which is formatted in accordance with Australian Accounting Standards, ititisisimportant for for Council to understand the annual operating results for the programs servicesand Standards, important Council to understand the annual operating results for the and programs delivered to the community. services delivered to the community. represent the the forecast operating result for the for 2021/22 financial year, with year, the information The following followingfigures figures represent forecast operating result the 2021/22 financial with the provided on a program basis. information provided on a program basis.
Item
Operating Revenues ($’000)
Operating Expenses ($’000)
Operating Result (‘000)
Planning and Environmental Health Strategic Planning Development Services Public and Environmental Health Public Order Northern Rivers Community Gallery Open Spaces Open Spaces Buildings and Structures Sub Total
96 2,922 717 277 106 1,277 0 5,395
459 3,238 2,405 678 468 5,624 2,277 15,149
(363) (316) (1,688) (401) (362) (4,347) (2,277) (9,754)
Civil Services Asset Management Stormwater and Environmental Protection Roads and Bridges Ancillary Transport Services Transport for NSW Emergency Services Quarries Waste - Resource Recovery Waste - Domestic Waste Management Sub Total
333 596 931 762 1,040 118 69 7,969 8,557 20,375
1,304 2,857 12,877 2,736 749 606 145 7,943 8,471 37,688
(971) (2,261) (11,946) (1,974) 291 (488) (76) 26 86 (17,313)
Corporate and Community Governance Communications and Customer Service Financial Services - General Purpose Revenues Financial Services Information Services People and Culture Commercial Property Management Ballina Byron Gateway Airport Community Facilities Richmond Tweed Regional Library Swimming Pools Tourism Facilities Management Fleet and Plant Sub Total
20 15 31,431 245 247 151 2,815 7,425 708 116 1,105 62 44 5,172 49,556
1,348 562 0 730 2,997 339 1,724 5,599 1,141 1,815 1,996 549 2,445 4,451 25,696
(1,328) (547) 31,431 (485) (2,750) (188) 1,091 1,826 (433) (1,699) (891) (487) (2,401) 721 23,860
75,326
78,533
(3,207)
13,956 21,308
13,659 18,133
297 3,175
110,590
110,325
265
General Fund - Operating Result Add Restricted Operations Water Supplies Wastewater Services Total Operating Result – Consolidated Operations
60
59
11
distribution of general purpose rate income
11. distribution of general purpose rate income Council provides a number of services from within the General Fund, the majority of which are subsidised by the income collected from general purpose rates. The remaining programs are self-funded and include fleet and plant, airport, waste management and Council’s property portfolio. This chart illustrates how the average residential rate for 2021/22 of $1,149 is allocated across the subsidised programs.
Development Services
$12
Gallery
$12
Emergency Services
$12
Public Order
$14
Tourism
$16
Strategic Planning
$17
Community Facilities
$31
Swimming Pools
$46
Stormwater
$50
Library Services
$56
Public and Environmental Health
$61
Governance and Corporate Services Open Spaces and Buildings Roads and Ancillary Transport
$169 $222 $431
61
12
revenue policy
12. revenue policy General Rate - Rating Structure
12. revenue policy
Council’s rating structure incorporates a base amount and a rate in the dollar.
Council is of the opinion that a base amount is the most equitable rating system, as it reduces the impact of land values in calculating rates, and Council’s rating structure incorporates a base results in a more even spread of the rate burden.
This means that in these two categories the base charge raises less than 50% of the yield as the average land value is higher in business and farmland as compared to the residential category.
General Rate - Rating Structure
It is accepted that land value plays the more
The base charge for business and farmland dominant role in the ratesame calculation business categories is set at the dollar in value as theand farmland categories because these properties tend residential base charge.
amount and a rate in the dollar.
TheCouncil base amount is a flat charge that is raised is of the opinion that a base amount is equally against all properties each rating the most equitable ratinginsystem, as it reduces category. the impact of land values in calculating rates, and
to be income producing.
This means that in these two categories the base Increases in less a council’s rateofincome areasdetermined charge raises than 50% the yield the average land valuebasis is higher in business and Pricing on a percentage by the Independent farmland as compared to the residential category. and Regulatory Tribunal (IPART). This is referred to
results in a more even spread of the rate burden. All properties in the shire are categorised Theupon basethe amount is a use flat of charge thatwith is raised based dominant the land the equally allowed against under all properties each rating categories the NSWinLocal category.Act being residential, business, Government farmland or mining. has nocategorised properties All properties in Council the shire are categorised as mining. based upon the dominant use of the land with
rate peg limit. Itas is the accepted that land value plays the more dominant role in the rate calculation in business For 2021/22 IPART approved a rate peg of 2.0%. and farmland categories because these properties tend table provides the estimated total rate toThe befollowing income producing. income for 2021/22.
categories under the NSW is Local Thethe base amount inallowed the residential category set
Increases in a council’s rate income are determined on a percentage basis by the Independent Pricing and Regulatory Tribunal (IPART). This is referred to as the rate peg limit.
