Skip to main content

Aya el sherbiny - Portfolio

Page 1

PORTFOLIO

AYA EL SHERBINY


Aya El Sherbiny

RIBA 1 | Royal Institute of British Architects Accreditation The Arab f Science, Technology and Maritime Transport, Cairo, Egypt | School of Architecture and Environmental Design Address Villa 2, St 75C, Mirdiff, Dubai, U.A.E Telephone 00971505981110 Email ayaelsherbiny@gmail.com


Table of Contents Resume ...................................................................................................... 1 Iconic Mosque Design...............................................................................2 - 3 Competition held by EMAAR, Dubai, U.A.E Schools of the Future................................................................................4 - 6 Competition held by Ministry of Development, Dubai, U.A.E Graduation Project ... ...............................................................................7 - 8 Redefining Livestock Farming in Egypt Polyark / Polyport III .................................................................................9 - 10 Super Mega Crit, Italy, Rome Binghatti Gems, Residential Building.....................................................11 Professional Work, Dubai, U.A.E Binghatti Food & Coffee Factory, Industrial Building...........................12 Professional Work, Dubai, U.A.E Kevadia & Ghaya Hotels..............................................................................13 Professional Work, Dubai, U.A.E Commercial Villas Complex....................................................................14 Professional Work, Dubai, U.A.E Residential Buildings ................................................................................15 Professional Work, Dubai, U.A.E Building Materials Warehouse ................................................................16 Professional Work, Dubai, U.A.E Morphing Norms .......................................................................................17 Parametric Design Summer Workshop Pencil Drawings/ Observational Drawing .............................................18 Perspective Drawing (Observational)


1

RESUME


ICONIC MOSQUE DESIGN COMPETITION THE MOSQUE, DUBAI, UAE FORM GENERATION

Full Volume mass

Breaking linearity directing mass towards green bridge

Main pulling force - Qibla Direction Breaking linearity to make court experience serine

Court

Breaking linearity - Following Context [Wildlife Sanctuary] Male zone

Female zone Introduction of a court - [Sahn]

Splitting the mass at a main axe Dubai Creek Tower / Green Bridge

Splitting the mass seperate men & women + create an exit

ACCESSIBILITY

Exit to green platform

Access from green bridge

Access from basement [Vehicular Access]


ROUTES TO ABLUTION

323 2

4

4 3

1

2 1

1

1 3 22

2

3

Basement Floor

4

4 3 1

1

Ground Floor

Route via escalators [ Main Route ] Route via elevators [ Handicapped Route ] Route from drop off [ Day to Day - Quick Route ]

Minerate

Operable shed depending on time Gallery to of day. overlook the Dome mosque & Dubai creek tower from opposite sides.

Accessible roof for prayers.

Female prayer hall.

Elevation Openings

Male Prayer hall Screens

Arcades

Elevation Patterns

2

MOSQUE ENTRANCE THROUGH ARCADES

Main Dome

COMPETITION | RELIGIOUS BUILDING

KIT OF PARTS


Main Entrance

Main Exit

Sahn [Court]

Arcades

Qibla Wall Exterior


FLOOR PLANS

Ground Floor Plan

COMPETITION | RELIGIOUS BUILDING

Basement Floor Plan

3

Mezzanine Floor Plan


SCHOOLS OF THE FUTURE INNOVATION OF SCHOOLS DESIGN IN THE UAE

AWARD WINNING PROJECT

FORM GENERATION - Modulation - Expandability - Repetition - Sustainability

School Main mass [ Classrooms ]

Mass split into 2 sections. [ Boys & Girls ] To create negative spaces.

Bridges added to connect classroom masses for ease of circulation.

Courts & atriums created for lighting / ventilation.

Main spine introduced to accomodate commen spaces & to seperate both genders.

Proportions of Masses altered to accomodate Swimming pool, Mulltipurpose hall & Auditorium.

Mass added for Extra spaces. [Multipurpose hall, swimming pool & auditorium]

Negative space increased to accomodate playgrounds.


The main module [ Classroom ]

Expanding the Form

Repeating the Module

The initial design is tailored to accomodate 1500 students, it can expand to accomodate 2500 students by adding classroom masses.

The main module of both schools is the classroom which repeats to create the form. The classroom dimensions is mainly 12m x 7m and in the KG section 12m x 8m.

