Skip to main content

Portfolio_Avani Mehta

Page 1

1


Endurance in Architecture

03

Wayside Amenity

11

Naroda Park

14

Urban Liveability

18

2


Endurance in Architecture Reviving the precinct of Mormugao, Goa

Sem X | Design Dissertation | 2024 Guide - Ar. Anmol Warang | anmol.w@lsrsa.edu.in

In the midst of today’s evolving landscapes, it becomes increasingly evident that change is inevitable. As we navigate this era marked by rapid urbanization, there’s a discernible disconnect emerging, both within ourselves and in our interactions with others. Architecture, when enduring, transcends the physicality of structures; its essence lies in how humans engage with it. How we feel in certain spaces, how we link ourselves in time through architecture and how we have spatial connections to a place, is all what keeps us and the architecture linked together.

All drawings for this project are made by Avani Mehta.

3


Mormugao Port and Fort Located in the Vasco da gama district, this region was a small part in the fortress of Mormugao, made to secure the habour by the Portuguese in 1624. Multiple structures, relics of the fort still remain in the context, even after 400 years of changes, like the broken down fort wall along the road, a jail cellar, the Viceregal palace. Rapid urbanisation has bled the heritage and culture of the area. This dissertation is looking at reactivation of these heritage points to knit the past back into the urban fabric.

4


Master Plan Despite the changes, this precinct has managed to endure yet everytime with newer unplanned developments, there are been a slight disconnect of the region from its people. With new infrastructure plans looming, it’s crucial to assess their impact on the existing built environment and community. The larger idea for the endurance of the place is through its functional revival which will in turn engage its community and all the other users that interact with the space.

5


Creating an Identity Creation of a space completely in sync with the local community around it, which can be accessed through their houses directly.

The space is created on the contour, connecting to the different levels of the existing houses of the locals. The concept was of a main space flowing through which connects on differnt contour levels. The structure is made using earth, sand and lime filling to make curved walls, an indicator of the susegad lifestyle of the goans 6 Section through the Community Center


Creating an Impact

View 1 - Entrance to Performance area

Reactivating the area through addition of a marketplace with a platform for performance for the people of the area. This area was the first ever railway line in Goa, started during the British Raj, and now it lies abandoned with only its warehouse, in ruins. The idea was an introduction of a much needed cultural space for interaction between the poeple and the different kind of users who came here, however staying true to its identity and remembrance of the community of the fishermen who live here from generations

Plan for reactivated market and performance area Entry from Port

Service Area Market Area

8M wid

e road

Entry Existin

g MPT

office

Outdoor seating area

Food Plaza

Art Gallery Lawn Performance Area

Outdoor spill out

12M wide road

7 Section AA’


Section AA’

The inner truss is made of metal while the outer roof structure by recycled wooden members. The wooden members used are of the old fishermen boats of the community which lay abandoned on the jetties.

8


Creating Opportunities Creation of a boutique hotel in an area with good potential for growth not only helps in economy boost but also creates job oppurtunities for the locals. The existing building is an abandoned public building used by the MPT office in 2012. This being a central junction, a creation of a main attraction point with a facade representing the region makes it a identity point. Creation of this area makes sure, the functional durability of the region stays and continues to change as per requirements of the future. Existing Building View

9 Entrance Elevation


Facade treatment to establish a strong aesthetic at the main junction of all user groups. Landsape curated for a easy going, calm environment for the guests as an escape from the city.

Section BB’

View of outdoor seating area

10


Way Side Amenity Samruddhi Mahamarg Initiative Sem IX | Architectural Design | 2023 Team - Avani Mehta, Soham Pahade Guide - Ar. Arun Fizardo | arun.f@lsrsa.edu.in

The Way-Side Amenity project focused on designing a selfsustaining pause point along the Samruddhi Mahamarg. The aim was to understand how architecture can support highspeed mobility without losing its human scale. The planning worked as a layered system - where heavy services aligned with the highway edge, while public functions opened toward quieter internal courtyards. Material choices and massing were kept low, porous, and climate-responsive to maintain comfort, clear sightlines, and operational efficiency.

Separate programs with social links for visibility

Integration of landscape

Initial Progress sketches and ideation

Provision of inward looking spaces

Main gathering area

Transitional spaces - enhances the user experience

Initial Zoning and Design Development

11


Master Plan Our design approach was built on integration: 1. Integrating the programme with the topography 2. Integrating circulation with vehicular 3. Pedestrian movement, and integrating the built form with climate, visibility, and orientation

Plan rendering and model for this project are done by Avani Mehta. Concept sketches for this project are done by Soham Pahade.