Government Act being residential, business,
to raise 50% to the total rate yield for that category. farmland or mining. Council has no properties The remainder of the yield for that category is based categorised as mining. on the land value multiplied by a rate in the dollar.
The base amount in the residential category is set
For 2021/22 IPART approved a rate peg of 2.0%.
Thetobase charge business and yield farmland raise 50% for to the total rate for that category. categories is set of at the the yield samefordollar value as isthe The remainder that category based residential base value charge. on the land multiplied by a rate in the dollar.
The following table provides the estimated total rate income for 2021/22.
Estimated Income from Ordinary Rates for 2021/22 Estimated Income from Ordinary Rates for 2021/22
Base Charge and Cents in the Dollar Proportional Contribution to Total Yield (%)
Rate Category
Rate (Cents In
Base Amount
Residential
0.15696
573
19,600,305
74.23
Business
0.73601
573
5,069,612
19.20
Farmland
0.12985
573
1,733,833
6.57
Mining
0.73601
573
0
0.00
N/A
26,403,750
100.00%
Totals
Category Yield
In respect to the proportional contribution to the total yield between business / farmland / residential properties, In respect to the proportional contribution to the total yield between business / farmland / residential properties, Council policy had been approximately 20% of the total yield from non-residential (business) properties. Council policy had been approximately 20% of the total yield from non-residential (business) properties. However 2021/22 percentage is 19.20% Council is aiming to reduce cents in the dollar differential However for for 2021/22 thethe percentage is 19.20% as as Council is aiming to reduce thethe cents in the dollar differential forfor business properties, as compared to residential properties, over a period of time. business properties, as compared to residential properties, over a period of time. The differential for farmland compared to residential is based on historical figures following the deduction of the
63
The differential for farmland compared to residential is based on historical figures following the deduction of the business property yield. Council does not have differential rates within rating categories. business property yield. Council does not have differential rates within rating categories.
64
Ballina Shire Council - Delivery Program / Operational Plan 2021 - 2025
Charges Structure In accordance with the NSW Local Government Act, Council is able to raise a charge for the provision of waste, water, wastewater and stormwater services. The charges levied by Council in relation to these items are as follows:
Waste Charges Council levies a range of annual waste charges to finance the operation of the Ballina landfill along with the collection and disposal of kerbside waste. The various charges levied to the different categories of properties are described on the following pages.
Waste Management – Urban Domestic (Residential) Properties Council levies an annual domestic waste collection charge of $415 (2020/21: $407) per self-contained occupancy, on all urban residential properties, where the service is available. This service includes a fortnightly kerbside recycling collection service, a fortnightly mixed waste service and a weekly organics collection service. This annual charge is payable whether or not the service is used. Urban properties generally include parcels of land within townships, villages or built up rural residential estates where low speed limits are applied. Non-strata titled residential units/flats are levied the annual domestic waste collection charge of $415 (2020/21: $407), dependent upon the number of units/flats or rural dwellings contained upon the property. For example a non-strata titled multiple occupancy property containing four units/flats will be subject to a total charge of $1,660 ($415 multiplied by four services). Appendix A to this document provides a map outlining all the eligible urban properties for this service.
Domestic Waste Exempt Collection Service A new charge, Domestic Waste Exempt Collection Service, was introduced in 2020/21. This charge, $45 (2020/21: $44.50), is equivalent to the Vacant Land Domestic Waste Collection charge. This fee is to apply for properties that are occupied and for which a domestic waste management service is available, but where Council has decided not to provide a collection service. This may occur, for example, for safety or physical limitations of the property. This fee would also apply to multi-unit dwellings approved by Council to utilise an alternative arrangement.
Waste Management - Rural Domestic (Residential) Properties As per urban residential properties, Council charges an annual domestic waste collection charge, per selfcontained occupancy, on all rural residential properties, where the service is available. The charge per annum is $362 (2020/21: $355). The service includes a weekly mixed waste and fortnightly recycled waste kerbside collection service. This annual charge is payable whether or not the service is used.
Waste Management - Vacant Domestic (Residential) Land This waste charge is mandatory for each residential parcel of vacant rateable land, for which the service is available. Properties are charged $45 (2020/21: $44.50) per annum.