4

FORM ORIENTATION

COMPETITION | EDUCATIONAL BUILDING

MODULATION, FORM REPITITION & EXPANDABILITY

Winter

Summer


5

COMPETITION | EDUCATIONAL BUILDING

HIGH SCHOOL - GROUND FLOOR


SUSTAINABILITY

PRIMARY SCHOOL / HIGH SCHOOL

Solar Panels Photovoltaic cells are used to generate energy that is used in the school. Making it a semi-self sufficient building. Also, teaching students more about power generation, conservation and renewable energy.

Louvers Louvers work as sun breakers, they are a sustainable way to cut down cooling costs and are an effective system for controlling the climate in the classrooms. In the North Elevation horizontal louvers are used that are made of photovoltaic cells in order to work as sunbreakers and power generators. Where as in the East and West elevations the the louvers are vertical and work as sunbreakers.

Plant Your Own Plants The negative space between the classrooms have been designed to occupy farms planted and taken care of by the students. Which allows the students to interact with nature and appreciate it.


COMPETITION | EDUCATIONAL BUILDING

6

Green Roofs The green roofs introduced in the school have several advantages like storing storm water and reusing it, capturing airborne pollutants and works as a sound and heat insulation.

Urban Bicycle Racks Bike parking encourages people to cycle. If a person chooses to ride a bike and at their destination they find bike parking is unavailable or inconvenient, they may choose to drive alone.

Sustainable Stone Stone is a natural material, it is inherently earth-friendly. Natural stone adds an aesthetic value, durable and can be recycled and reused. Using stone in the elevations of the school teaches students about natural materials and sustainability.

Recycling Bins Recycling bins conserves natural resources, prevents pollution and saves energy as raw materials are reused. It also makes students more aware about energy consumption and conservation.


TAMING MIGRATION IN EGYPT REDEFINING LIVESTOCK FARMING An Unleached Potential The Livestock Sector in Upper Egypt and Beyond The dairy and livestock sector in Upper Egypt is important for strategic and economic reasons to Egypt. Largely an untapped agricultural potential for horticulture and livestock, the region offers significant opportunity to contribute to exports and the domestic food processing industry while alleviating household poverty. The tremendous potential of the livestock sector in Egypt is largely lost to a number of constraints. It is a fragmented industry resulting in an absence of economies of scale, inefficient marketing channels, and a lack of reliable market information. Small farmers tend to rely on traditional knowledge and apply inefficient practices. They are unable to access quality feed at reasonable cost, and often unwittingly manage their dairy and livestock assets at a loss.


Livestock Farming VS. Assuit Assuit Residents are distributed into : CITY

CENTER

VILLAGE

Almost every household in Assuit contains Livestock whether they have suitable farming conditions or not. Inspite of that there are not services provided, medication and no one knows how to take professional / proper care of Livestock. There are not schools to teach livestock farming, no veteranian hospitals to treat livestock and definetly no projects to develop and improve Livestock Farming.

EDUCATIONAL WORK | GRADUATION PROJECT

A STARTING POINT

7

The Livestock population in Egypt is very High. The Highest number of Livestock is in Beheira followed by Sharkia, Menoufia, Sohag, Menia, Garbeyya, Kafr El Sheikh then Assuit. Assuit contains about 400,000 Cattle. According to Migration statistics and the fact that Assuit has the highest rate of Poverty in Egypt. The project Starting point will be in Assuit.


Livestock Farming Development VS. Community Job Opportunities

Benefiters

Form Generation Based on Cattle Behaviour Based on the cattle behavior the form has to be generated on concentric paths in order to be able to handle cattle within the project. Concentric pathways will allow cattle to move from one function to another easily. Therefore, the project is split into two different Geometries one suitable for Human behaviour and the other suitable for Cattle Behaviour.

HUMAN ZONE

CATTLE ZONE


EDUCATIONAL WORK | GRADUATION PROJECT

MASTER PLAN

8

MAIN SECTION


ABERDEEN’S POWER Main project aim : Visual and physical connectivity between the city and the port, restoring the public amenity of the quayside and making the harbor a part of the city. - Energy/ sustainability - Innovation - Branding Turning Aberdeen into “The City of Light and Colour” through an extreme spatial experience and the development of a renewable energy source.

