Planned Major Works

L&Q, Newquay House, Black Prince Road, London

Highlights

The L&Q Planned Major Works South programme at Newquay House comprised the refurbishment of a 100-year-old, Grade II listed residential block containing 72 occupied social housing flats. The scheme focused on restoring the building’s original character while improving building performance and compliance.

The works included full scaffolding, asbestos surveys, replacement of rear windows and doors, overhaul of front entrance doors and refurbishment of communal areas, alongside FRA-related internal remedial actions. New windows were designed to replicate the original appearance, addressing the poor condition of the existing units while maintaining the historic façade.

The project had been in long-term planning and was transferred to Axis following delays under a previous contractor. Axis progressed the scheme through detailed coordination with consultants and the local planning authority, including support for listed building consent via technical drawings from the specialist subcontractor.

Specifications

• Scaffolding installation across full block

• Asbestos surveys and associated management works

• Replacement of windows and rear doors

• Overhaul of front entrance doors

• Communal area decorations

• Planning approval support for listed building consent

• FRA-related internal remedial works

• Resident engagement and communication programme

£2.5 -3m value

11 months duration

Resident Communication and Care

All 72 flats remained occupied throughout the works. Communication was managed through regular resident letters, weekly drop-in meetings in communal areas, and direct engagement from the site team and RLO when required. A site office was also maintained for day-to-day queries.

Pre-start engagement included a coffee morning attended by Axis, L&Q and the window installer, along with a sample window display to support resident understanding of the works. Additional social value activity included a free haircutting session at Christmas.

Benefits

• Restoration of original architectural character

• Improved thermal performance and EPC rating

• Reduced energy bills for residents

• Improved condition of external building fabric

• Lower long-term maintenance requirements

Client Relationship

Axis maintained a long-standing framework relationship with L&Q and had delivered multiple programmes across their portfolio. This scheme continued that partnership, with L&Q relying on Axis to progress a previously delayed project and support successful delivery in a complex listed building environment.