64
Additional Domestic (Residential) Services Additional Domestic (Residential) Services
Additional services are available for the following extra annual charges: Additional services are available for the following extra annual charges: • Additional Mixed Waste - Urban (Fortnightly) - $124 (2020/21: $122) per annum • Additional Mixed Waste - Urban (Fortnightly) - $124 (2020/21: $122) per annum • Additional Mixed Waste - Rural (Weekly) – $247 (2020/21: $242) per annum • Additional Mixed Waste - Rural (Weekly) – $247 (2020/21: $242) per annum • Additional Domestic Recycling – Urban and Rural (Fortnightly) – $100 (2020/21: $112) per annum • Additional Domestic Recycling – Urban and Rural (Fortnightly) – $100 (2020/21: $112) per annum • Additional Organics Waste Collection - Urban (Weekly) – $175 (2020/21: $242) per annum • Additional Organics Waste Collection - Urban (Weekly) – $175 (2020/21: $242) per annum
Waste Management – Non-Domestic (Non-Residential) Properties Waste Management – Non-Domestic (Non-Residential) Properties Council offers a weekly mixed waste collection service at an annual charge of $387 (2020/21: $379) for nonCouncil offers a weekly mixed waste collection service at an annual charge of $387 (2020/21: $379) for nondomestic (i.e. commercial, business) properties. domestic (i.e. commercial, business) properties. Non-domestic properties can also elect to receive a fortnightly recycling collection service at an annual Non-domestic properties can also elect to receive a fortnightly recycling collection service at an annual cost cost of $191 (2020/21: $187) and a weekly organics waste collection service at an annual cost of $250 of $191 (2020/21: $187) and a weekly organics waste collection service at an annual cost of $250 (2020/21: (2020/21:$330). Additional services are available at the same cost per service as the first collection. $330). Additional services are available at the same cost per service as the first collection.
Summary Charges and and Net Net Estimated Estimated Yield Yield for for 2021/22 2021/22 Summary of of Waste Waste Charges Type of Charge
Frequency
Number
Annual Charge ($)
Domestic Waste Collection Charge – Urban
Weekly
15,927
415
6,610,000
Domestic Waste Collection Charge – Rural
Weekly
2,776
362
1,005,000
Domestic Waste Charge – Vacant Land
N/A
711
45
32,000
Domestic Waste Collection Charge - Other
Various
Various
Various
25,900
Waste Management - Non-Domestic Properties
Various
Various
Various
667,000
Total
Yield ($)
8,339,900
Water Charges Water Charges Council’s policy is to charge for water through a structure that encourages water users to conserve water. Council’s is to to charge water through a structure thatmaintain encourages water users to conserve water. Charges Charges policy are set provideforsufficient funds to operate, and renew a water supply system and to are set to provide sufficient funds to operate, maintain and renew a water supply system and to minimise the use of minimise the use of loan funds for new capital works. loan funds for new capital works. As per the NSW Local Government Act, charges are levied upon land that is supplied with water from As per themains, NSW Local Government charges are levied upon land is supplied with water from Council Council and vacant land Act, situated within 225 metres of athat Council water main, whether or not the mains, and vacant land situated within 225 metres of a Council water main, whether or not the property is connected to Council’s water supply, provided it is possible to supply water to the property, if property is connected to Council’s water supply, provided it is possible to supply water to the property, if requested. requested.
The tiers, a fixed annual access charge for for all properties andand a The water water charging chargingstructure structureisismade madeup upofoftwo two tiers, a fixed annual access charge all properties consumption charge based on actual water consumed. A small amount of revenue is generated from fire a consumption charge based on actual water consumed. A small amount of revenue is generated from fire services. services.
66
65
Ballina Shire Council - Delivery Program / Operational Plan 2021 - 2025
Water Access Charge
Water Access Charges will be made as Charge listed, except for parcels of land exempt from the charge under Section 552 of the Water Access Local Government Act 1993Charge (i.e. land unable to be connected to a Council water pipe or land further than 225 metres Charges will be made as listed, except for parcels of land exempt from the charge under Section 552 of the fromLocal aCharges Council water pipe). will be made listed, except parcels exempt from chargewater underpipe Section 552 of the than 225 Government Act as 1993 (i.e. land for unable to of beland connected to a the Council or land further Local Government Actdwellings 1993 (i.e. land be connected to a- Council water charge pipe or land metres from a Council water pipe). (a) metres For single residential andunable stratatotitled properties One access per further annumthan for 225 each separate from a Council water pipe). rateable assessment. The charge increases size (as per access following tableper below). The levied (a) For single residential dwellings and strata with titledmeter properties - One charge annum forcharge each separate on(a)strata titled properties shall be as per the charge for a standard 20mm service for each strata unit. For single residential dwellings and strata titled properties One access charge per annum for each separate rateable assessment. The charge increases with meter size (as per following table below). The charge levied assessment. The charge increases with meter (as per 20mm following tablefor below). charge on rateable strata titled properties shall be as per the charge for asize standard service each The strata unit. levied
(b) For multiple occupancy dwellings (flats) - Each unit / tenement will be charged the 20mm water access on strata titled properties shall be as per the charge for a standard 20mm service for each strata unit. (b) For multiple occupancy dwellings (flats) - Each unit / tenement will be charged the 20mm water access charge. (b)charge. For multiple occupancy dwellings (flats) - Each unit / tenement will be charged the 20mm water access
(c) Each parcel of separately valued vacant land to be levied the equivalent of one 20mm service access charge charge. (c) Each parcel separately valued Act vacant land to be levied the equivalent of one 20mm service access charge (Section 501(3)ofLocal Government 1993). (c)(Section Each parcel separately valued vacant land to be levied the equivalent of one 20mm service access charge 501(3)ofLocal Government Act 1993).