12


Bamboo Joinery

Stone Pedestal and Bamboo Junction

Food Plaza

Vray model done by Avani Mehta. View render done by Soham Pahade.

13


Naroda Park, Ahmedabad M/s Prabhakar B. Bhagwat - Landscape India

Sem VIII | Internship Work | 2023 Guide - Ar.Aniket Bhagwat | pbb-ahm@landscapeindia.net

The area - Nava Naroda - located in the North-East part of Ahmedabad, has long endured the absence of public parks that further ideas of society and association. A few trees - such as the Holoptelea integrifolia, or the Indian Elm - were present at the entrance of the park. The renewed design celebrates these trees at the entrance; other trees present on the land have been subsumed into the primary walkways of the park. Having been refurbished, this public park now sees approximately 7000 - 8000 visitors every day, and is heavily used.

Initial masterplan sketch (Ar. Vinay Kushwah)

DESIGN PROCESS

Progress Sketches (author - Avani Mehta)

DESIGN PROCESS

14


E 1000

E 1005

E 1010

E 1015

E 1020

E 1025

E 1030

E 1035

E 1040

E 1045

E 1050

E 1055

E 1060

E 1065

E 1070

E 1075

E 1080

E 1085

E 1090

E 1095

E 1100

E 1105

E 1110

E 1115 N 1060

LEGEND 1. MAIN ENTRANCE 2. SEATING PLAZA 3. ENTRANCE PLAZA 4. CENTRAL CHHARU PLAZA

TR1

0 .0

50 1.

2.00

LVL 99.67 LVL 99.62

2.00

8 3.4

0 2.5

5

PROPOSED BOREWELL

N 1020

5.6

1.5

9 0.4

6 1.4

1

0

4.2

1.00

TOILET BLOCK

9

0

13.04

LVL 99.72

1.18

REFER TO DETAIL DRAWING N 1005

12

LVL. 00

PROPOSED HARDSCAPE LEVEL

LVL. 00

PROPOSED SOFTSCAPE LEVEL

LVL 99.75 7.00 LVL 99.70

LVL 99.67

SECURITY CABIN PROPOSED UGT (30,000KL CAPACITY)

