1 minute read

BENDEELA D AM PIPELINE CONTROL STRUCTURE

PROJECTS

BENDEELA DAM PIEPLINE CONTROL STRUCTURE

Advertisement

• Sydney Catchment Authority. • Double isolation for pipeline control structure. • Segmented top sealing bulkheads designed to withstand 30m head pressure including: - 4300mm wide x 8000mm high marine grade aluminium segmented stoplogs (four of 2m segments) including a 200mm venting valve inserted into 20m deep guides. - Marine grade aluminium stopboard self-engaging lifting frame. - Marine grade aluminium storage rack.

This article is from: