Refurbishment and M&E Installation Westminster City Council, Fernhead Road, London W9

Highlights

Specifications

Axis delivered a refurbishment and M&E improvement programme at Lydford Community Hall on behalf of Westminster City Council. The project formed part of the council’s investment in a local authority community facility and focused on improving the building’s condition, functionality and long-term performance for local residents.

• Roof replacement • Door repairs and replacements • Internal decoration works • New flooring installation • Above and below ground drainage works • Electrical works • Repair and replacement of ventilation systems, including extract fans • New kitchen installation • Mechanical and electrical upgrades • Planned refurbishment of a local authority community centre

The scope of works included replacement of the existing roof, repairs and replacement of doors, internal decoration, new flooring and drainage works. The programme also included electrical works, repairs and replacement of ventilation systems, including extract fans, together with the installation of a new kitchen to enhance the facility’s usability. The project required co-ordination of multiple trades and careful programme delivery within an active community setting. During the works, design alterations were required to the MVHR system after the original location proved unsuitable. Approval of the revised design resulted in delays to the programme, which were managed in collaboration with the client and project stakeholders.

Housing | Commercial | Heritage | Public Sector | Education

£765,000 value 8 months duration


The completed refurbishment improved the overall condition of the building, upgraded key building services and created a more functional community facility. The works supported Westminster City Council’s asset management objectives while improving a valuable local resource for residents. Resident Communication and Care The project took place within a community centre serving local residents and community groups. Effective communication was maintained throughout the programme to ensure stakeholders remained informed about progress and planned activities. Axis worked closely with Westminster City Council’s resident association team, which communicated directly with local residents and councillors. This collaborative approach helped provide timely updates and ensured any concerns were addressed quickly. The co-ordinated communication strategy supported smooth programme delivery and helped minimise disruption throughout the refurbishment works.

Housing | Commercial | Heritage | Public Sector | Education

Benefits • Improved condition and longevity of the community centre • Upgraded mechanical and electrical services • Improved internal environment through refurbishment works • Enhanced facilities through the installation of a new kitchen • Increased usability and value of a key community asset


Client Relationship Axis secured the contract through a competitive tender process and built upon an existing relationship with Westminster City Council. Previous experience working with the client demonstrated the capability and reliability required to deliver refurbishment and building services projects across the council’s estate. Successful delivery of the programme strengthened the ongoing relationship and supported the council’s objectives for maintaining and improving community facilities.

Contact joseph.hayes@axiseurope.com 020 3597 2545 axiseurope.com Housing | Commercial | Heritage | Public Sector | Education HOU -139


Turn static files into dynamic content formats.

Create a flipbook
8587 Axis Lydford Community Centre case study proof 1 by Axis CLC - Issuu