Case Study | Social Housing | Fire Safety
Number of flats
700 Number of Years
2 Contract Value
View the Case Study
£4m
Wigan Council Fire Safety Retrofit of High-Rise Tower Blocks
Project Details Fieldway were awarded the contract to undertake and deliver an efficient, multidisciplined project for Wigan Council at Scholes Village, working across seven high-rise tower blocks comprising over 700 flats. As Principal Contractor, we worked hand-inhand with design consultant NECO, and Wigan Council’s consultants’ Walker Sime and Cundall, to take the overall design from RIBA stage 3 to stage 4, and through to completion. We considered building data, and maintained a golden thread of information continuously, communicating with stakeholders to ensure compliance and comprehension across the complex design.
“
“
Definitely worth a look, the improvements would definitely make our lives easier in the event of a confirmed high-rise fire at any of the blocks.
Tenant, Wigan Council
“
“
Fieldway have been the best. They were always punctual, and the quality of the work was brilliant.
Wigan Community Fire and Ambulance Station
Delivery Our dedicated team, comprised of directly employed Fieldway labour and local staff sourced as part of our Corporate Social Responsibility (CSR) contributions, completed Brook House first. We progressed through the following 6 buildings in 2-block batches until completion. Our Tenant Liaison Officer, dedicated to Scholes Village, managed appointment booking and prolific communication with tenants, achieving a 99.6% project-wide access rate for their efforts. Works in communal areas, such as the upgrades to emergency lighting and stairwell AOVs, were completed first to ensure tenants maintained complete access to the whole building throughout the procession of works. We utilised a floor-by-floor approach to provide tenants with advanced notice and minimise disruption at all opportunities.
Contact 0151 480 9909 | www.fieldway.co.uk
Specifications Enhanced PA and Communication System Fire Compartmentation Works Fire Alarms Automatic Opening Vents (AOVs) Emergency Lighting Boosted and Mains Cold-Water Systems
Innovative Technology Our new Enhanced PA and Communication System, designed to give the Fire and Rescue Service greater control over emergency and evacuation announcements on a floor-by-floor basis, sends live speech and pre-recorded evacuation broadcasts from a ground floor master control, reaching residents through speakers and amplifier panels. Two-way communication, visual alerts and Emergency Voice Communication System (EVCS) support resident evacuation and safety.
Measurable Improvement
Social Responsibility
Fieldway has completed the first retrofit project in the country that is fully compliant with the new building regulations. In just under 14 months, we have installed, upgraded and improved fire safety systems for 7 high-rise blocks within Scholes Village, as part of our contract with Wigan Council.
Our Social Value improvements have been consistently delivered across the project’s duration, amounting to over £600,000 in spend with the local community. We have contributed financially, donated our time for community groups and schemes, and used local businesses to boost the area’s economy.
Our design has ensured a measurable increase in fire detection across all seven sites – we have increased the number of smoke and heat detectors present within communal and residential areas, consequently improving overall coverage and resident safety. The system connects to all floors when fire/smoke is detected; triggering the EVAC system with ‘stay put’ orders, and the AOVs to open their vents to draw out smoke, improving air quality and visibility.
We have worked with the Wigan Scouts and atrisk children to paint fences for a therapy garden and used recycled materials to make hedgehog boxes. This was part of our goal to teach the younger residents to value and care for their community.
The AOVs we installed have been programmed to open daily at specific times to improve the ventilation across all floors and promote healthier air quality for tenants. The AOVs recognise when it is raining, triggering automatic closing of vents to prevent any risk of damp or pooling water.
Our TLO acted as a mentor for veterans, providing support and counselling. We worked with Sunshine House Community Hub and The Brick to help veterans in the local area, provided meals and ran clothing collections of coats, hats, gloves and scarves to ward off the winter weather. We purchased eight slow cookers and provided cooking lessons where tenants were educated on the use of these kitchen appliances and provided with recipes for affordable, slow cooker meals capable of feeding their families.
Project Resourcing Our dedicated Project Manager, Site Manager and Tenant Liaison Officer occupied the on-site cabins continuously throughout delivery, acting as a persistent presence should the tenants or local community have any queries or request an update on works. They supervised the operatives, enforcing high-quality workmanship and adherence to regulation, legislation and health and safety policies. The combination of specialist trades delivered successfully, without issue, for Wigan Council soundly demonstrates our capability to manage, delivery, and control multiple disciplines simultaneously. Our BAFE accreditations, underpinned by individual qualifications and vast experience working within occupied social housing properties, ensured our team was able to achieve a timely, high-access, compliant project delivery.
Client & Tenant Benefits Enhanced Safety Improved fire detection, evacuation, and smoke control
Minimal Disruption Advanced notice and continuous building access maintained
Healthier Air Daily ventilation improves communal air quality
Communication Dedicated liaison officer provided consistent tenant updates
Lower Running Costs Energy-efficient lighting enables remote monitoring and maintenance.
Social Housing | Education | Defence | Healthcare | Hotel & Leisure | Retail & Commercial | Blue Light | Utilities & Industrial | Heritage Active Fire | Passive Fire | Security & Access Control | Fire Safety Consultancy | Electrical Compliance
0151 480 9909 | www.fieldway.co.uk