RIBA MAGAZINE ARTICLE


9

WORKSHOP | POLYARK / POLYPORT


10

WORKSHOP | POLYARK / POLYPORT


BINGHATTI GEMS DUBAI, UAE

3.00 m setback towards neighbor [As per regulations]

MASS GENERATION

Plot full volume mass

Full volume extension to facilitate maximum parking.

Plot constraints

3.00 m setback towards hessa street [As per regulations]

Grid of 7.00 m per unit

Space for amenities also to give apartments pool view. Main mass generation

Repitition of mass fullfilling GFA

Extrusion of balconies

FACADE DESIGN - OPTION - 01

A four sides enclosed balcony is calculated in GFA

FACADE DESIGN - OPTION - 02 A, B & C Repitition of simple diamond shape

Repitition of diamond shape creating a pattern

1 Apartment - Consisting of 2 balconies a solid wall, opening & a shed. Therefore, not calculated in GFA.

Repitition of diamond shape creating an inverted pattern

The

second

option

works

around the GFA by having mashrabiyas on both sides of the balcony instead of solid walls so that the balcony is not included in the GFA. The mashrabiya patterns open upwards and downwards in order to create a continous motion along the elevation.


Binghatti Gems is a residential building in JVC, Dubai. The client required every single space to contain a balcony and due to Nakheel regulations this would include the balconies in GFA. This was the main challenge in the facade design. Option - 01

Ground Floor Plan

611

Option - 01

PROFESSIONAL WORK | INDUSTRAL BUILDING

FLOOR PLANS

Podiums Floor Plan

Option - 02

First Floor Plan

Option - 02

Typical Floor Plan


BINGHATTI FOOD & COFFEE FACTORY DUBAI, UAE

Environmental Analysis

Accessibility

Conclusion Site orientation provides pleasant sunlight and wind mainly on the front facade. Making it suitable for the main recreational space, [Cupagahwa Cafe]

Conclusion Site can be accessed from front, one side & rear. Making it possible to provide seperate entrances for end users, employees and services.

Concept As Cupagahwa is a subsidiary of Binghatti Hospitality. In the first concept the masses are dealt with as Main & Subsidary where Binghatti Hospitality is the Main mass UNWRAPPING Cupagahwa which is the sub mass. CupaGahwa Cafe

Binghatti Hospitality

Key Words BINGHATTI HOSPITALITY -- MAIN -- DOMINANT -- SOURCE CUPAGAHWA -- SUBSIDARY -- DERIVATIVE - UNWRAP - RELEASE - UNLEASH

CupaGahwa Cafe

Binghatti Hospitality


Option - 01

Poultry Products Route

12

Option - 02

PROFESSIONAL WORK | INDUSTRAL BUILDING

Bakery Products Route

Fruites & Vegetables Route Option - 03

Visitors Produciton Experience Route

Visitors Experience Path on Elevation

Final Render - Clients Choice


KEVADIA HOTEL DUBAI, UAE

In Kevadia Hotel the client’s target was to make maximum use of the plot given. In order to maximize the profit. After some research in this case a hotel was expected to make more profit than a residential building. From here the decision of building a hotel was made. The design was meant to be extremely practical, not waste any space as the plot of land was not very big but at the same time have a unique design.

0.90

0.90 3.70

CLOSET

1.10

1.90

CORRIDOR 1.10 WIDTH

5.20 SQ.M. SHOWER TRAY

3.00 BATH 6.20 SQ.M.

07 ROOM- 12

ROOM- 11

ROOM- 10

ROOM- 09

28.00 SQ.M.

26.00 SQ.M.

26.00 SQ.M.

26.00 SQ.M.

6.45

2.50

n 1. 80 ro je ct io

m

ax

ROYAL SUITE HALL

3.70

3.70

1.90 1.90

3.70

AREA BEFORE PROJECTION = 12.35 m²

ROYAL SUITE BED ROOM

19.50 SQ.M. BATH 6.00 SQ.M.

3.30

TYPICAL FLOOR PLAN

0.90

1.80

SHOWER TRAY

GROUND FLOOR PLAN

3.70 3.70

CORRIDOR 1.10 WIDTH

2.95

SLOPE 8%

80

2.

3.20

3.70

5.00 CLOSET

AREA BEFORE PROJECTION = 11.00m²

3.70

20.20 SQ.M.

0.90

19.50 SQ.M.

BUSINESS CENTER.

