Major Investment Programme

L&Q, Lewisham Park Towers, south east London

Highlights

Axis delivered a comprehensive £20 million Major Investment Programme across three 17-storey tower blocks for L&Q.

We are improving 204 occupied flats to create healthier, more efficient homes for 240 residents. This flagship project demonstrates how large-scale retrofit works can achieve significant energy efficiency improvements while maintaining exceptional resident satisfaction. The project forms part of L&Qs broader £3 billion, 15-year Major Works Investment Programme and is part-funded by the Social Housing Decarbonisation Fund, reflecting its focus on sustainability and the pathway to Net Zero 2050.

The goal was to boost energy efficiency and thermal performance of the buildings, reducing energy consumption, lowering carbon emissions, reducing energy bills for residents, and helping tackle fuel poverty.

Additionally, the works improved safety, comfort, and overall living conditions through essential fire safety works, structural repairs, and providing warmer homes.

Specifications

• EWI

• Roof Insulation

• Window Replacements

• Structural Repairs

• Extractor Fan Upgrades

• Boiler Flue Extension

• Soil Vent Pipes

• Mechanical & Electrical Upgrades including new boilers and ventilation

• Ground Works

The programme combined technical solutions with resident engagement. Technical solutions include External Wall Insulation chosen for excellent thermal performance, durability, and A1 fire safety rating. All 900 windows were replaced within 10 weeks. Building services upgrades include structural repairs, extractor fan upgrades, boiler flue extensions, and new external Soil Vent Pipes.

The project delivered substantial energy efficiency improvements including energy bill reductions of more than 50% for residents, with many already reporting reduced heating needs and improved comfort. The EWI system provides substantial carbon savings and improves thermal efficiency to a U-Value of 0.26.

The innovative roof insulation, manufactured from 80% biomassbased materials, demonstrates commitment to sustainable construction practices.

30.62% reduction in fuel costs (£199 annual saving per household )

U-Value 0.26 Wall thermal performance improved 92% resident satisfaction score

D66 to B85

EPC rating improvement (19 SAP point improvement ) 74.19% reduction in space heating demand

52.38% reduction in carbon emissions (1.1 tonnes CO2 per flat annually) 100% on-time and in-budget project delivery

We programmed our works simultaneously across three blocks with capped live flats to ensure quality and resident care. The coordinated approach included scaffold erection, window renewals, M&E works, structural repairs, roof replacements, EWI application, scaffold strike, and ground works completion. The project delivered significant outcomes in building performance, resident satisfaction, and project management. Comprehensive renovations improved safety and living conditions.

Resident Engagement

Community solutions were equally comprehensive. The Residents’ Hub provided respite from works, offering quiet office spaces with free Wi-Fi and hosting community activities in partnership with local charities. A multi-channel communication strategy included a bespoke project website and app, newsletters, bi-monthly meetings, and real-time updates, with translation services supporting the diverse community. Site - based Resident Liaison Officers ensured resident needs were considered throughout delivery.

Beyond physical improvements, the project fostered community spirit through The Residents’ Hub and activities. Environmental sustainability is demonstrated through innovative materials and energy efficiency improvements.

Projects included:

• Restoration Lewisham War Memorial Garden railings at no cost

• Transformation bedbound resident’s overgrown garden

• Hosting Community Recycle Day collecting 1,640kg of waste

• Funding L&Q resident’s medical studies abroad

Resident Impact Awards for Lewisham Park Towers

Winner of Community Engagement Project of the Year at the CN Awards 2026

Winner Housing Innovation Awards 2026 ( led by Housing Digital ) for Most Innovation Approach to Tenant Communications

Highly Commended at the National Housing Maintenance Forum ( NHMF)’s 2026 Best Resident Impact Award

Benefits to Residents

• Thermal performance improvements

• Building fabric and safety enhancements

• Energy bill reductions

• Substantial carbon savings

• Improves thermal efficiency

• Fuel poverty reduction across affected household

• Contributes to Net Zero targets

• First London installation of sustainable Eco FF insulation

Project Legacy

Plans include renovating the towers’ old community room and involving residents and an architect in designing new outside spaces, ensuring lasting positive community engagement beyond construction completion.

The project provides a replicable model for Major Investment programmes across the social housing sector, demonstrating that large-scale retrofit can be delivered with exceptional technical performance, resident satisfaction, and community benefit.