(d) Water (Section meters are readLocal and accounts payable on a quarterly basis. Non-residential customers have their 501(3) Government Act 1993). (d) Watercharge meterslevied are read and accounts payable on a quarterly Non-residential customers have their access quarterly. Residential charges are leviedbasis. annually and the customer can choose to (d)access Watercharge meters levied are read and accounts payable on a quarterly basis. Non-residential customers have their quarterly. Residential charges are levied annually and the customer can choose to pay pay by quarterly instalments. charge levied quarterly. Residential charges are levied annually and the customer can choose to by access quarterly instalments.
Water access charges are instalments. levied based on financial quarters in advance (i.e. 1 July to 30 September, 1 pay by quarterly Water access charges are levied based on financial quarters in advance (i.e. 1 July to 30 September, 1 October October to 31 December, 1 January to 31 March and 1 April to 30 June).
access charges areto levied basedand on financial in advance (i.e. 1 July to 30 September, 1 to Water 31 December, 1 January 31 March 1 April toquarters 30 June). 31 December, 1 January to 31 March and 1 April to 30 June). Water October meters aretoread and accounts payable on a quarterly basis. Non-residential customers have their access charge Water meters are read and accounts payable on a quarterly basis. Non-residential customers have their access levied Water quarterly. Residential charges are levied annually and the customer can choose to pay by have quarterly instalments. metersquarterly. are read and accounts charges payable on a quarterly basis. Non-residential customers their charge levied Residential are levied annually and the customer can choose toaccess pay bycharge quarterly levied quarterly. Residential charges are levied annually and the customer can choose to pay by quarterly instalments. instalments.
Summary ofof Water Summary WaterCharges Chargesfor for2021/22 2021/22 Summary of Water Charges for 2021/22 Service
Residential Number
ServiceCharge – 20mm Service Water Access
Residential Number 16,922
Water Access Charge – 20mm Service
16,922
Water Access Charge – 25mm Service
52
Water Access Charge – 25mm Service
52
Water Access Charge – 32mm Service
14
Water Access Charge – 40mm Service
2
Water Access Charge – 50mm Service
0
Water Access Charge – 65mm Service
0
Water Access Charge – 80mm Service
0
Water Access Charge – 100mm Service
0
Water Access Charge – 150mm Service
0
Water Access Charge – 200mm Service Water Access Charge – 200mm Service
0
Water Access Charge – 32mm Service Water Access Charge – 40mm Service Water Access Charge – 50mm Service Water Access Charge – 65mm Service Water Access Charge – 80mm Service Water Access Charge – 100mm Service Water Access Charge – 150mm Service
14 2 0 0 0 0 0 0
Annual Charge ($)
Estimated Yield
Annual Charge 216 ($)
Estimated Yield 3,624,000
216
3,624,000
337
17,500
337
17,500
553
7,800
866
1,700
1,352
0
553
7,800
866
1,700
1,352
0
2,285
0
3,471
0
5,414
0
12,179
0
21,652 21,652
00
2,285
0
3,471
0
5,414
0
12,179
0
Total Total
3,651,000 3,651,000
Summary of Yield for Access Charges forfor 2021/22 Summary of Estimated Net Estimated Yield for Water Access Charges for 2021/22 Summary ofNet Net Estimated Yield forWater Water Access Charges 2021/22 Service Service Residential Access Charges Residential WaterWater Access Charges Non-Residential Access Charges Non-Residential WaterWater Access Charges
Total Total
66
Estimated Yield Estimated Yield ($)($) 3,651,000 3,651,000 771,000 771,000 4,422,000 4,422,000
67 67
Water Consumption Charges Water consumption charges are levied based on financial quarters in arrears (i.e. 1 July to 30 September, 1 October to 31 December, 1 January to 31 March and 1 April to 30 June). Water consumed per separate water meter will be charged at $2.43 per kilolitre for the first 350 kilolitres of water consumed and $3.65 per kilolitre for water consumed in excess of 350 kilolitres. The estimated income from consumption is approximately $8.4 million. Water consumption charges are levied based on the date the water meter is read.
Strata Units - Water Consumption charges Strata developments, where individual units are not separately metered by a Council owned water meter, will have all water consumption charges levied on the “Owners Corporation” of the Strata Plan. Refer to Council’s Schedule of Fees and Charges for the charging structure. The number of water access charges levied on the whole strata complex (i.e. each individual lot), determines the level of water consumption charged at the first step rate. For example a complex with four strata units will be levied four 20mm access charges and be entitled to consume 1,400 kilolitres at $2.43 per kilolitre prior to paying for water at the higher tariff of $3.65 per kilolitre. Strata units separately metered by a Council connected meter will receive individual water accounts (for both access and consumption charges).