ROOM- 06

SHOWER TRAY

5.20 SQ.M. BATH

.p

5.80

5.80

0 5.3

CORRIDOR 1.10 WIDTH

06

1.05

1.70

1.80

E

10.70

CLOSET

S

ROOM- 08

5.00

20.20 SQ.M.

CLOSET

2.20 08

5.65

UL

IB

SL

WAITING AREA 44.00 SQ.M.

05

ROOM- 05

4.85

24.50 SQ.M.

10

ST

E

OP

WAITING AREA

5.00

SHOWER TRAY

SHOWER TRAY

LOBBY 1.20*2.40

LENGTH 5.90 m 8%

2.50

CORRIDOR 1.10 WIDTH

3.70

CLOSET

SHOWER TRAY

1.80 0.90 1.80

1.10 CORRIDOR 1.10 WIDTH

BATH 5.20 SQ.M.

1.60

1.40

1.90

2.50

1.30

1.40

1.90 BATH 5.20 SQ.M. SHOWER TRAY

BATH 5.20 SQ.M.

3.00

1.20

70 3.

1.10 CORRIDOR 1.10 WIDTH

20.20 SQ.M.

SHOWER TRAY

0.90

6.45

12.80

CLOSET

1.80

CLOSET

RESTAURANT AREA=165.00 m2

COFFEE 83.00 SQ.M.

7.50

CLOSET

SHOWER TRAY

6.

VI

90

1.10 CORRIDOR 1.10 WIDTH

BATH 5.20 SQ.M.

ROOM- 04

0.90

ROOM- 13

40

0.

1.90

1.10 1.90

2.50 5.20 SQ.M. BATH

HOUSE KEEPING

AIR SHAFT

1.50

6.45

2.

00

6.

2.10

1.90

4.00

20

80

SHOWER TRAY

20.20 SQ.M.

CLOSET

09

GARBAGE ROOM

2.50

CORRIDOR 1.10 WIDTH

2.20

2.50

CLOSET

10 ELEC .ROOM

0.90

3.50

ONE WAY DRIVE WAY WIDTH 3.50M

15.10

50 4.

E

UL

COUNTER

IB

ST

80

ROYAL SUITE HALL 21.00 SQ.M.

5.

RECEPTION

70.00 SQ.M.

1.

MAIN HOTEL LOBBY

5.20

6.90

VI

5

5.2

2.

1.10 CORRIDOR 1.10 WIDTH

11

1.80

0.90

SERVICE COUNTER

3.

65

2.

40

7.60

TELE .ROOM

1.90 BATH 5.20 SQ.M.

0.90

11.55

12

1.10

6.50

OFFICE-02

13

S

1.50

1.80

1.30

TOILET 3.00 SQ.M.

AREA BEFORE PROJECTION = 11.00m²

ROOM- 03

CLOSET

3.70

1.00

CORRIDOR 1.10 WIDTH

1.10

0.60

2.05

2.20

CORRIDOR 1.10 WIDTH

04

1.10

2.20

MAIN CORRIDOR 1.80 M. WIDTH

14

70

3.

2.50

3.

0.90

1.55

2.50

1.20

0.90

2.20

5.00

SHOWER TRAY

03

1.10

1.80 2.55

2.55

2.85

2.40

2.50

4.60

2.20

5.00

0.90

F.H.

1.20

4.65

20.20 SQ.M.

CLOSET

BATH 5.20 SQ.M.

1.10

2.20

1.20

2.55

1.20

2.55

2.55 1.20

SERVICE LIFT

ROOM- 02

SHOWER TRAY

CORRIDOR 1.10 WIDTH

02

2.20

0.90

MAIN CORRIDOR 1.80 M. WIDTH

F.H.

CLOSET

1.20

3.00

1.80

CORRIDOR 1.10 WIDTH

1.20 V.LIFT

01

23

SHOWER TRAY

BATH 6.20 SQ.M.

22

21

CORRIDOR VISITORS LIFT LOBBY

LOBBY 1.20 * 2.40

2.00

1.90

BATH 5.20 SQ.M.

1.10

1.80

CLOSET

1.10

20

V.LIFT

1.20

SHOWER TRAY

24.50 SQ.M.

3.70

1.10

5.50

6.10 SHOWER TRAY

CORRIDOR 1.10 WIDTH CLOSET

2.00

0.90

CORRIDOR 1.10 WIDTH

BATH 5.20 SQ.M.

2.00

2.50

0.90

0.90

0.90

SHOWER TRAY

2.50

2.50

1.80

BATH 5.20 SQ.M.