5.00 7.00

0

.0 R1

SC N 1010

3.00

0.57

.00

1.20

5 R1.0

R1

3.23

LVL 99.73 0 1.18

R1.0

R2.87

LVL 99.85

0.6

R5

5.75

3.00

D

1

.37

2.15

LOOSE BENCHES

N 1015

0 5.6

2.00

1.17

TR13

1.5

4.2

5

8

R0.68

9

2.50

2.50 0.63

1.50

3.00

2.50

11

2.55

1.75

9.25

1.00

2.00

2.6

0.6

4.36

4.50

3.00

4.20 1.00

2.00

2.00

2.50

1.55

4.00

1.25

3.00

1.00 2.50

3.00

LVL 99.76

2.50

4.50

PROPOSED TREE

CHAMBER

0

2.75

2.75

.30

R1 1.20

3.00 2.00

4.00

4.00

N 1025

R1.30

LVL 99.81

10.25

TR14

PROPOSED RECHARGE WELL

LVL 99.90 1.50

LVL 99.73

11

2.50

1.50

1.20

2.50

2.00

0 .5 R8

0 1.5

9

5 6.8 3.05

1.00

.80

R1.80 TR11

LVL 99.78 1.50

LVL 99.71

R1.50

R1

B

TR12

11.75

1.00

1.55

1.00 3.00

4.00

1.00 3.00

9.25 1.50 2.55 2.50

1.20

4.20

3.00

4.50

LVL 99.86

D

TR10

11 3.00

C

LVL 99.82

LVL 99.90

7

0.99

2.00

LVL 99.95

LVL 99.91 13.58

R

1.50

3.00

2.00

1.20

R1

5 2.7

2.7

5

2.75 0.63 2.50

5.75

7 .3

2.00

LVL 99.87

1.46

EXISTING TREE .50

R1

.3

R5

6.7

2.00

0 2.0

2.00 1.00

2.50

3.90

2.20

0 1.5

0 .6

.70 R3

2.50

R0

0 R3.0

0 .0 R5 20.63

5.30

0

LVL 99.60

1.75

11.75

CENTER LINE

8.89

R5

LVL 99.60

2.50

1.25

LVL 99.80

4.00

4.58

32.90

11

4.00

R3.0

7.5

LVL 99.65

2.00

3.50

R1.40

LVL 99.85 3.96

R1.80

LVL 99.76 LVL 99.68

N 1030

0.40

R0.64

.50

R0.80

2.66

0

2.40 5.20

LVL 99.82

TR9

2.5 M GRID

R1

13.04

2.0

A1 FENCE R0.60

.50

.50

6.90

.60

R1

.0 R1

R1

4.50

2.00 11

R1.40

R

1.46

PLANTING

N 1035

0

1.20

0

12

0

2.15

1.50

STONECRETE

LAWN

R1.0

0 1.5

LVL 99.73 1.50

LVL 99.66

.75

R0

0 1.5

9.74

10.25

R14

7

.50

R4.0

0

LVL 100.00

2.59

0 LVL 99.70 R2.87

3.00

R1.50

R1

0

.0

0

0

7 0.2

0.6

1.7

LVL 99.50

R1

R1.30

0 .5 R1 R1 .50

8

6.15 LVL 99.77

R1.50

A

1.4

LVL 99.71 1.50

2.50

5

R1.80

.80

5

1.5

6 5.4

5.28

.37

R1.50

0

UP

R5

1.17

TR8

R1

LVL 99.74

2.50

2.2

2.0

CHHARU N 1040

R0.60

2.25

R1

4.50

.50

3

5.3

SC

LVL 99.63

0

.50

16.26

.50

4

8.81

6

R

LVL 99.68

LVL 99.65

1

.5

2.50

R1.3

1.46

R1

8 4.2

5 1.5

5

1

6.7

R1

R3

.50

R1

TR6

0

.80

0 1.5

.00

1.3

1.8

8

0

R1

3

1

R0.6

LVL 99.71

6.20

TR7

LVL 99.62 6.5

0

3.0

LVL 99.68

R0.60

4.38

LVL 99.79

TR5

6

3.18

R0.60

8.81

LVL 99.76 12.50

R1.5

6.3

0

2.3

MP

1.4

R1.80

2.5

2.0

LVL 100.00 3

R1.50

C

4.50

LVL 100.00

R0.60

2.58

R1

1.7

R1

8

5

2.6

LVL 99.65

1.46

R1

1.50

6.90

0

0

R1.40

LVL 99.73 .50

R1.3

.50

5.20

LVL 99.70

LVL 99.65

1

1.5

0

5.6

2.40

R1

R

1.5

4

R1.40

4.58

4.30

3.4

TR3

.50

R1

.50

R1

R1.50

5

7 0.

5

R1

8

.7

R1.51

4.00

8.89

TR4

4

1.7

2.0

R0

R0.64

5.38

0

7

0.40

.50

.50 R1 0 0.0 R1

LVL 99.73 R1.00

R1

1.5

R0.60

1.25

TR2

R0.60 1.50

0

.60

R0

9

50

R1.5

5.38

LVL 99.98

.

R1

R1.50

R1.50

5

2.2

R1

0

LVL 99.95

2.18

1.5

2.00

2.50

R1.5

4

R0.7

5.14

R17.00

2.58

LVL 99.92

LVL 99.93

.74

R1.50

2.25

LVL 99.88

5

8 LVL 99.91

R0

1.50

R1.50

R0.60

RA

.50

R1

2.58

LVL 99.75

UP

.50

N 1045 SAND PIT

25.00 .7

LVL 99.88

R1

10

5

.7

R0

2.20

2.00

LVL 99.80

R0.60

2

LVL 99.83

5.10

0

9.50

LVL 99.75

LEGEND

6

0

R0.6

4.13

R0

12.00

.5

1.25

2.20

25.00

11. SEATING PODS

.00

7

R0.68

0

R0.60

R8

9. MAIDAN

12. SERVICE BLOCK

.75

R0

R1 .5 R1 0 0.0 0

4.13

2.58

1.50

12.00

50

2.00

.60

1.

5

2.00

R0

5

4.00

.60

R17.00

R0

0.

00

.7

6. LAWN 8. HERB GARDEN

N 1050

R0

5. 2.5 METER WIDE ROAD

10. CHILDRENS PLAY AREA

R1

.7

R0.68

R1

R0.75

R2.00

LVL 100.10

R1 0

0

R0

1.50

.74 R0

6

R0.75

8.83

7

7.0

N 1055

7. 2.5 METER WIDE WALKWAY

1.6

R0.75

2.50

R0.75

R0.75

.74

R0

R0.75

0.55

R1

1.50

10.30

1.50

R0.75

LVL 100.05

R0.75

R0.75

.75

1.50

LVL 100.10

B

LVL 100.03

10.30

8.83

LVL 100.05

0

R0

LVL 99.95

LVL 100.00

LVL 100.00

R20.0

R2.00

2.50

LVL 100.15 WALL TOP

A

LVL 99.95

R0.75

LVL 99.90 R20 .00

LVL 99.85

R0.75

LVL 99.617

N 1000

HARDSCAPE SLOPE

SOFTSCAPE SLOPE

PANASHIYA FLATS N 995

NOTES --- IN EVENT OF ANY AMBIGUITY INFORM US BEFORE COMMENCING WORK. --- ALL DIMENSIONS ARE TO BE READ AND NOT TO BE SCALED. --- ALL LEVELS ARE FINISHED LEVELS AND ARE IN METERS --- ALL LEVELS AND DIMENSIONS TO BE VERIFIED FOR SITE SUITABILITY BEFORE COMMENCING WORK. --- ALL DIMENSIONS ARE IN METERS --- TO BE READ ALONG WITH MASTERPLAN AND SECTIONS