Flats Flats are a non-strata unit development with common ownership and are considered as a single rateable assessment under the Local Government Act. As Council now charges an access charge based on occupancy / tenement, each flat assessment will receive a 350 kilolitre allowance at the step 1 tariff for each / occupancy tenement on the property. (See explanation above for Strata Units).
Rous County Council Water Supply Water charges do not apply to those consumers who are connected to and serviced by Rous County Council.
Home Dialysis Customer Allowance A water consumption allowance of 100 kilolitres per annum (at 25 kilolitres per quarter) is provided to customers that utilise home dialysis treatment (as advised by the local area health service). Water consumption above the allowance is charged at normal rates.
Wastewater Charges Council’s policy is to levy charges across all sewered areas of the shire, at a level sufficient to provide funds to operate, maintain and renew the wastewater (sewer) system, to re-pay existing loans and to generate additional reserves to minimise the impact of any major capital expenditure. Wastewater charges for nonresidential properties are based on the volume of water consumed and the water meter size. Wastewater charges for residential properties relate to averaged meter sizes and water consumption producing a standard annual wastewater charge for all residential tenements. Wastewater charges are levied upon land that is connected to Council’s sewer mains, and vacant land situated within 75 metres of a Council sewer main, whether or not the property is connected, provided it is possible for the land to be serviced if requested.
67
Ballina Shire Council - Delivery Program / Operational Plan 2021 - 2025
Residential Properties and Vacant Land Each self-contained occupancy (i.e. unit/flat/dwelling) on a rateable property will be levied an annual charge of $1,037 as will each separate strata titled residential unit/flat. Non-strata titled residential unit/flat properties will be levied an annual charge of $1,037 dependent upon the number of units/flats contained in the property. Vacant land will be levied an annual charge of $783.
Non-residential Properties Charges for non-residential properties will be based on a combination of water meter size and water consumption. These factors are placed into a formula that also includes a sewerage discharge factor (SDF). The SDF is the estimated percentage of total water consumption that is returned to the sewer system. The formula used to calculate the annual account is in accord with the best practice guidelines issued by the NSW Office of Water. The formula is as follows: SDF x (AC+ C x UC) Where: SDF
=
Sewerage discharge factor
AC
=
Annual Non-residential Wastewater access charge based on water meter size
C
=
Water consumption measured in kilolitres
UC
=
Sewerage usage charge per kilolitre = $2.61/kL
Non-Residential Strata Units and Flats (not individually metered by Council) Volumetric wastewater consumption charges for non-residential units and flats will be levied on the Owner’s Corporation of a strata complex or the owner of the property as the case may be.
Recycled Water Some properties in the Shire are connected to the urban dual reticulation scheme (recycled water). This water is suitable to flush toilets, wash clothes, water garden plants, wash cars and pathways. Council has resolved to charge a consumption charge only for this water and this charge is to be 80% of the first step of the potable water charge; i.e. 80% of $2.43 is $1.94/kl. In addition to this, for designated users of bulk recycled water for open space purposes (i.e. Golf Club, Racecourse) the charge will be 10.0% of the potable price. A summary of the annual wastewater charges and estimated yield is in the following tables.
68
Summary of Wastewater Charges for 2021/22 Summary of Wastewater Charges for 2021/22 Summary of Wastewater Charges for 2021/22 Summary of Wastewater Charges for 2021/22
Service Service Service Residential Residential
Wastewater Charge Category
Charge ($)
Wastewater Charge Category Wastewater Charge Category Vacant Charge
Charge ($) 783
Vacant Charge Residential Charge Vacant Charge
783 1,037 783
Residential Charge Non Residential Charge:Residential Charge
1,037 1,037
Non Residential Charge:Non Residential Charge:20mm Water Service
783
20mm Water Service 20mm Water Service 25mm Water Service
783 783 1,223
25mm Water Service 25mm Water Service 32mm Water Service
1,223 1,223 2,005
32mm Water Service 32mm Water Service 40mm Water Service 40mm Water Service 40mm Water Service 50mm Water Service
2,005 2,005 3,135 3,135 3,135 4,888
50mm Water Service 50mm Water Service 65mm Water Service 65mm Water Service 65mm Water Service 80mm Water Service 80mm Water Service 80mm Water Water Service Service 100mm 100mm Water Service 100mmWater WaterService Service 150mm 150mm Water Service 150mmWater WaterService Service 200mm 200mm Water Service 200mm Water Recycled Water Service Recycled Water Recycled Water
4,888 4,888 8,261 8,261 8,261 12,512 12,512 12,512 19,549 19,549 19,549 43,983 43,983 43,983 78,200 78,200 78,200 N/A N/A N/A
Charge ($)
Summary of Net Estimated Yield for Wastewater Charges for Summary of Net Estimated Yield for Wastewater Charges for Summary Estimated Yield Wastewater Charges 2021/22 Summary of of NetNet Estimated Yield for for Wastewater Charges for for 2021/22 2021/22 2021/22 Number Number Number 16,000 16,000
Annual Charge ($) Annual Charge ($) Annual Charge ($) 1,037 1,037