1.10

19

4.65

1.05

0.60

1.90

2.50 BATH 5.20 SQ.M.

35

2.40

20

OFFICE-01

CLOSET

1.10

2.

2.20

4.65

65

2.50

1.10 1.10 1.90

BATH 5.20 SQ.M.

1.10

ROYAL SUITE BED ROOM

3.10

3.45

AREA BEFORE PROJECTION = 13.25 m²

BUFFET

SHOWER TRAY

CORRIDOR 1.10 WIDTH CLOSET

2.00

1.90

3.70

00 0. R1

1.95

1.95

LOBBY

4.65

SERVICE LIFT

CORRIDOR 1.10 WIDTH

BATH 5.20 SQ.M.

1.60

V.LIFT

23.50 SQ.M.

0.90

down from typical

CORR.

30

SHOWER TRAY

3.05

MAIN CORRIDOR 1.80 M. WIDTH

5.20

2.55

1.20

CORRIDOR VISITORS LIFT LOBBY

2.55

V.LIFT

2.55

1.20

2.55

2.30

2.55

5.15

up from basement

1.85 BAGGAGE

2.

CLOSET

BATH 6.20 SQ.M.

15

SHOWER TRAY

0.90

GARBAGE ROOM.

6.00

ROOM- 01

22.00 SQ.M.

2.50 LOBBY 1.20 * 2.40

SHOWER TRAY

2.20

MAIN CORRIDOR 1.80 M. WIDTH

0.90

1.50

1.50

1.50

CORRIDOR 1.50 M.

24.60 SQ.M.

BATH 5.20 SQ.M.

18

16

CORRIDOR 1.10 WIDTH

21.00 SQ.M.

AREA BEFORE PROJECTION = 13.30 m²

18.30

1.00

1.95

3.90 MEETING ROOM 40.00 SQ.M.

ROOM- 15

1.80 3.70

0.90

3.15 5.95 1.50

1.50

0

.5

R6 KITCHEN

AREA=100.00 m2

DISABLED TOILET

JANITOR

24.60 SQ.M.

BATH 5.20 SQ.M.

CORRIDOR 1.10 WIDTH

CLOSET

5.20

0.90

CCTV. ROOM.

STORE

5.10

CLOSET

1.95

1.10

1.50

0.90

0.90 2.70

1.55

1.80

24.60 SQ.M.

CORRIDOR 1.10 WIDTH

17

4.10 0

1.80

2.85

BATH 6.00 SQ.M.

1.05

ROOM- 23

CORRIDOR

3.5

CORRIDOR 1.50 M.

24.60 SQ.M.

2.05

1.85

3.70

ROOM- 22

SHOWER TRAY

ROOM- 16

21.00 SQ.M.

7.60

FEMALE TOILETS

1.60

2.50 2.00

ABLUTION

1.25

1.20

DIRECT DISCHARGE CORRIDOR.

7.40

1.40

QIBL

A

1.40

3.65

SLOPE 8%

1.

1.80

AREA BEFORE PROJECTION = 13.35 m²

2.25

1.45

1.30

5.50

5.55

4.60

1.45

MALE TOILETS

PRAYER ROOM

1.50

2.25

4.00 3.70 L.V. ROOM.

AREA= 23.15 m2

0.90

7.30

ELEC .S.S.

AREA= 39.00 m2 ONE TRANSFORMER

1.90

RAMP UP FROM 1ST BASEMENT TO GROUND FLOOR WIDTH 3.50 m SLOPE 12.50% LENGTH 29.60

1.80

3.55

3.80

ROOM- 21

CORRIDOR 1.10 WIDTH

B

B

1.20

2.55

2.55

22.00 SQ.M.

TELE.

3.70

ROOM- 20

1.10

ROOM- 19

6.10

6.10

ROOM- 18

6.10

1.10

1.15 SECURITY

3.80

SHOWER TRAY

CORRIDOR 1.10 WIDTH

3.65

4.85

3.70

6.00 SQ.M.

SHOWER TRAY

ROOM- 17 26.00 SQ.M.

