Case Study | Defence | Decarbonisation
NUMBER OF MONTHS
15
CONTRACT VALUE
£3.08M 62
PROPERTIES
View the Case Study & Video
VIVO Defence Services SOUTHWICK MOD EWI & REFURBISHMENT PROGRAMME
Energy Efficiency Stats
79%
carbon footprint reduction
EPC C/B
ratings after works from EPC E/D
0.27 W/(m²K)
u-value after works from 1.20 W/(m²K)
Project Details CLC has an established relationship with VIVO, having previously delivered fire safety and refurbishment projects. Our consistent, highquality delivery led to our appointment via competitive tender to carry out external wall insulation (EWI) and associated upgrades to 62 three-bedroom semi-detached homes in Southwick. The £3.08 million project, running from February 2024 to May 2025, aims to enhance energy efficiency, improve thermal comfort, and uplift the visual appeal of MOD properties. Alongside EWI, works included roof replacements, loft insulation, new windows and doors, drainage upgrades, external lighting, and asbestos removal.
Military family member
“
“
It’s such a nice house to live in, it’s brighter, it feels warmer, it’s cooler in the summer. For me, the biggest thing was the mould – I haven’t seen a speck of mould since we’ve had the work done. And everyone was brilliant, from the contractors, all the way up to the people managing the project. It was brilliant. REFURBISHED HOME, SOUTHWICK
Results The 1950s MOD housing stock initially had poor thermal performance, with U-values around 1.20 W/(m²K). Through the installation of EWI, this was reduced to 0.27 W/(m²K) – a performance level better than many newbuilds. As a result, EPC ratings increased from an average D to C, with some properties achieving a B rating. These measurable outcomes highlight the success of the programme and CLC’s ongoing trusted partnership with VIVO.
Results at a Glance
~78%
Specifications External Wall Insulation (EWI) Roof replacements Loft insulation New UPVC windows and doors Drainage system upgrades New external lighting Asbestos surveys and removal Creation of new french door openings TV aerial upgrades
Improved thermal performance
EPC C
Average rating after works
EPC B
Best performing homes rating
Project Process The project followed a phased delivery approach, minimising disruption in occupied properties. CLC’s Tenant Liaison Officer (TLO) coordinated with families and military personnel to ensure smooth operations. Works were systematically planned to ensure each property was secure and watertight daily.
Engagement Our dedicated TLO maintained direct communication with each military family, offering updates and responding to queries. Families received clear literature detailing the works, timelines, and contact details, including an out-ofhours emergency number for urgent issues.
Aligning with Client Values CLC were selected for this project because of the strong alignment between our company values and those of VIVO and the DIO. Beyond providing value for money, we share a commitment to the principles that matter most to our client: prioritising safety, maintaining a family-focused approach, and consistently delivering work of the highest quality. To support local biodiversity, hedgehog highways were integrated into rear garden fencing, bee bricks were installed to create habitats for solitary bees, and swift nesting boxes were added to support declining bird populations. These measures were delivered in collaboration with the client as part of VIVO’s ongoing commitment to protecting wildlife and enhancing the surrounding environment across their estate.
Occupied Properties With 95% of homes occupied, CLC carefully coordinated works around the families’ schedules and military deployments. Managing access and ensuring each property remained secure and habitable required daily communication and flexible programming. By sequencing works efficiently and maintaining strict quality controls, disruption was minimised while still prioritising the military family’s safety throughout the project.
Client Benefits
Family Benefits
Energy Performance
Comfort & Warmth
Cost Efficiency
Lower Bills
Asset Appeal
Safety & Security
U-values and EPC ratings improved to meet future standards.
Long-term savings through reduced energy use and maintenance.
Accommodation is more appealing to current and future military families.
EWI keeps homes warmer in winter and cooler in summer.
Energy-saving measures reduce heating and electricity costs.
Windows and doors boost security; EWI cuts risk of damp and mould.
Social Housing | Education | Defence | Healthcare | Hotel & Leisure | Retail & Commercial | Blue Light | Utilities & Industrial | Heritage Planned Maintenance | Responsive Repairs | Decarbonisation | Building Compliance | Refurbishment | Fire Safety
023 8070 1111 | www.clcgroup.com