Residential– not connected/vacant land Residential Residential – not connected/vacant land
16,000 580 580
1,037 783 783
16,300,000 480,000 480,000
Residential – not connected/vacant land Non-Residential Access Non-Residential Access
580
783 AsAs per performula formula
480,000 2,000,000 2,000,000
per formula AsAs per formula As per formula
2,000,000 1,200,000 1,200,000
As per formula
1,200,000 380,000 380,000
Non-Residential Access Non-Residential Usage Non-Residential Usage Non-Residential Usage Recycled WaterWater Usage – Residential Recycled Usage – Residential Recycled Water Usage Residential Recycled Water Usage – Non-Residential Recycled Water Usage – –Non-Residential
Estimated Yield ($) Estimated Yield ($) Estimated Yield ($) 16,300,000 16,300,000
380,000 17,000
Total Water Usage – Non-Residential Recycled Total
20,377,000 17,000 20,377,000
Total
20,377,000
On-site Sewage Management (OSSM) Fee On-site SewageManagement Management (OSSM) Fee On-site This fee is Sewage raised on properties with an on-site sewage(OSSM) system in placeFee (e.g. septic tank) in accordance This fee is raised on properties with an on-site sewage system in place (e.g. septic tank) accordance with section 608(2) with section 608(2) of the Local Government Act. The fee is as follows and theinrevenue generated funds an On-site Sewage Management (OSSM) Fee This fee is raised on properties with an on-site sewage system in place (e.g. septic tank) in accordance with section 608(2) of the Local Government Act. The fee is as follows and the revenue generated funds an inspection program, general advice
inspection program, general we provide torevenue owners,generated and replaces the need for periodic ofThis thewe Local Government Act. Thewith feeadvice isthe as follows and the funds an inspection program,renewal general of advice provide to owners, and replaces need sewage for periodic renewal of approval fees. tank) in accordance with section 608(2) fee is raised on properties an on-site system in place (e.g. septic approval fees. and replaces the need for periodic renewal of approval fees. we provide to owners, of the Local Government Act. The fee is as follows and the revenue generated funds an inspection program, general advice we provide to owners, and replaces the need for periodic renewal of approval fees. Summary of OSSM Charge and Net Estimated for 2021/22 Summary of OSSM Charge and Net Estimated Yield forYield 2021/22 Summary of OSSM Charge and Net Estimated Yield for 2021/22
and Net Estimated Yield forCharge 2021/22 Property Type Summary of OSSM ChargeNumber Annual ($) Property Type Number Annual Charge ($) Per eligible property 2,666 67 Property Number Annual67Charge ($) Per eligibleType property 2,666 Per eligible property
70 70 70
2,666
67
Estimated Yield ($) Estimated Yield ($) 178,000 Estimated 178,000Yield ($)
69 178,000
Ballina Shire Council - Delivery Program / Operational Plan 2021 - 2025 Ballina Shire Council - Delivery Program / Operational Plan 2021 - 2025 Ballina Shire Council - Delivery Program / Operational Plan 2021 - 2025
Stormwater Charges This charge is raised on developed urban properties and Council has resolved to charge the maximum Stormwater Charges Stormwater Charges allowable stormwater management service charge on both residential and non-residential properties.
This charge isisraised onon developed urban properties and Council has resolved to charge the maximum Thischarges charge and raised developed The estimated yield are as urban follows:properties and Council has resolved to charge the maximum allowable stormwater management service charge on both residential andand non-residential properties. allowable stormwater management service charge on both residential non-residential properties. The and estimated yieldyield are asare follows: Summary of Stormwater Charges and Net Estimated Yield for 2021/22 Thecharges charges and estimated as follows: Property Type
Summary Stormwater Charges andand Net Net Estimated Yield for ($) 2021/22 Number Annual Charge Estimated Yield ($) Summaryofof Stormwater Charges Estimated Yield for 2021/22
Per residential property Property Type
9,464 Number
Per business property Per residential property
3,968 9,464
Per business property
3,968
Per residential strata lot
4,627
Per business strata lot Per residential strata lot
7,867 4,627
Per business strata lot
7,867
25.00 Annual Charge ($)
236,600 Estimated Yield ($)
Based on impervious area @ $25 per25.00 350 square metre Based on impervious area @ $25 per 350 square metre 12.50
Based on impervious area @ $12.50 12.50 Based on impervious area @ $12.50
99,000 236,600 99,000 57,400
10,000 57,400 10,000
Stormwater charges for business properties are based on the impervious area of the land. Stormwater charges for business properties are based on the impervious area of the land. The charge is $25 The charge charges is $25 per or properties part thereof. Stormwater for 350m2 business are based on the impervious area of the land. per 350m 2 or part thereof. In respect to business strata units the appropriate business charge is apportioned In respect to business strata units the appropriate business charge The charge is $25 per 350m2 or partto thereof. based on unit entitlement subject each unit paying a minimum of is $5.apportioned based on unit entitlement subject to each unit paying a minimum of $5. In respect to business strata units the appropriate business charge is apportioned based on unit entitlement subject to each unit paying a minimum of $5.