Naroda Master Plan (author - Avani Mehta)

--- CONTENTS OF THIS DRAWING CONSTITUTE THE ORIGINAL AND UNPUBLISHED WORK OF M/S PRABHAKAR B. BHAGWAT AND NO PART OF THE DRAWING SHALL BE DISCLOSED/MODIFIED/USED IN ANY MANNER WITHOUT THEIR PRIOR CONSENT.

REV A _DATED 22-02-2023_DRAWING UPDATED

UDYAN PRAVAH AHMEDABAD

SCALE1:250

TITLE: NARODA PARK MASTER PLAN

PROJECT NO: FOR APPROVAL UP-NAR-MP-01 DATE: 08-02-2023 

15


The overall structure and design of the park is a geometry of three circles, each circle being assigned a unique function.

All drawings for this project are done by Avani Mehta.

The first circle serves as the Children’s Play Area, while the circle towards the other end functions as an outdoor exercise space. The circle in the centre has been tasked as a space for congregation, and gathering. 16


These images are from Landscape India’s website. During my internship, worked on the GFC drawings only. I have not worked on execution for the same.

All drawings for this project are done by Avani Mehta.

17


Urban Liveability Chembur Public Plaza

Sem VI | Architectural Design | 2022 Guide - Ar. Anuj Gudekar | anuj.g@lsrsa.edu.in

Our brief centred on Chembur, a neighbourhood defined by constant movement, mixed-use edges, and fragmented open spaces. The goal was to study how streets, plazas, edges, and programmatic anchors can enhance social interaction, comfort, accessibility, and environmental quality. The plaza’s irregular site geometry became the generator for a continuous pathway that threads through it, guiding movement and shaping spatial experience. As the route adapts to edges, openings, and contextual cues, it naturally expands and contracts to form a series of active pockets and moments of pause.

On site and Off site Accessibiltiy

Concept - Unifying through a single element This pathway is not just circulation; it acts as the plaza’s spine. As it moves, it shifts in width, texture, and direction in response to the surroundings, creating pockets of activity, pause points, shaded courts, and interactive edges.

Community Empowerment public health

versalite public spaces

Initial ideation and design development

Multipurpose community space local awareness Well-linked outdoor and indoor spaces

wellness spaces

Community Interaction

Exhibition Area

Local Fleamarket

Performance and events area

Understanding pedestrian movement

18


Ent

ry

Entry

ad

ide ro

16M w

Wa y to

Bhaji Poli

Existing temple

Bas

em

ent

Par ki

ng

Cafe Community Park

Public Plaza

Daycare and Outdoor playscape

Library

Hall 1

Hall 2

BMC Ward

Master Plan

Stage storage

Art Gallery

Way to basement level

wid

e ro

ad

Public toilet

13M

The architecture prioritises accessibility, walkability, and comfort through shaded edges, visual openness, and seamless spillover between indoor and outdoor spaces. The overall intent is to enhance urban liveability by offering a shared, inclusive environment where community life can unfold naturally.

Exhibition Area

Natraj Cinemas

All drawings for this project are done by Avani Mehta.

Entry

19


Swimming Pool

Hall 4 Surrounding buildings

Flea market area Installations

Informal Seating

Surrounding buildings

Parking

The public plaza integrates a multi-use community building that supports everyday urban life. It anchors this public realm with functions that respond to daily needs: flexible workshop zones for skill-building, a swimming pool as a recreational and healthoriented facility, and halls that accommodate local meetings, and cultural activities.

Section AA’

2 wheeler Parking

Male changing room

4 wheeler Parking Out Hall 3

Spill out area

In

Public staircase and lift block

Loading/ Unloading

Swimming Pool

Spill out area Cafe

Karate room

Workshop area

Entry

Indoor games

Makeshift Amphitheatre Arena

Basement Floor Plan

Outdoor spill out

Ground Floor Plan

Female changing room

First Floor Plan 20


Turn static files into dynamic content formats.

Create a flipbook
Portfolio_Avani Mehta by Avani Mehta - Issuu