1.90

2.85 BATH

1.90

6.20 AREA BEFORE PROJECTION = 16.90 m²

LENGTH 26.00m

5.50

3.00

3.70

3.50

3.50

A RAMP DN FROM GROUND FLOOR TO 1ST BASEMENT WIDTH 3.50 m SLOPE 12.50%

3.50

BULK WASTE A


GHAYA HOTEL DUBAI, UAE

ments building. It also consists of several swimming pools, landscape areas, restaurants, shops and underground parking. This project was designed by our team in Proline Engineering Consultants. I participated in

13

Designing the form, plans and elevations. All projects’ drawings are available for reference.

PROFESSIONAL WORK | HOTEL

Ghaya hotel consists of 3 buildings, a five star hotel, a four star hotel and a hotel apart-

FIRST FLOOR PLAN

GROUND FLOOR PLAN


ELEVATIONS - OPTION 01

LANDSCAPING

PLOT LIMIT 45.72 M 5.40

B

2.50

2.50

5.40

5.40

2.50

5.40

2.50

2.50

5.40

3.11

4.10

4.12

3.11

BREAKFAST AREA

BATH

3.00

STORE

BATH

STORE

LIFT

ENT.HALL

3.55

OTS

LIFT

DINING

TOIL.

DINING

LOBBY

LOBBY

ENT.HALL

DINING

LIFT

LOBBY

LIFT

LIFT

A

LOBBY

ENT.HALL ENT.HALL

ENT.HALL

3.60

BATH

STORE

STORE

TOIL.

1.30

LOBBY

LAUNDRY ROOM

LAUNDRY ROOM

TOIL.

DINING

A

1.30

1.80

BATH

TOIL.

DINING

LIVING

LIVING

LIVING

LIVING

1.72

LIVING

1.72

LANDSCAPING

KITCHEN

LAUNDRY ROOM

OTS TOIL.

PLOT LIMIT 30.48 M

RECYCLE WASTE NON RECYCLE WASTE

KITCHEN

LAUNDRY ROOM

STORE

BREAKFAST AREA

NON RECYCLE WASTE

KITCHEN

3.00

BATH

BREAKFAST AREA RECYCLE WASTE

NON RECYCLE WASTE

1.80

LAUNDRY ROOM

RECYCLE WASTE

3.60

3.55

NON RECYCLE WASTE

KITCHEN

KITCHEN

MAIN ENTRANCE

MAIN ENTRANCE

MAIN ENTRANCE

CAR PARKING

MAIN ENTRANCE

MAIN ENTRANCE

CAR PARKING CAR PARKING

CAR PARKING

CAR PARKING

DRIVE WAY 6.10 M

BATH

WATCHMAN ROOM

VEHICLE GATE

B 3.11

5.40

2.50

2.50

5.40 30.48

NEIGHBOR PLOT 251 - 601

GROUND FLOOR PLAN

5.40

2.50

5.40

2.50

VEHICLES ENTRANCE / EXIT

2.50

15.24 M

5.40

ASPHALT ROAD

3.11

PLOT LIMIT 30.48 M

RECYCLE WASTE

NON RECYCLE WASTE

NEIGHBOR PLOT 251 - 2862

BREAKFAST AREA

BREAKFAST AREA RECYCLE WASTE


COMMERCIAL VILLA COMPLEXES DUBAI, UAE

ELEVATIONS - OPTION 02

LANDSCAPING

PLOT LIMIT 45.72 M 2.50

2.50

5.40

2.50

2.50

5.40

3.11

BATH

BATH

LIFT

BATH

LIFT

CORR. LOBBY

LIFT

LIFT

LOBBY

BATH

BATH

A

1.72

BAL.

BAL.

M.BED ROOM

M.BED ROOM

BAL.

3.60

M.BED ROOM

M.BED ROOM

M.BED ROOM

BAL.

1.72

3.60

1.30

BATH

3.55

BATH

OTS

CORR. LOBBY

BATH

M.BED ROOM

BATH CORR.

BATH

M.BED ROOM

BAL.

B

3.11

5.40

2.50

2.50

5.40 30.48

NEIGHBOR PLOT 251 - 601

FIRST FLOOR PLAN

5.40

2.50

5.40

2.50

2.50

5.40 15.24 M

ASPHALT ROAD

3.11

14

M.BED ROOM

BATH

BATH

LIFT

M.BED ROOM

PROFESSIONAL WORK | COMMERCIAL VILLAS

4.12 BATH

OTS

CORR. LOBBY

M.BED ROOM

1.30

A

M.BED ROOM

BAL.

3.00

M.BED ROOM

BAL.