Pensioner Concessions Pensioner Concessions Concessions are available to eligible pensioners who are solely or jointly liable for the payment of rates and charges and reside at the property. These rebates asorfollows: Concessions are available to eligible pensioners who are are solely jointly liable for the payment of rates and charges Pensioner Concessions and at the the property. These are as follows: • reside 50% of combined ratesrebates and domestic management charges up to a $250 maximum Concessions are available to eligible pensioners who waste are solely or jointly liable for the payment of rates and charges concession and at the These rebates are as follows: • reside 50% of the property. combined rates and domestic waste management charges up to a $250 maximum concession 50%ofofthe water accessrates and and consumption up to a $87.50 maximum •• 50% combined domestic charges waste management charges up to aconcession $250 concession •• maximum 50% of water access and consumption charges up to a $87.50 maximum concession 50% of wastewater (sewer) charges up to a $87.50 maximum concession
•• •
50% ofofwater wastewater charges upcharges to a $87.50 concession 50% access (sewer) and consumption up tomaximum a $87.50 maximum concession 50% of wastewater (sewer) charges up to a $87.50 maximum concession
Fees Fees Section 608 of the NSW Local Government Act permits fees to be charged for services provided by Council. Fees Section the NSWthe Local Government Act categories permits feesin toestablishing be charged foritsservices Council608 hasofadopted following pricing fees. provided by Council. Council has adopted pricing categories establishing Section 608 ofthe thefollowing NSW Local Government Act in permits fees toits befees. charged for services provided by Council. Council has adopted the following pricing categories in establishing its fees. Category
Methodology
Category Business / Commercial
Methodology Prices are established in accordance with the prevailing market
Business Commercial Full Cost/ Recovery
Prices aretoestablished accordance with the Fee set recover theinfull cost to provide theprevailing service market
Full Cost Recovery Partial Cost Recovery Partial Cost Recovery Fixed by Legislation
Fee the full costtotothe provide the service Feeset settotorecover provide services community at an affordable cost, the balance being met from general revenue Fee set to provide services to the community at an affordable cost, the balance being met from general Fee setrevenue by legislation
Fixed by Legislation
Fee set by legislation
The details detailsofofeach each Council set inout in Council’s Schedule of Fees and Charges. A copy of thisis The Council fee fee are are set out fullininfull Council’s Schedule of Fees and Charges. A copy of this document document is available for inspection at Council’s Customer Service Centre or on our website. The detailsfor of inspection each Council fee are setCustomer out in full Service in Council’s Schedule of Fees and Charges. A copy of this document is available at Council’s Centre or on our website.
70
available for inspection at Council’s Customer Service Centre or on our website.
71 71
Private Works The Local Government Act allows Council to carry out private works on a fee for service basis. Council will generate a surplus on these works and the surplus will be added to the following rates - Labour plus 72.5%; Materials plus 15%; Plant hire at rates set by Council.
New Loan Borrowings Council intends to borrow as follows for 2021/22:
•
$2.3 million for improvements to the Ballina Byron Gateway Airport Car Park, Solar and Boulevard Connect
•
$1 million for industrial land development activities at Boeing Avenue, Ballina
•
$2.4 million for residential land development activities at the Wollongbar Urban Expansion Area
•
$2.2 million for Airport Boulevard Road
•
$1.3 million for River Street 4 Lane Project
Dividends The Local Government Act allows councils to take a dividend from the Water and Wastewater Programs. The Act allows a compulsory and a non-compulsory dividend. A compulsory dividend is payable to General Fund, being the lesser of the ‘calculated tax equivalent’ payments or $3 per assessment. Council calculates tax equivalent payments when preparing the Special Purpose Financial reports, at the end of each year. They relate to taxes, excluding company tax, from which Council business activities are exempt. Typically, this refers to stamp duty and land tax. The Long Term Financial Plan includes compulsory dividends of $34,500 from water and $44,000 from wastewater. Council may extract a non-compulsory dividend from both the Water and Wastewater Programs. To do this it is required that Council substantially complies with ‘best practice’ guidelines provided by the State Government. In terms of meeting the criteria to be eligible for a non-compulsory dividend, Council complies with the best practice guidelines however; it is not intended to take a non-compulsory dividend. Water is not sufficiently profitable to provide a dividend as Rous County Council is planning for a number of bulk water price increases above the CPI. For Wastewater all available funds are required to meet loan commitments and maintain reserves.
Other Section 404 Requirements In accordance with Section 404 of the NSW Local Government Act Council has determined that there are no other matters prescribed by regulation that require a statement to be included in Council’s Revenue Policy.
71
13
related policies and information
13. related policies and information Sale of Assets Plant and Equipment Plant and equipment to be disposed of or replaced has either reached the end of its economic life or is no longer required for Council’s operations. Motor Vehicles Council’s sedan type vehicles are traded at the time considered the most economically viable, taking into account age, kilometres travelled, changeover costs and market demands. Land Council holds areas of industrial and residential land. If any land is to be sold a resolution will be obtained from Council prior to sale.
Commercial Activities and Competitive Neutrality The following activities undertaken by Council are considered to be of a commercial nature: Category One Businesses
Category Two Businesses
(Turnover greater than $2 million)
(Turnover less than $2 million)
Water Services
N/A
Wastewater Services Waste Management Airport Land Development In accordance with National Competition Policy guidelines, Council has included into its costing processes, all direct and indirect costs, plus taxes that a private sector operator would face in the operation of a similar business. These taxes are known as taxation equivalent payments (TEP’s), and are based on items such as land tax and company tax. For Water and Wastewater operations Council has adopted a target rate of return of 0%. However it is acknowledged that operating expenses for Water and Wastewater incorporate the payment of a dividend to General Fund. For other commercial activities the target rate of return is the Commonwealth ten year bond rate. Council has a procedure designed to effectively manage competitive neutrality complaints. This type of complaint refers to instances whereby an actual or potential competitor of a Council business believes that it is being adversely affected through Council’s failure to adopt competitive neutrality. For enquiries relating to Commercial Activities and Competitive Neutrality contact the Manager Commercial Services, or our Manager Financial Services.
Council’s Training Plan Council’s Training Plan aims to encourage and assist all staff to develop a level of knowledge, skill and competency essential to the effective and efficient operation of the organisation. It also aims to offer individual staff opportunities for career and personal development.
73
Ballina Shire Council - Delivery Program / Operational Plan 2021 - 2025
Equal Employment Opportunity (EEO) Council’s EEO Management Plan identifies activities to be undertaken to ensure implementation of Council’s EEO Policy. Council last reviewed and amended the EEO Policy and Plan in April 2017. These documents have been prepared in accordance with the Anti-Discrimination Act 1977 and the Local Government Act 1993, and reinforce Council’s commitment to EEO, fair treatment and non-discrimination for all existing and future employees. The EEO Policy and Plan can be viewed on Council’s website. For specific enquiries relating to EEO contact the Human Resources Section.
Financial Assistance - Section 356 of the Local Government Act Council has various financial assistance programs in place. These programs are outlined in the following policies:
• • • • • • • • •
Donations - Assistance with Council Fees for Community Groups Donations - Australian Representation Donations - Community Sporting Groups Capital Works Assistance Donations - Financial Assistance for Community Groups Donations - Insurance for Environmental Volunteer Groups Donations - Rates and Charges Donations - Waste Disposal Fees for Not for Profit Groups Donations - Waste Disposal for Not for Profit Disposal of Feral, Orphan Animals and Native Fauna Concealed Water Leaks - Financial Assistancy Policy.
For details as to how this financial assistance is provided, refer to the relevant policy documents on Council’s website.
Detailed Estimates of Council’s Detailed Estimates of Council’s Income and Expenditure Council also prepares a separate document, titled the Long Term Financial Plan, which provides a more detailed outline of the income and expenditure estimates over a ten year period. That document is also available on our website, search long term financial plan. Copies are also available upon request from Council’s Customer Service Centre.
Local Government Remuneration Tribunal Section 248 of the Local Government Act requires a council to set an annual fee for payment to the Councillors for acting in their role as a Councillor. The Mayor is also paid an additional fee as Mayor. The maximum fee payable is determined each year by the Local Government Remuneration Tribunal and Council practice is to adopt the maximum fee. This notification confirms that by adopting the Delivery Program and Operational Plan Council is adopting the maximum fee for the Councillor and Mayoral allowance as determined by the Local Government Remuneration Tribunal.
Agency Information Guide - Government Information (Public Access) Act 2020 For a complete list of Council’s plans and policies refer to the latest Agency Information Guide available on our website ballina.nsw.gov.au
Further Information For further information on the contents of this document contact Council’s Communications and Customer Service Section on 1300 864 444.
74
14
appendix a : roads reconstruction program
appendix a roads reconstruction program
Legend 2021/22 Roads program 2022/23 Roads program 2023/24 Roads program 2024/25 Roads program
Ballina
Roads Reconstruction Program
Ballina Shire Council 40 Cherry Street Ballina NSW 2478 ph 1300 864 444 | e council@ballina.nsw.gov.au
ballina.nsw.gov.au