1.80

4.10 3.55

BATH

CORR.

1.80

5.40

BAL.

M.BED ROOM

M.BED ROOM

3.00

M.BED ROOM

BAL.

BATH

LANDSCAPING

2.50

B BAL.

PLOT LIMIT 30.48 M

5.40

PLOT LIMIT 30.48 M

5.40

NEIGHBOR PLOT 251 - 2862

3.11


RESIDENTIAL BUILDINGS DUBAI, UAE

NEIGHBOR PLOT NO. 648550

NEIGHBOR PLOT NO. 648551 pl

ot

it

lim

ot

it

pl

se

tb

lim

it

ac

k

Lim

se

14V

BULK WASTE

13V

12V

11V

10V

9V

8V

7V

6V

4V

5V

3V

2V

k

ac

tb

it

Lim

1V

ONE WAY DRIVE WIDTH 6.92 M

11

VEHICLES EXIT

15V

16V

10

12

13

VEHICLES ENTRANCE

17V

18V

09

19V

93

NEIGHBOR PLOT NO. 6488654

ONE WAY DRIVE WIDTH 6.00 M

PLOT NO. 64891

UP TO PODIUM 1

BICYCLE RACK

GENERATOR

RAMP UP TO PODIUM 1 TO GF IN SLOPE OF 12.5 % UP

VEHICLES EXIT

PUMP ROOM

RAMP DN FROM PODIUM 1 TO GF IN SLOPE OF 12.5 %

BATH

GREEN AREA

WATCHMAN ROOM

PANTRY

08

NEIGHBOR

DN FROM PODIUM 1

WATER TANK

TOIL.

07

MANAGEMENT OFFICE

06

TEL. ROOM ENTRANCE LOBBY

DIRECT DISCHARGE

LIFT LOBBY

KIDS' PLAY AREA

FOOT PATH

01

05

02 04

LV ROOM

ELEC. SUBSTATION

03

GREEN AREA

SLOPE 8%

MAIN ENTRANCE

it

k

ac

tb

Se

Lim

se

tb

ac

k

Lim

it

pl

it

ot

pl

ot

lim

lim

it

VEHICLES EXIT

VEHICLES ENTRANCE

GROUND FLOOR PLAN

TYPICAL FLOOR PLAN

GROUND FLOOR PLAN

TYPICAL FLOOR PLAN


PROFESSIONAL WORK | RESIDENTIAL BUILDING

AL FURJAN RESIDENCE

15

DUBAI, UAE

GROUND FLOOR PLAN

FIRST FLOOR PLAN


132.61 PLOT LIMIT

NEIGHBOR 5336299

9.00

11.00

12.20

F.H.R

3.00

12.20

12.20

3.00

3.00

F.H.R

3.00

3.00

5 3.2 R1

3.66

12.20

12.20

3.00

3.00

9.00

9.00

4.57

POCKET SUBSTATION

5

9.00

F.H.R

F.H.R

3.00

area = 236.40 m2

WAREHOUSE - 08 area = 236.40 m2

WAREHOUSE - 09 area = 236.40 m2

5.10

11.70 SET BACK

2.90 2.90

19.90

WAREHOUSE - 07

2.00

area = 236.40 m2

ELEC. ROOM TEL.

1 2 3

2.00

WAREHOUSE - 06

19.70

area = 236.40 m2

19.70

WAREHOUSE - 05

19.70

area = 236.40 m2

19.70

WAREHOUSE - 04

19.70

area = 236.40 m2

19.70

WAREHOUSE - 03

19.70

area = 236.40 m2

19.70

19.70

19.90

WAREHOUSE - 02

9.00

1.40

area = 236.40 m2

4.57m*3.66m (open to sky)

.7

R8

6.20 SET BACK

WAREHOUSE - 01

5.40 SET BACK

HOLDING TANK

15.00 SET BACK

5.30 9.00 LOADING & DRIVE WAY UNLOADING

9.00

9.00 12.20

F.H.R

3.00

6.00

9.00

5.30 DRIVE WAY

9.00

.75

B

9.00 LOADING & UNLOADING

15.00 SET BACK

5

.2

13

R

R8

E 476624161 N 2746405.146

3.00

E 476547.769 N 2746513.544

GREEN BUFFER

4 5 6 7 8

NEIGHBOR 5330310

9 10 11 12 13

12.00

12.00

12.00

12.00

12.00

12.00

PUMP

15

ROAD 36.50

12.00

12.00

70.00 PLOT LIMIT

70.00 PLOT LIMIT

12.00

4.60

14

16 17 18

4.50

20 21

UNDERGROUND WATER TANK

22 23

15

14

13

12

11

10

9

8

13

9

10

4.65

2.50 1.20

12.00

12.00

2

3

4

5

6

7

8

16 15

2.00

11

1

3.40

2

01

1.35

17

10.75

3.90

12.00

4.00

12.00

(12.05*6.80*2.40)

12

1.20

UP TO MEZZANINE

1

18

12.00

12.00

12.00

6.00

14

DOWN TO PUMPROOM

23 22 21 20 19

12.00

2.50

19

RECEPTION

14

2.50

13 12 11 10 9 8

3.20

3.00

1.20

OFFICE-02

PANTRY

1.85

OFFICE-01

IRRIGATION 02 TANK

TOIL.

1.25

1.00

4.50

1.58

1.58

1.00

1.70

4.50

A

A

STORM WATER 2.00 TANK

11.70 SET BACK

5

B

R8 3.2 5

3.00 9.00

R1

F.H.R

EGRESS

3.00 12.20

9.00

3.00 12.20

15.00 SET BACK

F.H.R

9.00

3.00 12.20

9.00 LOADING & UNLOADING

3.00 12.20

9.00

9.00

F.H.R

9.00

3.00 12.20 9.00 LADING & UNLOADING

9.00

9.00

3.00 12.20

5.30 DRIVE WAY

5 3.2

F.H.R

11.00

14.80 SET BACK

.75

R8

R1

3.00

9.00

5.30 DRIVE WAY

3.00 F.H.R

INGRESS

.7

6.00

E 476490.55 N 2746473.22

19.90

area = 236.40 m2

1.79

area = 236.40 m2

WAREHOUSE - 10

19.70

area = 236.40 m2

WAREHOUSE - 11

19.70

area = 236.40 m2

WAREHOUSE - 12

19.70

area = 236.40 m2

WAREHOUSE - 13

19.70

area = 236.40 m2

WAREHOUSE - 14

19.70

WAREHOUSE - 15

19.70

area = 236.40 m2

19.70

19.70

19.70

19.90

area = 236.40 m2

WAREHOUSE - 16

3.10

2 1

area = 236.40 m2

6.20 SET BACK

WAREHOUSE - 17

6.00

7 6 5 4 3

WAREHOUSE - 18

E 476566.942 N 2746384.822 132.61 PLOT LIMIT

NEIGHBOR 5330270

GROUND FLOOR PLAN


1 20 ROOF SLOPE >> 1 : 20

C

1 20 ROOF SLOPE >> 1 : 20

B

A

SANDWICH PANEL CORR

WAREHOUSE

WAREHOUSE

04

15

0.30

BLOCK WALL

7.90

7.90

7.90

SANDWICH PANEL CORRUGATED SHEET

SECTION - A - A 1

1

1

1

1

17

WAREHOUSE 18

SANDWICH PANEL CORRUGATED SHEET

BLOCK WALL

PROFESSIONAL WORK | INDUSTRIAL BUILDING

SECTION - B - B

16

16

WAREHOUSE

7.90

15

WAREHOUSE

7.90

WAREHOUSE

7.90

SANDWICH PANEL CORRUGATED SHEET

7.90

4

DUBAI, UAE

7.90

HOUSE

BUILDING MATERIALS WAREHOUSES


WORKSHOP | PARAMETRIC DESIGN

17 THE PREDATOR This pavillion has been digitally designed and fabricated using parametric-modelling software, and computer fabrication technology. The Predetor pavillion offers a unique spatial experience that is achieved by folding a complex 3D surface into multible 2D facets. By aligning the “facets� at varying angles to one another, the overall structural integrity of the form is acheived; the geometry was designed to focus on the controlled experience of the pavilion using angular oriented units of various angles and levels. The pavilion is made up of approximately 500 unique MDF facets each has been individually milled using a 3-axis CNC machine that automatically cut and numbered piece. The Predetor pavillion is the first full-scale parametrically designed and digitally fabricated structures in Egypt.


18

PENCIL DRAWINGS


Turn static files into dynamic content formats.

Create a flipbook
Aya el sherbiny - Portfolio by Aya El Sherbiny - Issuu